B-15-1299 BP U8 CONDIp,� Commonwealth of Massachusetts
Citv of Salem
120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641 yj
Return card to Building Division for Certificate of Occupancy
Permit No. B-15-1299
FEE PAID: $245.00
PERMIT TO BUILD
DATE ISSUED: 11/30/2015
This certifies that BONNER DAVID C JR BONNER SHARON D
has permission to erect, alter, or demolish a building 5-U8 SCHOOL STREET Map/Lot: 270081-801
as follows: Windows INSTALL SEVEN (7) SKYLIGHTS
Contractor Name: ROBERT LABELLE
DBA: LABELLE ROOFING
Contractor License No: 098666
11/30/2015
Building Official Date
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official
may grant one or more extensions not to exceed six months each upon written request.
All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted.
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the
work until the completion of the same.
The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit.
H IC#: 154084 "Persons contracting with unregistered contractors do not have access to the guaranty fund"(as set forth in MGL c.1 42A).
Restrictions:
Building plans are to be available on site.
All Permit Cards are the property of the PROPERTY OWNER.
��ONDIT,I� Commonwealth of Massachusetts
City of Salem
120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641
Return card to Building Division for Certificate of Occupancy yj
Structure CITY OF SALEM BUILDING PERMIT60
`
Excavation
PERMIT TO BE POSTED IN THE WINDOW
Footing INSPECTION RECORD
Foundation
Framing
Mechanical
Insulation INSPECTION: BY DATE
Chimney/Smoke Chamber
Final
0' Plumbing/Gas
Rough:Plumbing
Rough:Gas
Final
W4 TAM
Electrical
Service
Rough
Final
Fire Department
Preliminary
Final
Health Department
Preliminary
Final