Loading...
1 LEE FORT TERRACE - BOH PROJECT CONDITIONS LETTER CITY OF SALEM, MASSACHUSETTS BOARD OF HE iLTH 98 WASHINGTON STREET,3RD FLOOR SALEM,MA 01970 TEL. (978) 741-1800 DOMINICK PANGALLO health<u salem.com DAVID GRILNBAUM,RS,CHO MAYOR HEw_Tl I AGENT December 20, 2023 Patrick Bowler Callahan Inc. 80 First Street Bridgewater, Massachusetts 02324 Dear Mr. Bowler: On behalf of the Salem Board of Health I have conducted the Plan Review for the proposed project at 1 Lee Fort Terrace, the Salem Board of Health places the following conditions on this project: 1. The individual presenting the plan to the Board of Health must notify the Health Agent of the name, address, and telephone number of the project (site) manager who will be on site and directly responsible for the construction of the project. 2. If a DEP tracking number is issued for this site under the Massachusetts Contingency Plan, no structure shall be constructed until the Licensed Site Professional responsible for the site meets MA DEP standards for the proposed use. 3. A copy of the Licensed Asbestos Inspector's Report must be sent to the Health Agent. 4. A copy of the Demolition Notice sent to MA DEP, Form BWPA06, must be sent to the Health Agent. 5. The developer shall adhere to a drainage plan as approved by the City Engineer. 6. The developer shall employ a licensed pesticide applicator to exterminate the area prior to construction, demolition, and/or blasting and shall send a copy of the exterminator's invoice to the Health Agent. 7. The developer shall submit a plan for rodent control and maintain the area free from rodents throughout construction. 8. The developer shall submit to the Health Agent a written plan for dust control and street sweeping which will occur during demolition and construction. 9. The developer shall submit to the Health Agent a written plan for containment and removal of debris, vegetative waste, and unacceptable excavation material generated during demolition and/or construction. 10. In accordance with Board of Health Regulation #7, the developer must ensure that the trash contractor offers mandatory recycling to the development. 11. All trash and recycling areas, including dumpsters, totes, and other refuse containers, used by occupants of the resultant residential or commercial spaces must be contained in enclosures. 12. The Fire Department must approve the plan regarding access for firefighting. 13. Noise levels from the resultant establishment(s) generated by operations, including but not limited to refrigeration and HVAC systems, shall not increase the broadband sound level by more than 10 dB(A) above the ambient levels measured at the property line. 14. The developer shall disclose in writing to the Health Agent the origin of any fill material needed for the project. 15. The drainage system for this project must be reviewed and approved by the Northeast Mosquito Control and Wetlands Management District. 16. The resultant establishment shall dispose of all waste materials resulting from its operation in-an environmentally sound manner as described to the Board of health. 17. The developer shall notify the Health Agent when the project is complete for final inspection and confirmation that the above conditions have been met. If I may be of any assistance to your Board, please feel free to call me. Sincerely your , For the Boar f Health, *irebaum Health Agent Cc: Salem Board of Health