B-18-229 SHEET METAL 1ST FL & 3RD FL Commonwealth of Massachusetts Q "
Citv of Salem
120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641
Return card to Building Division for Certificate of Occupancy
Permit No. B-18-229
FEE PAID: $35.00
PERMIT TO BUILD
DATE ISSUED: 3/28/2018
This certifies that PARTNER FOMES, LLC
has permission to erect, alter, or demolish a building 6 LINDEN STREET Map/Lot: 330308-0
as follows: Sheet Metal INSTALL DUCTWORK FOR HEAT$A/C FOR IST FL (UNIT IN BASEMENT) &
3RD FL. (UNIT INjATTIC)
Contractor Name: BILLY SILVA
DBA:
Contractor License No: 1446
3/28/2018
Building Official Date
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official
may grant one or more extensions not to exceed six months each upon written request.
All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted.
All construction,alterations and changes of use of any building and strictures shall be in compliance with the local zoning by-k^"and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for pubic irns*tlon for the entire duration of the
work until the completion of the same.
;f
The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provkieo on this permit.
H IC#: "Persons contracting with unregistered contractors do not have access to the guaranty fund'(as set forth in MGL c.142A).
Restrictions:
Building plans are to be available on site.
All Permit Cards are the property of the PROPERTY OWNER.
Commonwealth of Massachusetts'
{ City of Salem
�II
120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641
Return card to Building Division for Certificate of Occupan�y
Structure CITY OF SALEM BUILDING PERMIT
Excavation
PERMIT TO BE POSTED IN THE WINDOW
Footing
INSPECTION RtECORO
i
Foundation
Framing
Mechanical •
Insulation INSPECTION: BY DATE
Chimney/Smoke Chamber
Final
Plumbing/Gas
Rough:Plumbing
Rough:Gas
Final
Electrical
Service
Rough
Final
I
Fire Department
i
Preliminary I
f
Final
Health Department
Preliminary
I
Final