Loading...
73-89 LAFAYETTE STREET - EL CENTRO PROJECTOn behalf of the South River Partnership LLC (a joint venture between the North Shore Community Development Coalition and North Shore Community Health), we are pleased to submit this Draft Environmental Impact Report (“DEIR”) (EEA # 16603) for the proposed El Centro project in Salem, MA. The project seeks to redevelop seven parcels of land adjacent to the South River located at the juncture between two neighborhoods, The Point and Downtown Salem. El Centro will be located at the corner of Lafayette Street and Derby Street, and a portion of Peabody Street, at the west end of the South River (approximate address of 73-89 Lafayette Street and 9 & 15 Peabody Street). El Centro will relocate and expand North Shore Community Health’s Salem Family Health Center and will entail construction activities over approximately 1.45 acres on the banks of the South River. Two new buildings will be constructed, including the redevelopment of 73-89 Lafayette Street into a five-story, approximately 52,400 gross square foot mixed-use health care, urgent care, residential, and commercial building. This building will contain approximately 22,380 square feet of health care uses, the North Shore Bank, and 19 age- and income-restricted residential units. The new construction at 9 Peabody Street will consist of a five-floor, approximately 38,880 gross square foot mixed-use residential and arts building. It will include approximately 700 square feet of gallery space on the ground floor, and 29 age- and income-restricted residential units on the upper floors. There will be a total of 18 parking spaces serving residents and visitors of the site, including 6 covered spaces at 9 Peabody Street and 12 uncovered spaces at 73-89 Lafayette Street. Community-based organizations and tribal organizations are receiving this notification in accordance with the MEPA Public Involvement Protocol for Environmental Justice Populations, which took eƯect on January 1, 2022. More information is available on the MEPA website. The complete DEIR submission can be accessed at the following link: https://www.dropbox.com/scl/fo/37zp394k6lo8hdit8aoi2/h?rlkey=rz740z3ac4q6w9e53c3v8ga77&dl=0 The DEIR will be published in the Environmental Monitor on Friday, March 22, 2024. The MEPA comment period closes on Monday, April 22, 2024. The link to the MEPA comment portal is provided here: Mass.Gov - MEPA Public Comments (state.ma.us). Hard copies of the DEIR submission are available upon request. Please let me know if you have any questions, comments, concerns, or ideas. Thank you. Adam Adam L. Duchesneau, AICP (he/him/his) | Senior Planner Fort Point Associates, Inc. | A Tetra Tech Company 31 State Street, Third Floor | Boston, MA 02109 Direct: 617-357-5789 | OƯice: 617-357-7044 | aduchesneau@fpa-inc.com www.fpa-inc.com