Loading...
17 FAIRVIEW ROAD - BUILDING JACKET Vtw llll UPC 10333 o- No. 153L-3 �wx HASTINGS. MH Bourne Consulting Engineering- -.184.West Central Street Ronald R. Bourne,P.E. - President - - Franklin, MA 02038 February 15;2001 Zoning Board City of Salem One Salem Green Salem,MA 01930 Attn: Chairman RE: Job#20310 - Mr. Stephen Manning— 17 Fairview Road Dear Sir or Madam: Mr. Stephen Manning of 17 Fairview Road; Salem.is currently seeking a DEP Waterways License-BRP WW 01 for the repair of an existing concrete seawall and the, installation of a30' gangway with 8'x20' floating dock located in Salem Harbor. One requirement of said license is for the Local Zoning Board to verify, that this project is not in violation of local zoning ordinances and bylaws. As verification, a form has been enclosed for the Zoning Boards signature. Please find enclosed one complete copy of the Waterways License Application. Weare requesting that you sign the attached sheet, as proof of notification, and return it to us in the enclosed stamped envelope at your earliest convenience. Thank you for your assistance in this matter. Very truly yours, BOURNE CONSULTING ENGINEERING Blake A. Peters Waterfront.Engineer y Encl. Tel. (508)528-8133•Fax(508)520-6671 •e-mail: bce@bournece.com Massachusetts Department of Environmental Protection t; Bureau of Resource Protection - Waterways BRP WW 01 Waterways License or PermitTr wolsa Transmittal Number BRP WW 03 License or Permit Amendment General Waterways Application A. Project Information Important: 1. Which Permit are you applying When filling Y for? ® BRP WW 01 El BRP WW 03 out forms on BRP WW 01 Waterways License the computer, If this is an amendment,please reference the license# use only the tab key to 2 Applicant: move your Stephen Manning cursor-do Name not use the 17 Fairview Road return key. Mailing Address Salem Essex MA 01970 City/Town County State Zip Code (978) 745 -2048 ext. renm Day Telephone# 3. Authorized Agent(if any): Bourne Consulting Engineering contact: Blake A. Peters Name Note: Please 184 West Central St. refer to the Mailing Address "Instructions for Franklin MA 02038 Completing Application BRP City/Town State Zip Code WW 01 &BRP ( 508 ) 528 - 8133 ext. WW 03"before Day Telephone# completing sections A-E of 4. Property YInformation (all information must be provided): this form. Same Owner Name(if different from applicant) Tax Assessor's Map and Parcel Numbers 17 Fairview Road Salem Location(street address) City/Town Essex 01970 County Zip Code Latitude Longitude 5. Name of the water body: Salem Harbor 6. The waterbody at the project site is within: (check a, b & c) a. ❑ uncertain ® tidal ❑ great pond ❑ river/stream ❑ filled tidelands b. ❑ uncertain ® natural ❑ enlarged/dammed c. ❑ uncertain ❑ ACEC ❑ DPA ❑ ocean sanctuary vre06.tlac Page 1 of 11 Rev.06100 Massachusetts Department of Environmental Protection w t Bureau of Resource Protection - Waterways LL 48 BRP WW 01 Waterways License or Permit W0184Transmittal Number BRP WW 03 License or Permit Amendment General Waterways Application A. Project Information Cont. 7. Project/Activity description: Repair existing stone masonry seawall with 8" thick concrete facing. Install 30' gangway with an 8'x20'floating timber dock. 8. Description of existing and/or proposed uses(s): (select use(s) from Appendix C) Seawall repair for shoreline stabilization for the protection of existing structures. Floating dock is for private recreational use. 9. Is this project: ® water-dependent? ❑ non water-dependent? 10. What is the approximate total cost of any proposed work(including materials & labor)? 11. List the name & complete mailing address of each abutter(attach additional sheets, if necessary): See Attached 12. "1 have attached project plans in accordance with the instructions contained in...": ❑ Appendix A(for permit applications) ® Appendix B (for license applications) ❑ Appendix C (use statements for permit & license applications) Appendices A-D begin on page 5 of this application package. 13. Term: ® Standard 30 years ❑ Extended 31-99 years • Provide additional documentation in accordance with 310 CMR 9.15 (1)(b)(2). • Provide appropriate application fee in accordance with "Table 1" at 310 CMR 9.16. 14. Other Approvals: • Water Quality Certificate • Wetlands File No. (Date of Issuance ) • MEPA File No. 0 Date of Secretary Certificate ww96.doc Page 2 of 11 Rev.06100 2-173-21101 2:138PM FROM BOURNE CONSULTING 1 SOB S20 6671 P_ S C Massachusetts Department of Environmental Protection Bureau of Resource Protection - Waterways BRP WW 01 Waterways License or Permit L W018448 l?i BRP WW 03 License or Permit Amendment Transmittal Number C�\ General Waterways Application B. Certification All applicants, property owners and authorized agents must sign this page.All future applications Applic is ignature � ^ - correspondence may be signed by the authorized g d�0 /- agent alone. Date �- "I hereby make application for a permit or Massachusetts Coastal Zone Management Program to enter upon the premises of the project site at Property Owner's signature(if different than applicant) reasonable times for the purpose of inspection. "I hereby certify that the information license to Date - - authorize the activities I have described herein. Upon my signature, I agree to allow the duly authorized 2 representatives of the Massachusetts Department of Agent's signature rf applica Environmental Protection and the submitted in this Z- S-_ application is true and accurate to the best of my ___. __.... Knowledge." Date C. Waterways Dredging Addendum 1. Provide a description of the dredging project: ❑ Maintenance Dredging Improvement Dredging (include date of last dredge & Permit No.) No dredging is proposed. - -- —.. purpose of dredging 2. What is the volume (cubic yards) of material to be dredged? 3. What method will be used to dredge? ❑ Hydraulic ❑ Mechanical ❑ Other 4. Describe method of disposal and give the disposal location (include a separate disposal site location map): 5. In the event beach nourishment is proposed for private property, pursuant.to 310 CMR 9.40(4)(a)1, easements for public access below the existing high water mark shall be secured by the applicant and submitted to the Department. ww06.Coc Reu.JPJ00 PUGe'of 11 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Waterways t w BRP WW 01 Waterways License or PermitTr wolsa Transmittal Number :. BRP WW 03 License or Permit Amendment General Waterways Application D. Municipal Zoning Certificate Stephen Manning Name of Applicant 17 Fairview Road Salem Harbor Project street address Waterway Salem City/Town Description of use or change in use: Seawall repair for shoreline stabilization for the protection of existing structures. Floating dock is for private recreational use. No change in use is proposed. To be completed by municipal clerk or appropriate municipal official: "I hereby certify that,the project described above and more fully detailed in the applicant's waterways license application and plans is not in violation of local zoning ordinances and bylaws." Printed Name of Municipal Official Signature of Municipal Official Title City/Town Date .06.doo Page 4 of 11 Rev.06100 I CERTIFY THAT THIS PLAN AS PREPARED CONFORMS TO THE RULES AND REGULATIONS OF THE REGISTERS OF DEEDS. Of RONALD R. j DDURN g ST=UJEtAL 3086 L { > Park': PfCkef Q W Pvinf cn Z ,,� O G � a m O W W LLJ m N J �� W Ll p aLLJ ' O NW Z O O W z (f) c SA EM C9� Q 00 N mm m � V) :HA(t OR" , s zw x 0 w � r J x 00 z W W57<a Q O a SCALE: 1 " = 2000' < LO 3.., -__-0 w p MyW _ - LOCUS PLAN I I o z Q J .7, W Z Q QH „ LL _ O W (ifN O W Z _.. Q W - z � . _ o g 0 OVOa kVMN3N]H w / < Z--- Q ,\ � W - ,— r > p - o OF At tW�9 c� RGNPl R. 4L � A043W� �tUUNNE P '00 51 RUL1UNAL -� q No. 30561 00 I r) I SITE PLAN 0 50 100 SCALE: 1 "=50'-0" SCALE: 1 "=50'-O" PLANS ACCOMPANYING PETITION OF SHEET 1 OF 3 STEPHEN MANNING TO REPAIR & MAINTAIN EXISTING SEAWALL AND INSTALL & MAINTAIN GANGWAY AND FLOATING DOCK AT 17 FAIRVIEW ROAD, SALEM, SALEM HARBOR, ESSEX COUNTY. x ' EXISTING WALL TO REMAIN i i i Y V <\� LIMIT OF CONCRETE OVER TOP �'REMOVE _EXISTING Y \ WALL REPLACE, W/GRANITE BLOCKS �`yi`� LIMITS OF EXISTING WALL O > - 4' TO 5' FROM/\� \< �l I C7 CORNER OF WALL, m mcFTI �- `% m STONE RIPRAP TO BE j j/ / ;�/� ,/; PULLED BACK FOR D REPAIR OF WALL cn z PROPOSED CONCRETE m C7 A BFACE 8" MINIMUM 70 O 3 3 C/) 70 z =_ o 0 o CORNER WALL REPAIR - TYPICAL (PLAN) 1 C � = n m z 3 y mm m r}"/ ' Z SCALE: 1/2" = V-0" R m �07 -1 N �l�s�a tliisNu (J) C/) 0 0 2 4 SCALE: 1/2" = 1 '-0" I CERTIFY THAT THIS PLAN AS PREPARED CONFORMS TO THE RULES AND REGULATIONS OF THE REGISTERS OF DEEDS. RONAtio RUCRNE }Ho 0r61N ' y c�seTEp� SYAL FACE OF EXISTIN G WALL-� 6" CONCRETE OVER TOP AND BACK TOP OF EXISTING . + 13.8 FILL VOIDS EXISTING GRADEJ) PROPOSED LAWN AREA J )�� PROPOSED CONCRETE FACE @ 8" MIN. #4 DOWELS @18" O.C. w/MIN 6" EMBEDMENT HTL +11 .13 NOTES: EXISTING CONCRETE REPAIR 1 . REMOVE ALL MHW +9 32 UNSOUND CONCRETE, STONE, AND MORTAR. ` 1, BATTER FACE TO MATCH EXISTING = 2. ALL REINFORCING TO - HAVE MIN. 3" COVER. )-i #4 18" EACH WAY 6 BOTTOM WALL +6.50 EXISTING MUDLINE MLW 0.0__ VARIES (ABOUT 2'-0") MIN 18" BELOW GRADE A PROPOSED EAST WALL REPAIR - SECTION 3 SCALE: 1/4" = 1 '-0" EXISTING WALL TO REMAIN PROPOSED CONCRETE FACE 8" MIN. HTL +1113 PROPOSED GRANITE BLOCK BATTER FACE TO MATCH EXISTING MHW +9,3 � 1 1' #4 DOWELS MIN, 1 PER GRANITE BLOCK � I #4 @ 18" EACH WAY BOTTOM OF WALL EL +6 5 �pRgYq n =IIR I iI=III=III=III=1. NOTES REINSTALL EXISTING IBIIEXISTING MUDLINE RIP RAP AGAINST EXTEND FOOTING TO SUPPORT GRANITE WALL. B CORNER WALL REPAIR - SECTION 3 SCALE: 1/4" = l '—O" ..tN or RONALD R. 4` Al — N �0 AlEai 8 SCALE: 1/4" = 1 '-0" SHEET 3 OF 3 Q��M�t loy.ol 'ark' Puke.' Q w Porn Z O O W fn W N p {y F Ld m OJ (nQ d LaJ p� Q LLJ M LLL Q Of cl� O O - QmZHK O ciwZ _ w =Q: O O W Z OT 0� < �0 m m 0 ;vc QZW NM X W .. N M M W z O Q Z ` W J XO NJ V) W' J a '~ x a o o a SCALE: 1 " = 2000' n w 3 —c7 W LOCUS PLAN � H O z / �7- J Q Q K _ —Oc J Z Q KN ,.i � O W O r t M Q „. Qpf>_ O r n co co O 9 K O OV08 kVMN]A]H Ln L'- Q � / w a 0 — N G3 C, ��� � `O STAMPED FOR No SUBMISSION TO SALEM CONSERVATION COMMISSION ONLY SITE PLAN o so 100 SCALE: 1 "=50'-O" SCALE: 1 "=50'-0" PURPOSE: TITLE: APPLICATION BY: SEAWALL REPAIR SITE PLAN STEPHEN MANNING 100 YR FLOOD IN: SALEM HTL MHW 9.32 Bourne Consuftla E°gI°ee'�°g AT: SALEM HARBOR Ia'�"-�00.!� COUNTY: ESSEX STATE: MA NGVD --�,i —� m(m)�- , :ii ma) , , MLW 0.00 SHEET 1 OF 3 DATE: FEB. 01 EXISTING WALL TO REMAIN LIMIT OF CONCRETE OVER TOP REMOVE EXISTING WALL REPLACE LIMITS OF EXISTING WALL W0 4 TOE 5B LFROM Yx CORNER OF WALL y� STONE RIPRAP TO BE / PULLED BACK FOR REPAIR OF WALL PROPOSED CONCRETE q B FACE 8" MINIMUM 3 3 n CORNER WALL REPAIR - TYPICAL (PLAN) STAMPED FOR 2 SUBMISSION TO SCALE: 1/2" = V-0" SALEM CONSERVATION COMMISSION ONLY 100 YR FLOOD NGVD TITLE: CORNER REPAIR IN SALEM HTL 11.13 MLW 0.00 AT:SALEM HARBER MHW 9.32 COUNTY: ESSEX STATE: MA �Booroe Coosalting Englaeer/ng PURPOSE: APPLICATION BY: SHEET 2 OF 3 ^� SEAWALL REPAIR STEPHEN MANNING DATE: FEB. '01 f FACE QF_, EXISTING WALL 6" CONCRETE OVER TOP AND BACK TOP OF EXISTING WALL EL. +13.8 rl=i' FILL VOIDS EXISTING GRADE r\ ; PROPOSED CONCRETE FACE @ 8" MIN. LAWN AREA V � NOTES: #4 DOWELS @18" O.C. w/MIN 6" EMBEDMENT HTL +11 .13 1 . REMOVE ALL EXISTING CONCRETE REPAIR UNSOUND CONCRETE, BATTER FACE TO MATCH EXISTING MHW +9.32 STONE, AND MORTAR. 2.ALL REINFORCING TO #4 Q 18" EACH WAY HAVE MIN. 3' COVER. ' L 6 BOTTOM WALL +6.50 `IIL=11 L= -1 uu=u611euL- MLW 0.0 EXISTING MUDLINE VARIES (ABOUT 2'-0") MIN 18" BELOW GRADE ��� PROPOSED EAST WALL REPAIR - SECTION 3 SCALE: 1/4" = 1 '-0" EXISTING WALL TO REMAIN J� PROPOSED CONCRETE FACE 8" MIN. HTL +11 .1 PROPOSED GRANITE BLOCK O1, NBATTER FACE TO MATCH EXISTING MHW +9.32 #4 DOWELS MIN. 1 PER GRANITE BLOCK D #4 @ 18" EACH WAY BOTTOM OF WALL EL. +6.5 L LII-I I g - L �IIRIFr-J, 4 gl��Fl. NOTES: REINSTALL EXISTING EXISTING MUDLINE RIP RAP AGAINST EXTEND FOOTING TO SUPPORT GRANITE WALL. n CORNER WALL REPAIR - SECTION 3 SCALE: 1/4" = 1 '-0" STAMPED FOR SUBMISSION TO SALEM CONSERVATION COMMISSION ONLY PURPOSE: TITLE: SECTIONS ApPLICATION BY: STEPHEN MANNING SEAWALL REPAIR 100 YR FLOOD IN: SALEM MHW 19 32 Bourne Consultlng Bngineering AT: SALEM HARBOR COUNTY: ESSEX STATE: MA NGVD %� nfw/en un iii mv/em nr MLW 0.00 SHEET 3 OF 3 DATE: FEB. 01 . ......... . ..... . _.. Jul 31 01 09. 31a P C 0]1A/ol 16:.09 Ekx 617 476 3269 FPC$S Q002 t. DEP File Number. Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands 64-316 WPIC Form 5 - Order of Conditions Pmvlded by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A.-GEaneral Information Important: From: When filling out forms on Salem the computer. Conservation Comtrrisslon use only the This issuance if for(check one): tab key to move your cursor-do ® Order of Conditions not use the return key. ❑ Amended Order of Conditions m Property Owner(if different from applicant): 7o: Applicant Stephen Mannino Same Name Name '® 17 Fairview Road Mciring Address Mailing Addre55 Salem MA 01970 Cily? n ow State Zip code Cityrrown state �'?Code 1. Project Location: 17 Fairview Road Salem street Address aryllrown Map 32 Lot 361 Asassars Map/Plat Nlmtoer Parcelflat Number 2. Property recorded at the Registry of Deeds for: 14249 6 Essex Book Page County Certificate(if registered land) . 3. Dates: February IS.2001March 6, 2001 March 6, 2001 Late Notlw of Intent Fled pate Pubric Hmnng Closed Date of Issuance 4. Final Approved Plans and Other Documents (attach additional plan references as needed): :Site Plan Sheet 10M, Comer Repair Sheet 2ot3 &Sections Sheet 3of3 Feb. 01 Date 5. Final Plans and Documents Signed and Stamped by: Ronald R. Bourne Jame 6. Total Fee: $200.00 (ham Appendix B:Wetland Fee Transmittal Form) P.w+dr WPA FamS aetp]AO .Jul 31 01 09k31a P 03(20/01 15:10 FU: 617 476 3269 FPCMS f�1003 i. Massachusetts Department of Environmental Protection DE?File Number. Bureau of Resource Protection-Wetlands, . 64-318 WPA Form 5 - Order of Conditions Provided by DEP Massalug —chusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Fundings Findings pursuant to the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing,this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that apply: ❑ Pudic Water Supply ® Land Containing Shellfish ® Prevention of Pollution ❑ Private Water Supply ❑ Fisheries Protection of Wildlife Habitat ❑ Groundwater Supply ® Storm Damage Prevention ® Flood Control Furthermore,this Commission hereby finds the project,as proposed,is:(check one of the following boxes) Approved subject to: ® the:following conditions which are necessary,in accordance with the performance standards set firth in the wetlands regulations, to protect those interests checked above. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above, the following General Conditions, and any other special conditions attached to this Order.To the extent that the following conditions modify or differ from the plans, specifications,or other proposals submitted with the Notice of Intent, these conditions shall control. Denied because: ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations to protect those Interests checked above. Therefore,work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect these interests, and a final Order of Conditions is issued. ❑ ths information submitted by the applicant is not sufficient to describe the site,the work,or the effect of the work on the interests identified in the Wetlands Protection Act.Therefore, work on this project may not do forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the AcVs interests,and a final Order of Conditions is issued.A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR General Conditions (only applicable to approved projects) 1. Failure to comply with all conditions stated herein,and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or Invasion of private rights. 3. Tiis Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state,or local statutes,ordinances,bylaws, or regulations. NPr.Fmm a ftw z a7 w..e>too I i Jul 31 01 09: 31a P. 4 03/1_0/01 ' 15:10 FAX 617 476 3269 I.FPCHS 11004 Massachusetts Departmentidf Environmental Protection oeF F-10 NumOer, Bureau of Resource Protection -Wetlands . . 64-318 WP.A Foram 5 — Order of Conditions Provided DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings (cont.) 4. The work authorized hareundenshall be completed within three years from the date of this Order unless either of the following apply: a, the work is a maintenance dredging project as provided for in the Act;or b. the time for completion has ibeen extended to a specified date more than three years,but less than five years,from the date of issuance. If this Order is intended to be valid for more than three years,the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5. This Order may be extended by Ithe Issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Any fill used in connection with Utis project shall be clean fill. Any fill shall contain no trash, refuse, rubbish,or debris,including butnot limited to lumber,bricks, plaster,wire,lath,paper, cardboard, pipe,tires, ashes, refrigerators,;motor vehicles, or parts of any of the foregoing. 7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such ari appeal has been taken, until lall proceedings before the Department have been completed. B. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title of the affected property. In the ;;ase of recorded land,the Final Order shall also be noted in the Registry's Grantor Index under(he name of the owner of the land upon which the proposed work is to be done. In the case of the registered land,the Final Order shall also be noted on the land Court Csrtificate,of Title of the owner of the land upon which the proposed work is done.The recording information shall be submitted tm this Conservation Commission on the form at the end of this Order, which form must be stamped by;,the Registry of Deeds,prior to the commencement of work. 9. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection"[or,VA DEP"j 'File Number 64-318 I 10. Where the Department of Environmental Protection is requested to Issue a Superseding Order. the Conservation Commission shallibe a party to all agency proceedings and hearings before DEP. 11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance(WPA Form 6A)to the Conservation Commission. 12. The work shall conform to the plans and special conditions referenced in this order. 13. Any change to the plans identified in Condition 912 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 14. The Agent or members of the Conservation Commission and the Department of Environmental Protectlon shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. WPA Fw 3 Papea dr Pn.ELW Jul 31 01 09: 31.3 p. 5 03,/2o/al 15:11 FA3: 617 476 1269 FPCRS QOoS Massachusetts Department of Environmental Protection DEP ole Numher. Bureau of.Resource Protection -Wetlands 64-319 WPA Form 5 — Order of Conditions Pmvlded by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings (cont.) 15. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this.Order. 15 Prior to the start of work,and if the project involves work adjacent to a Bordering Vegetated Welland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland be markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 17. AIS sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means.At no time shall sediments be deposited in a wetland or weter body. During construction,the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed.The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission,which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of worle line has been approved by this Order. Special Conditions (use additional paper, K necessary): Sere Attached. Findings as to municipal bylaw or ordinance Furthermore,the hereby finds (check one that applies): Conservalion Ca issiw F� that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: Name Municipal Ordinance or Bylaw Therefore, work on this project may not go forward unless and until a revlsed Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order of Conditions is issued. ❑ that the following additional conditions are necessary to comply with a municipal ordinance or bylaw, specifically: Name Municipal ordinance or Bylaw The Commission orders that all work shall be performed in accordance with the said additional conditions and with the Notice of Intent referenced above.To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. rage<m r WiR romS nw.oavo P. 31 01, 09- 32a 8](28/81 15:12 FAX 817 478 3289 FPCMS boas DEP File Number. Massacfiusette Department of Environmental Protection Bureau of Resourrre pmtection'Wetlan& Phi r� WPAi Form 5 - Order of Conditions MP Massarhusetis Wetlands Protection Act M.G.L. c. 131, §40 B. Findings (cont.) Additional condition relating to municipal ordinance or bylaw- This Omer Is Valid for three Years,unless otherwise specified as a special condition pursuant to General Conditions 04, from the date of Issuance. {Y1 �d 2v c D24e the Conservation Commission.The Order must be mailed by This Order must be signed try a maloritY of csrdfiixl mail(retum receipt requested)or,hand delivered to the applicarrL A copy also must be mailed or ppropriate Department of Environmental Protec8on Regional hand delivered at the same time to the a Offieei(see Appendix A)and the prvPertY owner(W different from apptioarrt). Signs Of On `a Moirth end Y®r Ory before me personally appeared „Fo Ing known to he the person desrsihed in and who executed the foregdn cEFA1D a dgad that sh the sea his/her free ad and deed M w.� My cbmrr�sion 6yiAe My Commlaebn This Order is issued to the PPlkant (lows: certified rrrHil reh�m � requested,on 0 by hand delivery on by Y\ }� Vn 2xo D� Duo pgSa7 wmr�e �.m1m Jul 31 01 • 09: 32a IA007 6vwai 15:13 FAX617 476 3269 FPCMS DEP File Number- Massachusetts Department of Environmental Protection T1s Bureau of Resource Protection-W etiands P wwea by oEP WPA Form 5 - order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 d. Appeals The applicant, the owner,any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions. The request must be made dix E: equ Reby certified qor hand uest Departmental Acton Fo the Dee Transmittalth the Formaaz provided o 'iing fee and a completed App 310 CMR 10.03(7)within ten business days from the date of issuance of this Order.A copy the to shall al.the same time be sent by certified mail or hand delivery to the Conservation Commission andnd the applicant.if he/she is not the appellant. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Omer does net contribute to andel is ian of the lthw with trestshe wetlanddentified sn the Massachusetts Wetlands regulations 310 CMR 10.00). Protection Act. the L.c. 139,§40) or To the extent thatat the Order is based on a municipalordinance bylaw �ju sdictionthe Massachusetts Wetlands Protection Act or regulations,the Department D. F:ecording Information This Order of Conditions must be recorded in the Registry c Deeds a the Land Court far the district in which, the land is located,within the chain of tibe of the affected property. In the case of recopied land, he Final Order shall also be noted in the Regis"'s Grantor Index under the name of the owner of the land subject to the Order.In the case of registered land,this Order shall also be noted on the Land Court he Order of oCertificae of Title of n Paget aget7 of Form 5the owner of the land shall be submitted o thelect to Co Conservation on Comm ssiotions.The n lusted below.recording lnformahon ;;stem conservation Qxr sslon pep9 6 N 7 WyA FATS Rev-�� Jul 31 01 09: 32a P- 8 03/20/01 15:14 FA-I .617 476 3269 FPCBS Q008 Massachusetts Department of Environmental Protection DEP File Number. Bureau of Resource Prctectlor, -Wetlands 64.318 WPA Form 5 — Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 D. Recording Information (cont.) Detach on dotted line,have stamped by the Registry of Deeds and submit to the Conservation Commission. To: Saiem Conservation Commisslon Please be advised that the Order of Conditions for the Project at: 17 Fairview Road 64-318 Proles Lorallon DFP File Number Has been recorded at the Registry of Deeds of. County Book Page for. Property Owner and has been noted in the chain of title of the zffected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant w AFa S gm707 1W.Um Jul 31 01 09: 32a p• 9 03/20/01 15:14 FAX 617 476 7269 FPCHS ®009 i I I Salem Conserv4tion Commission SPECIAL CONDIT16S-DEP FILE#64-318 17 Fairview Road, Saleni4 MIA 1. The Conservation Agent will be notified 48 hours prim to commencement of construction activities(978-745- 9595 ext 311). Members and agents of the Salem Conservation Commission(Commission)shall have the right to eater and inspect the promises to evaluate and ensure co®fiance with the conditions and performance standards stated in this Order,the Notice of Intent,the referenced plans,the Ac;and 310 MAR 10.00,and may require any information,measurements,photographs,observation and/or materials or may require the submittal of any data or information deemed necessary by the Commission,agent,or DEP determines that any of the work is not in compliance with this Order of Conditions. Work shall not resume until the Comnssssion is satisfied that the work will comply,and has so notified the applicant in writing. 2. Approval of this application does not constitute compliance with any law or regulation other mbar MGL Cbnpter 131,Section 40,and Wetlands Regulations 310 CMR 10.00. 3. This Order shall apply to any successor in control or succtssor in interest of the property described in the Notice of Intent and accompanying plans. These obligations shall be expressed in covenants in all deeds to succeeding owners or portions of the property. 4. The form provided at the end of this Order sball be completed and stamped at the Registry of Deeds after the expiration of the 10-day appeal period and within 30 days of the issuance if no request for appeal has been filed with the Department of Environmental Protection. This form shall be returned to the Commission wid ri 21 days of recording accordance and prior to commencement of any activities subject to the Order of Conditions. 5. Prim to any work commencing,a sign shall be displayed showing DEP file:64-318,and not placed on a livina tree. 6. The term"Applicant"as used in this Order of Conditions shall refer to the owner,any successor in interest or successor in control of the property referenced in the Notice.of Intent supporting documents and this Order of Conditions. The Commission shall be notified in writing within 30 days of all transfers of title of nay portion of the property that takes place prim to issuance of the Certificate of Compliance. 7. It is the responsibility of the ac plicanr to procure all other applicable federal,state and local permits and approvals associated with this project These pets may include but are not necessarily limited to the following: (1) Section 404 of the Federal Water Pollution Control Act(P.L.92.500,86 stat 816),U.S.Army Corp of Engineers. (2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority of sec. 27(5)of Chapter 21 of the Massachusetts General Laws as codified (3) Flood Plain (4) Grading Ordinance 8. If there are conflicting conditions within this Order,the stricter condition(s)shall rule. 9. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and surface waters during construction or after completion of the project 10. The Commission and its Administrator shall have the discretion to modify the erosion/siltation control methods and boundary during construction if necessary. 11. All work shall be performed in accordance with this Order of Conditions and approved site plans(s). No alteration of wetland resource areas or associated buffer zone,other than that approved in this Order,shall occur on this property without prior approval from the Commission. Jul 31 01 09: 33a P_ 10 63/20/01 ' 15:15 FAX 617 476 3289 FPCXS 010 12. If any changes am made in the ahove-described plan(s)which may or will alter an area subject to protection under the Wetlands Protection Act,or aav changes in activity subject to regulations under G.L. CIL 131,Section' 40,the applicant shall inquire from this Commission in writing,prior to their implementation in the field, whetber the change(s)is significant enough to require the filing of a nese Notice of IatmL Any error in the plans or information submitted by the applicant shall be considered changes and the above procedures shall be followed A copy of such request shall at the same time be sent to the Department of Environ menti Protection. 13. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has bees issued,the applicant or current landowner shall submit to the Commission a signed statement by the buyer that he/she is aware of an outstanding Order of Conditions ori the property and has received a copy of the Order of Conditions. 14. Conditions number NA as indicated shall continue in force beyond the Certificate of Compliance, in perpetuity,and shall be referred to in all fume deeds to this property. PRIOR TO CONSTRUCTION 15. Prim to commencement of any activity on this site,there shall be a PRECONSTRUCTION MEETING between the project supervision;the contractor responsible for the work or its administrator to and phone numbers of all responsible parties shall be registered with the Commission at the pre-construction meeting. 16. Prior to the pre-construction meeting and co®eacement of any activity on this site,sedimentation and erosion control barriers shall be installed as shown an the approval plan(s)and detail drawings. The Concession andlor its Administrator shall inspect and approve such installation at the pre-construction meeting. 17. Prior to the commencement of any activity on this sit=,the applicant or current landowner shall submit to the Commission in writing a construction schcdule/sequenee of work to complete this project. 18. Prior to any work on site,the proposed limits of work shall be cl=arly markad with stakes or flags and shall be confirmed by the Commission or its Administrator. Such markets shall be checked and replaced as necessary and shall be maintained until all construction is conmlete. Work=shall be informed that no use of machinery, storage of machinery or materials,stockpiling of soil or construction activity is to occur beyond this line at anytime. 19. Prior to commencement of construction onsite,the limits of wetland resource areas closest to construction activity shall be flagged with surveyor's tape and shall rpmam in place during construction. The limits of areas to beimpacted and the limits of work in the replication area f s)shall be clearly flagged. 20. There shall be—NA_hay bales and wooden staked stood under cover on the sire to be used only for emergency erosion control. EROSION CONTROL 21. Appropriate erosion control devices shall be in place prior to the beginning of aav phases of construction,and shall be maintained diving construction in the wetland areas and buffer zones. The erosion control specification provided to the Notice of Intent and the erosion control provision in the Order will be the minimum standards for this project;additional measures may be required by the Commission, 22. All debris,fill and excavated material shall be stockpiled a location far enough away from the wetland resource areas to prevent sedim=nr from entering wetland resource areas. 23. Erosion and sedimentation control devices shall be mapected after each storm event and repaired or replaced a9 necessary. Any accumulated silt adjacent to the barriers shall be removed. 24. The areas of construction shall remain in a stable condition at the close of each construction day. P. Jul 31 01. 09: 33a 0a42 Val 15:16 5a[ G17 476 8289 EPCHS X011 25. Any de-watering of trenches or other=="tirms required doting construction shall be conducted so as to ' prevent siltation ofwedandresourcc areas. Ail disebarges from de-watering activities shall be filtered through haybale sedirnimt naps,silt filter bags or other means approved by the Commission or its Administrator. 26. Within thirty days of completion of eoesnuctien on any given portion of the project,all disturbed areas in the completed portion of the site shall he permanently stabilized with tepidly growing vegetative cover,using sufficieat top soil to assure long-trim stabilization of disturbed areas. 27. If soils are to be disturbed for longer than two months,a temporary cover of rye or other gnus should be established to prevent erosion and sedimentation- If the season is nor appropriate for plant growth,exposed surfarrs shall be stabilized by other appropriate erosion control measures,firmly anchored,to prevent soils from being washed by twin or Hooding. DURING CONSTRUCTION 28. A copy of the Order of Conditions, construction plans,and copies of the documents and reports cited in Condition I t 1,shall be on the site upon commencement and during my site work fur contractors to view and adhere to. 29. Erosion and sedimentation ce¢nol devices shall be inspected after each motm event and repaired or replaced as necessary. Any accumulated silt adjaemr to the barriers shall be removed. 30. Only clean fill, free of masonry,stamps,asphalt,and any other mad of waste material shall be used or the site. 31. All waste products,grubbed stamps,slash,connection materials,etc.shall be deposited at least 100 feet from wetland reso ice areas and 200 feet from rivers. 32. All filling or removal of waste material from the site shall be done in accordance with the regulations of the City of saletn Health Department. 33. Cement trucks shall not be washed out in my wetland resource or buffer zone arca Any deposit of cement or cena'eic products into a buffer tune or wetland resource arra shall be removed by band. 34. No fuel,oil,or other pollutants scall be scored in any resource arra or the buffer zone thereto,unless specified in this Order of Conditions. 35. There shallbe no pumping of water from wetland reseorcc areas. 36. During construction,all drainage structures shall be inspecred regularly and cleaned as necessary. 37. The project shall not cause an increase in rtn-off onto adjacent properties,either during construction or when co olcte3 3g. The spplica.m is hereby notified that failure to comply with all requirements herein may result in the issuance of cnforcemeat actions by the Conservation Commission including,but not limited to,civil administrative penalties under M—G.L. Chapter 23A,section 16. POST CONSTRUCTION 39. All dismrbcd areas,slopes and proposed landscape areas shallbe learned and seeded or stabilized danugh the use of erosion control blankets or other approved mrans. All disturbed arras will be graded'loaned'and seeded prior to November I of each year,if possible. No disturbed areas or stockpiled i nuaw will be left uctaetecred or without erosion controls during the winter. p. 12 Jul 31 O1• 09: 34a Q012 6jy2alol 15:17 FAX 1517 476 3269 FKMS 40. Upon completion of construction,the applicant or cuaent landowner shall submit the following to the Commission is request a Certificnta of Cnrnnliaacc: (1) A letter requesting a Certificate including the following information a. Name and address of current hmdowncr; b. Name and address of the iadividual/ttust or other entity to whom the Certificate is to be issued: c. Street address and lot number for the project;and d- DEP file number (2) A letter from a Registered Pro&ssional Engineering or Land Surveyor certifying compliance of the property with this Order of Conditions (3) An•As-Built"plan signed and stamped by a Registered Profdsional Engineer showing post-construction conditions and: a. As-built elevations of all drainage ways constructed within loo feet of troy wetland resource area; b. As-built elcvauons and grades of all filled or altered wedsnd resource areas,buffer zones and replicated areas:and c. Distances to all suucra es within 100 feet of troy wetland resource area. 41- When issued,the Certificate of Compliance must be recorded at the Essex County Registry of Deeds- 42. If the completed work differs from that in the original plans and conditions,the report must specify how the work diffum at which time the applicant shall fast request a modification to the Order. Only upon review and approval by the Commission,may the applicant request in writing a Ccmncate of Compliance as described above. 43. Erosion control devices shall remain in place and properly functioning until all exposed soils have been stabilized with final vegetative cover and the Commission and/or its Administrator bas authorized their removal. ADDITIONAL CONDITIONS 44, A contingency plan shall be implemented in regards to any Rork associated with the use of a huge. Jul 31 01 09: 34a P. 13 COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS DEPARTMENT OF ENVIRONMENTAL PROTECTION Metropolitan Boston - Northeast Regional Office ARGEO PAUL CELLUM BOB DURAND Governor Secretary JANE SWIFT LAUREN LISS Lieutenant Governor Commissioner Mr. Stephen Manning JUN 2001 c/o Bourne Consulting Engineering- 184 ngineering184 West Central Street Franklin, MA 02038 Attn: Mr. Blake Peters RE: Waterways License Application No. W01-0106, License No. 8866 Salem Harbor. Salem, Essex County Dear Mr. Manning: The Department of Environmental Protection has approved the enclosed referenced license authorizing you to perform certain activities pursuant to M.G.L. Chapter 91 and regulations 310 CMR 9.00. Any unauthorized substantial change in use or substantial structural alteration of any structure or fill authorized by this license shall render it void. Pursuant to 310 CMR 9.17(1)(a) and 9.17(2), the Licensee may appeal this decision within twenty-one(21) days of the date of license issuance; by submitting a written request, by certified mail, for an adjudicatory hearing. Any notice of claim for an adjudicatory hearing must include the following information: the DEP Waterways Application File Number: the complete name, address and telephone number of the party filing the request; if represented by counsel, the name, address and telephone number of the attorney; a clear statement that a formal adjudicatory hearing is being requested; and a clear and concise statement of the specific objections to the Department's license decision, and the relief sought through the adjudicatory hearing, including: specifically, the changes desired in the final Waterways License. Docket Clerk Office of Administrative Appeals Department of Environmental Protection One Winter Street, 3[6 Floor Boston, MA 02108. This information is available in alternate format by calling our ADA Coordinator at (617)574-6872. 205a Lowell St. Wilmington, MA 01887 • Phone (978)661-7600• Fax (978)661-7615 • TDD 9 (978)661-7679 �, Vnmad on Rocvdoa PaDar Jul 31 01, 09: 35a p. 14 A copy of the Notice of Claim must be sent authe same time by certified mail or hand delivery to the applicant, the municipal official of the city,or town where the project is located, and the issuing office of the DEP at: James A. Sprague, Section Chief Wetlands and Waterways Program Department of Environmental Protection 205A Lowell Street Wilmington. MA 01387 A) Contents of Hearing Request Under 310 CMR 1.01(6)(b), the Notice of Claim must state clearly and concisely the facts that are the grounds for the request and the relief sought. Additionally, the request must state why the decision is not consistent with applicable laws and regulations. Pursuant to 310 CMR 9.17(3), any Notice of iClaim, for an adjudicatory hearing must include the following information: (a) the DEP Waterways Application FilejNumber; (b) the complete name, address, fax number and telephone number of the applicant; (c) the address of the project; (d) the complete name, address, fax number, and telephone number of the party filing the request and, if represented by counsel, the name, address, fax number, and phone number of the attorney; (e) if clairaing to be a person aggrieved.;the specific facts that demonstrate that the party satisfies the definition of"person aggrieved" found in 310 CMR 9.02; a clear statement that a formal adjudicatory hearing requested; (f) a clear statement of the facts which are the grounds for the proceedings, the specific object,ons to the DEP's written decision. and the relief sought through the adjudicatory hearing, including specifically the changes desired in the final written decision; and (g) a statement that a copy of the request has been sent to: the applicant and the municipal official of the city or town where the project is located. B) Filing Fee and Address A copy of the Notice of Claim along with a DEP Fee Transmittal Form and a valid check payable to the Commonwealth of Massachusetts in the amount of one hundred dollars ($100)must be mailed to: Commonwealth of Massachusetts Department of Environmental Protection Commonwealth Master Lockbox P.O. Box 4062 1 Boston,Massachusetts 02211 I The request will be dismissed if the filing fee is not paid, unless the appellant is exempt or is granted a waiver. The filing fee is not required if the appellant is a city or town (or municipal agency), county, or district of the Commonwealth of Massachusetts, or a municipal housing authority. The Department may waive theladjudicatory hearing filing fee pursuant to 310 CMR 4.06(2) for a person who shows that paying the fee will create an undue financial hardship. A Jul 31 01 09: 3541 p. 15 person seeking a waiver must file an affidavit setting forth the facts believed to support the claim of undue financial hardship together with the hearing request as provided above. Furthermore, this license must be recorded at the referenced County Registry of Deeds with 60 days from the date of license issuance or your license will be revoked. The Registry for your project is: Essex County - Southern District 36 Federal Street Salem, MA 01970 (978) 741-0200 The work or change in use authorized by this license shall not commence until said license and plans are recorded, the Department has received written notification of the date, book and page number of record, or if the Department receives the enclosed Notification Form to this office. Sincerely, aures A. Spr2Lgue Section Chief ���/// Wetlands and Waterways Program cc: DEP/Waterways Regulation Program. Boston Salem Conservation Commission, City Hall, Salem, MA 01970 Salem Harbormaster, Winter Island, Salem. MA 01970 r Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 2 — Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. General Information Important: When filling out From: forms on the Salem computer, use Conservation Commission only the tab key to move To: Applicant Property Owner (if different from applicant): your cursor- do not use the Stephen Manning Same return key. Name Name 17 Fairview Road ad Mailing Address Mailing Address Salem MA 01970 City/Town State Zip Code CitylTown State Zip Code 1. Title and Date of Final Plans and Other Documents: Manning Residence, 17 Fairview Road, Salem, MA, Propsed First March 5, 2003 Floor Plan, Sheet A-1 Final Date(or Revised Date if applicable) Title 2. Date Request Filed: May 29, 2003 B. Determination Pursuant to the authority of M.G.L. c. 131,§40,the Conservation Commission considered your Request for Determination of Applicability,with its supporting documentation,and made the following Determination. Project Description(if applicable): Construction of a 20-foot x18-foot sunroom and a 10-foot x16-foot deck to the existing residence at 17 Fairview Road. Project Location: 17 Fairview Road Salem Street Address CitylTown Map 32 Lot 361 Assessors Map/Plat Number Parcel/Lot Number WPA Forth 2 Page 1 of 1 Rev.02100 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 2 — Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Determination (cont.) The following Determination(s) is/are applicable to the proposed site and/or project relative to the Wetlands Protection Act and regulations: Positive Determination Note: No work within the jurisdiction of the Wetlands Protection Act may proceed until a final Order of Conditions (issued following submittal of a Notice of Intent or Abbreviated Notice of Intent) has been received from the issuing authority (i.e., Conservation Commission or the Department of Environmental Protection). ❑ 1. The area described on the referenced plan(s) is an area subject to protection under the Act. Removing, filling, dredging, or altering of the area requires the filing of a Notice of Intent. ❑ 2a. The boundary delineations of the following resource areas described on the referenced plan(s) are confirmed as accurate. Therefore, the resource area boundaries confirmed in this Determination are binding as to all decisions rendered pursuant to the Wetlands Protection Act and its regulations regarding such boundaries for as long as this Determination is valid. ❑ 2b. The boundaries of resource areas listed below are not confirmed by this Determination, regardless of whether such boundaries are contained on the plans attached to this Determination or to the Request for Determination. ❑ 3. The work described on referenced plan(s)and document(s) is within an area subject to protection under the Act and will remove, fill, dredge, or alter that area. Therefore, said work requires the filing of a Notice of Intent. ❑ 4. The work described on referenced plan(s)and document(s) is within the Buffer Zone and will alter an Area subject to protection under the Act. Therefore, said work requires the filing of a Notice of Intent. ❑ 5. The area and/or work described on referenced plan(s) and document(s) is subject to review and approval by: Name of Municipality Pursuant to the following municipal wetland ordinance or bylaw: Name Ordinance or Bylaw Citation WPA Fo"2 Page 2 of 2 Rev.02/00 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 2 — Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Determination (cont.) ❑ 6. The following area and/or work, if any, is subject to a municipal ordinance or bylaw but not subject to the Massachusetts Wetlands Protection Act: ❑ 7. If a Notice of Intent is filed for the work in the Riverfront Area described on referenced plan(s) and document(s), which includes all or part of the work described in the Request, the applicant must consider the following alternatives. (Refer to the wetland regulations at 10.58(4)c. for more information about the scope of alternatives requirements): ❑ Alternatives limited to the lot on which the project is located. ❑ Alternatives limited to the lot on which the project is located, the subdivided lots, and any adjacent lots formerly or presently owned by the same owner. ❑ Alternatives limited to the original parcel on which the project is located, the subdivided parcels, any adjacent parcels, and any other land which can reasonably be obtained within the municipality. ❑ Alternatives extend to any sites which can reasonably be obtained within the appropriate region of the state. Negative Determination Note: No further action under the Wetlands Protection Act is required by the applicant. However, if the Department is requested to issue a Superseding Determination of Applicability, work may not proceed on this project unless the Department fails to act on such request within 35 days of the date the request is post-marked for certified mail or hand delivered to the Department. Work may then proceed at the owner's risk only upon notice to the Department and to the Conservation Commission. Requirements for requests for Superseding Determinations are listed at the end of this document. ❑ 1. The area described in the Request is not an area subject to protection under the Act or the Buffer Zone. ❑ 2. The work described in the Request is within an area subject to protection under the Act, but will not remove, fill, dredge, or alter that area. Therefore, said work does not require the filing of a Notice of Intent. ® 3. The work described in the Request is within the Buffer Zone, as defined in the regulations, but will not alter an Area subject to protection under the Act. Therefore, said work does not require the filing of a Notice of Intent, subject to the following conditions (if any). 1. All stockpiled material shall be located outside the 100-foot Buffer Zone. 2. Excavation machinery shall be parked outside the 100-foot Bufer Zone at the end of each work day. 3. The Conservation Commission shall be notified 48 hour prior to the commencement of work. ❑ 4. The work described in the Request is not within an Area subject to protection under the Act (including the Buffer Zone). Therefore, said work does not require the filing of a Notice of Intent, unless and until said work alters an Area subject to protection under the Act. WPA Form 2 Page 3 of 3 Rev.02100 �\ Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 2 — Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Determination (cont.) ❑ 5. The area described in the Request is subject to protection under the Act. Since the work described therein meets the requirements for the following exemption, as specified in the Act and the regulations, no Notice of Intent is required: Exempt Activity(site applicable statuatory/regulatory provisions) ❑ 6. The area and/or work described in the Request is not subject to review and approval by: Name of Municipality Pursuant to a municipal wetlands ordinance or bylaw. Name Ordinance or Bylaw Citation C. Authorization This Determination is issued to the applicant and delivered as follows: ❑ by hand delivery on ❑ by certified mail, return receipt requested on Date Date This Determination is valid for three years from the date of issuance (except Determinations for Vegetation Management Plans which are valid for the duration of the Plan). This Determination does not relieve the applicant from complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. This Determination must be signed by a majority of the Conservation Commission.A copy must be sent to the appropriate DEP Regional Office (see Appendix A) and the property owner(if different from the applicant). Signatures: Date WPA Forth 2 Page 4 of 4 Rev.02100 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 2 — Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 D. Appeals The applicant, owner, any person aggrieved by this Determination, any owner of land abutting the land upon which the proposed work is to be done, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate Department of Environmental Protection Regional Office (see Appendix A)to issue a Superseding Determination of Applicability. The request must be made by certified mail or hand delivery to the Department,with the appropriate filing fee and Fee Transmittal Form (see Appendix E: Request for Departmental Action Fee Transmittal Form) as provided in 310 CMR 10.03(7)within ten business days from the date of issuance of this Determination.A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant if he/she is not the appellant. The request shall state clearly and concisely the objections to the Determination which is being appealed. To the extent that the Determination is based on a municipal ordinance or bylaw and not on the Massachusetts Wetlands Protection Act or regulations, the Department of Environmental Protection has no appellate jurisdiction. WPA Form 2 Page 5 of 5 Rev.02/90 ( Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands m WPA Form 2 — Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. General Information Important: When filling out From: forms on the Salem computer, use Conservation Commission only the tab key to move To: Applicant Property Owner(if different from applicant): your cursor- do not use the Stephen Manning Same return key. Name Name Fairview Road Ma � Mailing Address Mailing Address Salem MA 01970 City/Town State Zip Code City(rown State Zip Code 1. Title and Date of Final Plans and Other Documents: Manning Residence, 17 Fairview Road, Salem, MA, Propsed First March 5, 2003 Floor Plan, Sheet A-1 Final Date(or Revised Date if applicable) Title 2. Date Request Filed: May 29 2003 B. Determination Pursuant to the authority of M.G.L. c. 131, §40, the Conservation Commission considered your Request for Determination of Applicability,with its supporting documentation, and made the following Determination. Project Description (if applicable): Construction of a 20-foot x18-foot sunroom and a 10-foot x16-foot deck to the existing residence at 17 Fairview Road. Project Location: 17 Fairview Road Salem Street Address City/Town Map 32 Lot 361 Assessors Map/Plat Number Parcel/Lot Number WPA Form 2 Page 1 of 5 Rev.02100 r 1 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands p a WPA Form 2 — Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Determination (cont.) The following Determination(s) is/are applicable to the proposed site and/or project relative to the Wetlands Protection Act and regulations: Positive Determination Note: No work within the jurisdiction of the Wetlands Protection Act may proceed until a final Order of Conditions(issued following submittal of a Notice of Intent or Abbreviated Notice of Intent) has been received from the issuing authority (i.e.. Conservation Commission or the Department of Environmental Protection). ❑ 1. The area described on the referenced plan(s) is an area subject to protection under the Act. Removing, filling, dredging, or altering of the area requires the filing of a Notice of Intent. ❑ 2a. The boundary delineations of the following resource areas described on the referenced plan(s) are confirmed as accurate. Therefore, the resource area boundaries confirmed in this Determination are binding as to all decisions rendered pursuant to the Wetlands Protection Act and its regulations regarding such boundaries for as long as this Determination is valid. ❑ 2b. The boundaries of resource areas listed below are not confirmed by this Determination, regardless of whether such boundaries are contained on the plans attached to this Determination or to the Request for Determination. ❑ 3. The work described on referenced plan(s)and document(s) is within an area subject to protection under the Act and will remove, fill, dredge, or alter that area. Therefore, said work requires the filing of a Notice of Intent. ❑ 4. The work described on referenced plan(s) and document(s) is within the Buffer Zone and will alter an Area subject to protection under the Act. Therefore, said work requires the filing of a Notice of Intent. ❑ 5. The area and/or work described on referenced plan(s) and document(s) is subject to review and approval by: Name of Municipality Pursuant to the following municipal wetland ordinance or bylaw: Name Ordinance or Bylaw Citation WPA Form 2 Page 2 of 5 Rev.02100 '\ Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 2 — Determination of Applicability �+ Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Determination (cont.) ❑ 6. The following area and/or work, if any, is subject to a municipal ordinance or bylaw but not subject to the Massachusetts Wetlands Protection Act: ❑ 7. If a Notice of Intent is filed for the work in the Riverfront Area described on referenced plan(s) and document(s), which includes all or part of the work described in the Request, the applicant must consider the following alternatives. (Refer to the wetland regulations at 10.58(4)c. for more information about the scope of alternatives requirements): ❑ Alternatives limited to the lot on which the project is located. ❑ Alternatives limited to the lot on which the project is located, the subdivided lots, and any adjacent lots formerly or presently owned by the same owner. ❑ Alternatives limited to the original parcel on which the project is located, the subdivided parcels, any adjacent parcels, and any other land which can reasonably be obtained within the municipality. ❑ Alternatives extend to any sites which can reasonably be obtained within the appropriate region of the state. Negative Determination Note: No further action under the Wetlands Protection Act is required by the applicant. However, if the Department is requested to issue a Superseding Determination of Applicability, work may not proceed on this project unless the Department fails to act on such request within 35 days of the date the request is post-marked for certified mail or hand delivered to the Department. Work may then proceed at the owner's risk only upon notice to the Department and to the Conservation Commission. Requirements for requests for Superseding Determinations are listed at the end of this document. ❑ 1. The area described in the Request is not an area subject to protection under the Act or the Buffer Zone. ❑ 2. The work described in the Request is within an area subject to protection under the Act, but will not remove, fill, dredge, or alter that area. Therefore, said work does not require the filing of a Notice of Intent. ® 3. The work described in the Request is within the Buffer Zone, as defined in the regulations, but will not alter an Area subject to protection under the Act. Therefore, said work does not require the filing of a Notice of Intent, subject to the following conditions (if any). 1. All stockpiled material shall be located outside the 100-foot Buffer Zone. 2. Excavation machinery shall be parked outside the 100-foot Bufer Zone at the end of each work day. 3. The Conservation Commission shall be notified 48 hour prior to the commencement of work ❑ 4. The work described in the Request is not within an Area subject to protection under the Act (including the Buffer Zone). Therefore, said work does not require the filing of a Notice of Intent, unless and until said work alters an Area subject to protection under the Act. WPA Form 2 Rev,02/00 Page 3 of 5 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands WPA Form 2 — Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Determination (cont.) ❑ 5. The area described in the Request is subject to protection under the Act. Since the work described therein meets the requirements for the following exemption, as specified in the Act and the regulations, no Notice of Intent is required: Exempt Activity(site applicable statuatory/regulatory provisions) ❑ 6. The area and/or work described in the Request is not subject to review and approval by: Name of Municipality Pursuant to a municipal wetlands ordinance or bylaw. Name - Ordinance or Bylaw Citation C. Authorization This Determination is issued to the applicant and delivered as follows: ❑ by hand delivery on by certified mail, return receipt requested on `S \C\' 23 Date Date This Determination is valid for three years from the date of issuance(except Determinations for Vegetation Management Plans which are valid for the duration of the Plan). This Determination does not relieve the applicant from complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. This Determination must be signed by a majority of the Conservation Commission. A copy must be sent to the appropriate DEP Regional Office(see Appendix A) and the property owner(if different from the applicant). 0❑Signatures: t / Y Date WPA Farm 2 Rev.02/00 Page 4 of 5 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 2 — Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 D. Appeals The applicant, owner, any person aggrieved by this Determination, any owner of land abutting the land upon which the proposed work is to be done, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate Department of Environmental Protection Regional Office (see Appendix A) to issue a Superseding Determination of Applicability. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and Fee Transmittal Form (see Appendix E: Request for Departmental Action Fee Transmittal Form)as provided in 310 CMR 10.03(7)within ten business days from the date of issuance of this Determination. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant if he/she is not the appellant. The request shall state clearly and concisely the objections to the Determination which is being appealed. To the extent that the Determination is based on a municipal ordinance or bylaw and not on the Massachusetts Wetlands Protection Act or regulations, the Department of Environmental Protection has no appellate jurisdiction. WPA Form 2 Page 5 of 5 Rev.02100 t Ay��p��,�ggg,,,��,, . . . � . . . . . �.,�r . 1�1E ��������� ' a . 11' . . . . ' � : r : i�� st; �4 . � . . ).� ' � ry1���: 1 l J�'I�f�l' ' � � L� �h'.���� � . . ' - ����5'.1:1, �� I ` xM� ,� :�� f P .l: i�L1A�61N1�6f'•BEf��. +MHD OVEfl $Y 7+IE �N" �i ��� � JI�ISJ?�L7L�A dk�jpJ33 7D;�.P. . ��E1NC GRANTED ^� `'. I . ,�:.1 ., EITY OF S/�tEM No\\�� " '���.J� ' � o.ta ../�.7 �j y i <1' 4 . I� � i'� , � � I 1 � � .� .,_ � �� �8 P�opahy Locrtad m rac.tion of/, �, . { Ma HlsMdc Dlstdct? Yas�No_ Building o�ti/tw �. Is P�oparty Locatad In , I ;. IM Coruanetlqn A�w? Yw✓No� BUILDIN(i PERMIT APPLICATION FOR: ' ' Permft to: I, (Circle whichever appy) Roof, Reroof, Install Sfding, C�struct Deck, Sh�d, Pool, RepaidReplace, Other: .��f✓.,�.�, - �✓M����� ' PLEASE FlLL OUT LEOIBLY&COMPLETELY TO AVOID DELAYS IN PROC�B�N�It'� • TO THE INSPECTOR OF BUILDINaS: The undersigned hereby applies for a pertnit to bufld according to the 1o11owin9 specifications: - Owners Name J fGLG .� ✓4��ce /��o�o�•,f . Addreas & Phone . �7 Fa� ���..._ ,�/(•� (�l7Y) 7yS• ���1�' A►Chftect's Name /��+`c� !N� ��rlay. , ndd�ess & �r,or,e �� /�'w.,� ./"l,- l��1. �., s7yi► 63/- .323� MechaMcs Name �J�'�-� � /'4iO`�' '" Address & Phone o?/ E�.-� ��aeL (7J'1') 599-/�!O i+:'i:� �!:. A / � yx•''� YJO'��� ` `� ) � / . . . � { i� � � I O �!i � I WIM�U 11N 0�EUIId � ,tt � M.a�I a ari�np4 �.t,w.� n.dw.11no�lor now meny�emY�..� / j�1�, I WIII bulldlnp coMortn to kxlr �// AibaqoaT /✓v �`, �` 1�(;�I,� ��.. � � 6Wm.taa coet. .2 S'lJov,- Gqy uc«iw r ►J p` staa ucanea« D�/-O.�-o�;., ; /� �/ �'�� � , ! HoY Iapsavuant � L%/L ����� 1 Tdc. 1 O.3 C�4 "— +"�"'� �— Signature of Applicant � �. � SIGNED UNDER THH � � r' � ��� , OF PERJURY �� !�I ili � � DESCRIPTION OF WOAK TO �E DpWE �'IIII � / // {.�; ' / IVV %'- � / IV/ � '/� .. '•:i! �I�� i � ) �f � W/'� a� Iq �'1fJLG '� �� El '� � Ilil�� � � .5,�� /�.�, .4�`�,� �� a i�)q Iil �. .. : �,,;��, � r � �.! .i � • ��riYirilll�II� � ' �i14 .i:. . . . � .I���� ' �I ��. Y � ' �� . . . _ .... �� I ' �� t �` � n / / M r�� ;��I�'��, . � MAIL PERMIT T0�• /''a�... (..�,.f�/�.� ��� u�, � , �,y,�1�`' y " �� E/., /�/..�. 1 �� ; � ���„ � s � ,�,�,'��� u,.a�.-r��e.�7J� �si. D/� � � � �4i��.. , �� 4��� : ( ) n,. i ,. : c.� �,-: . . ' _ _ _;:.. r :. . - > .;� :_"�..i_— , . =; = -- — ._. " :.. �` �\��` 1•� _.. ',' �`;�` ,i, �l � — - �6�� � _ � - : - :: 3 �y �.) , � ' `. , ' i=✓ � . 3 ���V ^V '� V� i ^ ,^ J� u` � � �'r '� 7 '` ' ' . � j� , i: '% � �) � �, �•� : . :r �-�-. ig a i ..� � ,,.. . � `, !", a ,i 11P�LICATION FOR �rj ;'y y ,� n� !� Jfi PERMfI'TO • �. , f? � . • ' -_ /� 4 • -:� r.r `. � /,v. ' � . � l��'�,�c..1 � ''� /• ,n v� ; „ 4 J ,, '� "�6� "' � 3 . . -_ .�-,_.,`� C`/ . ��G."di ��1.f.h��U ' i' kq 1 � � l J "•. . F ' • . ..�J � --�-.,, p ` /�� `r s 2� � .�' ' � � LOl:n1n.^N ct°tGc . '�Qr'� �0", °//�J�''� . : •� .� 1` � i� � r � .J /J - , i:�� ,� r: ` � � , ^/'^/ I.Z�vL�/ � . -,� 4. , v � . . ' : ' �s'� N M I� f.i• a+ � > .�.. � J v f J• � . . � . . , . �' s FfERMITGRANTED� ; . ^ �- � �,; . ;� ,t .: /' ;. . ., . ,• , ,' . .°ij l..�iY"f / D �(r'�:I'. - h � . . � �7 � R .�_ „ . . . f. -•���— � . . � � • f • �. '✓ ✓� J � . ,. r . ✓'� � " . � 1'' A�PFiO `> ' ', � � ! � yi . i � . . �' •l.' � 'S' r, • .. . a Y � t `-> `3� � y �' � �l .. ` � [�� r../- + a. . ` e �:� ;.- i �i �,..y' ' 4 � . .. ♦ • �� INSPECTOR OF� U!L•DINGS '�`_•'. �, i."- %-'� �_� ;"=�" ,; - . � �- ' � �. , �; �.. • � , , �, : - �:.� � �, r ' �:-, s ' ' • '' -� , �.��. �= - . � �-� ` .:.� �.� =-3- -� , 4 -� � � -- -� , � =� . 4 � . , . . . � ' . _ .. ' U� � . .r�� ��%�.�n �... v... � - . . .. . � . . . . . , . . __ . _ ._. ..- ,. .___ . t�e�-es ��.v���Ce.d.a.�s " d.n��. " �,��(�t�c�. ���mo r � . r o c �z � = � N o ir—. _ _ 345 _ . �, '�<�� � � m � — —1'L c 0 o D -' Q �� E� c � � � SALEM HARBOR FL000 o � , D 3 100.0' 346 i � cn � � MLW o co' C� �y � � . o r,"iw � �7 R = 1 �,qWN � � EXISTING S-fONE STEPS - !� C=J J '� Z TO BE REMOVE�—R'��JP� a 348 347 GRANITE � �� S ; � _ _ . _ . � J_ 68.58' STAlRS 30' GANGWAY = � v, t—' , .. _ � �j . ^ . � 2 TIMBER c `� I Z 360 I �' >b �� � ,1 m o � - I � �-�' �' � MOORING PiLES a � LAWM AREA . � o �/' I , � 17 3b1 ,�-R��,r. _ f '� n /� - ' . ` � M �. � 8' x 20' TIMBER FLOAT � V 72.38' j 2+ ARAG �-" :FAIRVIEW _ <, �: __ �i ; L � (n �r° � ; ROAD ,. TIO � ti �EXISTING MORTARED STONE � � m -�, o� ��. ��; �; r jWALL TO BE REPAIRED�U r n �'p ,_`' i : . ,. . . . �, � ' '\ \ ' I �� . I � L A � 54.91 ' �� z��'}�N A�EAI-'r� i e I � ' CiOASTAL BANK c � 1 �� n i � � I� _ (J � z �� AIRVIEt�. . � . �t ' a � g � — I�OAD 109.00' , � U �$i . �s 362 Z � CORNER REPAIR q C�CaU 6 � 3g2 � �ETAIL SEE SH. 2 2 Q ��� � � '��' Q = o � z 'v o MORTARED STONE WALL � Z � � v ,� 0 ~ � �� � o � N � �. �,_:-_ � � Q n D � � � m Z m c�i i d,cSra.�nCsi-- Y�¢Sic�ev��"d (7 � fi��� 4 W X z { , o� �u.� m.l;( � .. . � � � o � il� � �oW� , p � • � � ��� : �` __ •,�_D m N A Z o c`�'i>(z„�� `_ � � lJe.6J Cb�sll� � T �� � o�� ,, � 4� f�Tl D Z p �A�m ^� ,..;�i v 0 -. � �:��y . 1??': -1 .n _ � �'',�� . ,.(.` r.• � Q� - G�� � E . m �DZ D o E�7F #,� . i v � � . O� p r O-t O . z :-�"�_ xr �. ' ''�t �''� W � D o �ZOzI � -/ a \ � '� �i .5 .. �t } .u. '`i.� l'f'e�-fS l c�.v�� �.2c�c�S �.o�e Ct,���,f�c�. ���-a0! � r . o c �z � _ -� � o i�'— . _ _ 345 _ c 47 _y 7J CTI Vf �p C �o �� o D ,-„ + '4 E� ' o c o � � � � SALEM HARBOR FL000 D 3 100.0' 346 ; � cn � w MLW - o co� c� ,� g o r,�`i W m '� R = 1 �qWN � � EXISTING STONE STEPS ' � 348 � 347 Z Z TO BE REMOVED—R��JU � GRA NITE _ ,� , � " � _ 68.58' STAlRS r 30 GANGWAY ' � ��'- "b — — �- �— .r ..� 2—TIMBER c ' o � ��' 'b �J' ^ '' MOORING PfLES x I Z 360 � � LAW�f AREA � �� � � � � � 72.38' � ' j � 17 3&t I ;� �� I � ; ', , 8' x 20' TIMBER FLOAT n � ' � ARAG - � " :FAIRVIEW. � c �r ��—; ; ROAD ' �TIO ' _� �. '�EXISTING tv10RTARED STONE � � rn i��,, �o� � i r IWALL TO BE REPAiRED-�1) F I _ �1 j . � �t � 7� i I I ` � G � � � � &�}.91 ' f� � �� � � �3 I '� I c `LA N A. EA � � C�OASTAL BANK � g Z �, �, �, ��' 2 ?� � v � g � f�OIADIE 6 ]09.00' ' � � �Ir a U �� . �� 362 Z � CORNER REPAIR A � 6 ��� 392 ;�' � DETAIL SEE SH. 2 2 Q v S / MORTARED STONE WALL io .-�,� ? v � � z t� � ` " "' � +�i +�i r� -D+ n � � tn �� � - D �, � ��-°a=�� C� O � o � � � m °z m �rn d.�Sra�Co_-l-reS�c(ev�p_�O (7 � (��8 w m z m � o� 52A.c.�c�.l;( C . � " , . x .� ' � � (/1 t.. ,.. . . o � � .. N � �OW—i �.` � `� � � a`y��� � �'. � �� � �,Q�,,, r*� N %p Z O c/>tzi��� ;� „� .$... f�F�lt� �I.0 L1tUR.LcV� .� II � O�n m r�*t n Z o z���rn - oN 'a : � � . i�: CO m G7 c <O O � p _ f �`,':�� :'�• r: • p�z D p ,{ f 'z�,� ' " . i � Z— �l ; Js , . � . � x� O � p r O--t O . Z - r rt b .� �v? �'g W D� p �zOz7 � ���� . � ���C .c �t � :' •`�.,"' • ' ' .4S$�ESS�RS.• MAP 32, LOT 361 = Z�K�e� RESIDENTIAL ONE FAMILY � � � � BRUCE A. & REF£RENCES.• SALLYJO CODY DEED BOOK 14249, PAGE 6 PAULA M PARKER D Z DEED BOOK 1743�, PAGE 213 (DEP I 0 � DEED BOOK 17121, PAGE 371 LICENSE N0. 8866) DEED BOOK 6140, PAGE 6.82 D PLAN BOOK 20, PLAN 4 PLAN #385 OF 1954 PLAN BOOK 20, PLAN 4 .� 5' "RESERVED" �E'� ' PLAN BOOK 20, PLAN 4 iHIS PLAN IS NOT TO BE CONSIDERED AN ALTA/ACSM LAND TITLE SURVEY, NOR IS IT ' I TO BE USED FOR RETRACEMENT OF � � PROPERTY LINES. ' 68.57' . — — � 113.00 ' + Ens��T cmr oF sa� � `° � PLAN #385 OF 1954— — — _ _ I : +� Z SEWER �7 � r �d m . � - MANHOLE 5 N EXISTING � . '�� � . � A . cv I I� I BREEZEWAY `v ' o�w � TO BE LOTS 'rjA BC 6 ENCLOSED Nw � AREA=15,036tS.F.. I I 1 S T ORY BR ICK & I ow � � WOOD yjj%/ `` O -o / FROPOSED ww � / U� a ING / ELEANOR MARY N �BRco�Y \\\\\\�� \\\\ DWE17 ���j/ DECK }I �o � w CONNOLLY � �ARAG� ` �`` ` �- # �;;r. m� ZZ Q � 42.1' X: \ , o� o \ � DEED BOOK;416Q. . PQG�.. 235 .,,...,.. .. .:. .. , _.. �: �� PROPOSED ..._ .��.���:������ --. . . ., . , �� _ . .,_,. ...�.;.;., Qo._ _, . . ,, . _ . _ PLAN #385 OF 1954 COR. ENTRY �pROPOSED� rn� `�'_ � BRICK I \� 48�t � I ��1 STORY�� �� � (TYP.) ��ADDITION: �a w yy ����������\ 26 t �� I � J J � � ' � � - � I � . � HISTORIC I �� . . Q . . - . _ � � . . MEAN HIGH WATER - — f^ 1, - $4.80. SCALED FROM - =r v i _ . �. {� - _-...PLAN #385 OF 1954 _ z Z . _ __. _,_. ` -- .1 � ap I w o . .. M M . . _ . _ . �a N I 1I � SEE PLAN INnSALEM^SITE PLAN AT: SALEM HARBOR / 109.00' � COUNTY: ESSEX STAiE: MA FAIRVIEW ROAD . I I PREPARED BNGINEERINGCONSULTING ���,�HOFr�� (SEE ALSO DEP IJCENSE # 8866) � JOSEPH � . � . . . � � I KATHLEEN HARRINGTON � _ . . - . � S� N m I DEED BOOK 9408, PAG Na.��» L� PLAN #385 OF 1954 PLOT PLAN CHK. BY \ A �r . �. V Li � � � . . � �\ �°� s�o�°' � o I OF LAND ,(�f,(( v � SALEM, MA � � ;: � � I PREPARED FOR.• STEPHEN MANN/NG 5/2l/04 � ; 1 � Q HANCOCK ! � � � 5/2504 � � I Survey Associates, Inc. SCALE.• f" = 20' . ✓OB PRO S/ .�L L N S YOR � I 185 CENTRE STREET, DANVERS, MA. 01923 NO. VOICE (978) 777-3050, FAX (978) 774-7816 0 10 20 40 112�0 � . . . 1 � F•Itmw a,o,xe,,ez�nzoo�ey� nzoosv.e.y MayY4 ?00} - b70 pm . Tr3- ICI -l3 Ct< 3-7 1 The Commonwealth of Massachusetts r� Board of Building Regulations and Standards CITY OF G ! Massachusetts State Building Code, 780 CMR' SALEM Revised Mar 2011 Building Permit Application To Construct, Repair, Renovate Or Demolish a One-or Two-Fandlp Dwelling This Section For Official Use Only Building Permit Number: Date Applied: JNl Ouilding Official(Print Name) Signature Date SECTION 1:SITE INFORMATION 1.1 Propert Address: 1.2 Assessors Map& Parcel Numbers I.1 a Is this an accepted street?yes_ no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: %oning District Profxised Use [,or Area(sq 11) Frontage(11) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Snpply:(iM.G.L c.d0,§54) 1.7 Flood '/_one Information: 1.8 Sewage Disposal System: Public❑ Private❑ Zone: _ Outside Flood Lone'? Check ifyes❑ Municipal❑ On site disposal system ❑ SECTION2: PROPERTY OWNERSHIP' 2.1�OTwn�er'of Record: y i c._y lllJll.Cr1 _A 104N 9 _ Name(Print) �r City,Slate,ZIP ,e IJf6fl/ oed No. and Street telephone Enmd Address SECTION 3: DESCRIPTION OF PROPOSED WORK'(check all that apply) New Construction ❑ Existing Building❑ Owner-Occupied ❑ 1 Repairs(s) ❑ 1 Alteration(s) ❑ Addition ❑ Demolition ❑ Accessory Bldg. El Number of Units Other ❑ Specify:_ Brief Description of Proposed Work'-:_ y_ �t�/ Jsty —" J SECTION a: ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: Official Use Only Labor and Materials) I. Building $ I. Building Permit Fee: S Indicate how fee is determined: 2. Electrical $ ❑Standard City/town Application Fee U Total Project Cost(Item 6)x multiplier_ x . Plumbing $ 2. Other Fees: $ 4. Mechanical (IIVAC) $ List: 5. Mechanical (Fire - Su i.ression) $ Total All Fees:$__ Check No. _Check Amount: Cash Amount: _ 6. Total Project Cost: $ ❑ Paid in Full ❑Outstanding Balance Due: _ a no GCS k CkKeduukLaA- 4E—mrA-LL-QE:�D slt �,k SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) O '�a�' RA" &aCI1/pA Lieense Number Expiration Date Name of CSL holder List CSL'Type(see below) �V �Q �� �� T Description No.and Street ��— Type ,y ' U Unrestricted(Building,u to 35,000 cu, R.) 644o y 64@ i-I ��D R Restricted l&2 FamilyDwellin- City/Townvn,Stat— M Masonry_ Rooting Covering Window and Siding Wq SF Solid Fuel Burning Appliances 360 CA(YI C&/a/ I ji Insulation 'telephone Email address D Demolition 5.a2 Registered home Improvement Contractor(IIIC) 6 ��IQsa� 4A atAts4 ` ° n''« IiIC Registration Numbr Expiration ate I IIC Company Name m I IIC Re istrant Namc t No.and Street ,5 fV-TSV may, Email address City/Town, State,ZIP 'telephone SECTION 6: WORKERS' COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes .......... No........... ❑ SECTION 7a: OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT 1,as Owner of the subject property,hereby authorize Tt4 tt N r1Q,t„ to act on my behalf, in all matters rel o authorized by this building permit application. S7Fct.f AjCtKK Z�ll tl— Print Owner's Name(Electronic rato ) Date SECTIO : OWNEW OR AUTHORIZED AGENT DECLARATION By entering my name below, I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate ttoo/(�/,I,t�e best of(my knowledge and understanding. Print Owner's or Authorized Agents Name(Elect... is Signature) pale ' NOTES: I. An Owner who obtains a building permit to do his/her own work, or an owner who hires an unregistered contractor (not registered in the Flome Improvement Contractor(HIC)Program), will not have access to the arbitration program or guaranty fund under M.G.L. c. 1 d2A.Other important information on the HIC Program can be found at www.mass.�4ov/oca Information on the Construction Supervisor License can be found at www.mass.uov/dns 2. When substantial work is planned, provide the information below: Total floor area(sq. ft.) (including garage, finished basement/attics,decks or porch) Gross living area(sq. If.)_ Habitable room count Number of fireplaces __ Number of bedrooms Number of bathrooms Number of halr/haths Type of heating system_ Number of decks/porches _ Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted For"'Total Project Cost" Print Page i of 2 Subject: Re: follow-up From: James Currier(bonncoinc1996@yahoo.com) To: smansalem@aol.com; Date: Wednesday, December 31, 1969 7:00 PM Steve, First ,Thank you for the projects. Steve, lets meet one more time Friday or Saturday would be good?Then we can sign the contracts and get deposits fof% both projects to be done ,as I keep writing hopefully I will answer your questions. Question 1 >"Does eliminating 4 downspouts have any price impact?"Please accept no because of the extra work we will need to do when we are up there doing the other work(we will) 1. Install new copper to the two rubber roof triangles @ the bottom the materials install are done improper and that is why the insulation is soft when you walk on it(I will show you when upthere 2.With that said the other rubber roof needs to be reflashed and repaired in many areas as well. Question 2>"Can we still do some work around the roof vents to eliminate the currant leak"?------Yes, If we or you have a chance to eliminate one or ten ,lets do it that's one less you have to worry about, and in conjunction with question 1 when we remove to existing materials(shingles ,tar,wood Etc. that much more needs to be done with the vents now staying except one, So with the removal of all existing shingle around the chimney we will remove the shingles around all vents,remove the one ,patch with wood ,remove all cement around the others and apply proper underlayment and new shingles(color to match as close as possible)...Flash all vents properly step flashed and sealed.The Chimney process is on the contract, Question 3> Can we get there to remove the existing gutters and brackets?Yes , but really not in till permit is confirmed and approved , but I don't see the harm in it by then the Appreciation will be in-waiting. after removing the existing materials we will need some time to order the special order-2-3 weeks then in or around the end of the month ....roughly. So as it stands with both projects to be...Copper gutters and DS....materials and labor...............................$ 19,245.00 Cost for materials and labor.....................Copper Chimney, remove one vent, repair and re-flash all other vents on the right side of the chimney, Install copper to the two rubber roofs and flash with rubber EPDM ,and more repairs the larger rubber roof, check entire roof and repair as needed-- record all events that are done. remove all debris from the grounds properly dispose of..............$3,645.00 >Total cost for both projects being done .........................................................................................................$22,890.00 >One third of the balance due before the start to order materials and permits to be p• led.........................-r 7U3t1ur� >One more third needed after chimney area and upper roof specs are donepsabownerownerand the half rounds gutters are done by 50%............................................ ............... .........$ 7,630.00 > Rest pon comple' ns and satisfaction of the home owners.................... ............. .......... $ 7,630.00 hank you ing/Home OwnerJames L Currier/Owner/President w Rd.Bonn Construction Co.lnc. a 01970 100 Ferncroft Rd Unit 204 Danvers Me 01923 Shop# 978-750-8881 Fax # 978-531-9202 Em.# 978-490-0818 Please sign and return with your payment............Thank you . On Wednesday, July 23,2014 1:39 PM, Steve Manning<smansalem@aol.com>wrote: I will call you as well but here is what I found out about the attic vents. One could be removed.The small one furthest from the chimney. The large one is for the attic fan and it has one bathroom exhaust fans connected to it. https:Hus-mg4.mail.yahoo.com/neo/launch?.rand=dbuosejr3peak 7/23/2014