S/O B-17-534 RECONSTRUCT CARRIAGE HOUSE ComWonwealth of Massachusetts p ,
Citi f Salem
120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641
Return card to Building Division for Certificate of Occupancy
Permit No. B-17-534
FEE PAID: $0.00
PERMIT TO BUILD
DATE ISSUED: /216 /2017
This certifies that PELLETIER THOMAS/OVERBERG C OVERBERG KELLIE
has permission to erect, alter, or demolish a building 138 NORTH.STREET Map/Lot: 270272-0
as follows: Other Building Permit RECONSTRUCTION OFtCAR'RIAOE 14OIUSE. NEW FRONT & ROCK
STRUCTURE, HVAC UNIT, TWO BAT141ROOMS Ai KITC NS
Contractor Name: GLEN THOMPSON
DBA:
Contractor License No: CS-049168
6/21/2017
B.uildittg OfYid. Date
.-
This permit shall be deemed abandoned and invalid unless the wontautht Cited by tt is ctkttmap lrl!I�t iiigmnths after issuance.The Building.0 `
may grant one or more extensions not to exceed six months each upon written regwest.
All work authorized by this permit shall conform to the approved i pplicadon and the approved constnicUf3rt doctfi l y1�tpis permit has been jAAi;d.
All construction,alterations and changes of use of any building and structures shall be in compliance with the $ -tew"nd codes
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open'for public inspection for the entire duration of the
work until the completion of the same.
The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials-a►e pfoWded orFthis:permit. "
H IC#: 169104 "Persons contracting with unreer aEtors do notfiave a4'Ced toter guaranty fund"(as set fortlrifi MGL c.142A).
Restrictions: t
Building plans"are to be available on site.
All Permit Cards are the property of the PROPERTY OWNER.
Comm
.
CitV Ofd
120 Washington St,3rd Floor Salem,WA 09970(97447 595%5644 ,
Retum card to Building Division for Certificate o�upanay�.
Structure CITY OF SALEM BUILDING IP MIT .
r R��
Excavation PERMIT TO BE POSTED IN THE
Footing INSPECTION RECORD
Foundation
Framing
Mechanical
Insulati —a NSPECTION: BY ,�>' DATE
Chimney/Smoke Chamber
Final`� a
Plumbing/G .C.� �;,►.�:
r4 �• ;�
Rough:Plumbing Q _
� s
Rough:Gas 0 ,h(.,,L� 0 6—E . �, ',o 19-12-
. ! 2--
Final
Electrical k
Service
Rough ; �y
Final
Fire DepdCment
Preliminary
Finaan�"
Health Department
Preliminary
Final