S/O B-16-1461 Commonwealth of Massachusetts
Citv f o Salem
y 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x 141
Return card to Building Division for Certificate of Occupancy
i
Permit No. B-16-1461
FEE PAID: $10,587.50 TO B
ULD
DATE ISSUED: 12/28/2016
I
This certifies that 43 BOSTON STREET REALTY TRUST DACEY PAUL/GAINES
has permission to erect, alter, or r emolish a building 43 BOSTON STREET Map/Lot: 150302-0
as follows: Other Building Permit Ct Mp1.ET 1 in brl BUILDING EXCEPT
EXTERIOR WALLS. NEW 11ir/K ,LS,.FI. If ; t =t :XT # 11"+ „ CAVITY INSULATED,
EXTERIOR DOORS, WINDOWS,PART 'I(�t�, alM�,� 1 TICAL, HVAC & FINISHES. (time
extended; new contractorwSI�1?
Contractor Name: THOMAS GROOM
DBA: GROOM CONSTRUCtION
Contractor License No: CS-040319
k
' 12/28/2016
B 'tdictg f i Date
This permit shall be deemed abandoned ani invalid unless the s#fter issuance.The Building Official
may grant one or more extensions not to exceed six months each upon written request. � "' ;
�
All work authorized by this permit shall con rm to the
appn"itton and the approved construction docurttsrlts iir;wtwcl�7 ,,permit has been granted.
All construction,alterations and changes of'tJse of any,bum and,Stnxtures shall be in compliance with the local�totgilg',bq-� t9'hd codes.
This permit shall be displayed in a location Teary visible 66001=0608 street or road and shall be maintained opsit ftir.p a As ton for the entire duration of the
work until the completion of the same.
The Certificate of Occupancy will not be issued until all
by the Building bffidill6ksos pf litdati bn a is permit.
HIC#: 104999 "Allost dpnq'l s,don4tt ►�ppeaslo"guaranty fund"(asset forth in MGL c.142A).
Restrictions:
Building plans are to be available on site.
All Permit Cards are the property of the PROPERTY OWNER.
I
I 1
Commonwealth of Massachusetts
i '
citv of Salem
120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641
Return card to Building Division for Certificate of Occupancyf lip
do Structure CITY OF SALEM BUILDING 'OERMIT
PERMIT TO BE POSTED IN THE WINDOW
Excavation �, INSPECTION RECO146
Footing
Foundation �•�..f�
Framing/ � �—
Mechanical DATE
INSPECTIot :
i
Insulation7777777
/ d �
Chimney/Smoke Chamber
Final
Plumbing/Gas '` ' ' A A3fixf 4S NuY
.�
Rough:Plumbin
M
Rough:Gast f 711:
Final fj- m
Electrical
= r
I ,
Rough �� ' /0 P/ �!/ I k
�
Final D
/f� h
e Department
Prelimin /� / , 3��s � §
F64
inal L� fT
Z4,50S,,"�ss
/
Health Departm nt I �---
Preliminary
Final fJ�