Loading...
AS BUILT, CONST CONT & ROUTING SLIPMAP 33 LOT 1 1 106'f H I 15't I I I I NEW FOUNDATION rw coI o o w tocn MAP 33 LOT 2 1 15't MAP 32 LOT 55 I AREA = 10,000 t S.F. H I M II II 106------------- --- BROADWAY OF INgSS AS BUILT FOUNDATION PLAN 0 GAIL L. m 15 BROADWAY L) SMITH cn SALEM a N0.35043 0 PROPERTY OF OAF G/STERE° BRIMPT S REALTY, LLC I CERTIFY THAT THE BUILDINGS SS" A" woS HEREON ARE LOCATED ON SCALE 1" = 20' MARCH 16. 2018 THE GROUND AS SHOWN. NORTH SHORE SURVEY CORPORATION 14 BROWN STREET — SALEM, MA DATE PROFESSIONAL LAND SURVEYOR 978-744-4800 4406 Initial Construction Control Document To be submitted with the building permit application by a Registered Design Professional for work per the 8a' edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title:Clarke Workshops Date: 12/12/18 Property Address: 15 Broadway Salem MA Project: Check one or both as applicable: X New construction Existing Construction Project description: Project is to replace existing workshop with new slab on grade workshop building on frost wall with wood framing and roof trusses. See sheets A1.1 and S1.1 for drawings I Thaddeus S Siemasko MA Registration Number: 6028 Expiration date: 8131119 ,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: x] Architectural Structural Mechanical Fire Protection Electrical Other for the above named project and that to the best of my knowledge,information,and belief such plans,computations and specifications meet the applicable provisions of the Massachusetts State Building Code,(780 CMR),and accepted engineering practices for the proposed project. I understand and agree that I(or my designee)shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review,for conformance to this code and the design concept, shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official,I shall submit field/progress reports(see item 3.)together with pertinent comments, in a form acceptable to the building official.h<t<t_o aR, Upon completion of the work,I shall submit to the building official a `Final Construction Con tr P ent . C, NO.60 Enter in the space to the right a"wet"or o BE E Y electronic signature and seal: z OF n1 PSS Phone number: 978-927-3745 Email: thad@svdesign.com Building official Use Only Building Official Name: Permit No.: Date: Version 06 11 2013 CITY OF SALEM ROUTING SLIP New Construction Certificate of Occupancy LOCATION j ) j34-.Z. U,),4/DATE )a-a/- ASSESSORS a-a/- ASSESSORS DATEa- 93 Washington St. p CITY CLERK DATE 93 Washington St. PUBLIC SERVICES DATE Z! z 120 Washington St. WATER DATE z/ L! 120 Washington St. CROSS CONNECTIO DATE 5 Jefferson Ave PLANNING DATE 120 Washington St. CONSERVATION DATE 120 Washington St. ELECTRICAL DATE 48 Lafayette St. FIRE PREVENTION DATE 29 Fort Avenue HEALTH DATE 120 Washington St. BUILDING INSPECTOR DATE 120 Washington St.