ROUGH & FINISH INSPEC. 1988 @ U2 LORING
Lndng Place
Y.O- Bot 226 C' --
Salem. Massachusetts 019-I1
(61T)-A tAW)
r5
(.envM1 Contracting
Award U inning Restorations 71
New Co s ru �u�t S ecAKA
�`e6rllary
Office of the Inspector of Buildings
Attn : James Santo
City of Salem
One Salem Green
Salem, MA 0100
Subject : ROUGH & FINISH INSPECTION: Unit #2; Cogswell
Condominium, 5 School Street, Salem, MA.
-------------------------
I am the Licensed Builder on the project at the Cogswell
Condominium. I was the Superintendent of the project from
start to finish . It is my professional opinion that Unit # '
was constructed in accordance with the current Massachusetts
State Building Code and in compliance with any best
understanding of the requirements of the City of Salem.
Sincerely,
tevan J. �authier
Vice President
Builders License #SCLC)
State Superintendent's License #020450
150 LINCOLN STREET, BOSTON, MASSACHUSETTS 02111 617-423-5807
23 February 1988
Office of the Inspector of Buildings
City of Sale m -
One Salem Green
Salem, Massachusetts 01970
Attention of: Mr. James Santo
Subject: Rough Inspection: Unit No. 2
The Cogswell Condominium
Five School Street, Salem. MA
Ladies and Gentlemen:
I am the Architect of Record for the above-noted project. With the assistance
of my staff and consulting structural engineer, Colin G. Simson, P.E., I directly
supervised the preparation of design plans and construction documents for
The Cogswell Condominium; in addition, we observed the construction in
progress at regular periodic intervals, from July 1987 through January 1988.
This letter is to certify that we made our rough inspection of Unit No. 2 of
the above-referenced project at the appropriate time during its construction.
It is my professional opinion that the rough framing was satisfactorily
completed in accordance with our construction documents. Moreover, I find
that Unit No. 2 was constructed in accordance with the current Mass. State
Building Code and in compliance with our best understanding of the
requirements of the City of Salem.
� D APC'/��
Very truly ours, ror 'o., A
BOSTON,
MA".
Rog P. Lan Pri cipal (Registered Architect, Mass.#33171 Fo�,�
LANG ASSO S, ARCHITECTS & CONSULTANTS -----
XC: Loring Development Corporation (Ms. Jessica B. Herbert)
Steven Gauthier, Licensed Builder
Colin G. Simson Consulting Engineer, Inc.
amcmr= a] CORN hU&M
150 LINCOLN STREET, BOSTON, MASSACHUSETTS 02111 617-423-5807
23 February 1988
Office of the Inspector of Buildings
City of Salem
One Salem Green
Salem, Massachusetts 01970
Attention of: Mr. James Santo ,
Subject: Final Inspection: Unit No. 2
The Cogswell Condominium
Five School Street, Salem, MA
Ladies and Gentlemen:
I am the Architect of Record for the above-noted project. With the assistance
of my staff and consulting structural engineer, Colin G. Simson, P.E., I directly
supervised the preparation of design plans and construction documents for
The Cogswell Condominium; in addition, we observed the construction in
progress at regular periodic intervals, from July 1987 through January 1988.
This letter is to certify that we made our final inspection of Unit No. 2 of the
above-referenced project upon the substantial completion of its construction.
It is my professional opinion that Unit No. 2 was built in accordance with our
construction documents. Moreover, I find that the unit was constructed in
accordance with the current Mass. State Building Code and in compliance
with our best understanding of the requirements of the City of Salem.
V ry truly yours, o A cy/Qrr
�`I
r
b k 3311 o ,
BOSTON.
Rog P. Lan , P ' cipal (Registered Architect, Mass.1133171
LANG ASS IA ARCHITECTS & CONSULTANTS ���,,4 M�gS
XC: Loring Development Corporation (Ms. Jessica B. Herbert)
Steven Gauthier, Licensed Builder
Colin G. Simson Consulting Engineer, Inc.