Loading...
REPORT FINDINGS @ ST PETER'S CHURCH 08/28/2018 Z_2 ST EN 1 STA 5565 Glenridge Connector,Suite 900 TOLL-FREE 888.782.3473 Atlanta,GA 30342 envistaforensics.conn FORENSICS REPORT OF FINDINGS ST. PETER'S CHURCH Church Insurance Company File No: 36629 Envista Matter No: MAT-82717-D8J7 REPORT DATE- August , 2018 JOSEPH M. ti o YARBOROUGH STRUCTURAL o No 48888 _Poc' GIST Ek91-�O �SSIOW.ti�G 8/30/18 Prepared For: Ms. Christine DeBow Church Insurance Company 19 E 34th St New York, NY 10016 cdebow@cpg.org CERTAINTY IN AN UNCERTAIN WORLD PT&C Forensic Consulting Semites,P.A.I TX Firm Registiotlon#F-19410 I NC firm Registration#C-2837 I FL Certificate of Authorization#27066 E N 1 STA Page 2 of 6 Envista Matter No: MAT-82717-D8J7 F O R E N 5 1 C 5 Church Insurance Company File No: 36629 BACKGROUND On May 30 and August 3, 2018, Envista Forensics (Envista) inspected the St. Peter's Church located at 24 Saint Peter Street in Salem, Massachusetts.The church consisted of multiple interconnected masonry structures which housed the sanctuary, the fellowship halls, and associated facilities. The main portion of the church, which housed the sanctuary, and comprised the subject of Envista's investigation, consisted of a rectangular stone masonry structure covered with a hipped roof clad with asphalt composition shingles. Reportedly, the church was constructed in the 1830s. For the purposes of discussion within this report, the front of the church was considered to be facing west (Attachment A, Photograph 1). Reportedly, the subject church sustained damage during the 2017-2018 winter season. Accumulations of ice and snow on the roof reportedly damaged the asphalt shingle roofing, and caused water to intrude and damage the plaster ceiling overlying the sanctuary. Upon removal of the plaster ceiling, the Building Official reportedly noted that some of the wood ceiling joist had failed, and required the ceiling framing assembly to be inspected by a professional engineer. PURPOSE Church Insurance Company retained Envista to inspect the subject building's wood roof structure and ceiling framing assembly, and to determine what measures would be required in order to rehabilitate the framing assemblies such that they could support a new roof covering and a new gypsum board ceiling. RECOMMENDATIONS 1. The existing wood decking throughout the subject building's roof structure should be progressively removed and replaced in its entirety with 5/8-inch-thick wood structural panel sheathing. The new asphalt shingle roofing and underlayment should then be installed in accordance with code requirements. 2. The proposed 5/8-inch-thick gypsum board ceiling with a veneer plaster finish can be attached directly to the existing wood strapping members which span between the existing ceiling framing members, and the existing wood framing components throughout the ceiling framing assembly do not require upgrading. 3. The dislodged 3x4 wood framing members near the northeast corner of the building's ceiling framing assembly can be reattached to the supporting wood beam by way of Simpson A34 clip angles or approved alternatives installed at each side of each of the dislodged connection. 4. All of the connections of the 3x4 wood framing members at the supporting 12x10 wood beams throughout the ceiling framing assembly should be reinforced by way of Simpson A34 clip angles or approved alternatives installed at each side of each connection. 5. The weight of new insulation installed atop the new ceiling assembly must be less than or equal to the weight of the insulation removed during the demolition of the plaster ceiling assembly. 6. The connections of the roof and ceiling framing members at the bell tower, and potentially other connections if damage is discovered, should be inspected by a licensed structural engineer after their exposure during construction. E N 1 STA Page 3 of 6 Envista Matter No: MAT-82717-D8J7 FORENSICS Church Insurance Company File No: 36629 DOCUMENTS REVIEWED The following documents and materials were reviewed as part of Envista's investigation: 1. American Society of Civil Engineers, Structural Engineering Institute. ASCE/SEI 7-10. Minimum Design Loads for Buildings and Other Structures. 2. International Code Council. 2015 International Building Code, with Massachusetts Amendments (780 CMR—9th Edition). 3. International Code Council. 2015 International Existing Building Code, with Massachusetts Amendments (780 CMR—9th Edition, Chapter 34). DISCUSSION The subject building was covered by a hipped roof with slopes of approximately 7 units vertical to 12 units horizontal. The north and south roof slopes formed a ridge at the roof centerline, whereas the east and west roof slopes were bounded by hips extending from apexes at the ridge's respective ends. A pair of wood trusses, built up from heavy timber members, spanned between the building's north and south exterior walls and provided the primary support for the roof structure. The trusses were spaced approximately 12 feet apart, and coincided with the ends of the ridge and the hip apexes. The building's roof consisted of wood decking supported by timber rafters. The rafters spanned from the building's eaves to the ridge member and hip rafters, and were supported intermediately by purlins which spanned between the top chords of the trusses. The sanctuary featured a plaster ceiling supported by wood lath which spanned between 4x6 wood strapping spaced at approximately 16 inches on-center. The strapping members spanned between wood beams spaced at approximately 5 feet on-center, which spanned between larger beams (approximately 12 inches wide by 10 inches deep) that spanned from the east and west exterior walls to the bottom chords of the respective trusses. The wood strapping between the trusses was supported by continuous north-south spanning 2x6 wood members which were suspended by intermediate members spanning between the bottom chords of the respective trusses. Proposed Repairs Reportedly, the building's roof and ceiling sustained damage during the course of the 2017-2018 winter months as a result of ice and snow accumulations on the roof and consequent intrusion of water. To repair the damage, representatives of the church and their contractor resolved to remove and replace the asphalt shingle roofing and ceiling in their entireties. Because the roof covering was supported on wood decking with gaps exceeding those allowed by many asphalt shingle manufacturers (typically manufacturers allow gaps up to 1/4-inch), the contractor intended to install plywood sheathing throughout the respective roof slopes after the removal of the existing roof covering so as to provide a solid substrate for the new roofing materials.Additionally, given the age and condition of the plaster ceiling and concerns about future failures of the ceiling, the church representatives and the contractor resolved to replace the plaster ceiling with a veneer plaster ceiling, consisting of a thin layer of plaster installed throughout the bottom surface of a 5/8-inch gypsum board substrate. Accordingly, Envista reviewed the applicable building code requirements for the proposed repairs. Code Review Envista conducted a review of the 2015 International Existing Building Code as amended by the State of Massachusetts (IEBC) in order to determine compliance of the proposed work. The damage reportedly E N 1 STA Page 4 of 6 FORENSICS Envista Matter No: MAT-82717-D8J7 Church Insurance Company File No: 36629 sustained to the building's roof and ceiling did not comprise substantial structural damage, as defined in IEBC Section 202. Thus, according to IEBC Sections 403.4 and 606.2.2, the damaged elements could be restored to their pre-damage state. However, because the roof covering and ceiling were to be modified and improved beyond their pre-damage state, Envista determined that the proposed work constituted alterations rather than repairs, and accordingly, were subject to the corresponding sections of the IEBC. Specifically, under the IEBC's Work Area compliance method, the proposed modifications to the roof covering and ceiling constitute Level 1 Alterations. 1. Roof Covering Replacement The existing asphalt shingle roof covering is reportedly to be removed in its entirety, and a new asphalt shingle roof covering is to be installed. As previously noted, church representatives and their contractor proposed to install plywood sheathing atop the existing wood roof decking so as to provide a solid substrate for the new roof covering. IEBC Sections 403.3 and 707.2 stipulates that the weight of new roof coverings shall not increase the weight of the existing roof covering by more than 5 percent. Given that the addition of a new 3/8-inch plywood substrate would increase the weight of the roof covering significantly more than this threshold, the referenced code sections require all structural members affected by the increased dead load to be strengthened, supplemented, replaced or otherwise altered as needed to carry the increased gravity load required by the 2015 International Building Code(IBC)for new structures. Envista initiated an analysis of the roof structure with current code-prescribed snow loads and found that many of the wood members would have to be upgraded as a result of the code requirements triggered by the increased dead load imposed by the installation of a new plywood sheathing layer. Alternatively, the existing wood decking can be removed and replaced with wood structural panel sheathing (i.e. oriented strand board or plywood). Using this alternative, the weight of the roof assembly would undergo a net decrease in dead load, which thereby eliminates the need to reinforce the existing roof structure. After considering the available options presented by Envista, Church Insurance Company opted to proceed with the removal of the roof decking and replacement with new plywood sheathing, in lieu of upgrading the existing structural framing components. The existing roof decking was supported by rafters spaced at 24 inches on-center. Accordingly, Envista recommends replacing the existing 1-inch decking with 5/8-inch-thick wood structural panel sheathing rated to supporting a ground snow load of 50 pounds per square foot. The decking should be removed in small sections and replaced with wood structural panel sheathing in a progressive manner (e.g. no more than 250 square feet of decking should be removed and replaced at a time) so as to preserve the bracing to the roof structure afforded by the decking. In summary, based on its analysis, Envista concluded that the existing wood decking throughout the subject building's roof structure should be progressively removed and replaced in its entirety with 5/8- inch-thick wood structural panel sheathing. The new asphalt shingle roofing and underlayment should then be installed in accordance with code requirements. It should be noted that the decision to replace the asphalt shingle roof covering in its entirety was made by others. The damage sustained to the roof covering was reportedly limited to the west roof field, and as such, less extensive repairs may be feasible. Replacing the roof covering on only that slope may eliminate the need to remove the existing roof decking; however, Envista did not conduct analyses of alternate repair scenarios. E N 1 STA Page 5 of 6 Envista Matter No: MAT-82717-D8J7 F O R E N S I C S Church Insurance Company File No: 36629 2. Ceiling Replacement At the time of Envista's inspection, the plaster ceiling and wood lath had been removed and disposed of. Inspection of the few remaining remnants of the plaster ceiling revealed that the plaster was approximately 5/16-inch thick, as measured from the ceiling surface to the bottom surface of the lath members. The lath consisted of 3/4-inch by 1-1/2-inch wood strips spaced approximately 5/16-inch apart. As with increased dead loads associated with new roof coverings as outlined above, IEBC Sections 403.3 and 707.2 require any existing structural members which an alteration causes an increase in design gravity load of more than 5 percent to be strengthened, supplemented, replaced or otherwise altered to carry the increased gravity load required by the IBC for new construction. Accordingly, if the proposed gypsum board and veneer plaster ceiling weighs less than 105 percent of the existing plaster and lathe ceiling, no structural upgrades are required. 5/8-inch gypsum board with a 3/32-inch-thick plaster veneer weighs approximately 3.4 pounds per square foot. Based on the thickness of the plaster ceiling material recovered during Envista's inspection, Envista determined that the weight of the plaster and lathe was approximately 3.6 pounds per square foot. This unit weight was based on specific weights of the plaster and lathe of 80 pounds per cubic foot and 35 pounds per cubic foot, respectively, and conservatively assumed that the keys of the plaster (i.e. the portion of the plaster that protruded from the gaps between the lath) comprised rectangular protrusion 5/16-inch tall. Therefore, because the dead load imposed by the proposed gypsum board ceiling is less than the dead load of the removed plaster ceiling, the IEBC does not require the existing structure to be upgraded in order to support the new ceiling. Therefore, Envista concluded that the proposed 5/8-inch- thick gypsum board ceiling with a veneer plaster finish can be attached directly to the existing wood strapping members which span between the existing ceiling framing members, and the existing wood framing components throughout the ceiling framing assembly do not require upgrading. Additional Items 3. Envista's inspection revealed that a portion of the ceiling framing assembly located near the building's northeast corner exhibited a sagging configuration. Inspection of the framing elements revealed that the sagging configuration had developed as a result of the failure of the tenon connections of the 3x4 wood framing members at their interfaces with the supporting 12x10 wood beam. The wood proximate to the joist ends and the morticed beam pockets remained intact, and as such, the dislodged 3x4 wood framing members near the northeast corner of the building's ceiling framing assembly can be reattached to the supporting wood beam by way of Simpson A34 clip angles or approved alternatives installed at each side of each of the dislodged connection. 4. Envista's inspection of the ceiling framing assembly did not reveal additional failed connections. However, in order to reduce the likelihood of similar failures in the future, Envista recommends that all of the connections of the 3x4 wood framing members at the supporting 12x10 wood beams throughout the ceiling framing assembly should be reinforced by way of Simpson A34 clip angles or approved alternatives installed at each side of each connection. 5. The insulation throughout the ceiling framing assembly had been removed prior to Envista's inspection. So-as not to increase the gross weight of the finished ceiling assembly as required by the referenced sections of the IEBC, the weight of new insulation installed atop the new ceiling assembly must be less than or equal to the weight of the insulation removed during the demolition of the plaster ceiling assembly. E N 1 STA Page 6 of 6 FORENSICS Envista Matter No:MAT-82717-D8J7 Church Insurance Company File No: 36629 6. It was noted that the interface of heavy timber framing members at the bell tower, abutting the west edge of the roof structure, exhibited deterioration which will likely require rehabilitation. The connection was not fully accessible at the time of Envista's inspection, and as such, the connection should be inspected after the overlying roof decking has been removed so that an appropriate repair can be designed and implemented. Accordingly, the connections of the roof and ceiling framing members at the bell tower, and potentially other connections if damage is discovered, should be inspected by a licensed structural engineer after their exposure during construction. Selected photographs pertinent to this discussion have been included as Attachment A of this report. CLOSURE This report is for the exclusive use of our client and is not intended for any other purpose. Our report is based on information made available to us at this time. Should additional information become available, we reserve the right to determine the impact, if any, of the new information on our opinions and conclusions and to revise our opinions and conclusions if necessary and warranted by the discovery of additional information. Envista Forensics seph . Yarborough, P.E. Peer Review by: Senior Project Engineer Brian C. Lindsey, P.E. (Colorado) Senior Project Engineer Attachment A: Photographs EN 1 STA Envista Matter No: MAT-82717-D8J7 Church Insurance Company File No: 36629 FORENSICS ATTACHMENT A Photographs Photographs taken during our inspection, which have not been included in this report, have been retained in our files and will be made available to you upon your request. Note that the brightness and/or contrast of some photographs may have been enhanced for purposes of clarity. Some photographs may be cropped from their original sizes in order to emphasize a specific item or feature. No significant changes to any photographs were made that would alter factual representations. E 1 STA ews Matter No: MAT-82717-D@7 IF0R ■ Ns , cs Our Insurance Company File No: a6629 Photograph t Wed and south exposures o subject building. A :y Photograph 2 Overview U roof above sanctuary, as viewed from the northeast. : x: EN 1 STA Envista Matter No: MAT-82717-D8J7 Church Insurance Company File No: 36629 F O R E N S I C S Photograph 3. Interior view of the sanctuary. Photograph 4. Interior view of the sanctuary. E N 1 STA Envista Matter No: MAT-82717-D8J7 F o R E N S i C S Church Insurance Company File No: 36629 Photograph 5. Overview of ceiling structure, as viewed from scaffolding. a. Photograph 6. Overview of ceiling structure. E N 1 STA Envista Matter No: MAT-82717-1)817 F o R E N SIC S Church Insurance Company File No: 36629 Photograph 7. Dislodged ends of ceiling joists near northeast corner of building.. 'd 2- Photograph Photograph 8. Dislodged ends of ceiling joists near northeast corner of building. s y.� xi E N 1 STA Envista Matter No: MAT-82717-D8J7 F O R E N S I C S Church Insurance Company File No: 36629 Photograph 9. Overview of roof structure. V �y L , �r 1 Photograph 10. Overview of roof structure. �a b. 1� C E N V11 STA Envista Matter No: MAT-82717-D8J7 FORENSICS Church Insurance Company File No: 36629 Photograph 11. Overview of roof structure. 'M`y Photograph 12. Typical gaps between roof decking boards. f i EN 1 STA Envista Matter No: MAT-82717-D8J7 F O R E N S I C S Church Insurance Company File No: 36629 Photograph 13. Typical gaps between roof decking boards 3 A is •V Photograph 14. Remnants of ceiling lath. ` � v Its y 1 E N 1 STA Envista Matter No:MAT-82717-D8J7 FORENSICS Church Insurance Company File No: 36629 Photograph 15. Remnants of ceiling plaster. A � w Photograph 16. Typical roof decking board. i M A k EN 1 STA Envisto Matter No: MAT-82717-D8J7 F O R E N S I C S Church Insurance Company File No: 36629 Photograph 17. Ceiling and roof framing members at interface with bell tower. y Photograph 18. Deteriorated connection of members depicted in preceding photograph. �i q .yyA)v-u+1 ' x� a � i ru' :i .fie S s 1 a � s s FA � yn AC t .t, r