Loading...
17 CANAL STREET - BOH PROJECT CONDITIONS LETTER CITY OF SALEM, MASSACHUSETTS BOARD OF HEALTH 98 WASHINGTON STREET,3R°FLOOR S ALEm,MA 01970 TEL. (978)741-1800 DOMINICK PANGALLO health salem.com DAVID GRI3ENBAum,RS,CHO MAYOR HEALTH AGENT April 7, 2025 Kirt Reider, Chair Salem Planning Board 98 Washington Street Salem, Massachusetts 01970 Dear Chair Reider: On behalf of the Salem Board of Health I have conducted the Site Plan Review for the proposed project at 17 Canal Street. The Board of Health places the following conditions on this project: 1. The individual presenting the plan to the Board of Health must notify the Health Agent of the name, address, and telephone number of the project (site) manager who will be on site and directly responsible for the construction of the project. 2. If a DEP tracking number is issued for this site under the Massachusetts Contingency Plan, no structure shall be constructed until the Licensed Site Professional responsible for the site meets MA DEP standards for the proposed use. 3. A copy of the Licensed Asbestos Inspector's Report must be sent to the Health Agent. 4. A copy of the Licensed Lead Inspector's Report must be sent to the Health Agent. 5. A copy of the Demolition Notice sent to MA DEP, Form BWPA06, must be sent to the Health Agent. 6. The developer shall adhere to a drainage plan as approved by the City Engineer. 7. The developer shall employ a licensed pesticide applicator to exterminate the area prior to construction, demolition, and/or blasting and shall send a copy of the exterminator's invoice to the Health Agent. 8. The developer shall submit a plan for rodent control and maintain the area free from rodents throughout construction. 9. The developer shall submit to the Health Agent a written plan for dust control,and street sweeping which will occur during demolition and construction.