ARCHITECT 's FIELD RPT 11/13/17 the
architectural
ARCHITECT'S FIELD REPORT tatteam
PROJECT NAME: Pequot Highlands Interior Mod-Rehab
PROJECT LOCATION: 12 First Street Salem,MA United States
ARCHITECT'S PROJECT#: 16068.00 FIELD REPORT: 00015
DATE: 11/13/2017
WEATHER DESCRIPTION:
TIME TEMP WIND SPEED HUMIDITY REMARKS
11:00 AM 39°F 8.1 mph 96% Light Rain
EST.%COMPLETION&CONFORMANCE WITH SCHEDULE:44%Complete
PRESENT ON-SITE:
Michelle King The Silver Street Group,LLC
Chris Poulin Silver Street Development
Brenda Paradis The Silver Street Group
Eric Clory The Silver Street Group,LLC
Mike Swiatek Port Harbor Construction, INC.
Joe Lepera Port Harbor Construction, INC.
Stefania Angelini<sangelini@architecturalteam.com>
TOTAL: 7
OBSERVATIONS:
ITEM CATEGORY REMARKS PHOTOS
1 Work in Unit work has started back up on the 2nd floor of the
Progress South building. 12 units remaining.
2 Work in ADA unit work is ongoing in the South building.Unit
Progress #306
3 Work in Unit punchlist work is ongoing in North and South
Progress buildings.
4 Work in Fire Alarm installation in the South building and the
Progress North building common areas is ongoing.
5 Work in Elevator lobby scope is ongoing in the North
Progress building.
6 Work in Exterior Densglass and AVB installation on South
Progress building is ongoing.Down to the West side.
7 Work in Panel installation on South building is ongoing.
Progress South and East facades are complete except for
The Architectural Team, Inc. 50 Commandants Way at Admiral's Hill Chelsea MA 02150 T 617.889.4402 F 617.884.4329 wA-W.archdecturalteam.com
Page 1 of 5
ARCHITECT'S FIELD REPORT
DATE: 11/13/2017
FR: 00015
ITEM CATEGORY REMARKS PHOTOS
parapets.Work ongoing on North facade.
8 Work in North Building intercom troubleshooting is ongoing.
Progress
9 Work in Window installation on South building is ongoing.
Progress
10 Work in South Building roof replacement ongoing.90%
Progress complete.
11 Work in North Building roof replacement is ongoing.90%
Progress complete.
12 Work in Stairwell railing installation in South Building is
Progress ongoing.
13 Work in New Cogen unit installation is ongoing.
Progress
14 Observations Brick demolition on the South Building is complete.
15 Observations Exterior framing installation on South building is
complete.
16 Observations Swingstage work on 12 story building is on hold due
to weather.
17 Observations Exterior scaffolding is in place.
18 Observations Temporary mailbox location for North building is in
place.
19 Observations Photos
'v
The Architectural Team, Inc. 50 Commandant's Way at Admiral's Hill Chelsea AIA 02150 T 617.889.4402 F 61 7.884.4329 www.archdecturalteam.com
Page 2 of 5
ARCHITECT'S FIELD REPORT
DATE: 11/13/2017
FR: 00015
ITEM CATEGORY REMARKS PHOTOS
v.
ar,
i
The Architectural Team,Inc. 50 Commandants Way at Admiral's Hill Chelsea MA 02150 T 617.889.4402 F 617.884.4329 www.archdecturalteam.com
Page 3 of 5
ARCHITECT'S FIELD REPORT
DATE: 11/13/2017
FR: 00015
ITEM CATEGORY REMARKS PHOTOS
orf
.T�
ATTACHMENTS:
Report By: The Architectural Team,Inc./Lamarr Rollins II
The Architectural Team, Inc. 50 Commandant's Way at Adrnmal's Hill Chelsea MA 02150 T 617.889.4402 F 617.884.4329 w"Av.archrtecturalteam,cum
Page 4 of 5
ARCHITECT'S FIELD REPORT
DATE: 11/13/2017
FR: 00015
Distribution:
Phil Renzi The Architectural Team,Inc. prenzi@architecturalteam.com
Chris Poulin Silver Street Development cpoulin@thesilverstreetgroup.com
Enc Clory The Silver Street Group,LLC eclory@thesilverstreetgroup.com
Mike Swiatek Port Harbor Construction,INC. mswiatek@portharborconstruction.co
m
Joseph Lepera Port Harbor Construction, INC. jlepera@portharborconstruction.com
T he Architectural Team, Inc. 50 Commandant's Way at Admirals Hill Chelsea MA 02150 T 617.889.4402 F 617.884.4329 www.arch itecturalteam.com
Page 5 of 5