Loading...
ARCHITECT 's FIELD RPT 11/13/17 the architectural ARCHITECT'S FIELD REPORT tatteam PROJECT NAME: Pequot Highlands Interior Mod-Rehab PROJECT LOCATION: 12 First Street Salem,MA United States ARCHITECT'S PROJECT#: 16068.00 FIELD REPORT: 00015 DATE: 11/13/2017 WEATHER DESCRIPTION: TIME TEMP WIND SPEED HUMIDITY REMARKS 11:00 AM 39°F 8.1 mph 96% Light Rain EST.%COMPLETION&CONFORMANCE WITH SCHEDULE:44%Complete PRESENT ON-SITE: Michelle King The Silver Street Group,LLC Chris Poulin Silver Street Development Brenda Paradis The Silver Street Group Eric Clory The Silver Street Group,LLC Mike Swiatek Port Harbor Construction, INC. Joe Lepera Port Harbor Construction, INC. Stefania Angelini<sangelini@architecturalteam.com> TOTAL: 7 OBSERVATIONS: ITEM CATEGORY REMARKS PHOTOS 1 Work in Unit work has started back up on the 2nd floor of the Progress South building. 12 units remaining. 2 Work in ADA unit work is ongoing in the South building.Unit Progress #306 3 Work in Unit punchlist work is ongoing in North and South Progress buildings. 4 Work in Fire Alarm installation in the South building and the Progress North building common areas is ongoing. 5 Work in Elevator lobby scope is ongoing in the North Progress building. 6 Work in Exterior Densglass and AVB installation on South Progress building is ongoing.Down to the West side. 7 Work in Panel installation on South building is ongoing. Progress South and East facades are complete except for The Architectural Team, Inc. 50 Commandants Way at Admiral's Hill Chelsea MA 02150 T 617.889.4402 F 617.884.4329 wA-W.archdecturalteam.com Page 1 of 5 ARCHITECT'S FIELD REPORT DATE: 11/13/2017 FR: 00015 ITEM CATEGORY REMARKS PHOTOS parapets.Work ongoing on North facade. 8 Work in North Building intercom troubleshooting is ongoing. Progress 9 Work in Window installation on South building is ongoing. Progress 10 Work in South Building roof replacement ongoing.90% Progress complete. 11 Work in North Building roof replacement is ongoing.90% Progress complete. 12 Work in Stairwell railing installation in South Building is Progress ongoing. 13 Work in New Cogen unit installation is ongoing. Progress 14 Observations Brick demolition on the South Building is complete. 15 Observations Exterior framing installation on South building is complete. 16 Observations Swingstage work on 12 story building is on hold due to weather. 17 Observations Exterior scaffolding is in place. 18 Observations Temporary mailbox location for North building is in place. 19 Observations Photos 'v The Architectural Team, Inc. 50 Commandant's Way at Admiral's Hill Chelsea AIA 02150 T 617.889.4402 F 61 7.884.4329 www.archdecturalteam.com Page 2 of 5 ARCHITECT'S FIELD REPORT DATE: 11/13/2017 FR: 00015 ITEM CATEGORY REMARKS PHOTOS v. ar, i The Architectural Team,Inc. 50 Commandants Way at Admiral's Hill Chelsea MA 02150 T 617.889.4402 F 617.884.4329 www.archdecturalteam.com Page 3 of 5 ARCHITECT'S FIELD REPORT DATE: 11/13/2017 FR: 00015 ITEM CATEGORY REMARKS PHOTOS orf .T� ATTACHMENTS: Report By: The Architectural Team,Inc./Lamarr Rollins II The Architectural Team, Inc. 50 Commandant's Way at Adrnmal's Hill Chelsea MA 02150 T 617.889.4402 F 617.884.4329 w"Av.archrtecturalteam,cum Page 4 of 5 ARCHITECT'S FIELD REPORT DATE: 11/13/2017 FR: 00015 Distribution: Phil Renzi The Architectural Team,Inc. prenzi@architecturalteam.com Chris Poulin Silver Street Development cpoulin@thesilverstreetgroup.com Enc Clory The Silver Street Group,LLC eclory@thesilverstreetgroup.com Mike Swiatek Port Harbor Construction,INC. mswiatek@portharborconstruction.co m Joseph Lepera Port Harbor Construction, INC. jlepera@portharborconstruction.com T he Architectural Team, Inc. 50 Commandant's Way at Admirals Hill Chelsea MA 02150 T 617.889.4402 F 617.884.4329 www.arch itecturalteam.com Page 5 of 5