Loading...
DEMO PERMIT SIGN-OFF CITY OF S.,U EN4 (MASSACHUSETTS • BuUMNG DEP kRT1tEINT j 130 WASHINGTON STREET,3w FLOOR TEL (978) 745-9595 FAx(978) 740-9846 KI.\iBERLEY DRISCOLL MAYOR T Hoaus ST.PIERRe DIRECTOR OF KBUC PROPERTY/BUUMNG CONDUSSIONER Demolition Permit Sign-Off (Supplement to permit application) hereby supply the following releases as part of the application for a permit to demolish the structure located at ( l7 � "4` , ro .��� and shown on the Assessor's Maps of as being on Map # S-3 Block # Lot# -ooc,s The sixth edition of the Massachusetts State Building Code, 780 CMR, states in part: "A permit to demolish or remove a building or structure shall not be issued until a release is obtained from the utilities, stating that their respective service connections and appurtenant equipment, such as meters and regulators, have been removed or sealed and plugged in a safe manner." Utilily to be Notified Notice Received b Date Received Gas Telephone. Electric Public Utilities Munici al Health Department ! Fire Department Other- Other- Demolition debris hauler: 14, Location of licensed demolition debris landfill: , _ "��, jc` Signature of A licant Date: c / Signature of Owner �`` .,� Date: This sheet must be returned to the Inspections Department along with a completed application for a permit, a site plan, and any other applicable information and fees. Demoperm.doi