B-18-803 S/O W/OLD CONTRACTOR Commonwealth of Massachusetts ,
Citv of Salem
120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641
Return card to Building Division for Certificate of Occupancy
Permit No. B-18-803
FEE PAID: $440.00
PERMIT TO BUILD
DATE ISSUED: 8/10/2018
r
This certifies that PEREIRA DE SOUZA ITALO
has permission to erect, alter, or demolish a building 41 LIBERTY HILL,AVENUE Map/Lot: 270187-0
as follows: Renovation - 182 Family; R tW6VATE:°'t WALLS,CEILINGS, BATHROOMS, KITCHENS $
PAINT "
Contractor Name: ANTONIO PIRES
DBA: :
Contractor License No: CS-061650
8/10/2018
Building-ticial Date
� � T S
This permit shall be deemed abandoned and invalid unless 014VOrk;atlttto �tC l �a61v 8f)Mi'kmwths after issuance.The Building Official
may grant one or more extensions not to exceed six monthsK each wd0nllst
., v � soh
All work authorized by this permit shall conform to the appro`reti applk.ffikm and the approved construction ddcu ithis permit has been granted.
All construction,alterations and changes of use of any buildiii*- EHxt'stnxlures shall be in compliance with the k�f�,:' and codes.
This permit shall be displayed in a location clearly visible ft W»MeC+GBss street or road and shall be maintained open " for the entire duration of the
work until the completion of the same. �-
The Certificate of Occupancy will not be issued until alt apabb sign8glres by the Building and Fire Officials ;permit.
N Q-
k
K
H I C#: 183335 Persor>s �0 fund'(as set forth in MGL c.142A). j
Restrictions: M .. <='g
Building plans are to be available on site.
All Permit Cards are the property of the PROPERTY OWNER.
Commonwealth of Massachusetts ,
Citv of Salem
120 Washington St,3rd Floor Salem,MA 01870(978)745-9595 x564
Return card to Building Division for Certificate of Occupanc y
Structure _CITY OF SALEM BUILDING PERMIT
-
•� • PERMIT TO BE POSTED IN T WINDOW
Excavation
Fling INSPECTION RECOR
Foundation
Framing
Mechanical
Insulation INSPECTION: @ ' art DATE
��� "" i�L a .4 �F ! ! 'Y
ChimneVISmoke Chamber
Final . .rr.o` �,
Plumbing/Gas
Rough:Plumbing
t 1
Rough:Gas ,
Final
SN f
Electrical :���
Service f INN
� k
z
G S•('
Rough 0 ty�f a z
Fire Department
Prelimin
Final r
Health Department
y `
P
Preliminary
i
Final
a
FF
_ �.