S/O B-18-515 Commonwealth of Massachusetts K_\
Citv of Salem
120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641
Return card to Building Division for Certificate of Occupancy
Permit No. B-18-515 TO BUILD
FEE PAID. $1,050.00
PERMIT
DATE ISSUED: 6/12/2018
This certifies that MARGARET E. GAUDET TRUST OF 2015 THE GAUDET
has permission to erect, alter, or demolish a building 14 SHILLABER STREET Map/Lot: 100115-0
as follows: Other Building Permit REMODELING TO INCLUDE: NEW KITCHEN, ONE FULL BATH 2ND FL,
ONE 3/4 BATH 1 ST FL, INSULATE EXTERIOR WALL& CEILING, BLUEBOARD, PLASTER WALLS
& CEILINGS, NEW WINDOW, BACK DOORS, PLATFOAM &STAIRS. NEW FLOORING, INTERIOR
DOOR UNITS, TRIM DOORS &WINDOWS.
Contractor Name: GERALD CASALETTO
DBA: ALL CITY REMODELING
Contractor License No: CS-066091
6/12/2018
Building Official Date
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official
may grant one or more extensions not to exceed six months each upon written request.
All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted.
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the
work until the completion of the same.
The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit.
H IC#: 121110 "Persons contracting with unregistered contractors do not have access to the guaranty fund"(as set forth in MGL c.1 42A).
Restrictions:
Building plans are to be available on site.
All Permit Cards are the property of the PROPERTY OWNER.
co I
Commonwealth of Massachusetts
City of Salem
120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641
Return card to Building Division for Certificate of Occupancy
Structure i CITY OF SALEM BUILDING PERMIT
Excavation ,' PERMIT TO BE POSTED IN THE WINDOW '
Footing INSPECTION RECORD
Foundation
Framing
Mechanical
Insulation �,�
5 INSPECTION: BY ..��''l�tl t�, DATE l c�v
/
Chimney/Smoke Chamber 1
Finalex
I; Plumbing/Gas j
Rough:Plumbin
Rough:Gas
6Final /
z Electrical
Service /
Rough �!
Final
Fie De artment
I
Prelimina
Final
Health Department j
Preliminary
I
Final
i
I