Loading...
S/O B-16-1461 Commonwealth of Massachusetts Citv f o Salem y 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x 141 Return card to Building Division for Certificate of Occupancy i Permit No. B-16-1461 FEE PAID: $10,587.50 TO B ULD DATE ISSUED: 12/28/2016 I This certifies that 43 BOSTON STREET REALTY TRUST DACEY PAUL/GAINES has permission to erect, alter, or r emolish a building 43 BOSTON STREET Map/Lot: 150302-0 as follows: Other Building Permit Ct Mp1.ET 1 in brl BUILDING EXCEPT EXTERIOR WALLS. NEW 11ir/K ,LS,.FI. If ; t =t :XT # 11"+ „ CAVITY INSULATED, EXTERIOR DOORS, WINDOWS,PART 'I(�t�, alM�,� 1 TICAL, HVAC & FINISHES. (time extended; new contractorwSI�1? Contractor Name: THOMAS GROOM DBA: GROOM CONSTRUCtION Contractor License No: CS-040319 k ' 12/28/2016 B 'tdictg f i Date This permit shall be deemed abandoned ani invalid unless the s#fter issuance.The Building Official may grant one or more extensions not to exceed six months each upon written request. � "' ; � All work authorized by this permit shall con rm to the appn"itton and the approved construction docurttsrlts iir;wtwcl�7 ,,permit has been granted. All construction,alterations and changes of'tJse of any,bum and,Stnxtures shall be in compliance with the local�totgilg',bq-� t9'hd codes. This permit shall be displayed in a location Teary visible 66001=0608 street or road and shall be maintained opsit ftir.p a As ton for the entire duration of the work until the completion of the same. The Certificate of Occupancy will not be issued until all by the Building bffidill6ksos pf litdati bn a is permit. HIC#: 104999 "Allost dpnq'l s,don4tt ►�ppeaslo"guaranty fund"(asset forth in MGL c.142A). Restrictions: Building plans are to be available on site. All Permit Cards are the property of the PROPERTY OWNER. I I 1 Commonwealth of Massachusetts i ' citv of Salem 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641 Return card to Building Division for Certificate of Occupancyf lip do Structure CITY OF SALEM BUILDING 'OERMIT PERMIT TO BE POSTED IN THE WINDOW Excavation �, INSPECTION RECO146 Footing Foundation �•�..f� Framing/ � �— Mechanical DATE INSPECTIot : i Insulation7777777 / d � Chimney/Smoke Chamber Final Plumbing/Gas '` ' ' A A3fixf 4S NuY .� Rough:Plumbin M Rough:Gast f 711: Final fj- m Electrical = r I , Rough �� ' /0 P/ �!/ I k � Final D /f� h e Department Prelimin /� / , 3��s � § F64 inal L� fT Z4,50S,,"�ss / Health Departm nt I �--- Preliminary Final fJ�