Loading...
FINAL CONSRUCTION CONTROL DOC, PHASE 1 B-18-254 Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional for work per the 81h edition of the Massachusetts State Building Code.780 CMR, Section 107 Project Title: RCG,Peabody building(Phase One) —Date: 11/27/18 _Permit No. B-18-254 Property Address: 120 Washington St.Salem MA Project: Check one or both as applicable: X New construction X Existing Construction Project description:.Phase one consists of 4,275 st so called third floor north renovated and converted commercial — _ mace to 4 residential units units#306,307 308&309.The total conversion units are 14 which the phase twol0 units are not completed yet..Included the LobbWentry walkway 2nd&3rd floor _corridors.The building includes revised electrical mechanical plumbing fire protection fire alarm _ systems and minor structural modifications that are not included in this final construction__control _document.They will be done by others 1 Peter PitmanMA Registration Number: 8749 Expiration date: August 2019 ,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: [X] Architectural [ J Structural [ ] Mechanical [ J Fire Protection [ ] Electrical [ ] Other: for the above named project. 1,or my designee.have performed the necessary professional services and was present at the construction site on a regular and periodic basis.To the best of my knowledge,information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents appro\ed as part of the building pen-nit and that 1 or my designee: 1. Have reviewed,for conformance to this code and the design concept.shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction dOCLiments. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of"80 CMR 107. Enter in the space to the right a-wet'"or --r-..- � �' r � electronic signature and sea]:�. Phone number:_978,744.8982 Email: pfpitman@iuno.com Buildinia Official Use Onlc Building Official Name;- Pennit No.: Date: Version 06 1 1 2013