17 CANAL STREET - BOH PROJECT CONDITIONS LETTER CITY OF SALEM, MASSACHUSETTS
BOARD OF HEALTH
98 WASHINGTON STREET,3R°FLOOR
S ALEm,MA 01970
TEL. (978)741-1800
DOMINICK PANGALLO health salem.com DAVID GRI3ENBAum,RS,CHO
MAYOR HEALTH AGENT
April 7, 2025
Kirt Reider, Chair
Salem Planning Board
98 Washington Street
Salem, Massachusetts 01970
Dear Chair Reider:
On behalf of the Salem Board of Health I have conducted the Site Plan Review for the
proposed project at 17 Canal Street. The Board of Health places the following conditions on
this project:
1. The individual presenting the plan to the Board of Health must notify the Health Agent of
the name, address, and telephone number of the project (site) manager who will be on
site and directly responsible for the construction of the project.
2. If a DEP tracking number is issued for this site under the Massachusetts Contingency
Plan, no structure shall be constructed until the Licensed Site Professional responsible for
the site meets MA DEP standards for the proposed use.
3. A copy of the Licensed Asbestos Inspector's Report must be sent to the Health Agent.
4. A copy of the Licensed Lead Inspector's Report must be sent to the Health Agent.
5. A copy of the Demolition Notice sent to MA DEP, Form BWPA06, must be sent to the
Health Agent.
6. The developer shall adhere to a drainage plan as approved by the City Engineer.
7. The developer shall employ a licensed pesticide applicator to exterminate the area prior to
construction, demolition, and/or blasting and shall send a copy of the exterminator's
invoice to the Health Agent.
8. The developer shall submit a plan for rodent control and maintain the area free from
rodents throughout construction.
9. The developer shall submit to the Health Agent a written plan for dust control,and street
sweeping which will occur during demolition and construction.