RCG CONSTRUCTION OBSERVATION #5, OCT. 2018 PITMAN & WARDLEY .1rcl� i ! t'rtt: rr cti f>e� iecn 32 ('hurrh Strvet • Salem. MA • 478.7.{{.8982 CONSTRUCTION OBSERVATION-#5 October 312018 Tom St. Pierre Inspectional Services Director City of Salem Inspectional Services Salem,Massachusetts 01970 Project: RCG 120 Washington Street Re: Construction Observation Dear Tom, The following observations are based on a periotic site visits by Michel Beheshti,of my staff. Observation: General areas: • The work on the roof is 90%complete. • Roof hatch is replaced and the framing got reinforced. • All stair doors are new and have panic hardware. 2"d floor: • The 2nd Floor roof deck is being framed. • .The 2"d floor chase across from the elevator has been constructed. Lobby Area: • Concrete slope and the railing at the front door is complete except the planting areas. • Glass doors,side lights,transom glazing are in place,the trim inside and outside is not completed yet. • The front intercom is in place but not operational. • The Lobby north wall and the ceiling are completed,the brick south wall is scheduled to be painted. • The Mail boxes are not in place yet. • The sprinkler system,security camera and the heat as well as fire alarm in the Lobby are operational. • The elevator is upgraded and access separation for tenants is to be completed. The elevator wall has new tile installed. The elevator door&frame is painted. • The new wall and the new door to the rear with panic hardware is complete. 3rd floor south: • MEP work and the sprinkler system is in place • The rough framing is done. 31 floor north: • The corridor walls leading to the third floor North will be completed by the end of the week. • The finish electrical is signed off on the North side. • The North side units are ready for final inspection. • The new emergency and the new security systems are done for egress of North side. • The 3rd floor roof is 100%complete. 4u'floor: • The rough Stud wall framing is completed. Duct works are being done. • The rough framing is done and the progress is ahead of schedule. Recommendations or Actions: 1-The Structural Engineer will be submitting independent reports. Please do not hesitate to be in touch with this office should you have any further questions and or concerns. Respectful , Peter F. Pitman,Architect Massachusetts Registration No.8749 1 (cjk�-_DAigCy ��c,���•ttG.� F. o.8749 BO OIN KIA �NOFA