Loading...
71 LORING AVENUE - BIANNUAL THIRD-PARTY LANDFILL INSPECTION 2025 TETRA TECH RECEIVED SEP 15 2025 September 8, 2025 CITY OF SALEM p BOARD OF HEALTH City of Salem-Health Department 98 Washington Street, 31d Floor Salem, MA 01970 Subject: Biannual Third-Party Landfill Inspection Former GTE/Sylvania Landfill 71 Loring Avenue Salem, Massachusetts On behalf of Salem State University, Tetra Tech has conducted a third-party landfill inspection of the closed former GTE/Sylvania Landfill at 71 Loring Avenue in Salem, Massachusetts on 7/24/25. The attached Third- Party Inspection Report and photograph log document the findings of the semi-annual landfill inspection. The attached has been provided to you (hardcopy)and to the parties identified in the distribution list, as noted below. If you have any questions regarding this submittal, please do not hesitate to contact me at 508-834-0365 or david.homan@tetratech.com. Very truly yours, 3):4--ale� ro David Homan Third-Party Inspector SW48-0000215 Enclosures Third-Party Inspection Report Photograph Log c: Salem Health Department(w/encl. - hardcopy) T. Gallagher, Salem State University (w/encl.-electronic) MassDEP—Northeast Regional Office (w/encl. -electronic) Marlborough Technology Park 100 Nickerson Road, Marlborough, MA 01752 Tel 508.786.2200 Fax 508.786.2201 tetratech.com Massachusetts Department of Environmental Protection Important:When completing Bureau of Waste Prevention / Solid Waste M this form on a computer,use� only the Tab key to move your Third-Party Inspection Report—310 CMR 19.018(8) cursor-not the Return key. Operation & Maintenance SLP 1 Z02r� - - Instructions CITY OF SALHEALTH Use this form to record and report the results of a Third-Party Operation and Maintenance MassDEP Use Only Inspection conducted pursuant to 310 CMR 19.018. Be sure to obtain the most recent version Rec'd Date: of this form. All applicable sections of the submitted form must be completed to be accepted by MassDEP. Pursuant to 310 CMR 19.018(8)(a),the third-party inspector and facility owner/operator must sign FMF#: this Third-Party Inspection Report form and submit the completed report to the appropriate RO#: MassDEP regional office and one copy of each completed report to the board of health of the municipality in which the facility is located. Reviewer. In the event that this inspection report contains a recommendation for corrective action(s),the Comments: owner/operator shall also submit the information required by 310 CMR 19.018(8)(c)2. Forms and instructions are available online: http://www.mass.gov/eea/agencies/massdep/recycl a/approvals/solid-waste-applications-and-forms.html#8 Note: This form does not identify all of the requirements applicable to each solid waste management facility;other requirements and/or policies may apply to the operation, maintenance and monitoring for each facility. I. Facility Information Facility Type(check one): ❑ Transfer Station/Handling Facility ❑ C&D Waste Processor or C&D Waste Transfer Station ❑ Municipal Waste Combustor ❑Active Landfill ®Closed Landfill ❑ Other, Specify Facility: Salem State College Assistance Corp. - - Facility Name Salem MA 01970 City/Town State ZIP Code 978-542-3073 314305 NA Telephone Number Regulated Object Account Number FMF Number Operator: NA Operator Name(Doing Business As/Company Name) Telephone Number Email Address Mailing Address City/Town State ZIP Code Permittee: NA Permittee Name(Entity Identified on Facility Permit) Mailing Address City/Town State ZIP Code Responsible Official for the Facility: Tara Gallagher tallagher@salemstate.edu Responsible Official Name(Individual) Responsible Official Email Address Salem State University 978-542-3073 Responsible Official Company Name Responsible Official Telephone Number Third-Party Inspection Report(0&M)—Rev.12/4/14 Page 1 of 15 Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report-310 CMR 19.018(8)L111 ) Operation&Maintenance II. Third-Party Inspector David Homan _ Tetra Tech Third-Parry Inspector Name Company Name SW48-0000215 10/18/2026 MassDEP Third-Party Inspector Identification Number MassDEP Third-Party Inspector Expiration Date(MM/DD/YYYY) 508-834-0365 david.homan@tetratech.com Telephone Number Email Address 100 Nickerson Road Mailing Address Marlborough MA 01752 City/Town State ZIP Code Construction and Demolition Waste(C&D Waste)Processing Facility or C&D Waste Transfer Station Only: Identify the qualified individual that conducted the observation of incoming waste loads and collection of samples of suspect asbestos- containing materials during the inspection [pursuant to 310 CMR 19.018(6)(f)]. If the entire inspection was conducted by the third-party inspector listed above,then check the box and enter only the Asbestos Inspector Certification Number. ❑ Same as above. Provide Asbestos Certification Number► MA Dept.of Labor Standards Asbestos Inspector Certification Number Asbestos Inspector Name Company Name Telephone Number Email Address Mailing Address City/Town State ZIP Code III. Inspection Details A. FREQUENCY Indicate the scheduled inspection frequency for this facility as required by 310 CMR 19.018(6)(b),or a more frequent schedule set forth in the Facility Permit/Other Approval: ❑ Bi-Monthly ❑ Quarterly ® Semi-Annual ❑ Annual ❑ Biennial ❑ Other(include permitlapproval type and date of issuance): B. DATE,TIME&PERSONNEL Inspection Date(MM/DD/YYYY): 07/24/2025 Inspection Start Time: 9:00 ®AM ❑ PM Facility Representatives in Attendance During Inspection: None C. CONDITIONS Air Temperature: Approximately 80 degrees F. Wind Direction (direction from which the wind is blowing): Weather: ❑ Clear ® Partly Cloudy ❑ Cloudy ❑NW ❑N ❑NE ❑ Dry ❑ Rain ❑ Snow ®W Wind ❑E Wind Speed: ❑ Calm ® Breeze ❑ Moderate ❑ Strong ❑SW ❑S ❑SE Third-Party Inspection Report(O&M) Page 2 of 15 Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Third-Part Inspection Report—310 CMR 19.018 8 Y P P � ) Operation &Maintenance IV. Pre-Inspection Preparation A. FACILITY-SPECIFIC O&M REQUIREMENTS During each third-party inspection,the third-party inspector shall examine and evaluate the facility's solid waste activities,equipment, operations, practices, procedures,and records relevant to the type of third-party inspection being conducted in order to determine the facility's compliance with all applicable requirements as set forth in 310 CMR 19.018(6)(a)l. Therefore, pursuant to 310 CMR 19.018(6)(a)l,prior to conducting a third-party facility operation and maintenance inspection,the third-party inspector shall,without limitation,complete all of the following: ® Review and become familiar with the regulations set forth at 310 CMR 19.000—Massachusetts Solid Waste Regulations. ® Identify, review and become familiar with all solid waste permits, plans, approvals, and orders(or other enforcement documents issued to the facility by the Department), and the solid waste requirements applicable to the operation and maintenance of the facility. Relevant requirements may include, without limitation,specific practices and procedures for the operation, maintenance and monitoring of the facility,waste acceptance/storage limits,and other requirements related to the facility's solid waste activities. Without limitation,these facility-specific requirements may be contained in the Facility Permit,Authorization to Construct, Authorization to Operate, Operation and Maintenance Plan, Closure/Post-Closure Plans and Approvals, Facility Modification Approvals, Beneficial Use Determinations,Administrative Consent Orders,and other determinations,authorizations or enforcement actions issued by the Department. I, <enter name of the registered third-party inspector completing this report>,have identified, reviewed and No. DH understand all of the aforementioned requirements that are applicable to this facility and the following are Inspector Initials my observations and recommendations related to the facility-specific requirements. B. SOLID WASTE PERMITS, PLANS,APPROVALS&ORDERS List all relevant solid waste permits, plans,approvals, orders or other enforcement actions issued to the facility by the Department that contain specific practices, procedures and other requirements still in effect for the operation, maintenance and monitoring or closure/post-closure of the facility. Where applicable, provide the plan or issue date for each item. For enforcement actions, include the document number, effective date, and status of implementation by the facility. Discussion: None Third-Party Inspection Report(O&M) Page 3 of 15 Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report-310 CMR 19.018(8)!1 ) Operation &Maintenance V. Performance Standards Examine and evaluate the facility's solid waste activities,equipment,operations, practices,procedures and records relevant to the type of solid waste facility. Using the tables below, identify all areas evaluated by the inspector during the inspection by checking the box in the first column. Describe all deviations noted during the inspection in the third column. Provide recommendations for corrective action to return to compliance with the applicable performance standard in the fourth column. Facility Type Performance Standards Transfer Station/Handling Facility Complete Section A. (Including C&D Facility) If C&D Handling/Processing Facility,then also complete Section B. Municipal Waste Combustor Complete Section A. Active Landfill Complete Sections C.and F. If active ash landfill,then also complete Section D. Closed Landfill Complete Sections E.and F. A. TRANSFER STATION, HANDLING FACILITY,OR MUNICIPAL WASTE COMBUSTOR(INCLUDING C&D FACILITY) Comments/Observations and Evaluated Performance Standard Deviation(s) Recommended Corrective Action(s) 19.205(1) Storm Water Controls. 19.205(2) Equipment. 19.205(3) Weighing Facilities. 19.207(1) General. Discuss in Section VI. Discuss in Section VI. 19.207(2) Supervision of Operation. 19.207(3) Access to Facilities. 19.207(4) Security. ❑ 19.207(5) Posting of Handling Facility. ❑ 19.207(6) Unloading of Refuse. ❑ 19.207(7) Special Wastes. 19.207(8) Banned/Restricted Wastes. 19.207(9) - Hazardous Waste. ❑ 19.207(10) Household Hazardous Waste and Waste Oil Collections. ❑ 19.207(11) Bulky Waste. El 19.207(12) Liquid Wastes. Third-Party Inspection Report(0&M) Page 4 of 15 LlMassachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report-310 CMR 19.018(8) Operation& Maintenance Comments/Observations and Evaluated Performance Standard Deviation(s) Recommended Corrective Action(s) 19.207(13) Bird Hazards. ❑ 19.207(14) Dust Control. ❑ 19.207(15) Vector Control. 19.207(16) Control of Wind-blown Litter. ❑ 19.207(17) Staffing. ❑ 19.207(18) Employee Facilities. ❑ 19.207(19) Accident Prevention/Safety. ❑ 19.207(20) Fire Protection. ❑ 19.207(21) Recycling Operations. ❑ 19.207(22) Records for Operational and Plan Execution. ❑ 19.207(23) Screening and/or Fencing. ❑ 19.207(24) Open Burning. 19.207(25) El Inspections. ❑ 19.207(26) End-of-Life Mercury-added Products. B. CONSTRUCTION AND DEMOLITION (C&D)WASTE PROCESSING FACILITY OR C&D WASTE TRANSFER STATION Comments/Observations and Evaluated Performance Standard Deviation(s) Recommended Corrective Action(s) ❑ 19.206(1) Enclosed Operations. ❑ 19.206(2) Storage. ❑ 19.206(3) Contact Water. Suspect Asbestos-Containing El Material (ACM) Inspection and Management Protocol. LACample collection of suspect ❑ M from incoming loads. Discuss sample results: No. ❑Attach analytical reports. Third-Party Inspection Report(0&M) Page 5 of 15 LlMassachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report-310 CMR 19.018(8) Operation& Maintenance C. ACTIVE LANDFILL Evaluated Performance Standard Deviation(s) Comments/Observations and Recommended Corrective Action(s) El 19.130(1) General. Discuss in Section VI. Discuss in Section VI. 19.130(2) Operator Supervision. ❑ 19.130(3) Special Wastes. ❑ 19.130(4) Banned/Restricted Wastes. ❑ 19.130(5) Hazardous Waste. ❑ 19.130(6) Bulky Wastes. El 19.130(7) Liquid Wastes. 19.130(8) Solid Waste Handling. ❑ 19.130(9) Bird Hazards. ❑ 19.130(10) Equipment and Shelter. 19.130(11) Staffing. ❑ 19.130(12) Employee Facilities. 19.130(13) Accident Prevention/Safety. 19.130(14) Spreading and Compacting of Solid Waste. 19.130(15) Cover Material. 19.130(16) Vector, Dust and Odor Control. 19.130(17) Litter Control. 19.130(18) Top Slope and Side Slopes. 19.130(19) Storm Water Drainage. ❑ 19.130(20) Erosion Control. 19.130(21) Boundary/Elevation Markers. 19.130(22) Access Roads. 19.130(23) Security. 19.130(24) Posting of the Landfill. Third-Party Inspection Report(0&M) Page 6 of 15 Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Lj Third-Party Inspection Report-310 CMR 19.018(8) N. Operation & Maintenance Evaluated Performance Standard Deviation(s) Comments/Observations and Recommended Corrective Action(s) ❑ 19.130(25) Open Burning. El 19.130(26) Fire Protection and Control. El 19.130(27) Convenience and Recycling Drop-off Areas at Landfills. 19.130(28) Waste Oil Collections at Landfills. ❑ 19.130(29) Household Hazardous Waste Collections at Landfills. 19.130(30) Leachate Collection, Treatment and Disposal. El 19.130(31) Phase Completion of the Landfill. ❑ 19.130(32) Disruption of Landfilled Areas. 19.130(33) Construction of Buildings. ❑ 19.130(34) Records for Operational and Plan Execution. ❑ 19.130(35) Inspections. ❑ 19.130(36) Re-circulation of Leachate. 19.130(37) End-of-Life Mercury-added Products. D. ASH LANDFILL Evaluated Performance Standard Deviation(s) Comments/Observations and Recommended Corrective Action(s) El 19.131(1) Discuss in Section VI. Discuss in Section VI. General. 19.131(2) - Fugitive Emissions. 19.131(3) Ash Moisture Content. 19.131(4) Spreading/Compacting of Ash. 19.131(5) Vehicle Washdown/ Wheelwash/Other Measures. Third-Party Inspection Report(O&M) Page 7 of 15 Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report-310 CMR 19.018(8) Operation &Maintenance E. CLOSED LANDFILL Evaluated Performance Standard Deviation Comments/Observations and Recommended Corrective Action(s) ® 19.016 Post-closure Use. 19.142(1) ® General. Discuss in Section VI. Discuss in Section VI. ® 19.142(2) i Post-closure monitoring period runs Post-closure Period. through Dec 2026. ® 19.142(3) Post-closure Period Waiver. No waiver requested ® 19.142(4) Post-closure Period Extension. Post-closure monitoring period runs through Dec 2026. ® 19.142(5) All post-closure requirements Post-closure Requirements. currently being met. ® 19.142(6) Third-party inspection occur Inspection Requirements. biannually. ® 19.142(7) Additional Measures. ® 19.142(8) Termination of the Post- Post-closure monitoring period runs Closure Period. through Dec 2026. ® 19.143(1) See Note 1 below Applicability. ® 19.143(2) Post-closure use plans previously Submission of Post-closure submitted. Use Plans. ® 19.143(3) Criteria for Approval of Post- Post-closure use plans previously closure Use. I approved. ® 19.143(4) Post-closure Construction. See Note 2 below Note 1: Post-closure use as an athletic field and access ways constructed in 2007 was approved Note 2:The baseball field and associated structures and access ways constructed in 2007 occupythe majority of the landfill area.The gas vents formerly located on the landfill were removed as part of the construction of the baseball field in 2007.Replacement vents were installed during the construction.Monitoring wells P-203U-R&P-203L-R were installed at the Site in January 2009 under the oversight of Woodard and Curran,Inc.to replace monitoring wells P-203U and P-203L which were located within the footprint of the new baseball field and subsequently closed in 2007 as part of the baseball field construction on the closed landfill.The closure of the wells was approved by the MassDEP Third-Party Inspection Report(0&M) Page 8 of 15 Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report-310 CMR 19.018(8) Ll� Operation 8r Maintenance F. ADDITIONAL LANDFILL REQUIREMENTS Evaluated Performance Standard Comments/Observations and Recommended Corrective Action(s) ® 19.132 Environmental Monitoring Requirements. Is the monitoring of surface water,ground water, landfill gas and any other media as determined by the Department, including without limitation,soil and sediment, being conducted on the schedule established in the permit or as otherwise required by the Department? ®YES ❑ NO Are the analytical results of the environmental monitoring submitted to the Department within 60 days after the date of sample collection or as otherwise specified by the Department? (EYES ❑ NO ® 19.133 Maintenance of Environmental Control and Monitoring Systems. Are the facility operations conducted in a manner which protects all environmental control systems as approved in the Operation and Maintenance plan and monitoring systems as approved in the Operation and Maintenance plan or permit? ®YES ❑ NO Is regular maintenance of all landfill environmental control systems performed as approved in the Operation and Maintenance plan or permit? ®YES ❑ NO Has the Department been notified of the existence and extent of damaged or destroyed environmental control systems, monitoring devices,or surface water sampling location markers in accordance with 310 CMR 19.133(1)(c)and/or 19.133(1)(e)? ❑ N/A(if no damage to report) ❑YES ❑ NO Continue to Next Page► Third-Party Inspection Report(OEM) Page 9 of 15 Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report-310 CMR 19.018(8) L10 Operation &Maintenance F. ADDITIONAL LANDFILL REQUIREMENTS—Continued Evaluated Performance Standard Comments/Observations and Recommended Corrective Action(s) ® 19.121(4) No landfill gas recovery operations occur at the Landfill Gas Recovery Operation and Maintenance closed landfill. Requirements. Is condensate generation kept to a minimum and condensate recirculation,if proposed, performed in accordance with the permit? ❑YES ❑ NO Are the sampling and analysis of condensate conducted on the schedule established in the permit or as otherwise required by the Department? [:]YES ❑ NO Are the analytical results of condensate monitoring reported to the Department as established in the permit or as otherwise required by the Department? [:]YES ❑ NO Is an annual report on the operation of the landfill gas recovery facility submitted to the Department as specified in the permit? ❑YES ❑ NO Third-Party Inspection Report(O&M) Page 10 of 15 OL��,l Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report—310 CMR 19.018(8) Operation &Maintenance VI. Inspection Observations A. FACILITY CONDITION AND OPERATIONS Examine and evaluate the facility condition and operations as observed during the inspection, including the following: ® Describe any evidence of the following conditions observed at the time of the inspection: • Unpermitted discharges to air,water, land or other natural resources of the Commonwealth; and • Dust,odors, litter,and/or other nuisance conditions. ® Document and discuss all deviations from any specific requirements for the facility that are not addressed in the previous section (Section V.—Performance Standards), including without limitation,the requirements set forth in the facility's operation and maintenance plan,orders or other enforcement documents, and other solid waste permits,approvals, and authorizations issued to the facility by MassDEP. ❑ List the types and estimated quantities of all waste and materials stored at the facility at the time of the inspection. ® Provide a narrative that describes the overall status of the general condition,operation and performance of the facility as observed at the time of the inspection. *Attach photographs taken during the inspection that depict the general condition and operation of the facility. At a minimum,include photographs,as applicable,of the waste unloading(tipping)area,waste storage areas, recyclable material storage and,for transfer stations,the waste reloading activity. Discussion:The landfill was closed in 1993. No unpermitted discharges or deficiencies to the cap were observed.The cap is in good condition. B. RECORD REVIEW Examine and evaluate the facility's record-keeping. Without limitation,document the status of the facility's compliance with,and any deviations from,the record-keeping required by 310 MCR 19.000;the facility's operation and maintenance plan;orders or other enforcement documents issued to the facility;and other solid waste permits, approvals, determinations and authorizations issued to the facility by the Department, including the following: ❑ Discuss the evaluation of the Facility's"daily log"such as, daily tonnage records. ❑ List and discuss any special incidents that have occurred since the previous inspection such as exceedances of the facility's permitted waste acceptance limits, nature and outcome of complaints reported to the facility operator(including the identity of the complainant, if known), fires,emergencies,or other disruptions to the routine operation of the facility. Discussion:The landfill was closed in 1993 and does not accept any waste. Third-Party Inspection Report(OW) Page 11 of 15 qL1 Massachusetts Department of Environmental Protection Bureau of Waste Prevention 1 Solid Waste Management Third-Party Inspection Report-310 CMR 19.018(8) L� Operation &Maintenance VII. Summary and Recommendations Pursuant to 310 CMR 19.018(6)(a)4.,where a third-party inspector observes that the operation or maintenance of the facility deviates from the aforementioned applicable requirements, he or she shall document all such deviations and recommend corrective actions for the facility to take to return to compliance. A. INSPECTION RESULTS Based on the examinations and evaluations conducted in Sections V.and VI., please summarize the inspection results by checking one of the following determinations: ® No deviations from the applicable performance standards or additional requirements listed at 310 CMR 19.018(6) were identified during this inspection. If no deviations were identified during the inspection,check this box and proceed to Section VII.B. ❑ Deviations from the applicable performance standards or additional requirements listed at 310 CMR 19.018(6)were identified during this inspection and are discussed further in this report. If deviations were identified during the inspection,check this box and ensure that each deviation and the recommended corrective actions are discussed in the applicable section(s)below. B. STATUS OF PREVIOUS RECOMMENDATIONS FOR CORRECTIVE ACTION If a previous inspection report identified deviations with recommendations for corrective action, please describe the action(s)taken since the last inspection to return the facility to compliance with the applicable requirements. I Discussion: NA, no previous corrective actions. C. RECOMMENDATIONS FOR CORRECTIVE ACTION Based on the results of this inspection,please list all deviations noted during the inspection and provide recommendations for corrective action to return to compliance with the applicable requirement. Recommendations: No corrective actions required. D. ADDITIONAL COMMENTS Comments: Vill. Additional Information Checklist Attach the following additional information,as applicable,to complete the inspection report.* ® Attach photographs taken during the inspection that depict the general condition and operation of the facility,as required in Section VI.A. ❑ For C&D Waste facilities only, attach the analytical results,as required in Section V.B. *Note:Pursuant to 310 CMR 19.018(8), MassDEP may request additional information. Continue to Certification Statement on Next Page► IX. Certification —THIRD-PARTY INSPECTOR Third-Party Inspection Report(0&M) Page 12 of 15 ilMassachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report—310 CMR 19.018(8) � Operation & Maintenance "I attest under the pains and penalty of perjury that: r 1. I have personally examined and am familiar with the information Sinnati,rP of Thirri-Party Insnartnr contained in this submittal,including any and all documents accompanying this certification statement; David Homan 2. Based on my inquiry of those persons responsible for obtaining the Print Full Name information,the information contained in this submittal is,to the best of my knowledge,true,accurate and complete; Tetra Tech 3. 1 have been able to conduct the third-party inspection and prepare the Company Name third-party inspection report without being influenced by the facility owner or operator and, (if I am a municipal employee)without being 8/14/2025 influenced by my municipal employer,by any coworker or by any elected or appointed official of the municipality;and Date(MM/DD/YYYY) 4. 1 am aware that there are significant penalties,including,but not limited to,possible administrative and civil penalties for submitting false, inaccurate,or incomplete information and possible fines and imprisonment for knowingly submitting false,inaccurate,or incomplete information." X. Certification— FACILITY OWNERIOPERATOR Does the facility maintain a Financial Assurance Mechanism (FAM)pursuant to 310 CMR 19.051? ❑YES ® NO If yes: . Enter the amount of the current FAM: $ • Enter the date of the last revision of the FAM amount, pursuant to 310 CMR 19.051(6): As a reminder,pursuant to 310 CMR 19.051(6),the estimate of the cost of closure and post-closure maintenance must be revised every year,and every second year shall be submitted to the Department. "I certify under the penalty of law: / ti ,t 1. That I have personally examined and am familiar with the information au� xJ�f14�' submitted in this third-party inspection report,including but not limited to c,,,. t.— f the statements above concerning the financial assurance mechanism in Tara Gallagher place in accordance with any facility permit and 310 CMR 19.051, and Print Full Name all attachments and that,based on my inquiry of those individuals immediately responsible for obtaining the information,I believe that the Sustainability and EH&S Coordinator information is true,accurate and complete. I am aware that there are Title significant penalties both civil and criminal for submitting false information including possible fines and imprisonment. 08/21/2025 2. That,in the event that this inspection report contains a recommendation Date(MM/DD/YYYY) for corrective action(s),I have completed and attached to this report a Corrective Action Plan and Schedule`,pursuant to 310 CMR 19.018(8)(c)2." ► Pursuant to 310 CMR 19.018(8)(c),a copy of each third- party inspection report shall be maintained at the facility in *Note:The owner or operator may elect to correct deviations identified in the Third- accordance with the requirements of 310 CMR 19.000. The Party Inspection Report in a manner that is different than that recommended by the owner and operator shall make third-party inspection reports Third-Party Inspector,so long as the facility is brought back into compliance with available to personnel or authorized representatives of the applicable requirements. Department for review at the facility upon request. Within 30 days of the . Mail this completed form to the MassDEP Regional A list of municipalities and MassDEP Regional inspection date: Office that serves the municipality in which the facility Offices is available online at: is located.(Attention:Solid Waste Management) http://www.mass.gov/eealagencies/massdep/about/ contacts/find-th a-massd ep-re gional-office-for-you r- • Send one copy to the local board of health for the city-or-town.html municipality in which the facility is located. Third-Party Inspection Report(0&M) Page 13 of 15 Massachusetts Department of Environmental Protection Bureau of Waste Prevention I Solid Waste Management Third-Party Inspection Report-310 CMR 19.018(8) Operation&Maintenance GTE Landfill,Salem,MA—Landfill Inspection—Semi-Annual,August 8,2024 Photos,Page 1 of 3 _ E Date: 07124125 15 Picture No. 1 Date: 07124125 Picture No. 2 Comment: Baseball field retaining wall with Comment: Bullpen area monitorinq wells j^ ,V iw Date: 07124125 Picture No. 3 Date: 07124125 Picture No. 4 Comment: Monitoring well triplet east of landfill Comment: Landfill cap with turf athletic field. - Third-Party Inspection Report(0&M) Page 14 of 15 Massachusetts Department of Environmental Protection Bureau of Waste Prevention / Solid Waste Management Third-Party Inspection Report-310 CMR 19.018(8) Operation & Maintenance i ti 'q- f s. Date: 07124125 Picture No. 6 -" Comment: Retaining wall with athletic field above and grassed cap area. Date: 07/24/25 Picture No. 5 Comment: Perimeter oath and retaining wall. t Date: 08/08124 Picture No. 7 Date: 07/24125 Picture No. B Comment: Wetland area southeast of Lincoln Rd. Comment: Gas vent along perimeter of landfill cap. Date: 07124125 Picture No. 9 Date: 07124125 Picture No. 10 Comment: Wetland area northwest of Lincoln Rd. Comment: Grass&asphalt over capped landfill with baseball field retaining wall Third-Parry Inspection Report(OEM) Page 15 of 15