B-18-534 UPDATE TWO (2) UNITS N !,, Commonwealth of Massachusetts Q
F Citv of Salem
120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641
Return card to Building Division for Certificate of Occupancy
Permit No. B-18-534
FEE PAID: $735.00
PERMIT TO BUILD
DATE ISSUED: 6/11/2018
This certifies that MUSE CORRINNE E
has permission to erect, alter, or demolish a building 40 HANSON STREET Map/Lot: 150258-0
as follows: Repair/Replace REMODEL TWO (2) KITCHENS, FOUR (4) BATHROOMS, UPDATE ELECTRIC
& PLUMBING, PAINT, ETC.
Contractor Name: JOHN CAMIRE
DBA: JJC GENERAL CONTRACTING
Contractor License No: 095895
6/11/2018
Building Official Date
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official
may grant one or more extensions not to exceed six months each upon written request.
All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted.
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the
work until the completion of the same.
The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit.
H I C#: 182125 "Persons contracting with unregistered contractors do not have access to the guaranty fund"(as set forth in MGL c.1 42A).
Restrictions:
Building plans are to be available on site.
All Permit Cards are the property of the PROPERTY OWNER.
Commonwealth of Massachusetts
' R Citv of Salem
120 Washington St,3rd Floor Salem,MA 01970(978)745-9595x5641
Return card to Building Division for Certificate of Occupancy
Structure CITY OF SALEM BUILDING PERMIT
PERMIT TO BE POSTED IN THE WINDOW
Excavation
Footing INSPECTION RECORD
Foundation
Framing
Mechanical
Insulation INSPECTION: BY DATE
Chimney/Smoke Chamber 4 /► 9
Fina
Plumbing/Gas �,> _ Q 46�
Rough:Plumbing
Rough:Gas 71c / ;
Final
S Electrical
Service
Rough T 1 5 I , /O (94 L�'V— Q K
Final /
Fire De artment TAT
�
� V" � " lJi Iii
Preliminary 51 �//"X l"�
Final
Health De artment
Preliminary
Final