CONSTRUCTION OBSERVATION #8 PITT AN & \V Aki) fy
CONSTRUCTION OBSERVATION #8
November 27 2018
Tom St. Pierre
Inspectional Services Director
City of Salem Inspectional Services
Salem, Massachusetts 01970
Project: RCG 120 Washington Street
Re: Construction Observation
Dear Tom.
The folloNA ina observations are based on a periotic site visits by Michel Beheshti.of my staff.
Observation:
General areas:
• The work on the roof is complete.
2"d floor:
• The 2nd Floor roof deck is being framed.
• The door to the deck is in place.
• The ramp is complete.
Lobby Area:
• The Corten steel plant boxes at front entre area are in place.
• Glass entry doors. glazing gasket is not in place.
• The front entry door's inside handicap paddle is in place.
• The Lobby south exposed brick wall is painted and Peabody Loco has been placed.
• The Nlail boxes are in place.
• The planter is installed.
Yl floor south:
• The corridor's temporary doors to the units are in place in order to complete the egress of the north
units.
• The wall framing is complete.
• The MEP and fire protection are in progress.
3rd floor north:
• The 4 units. 306. 307.308 and 309 are complete.
411 floor:
• The wall framine is complete.
• The MEP is next.
Recommendations or .actions:
I-The Structural Engineer,,Will be submitting_independent reports.
2-The MEP. tire protection.civil reports are not part of this report,
Please do not hesitate to be in touch with this office should fou have any further'questions and or concerns.
Respectfull\'. '
Peter F. Pitman. Architect
Massachusetts Registration No. 8739