Loading...
SHA Roof Repair Small Project ReviewDecision Small Project Review - SRA-25-5 Address of Project: 292 ESSEX STREET Meeting Date:July 9, 2025 Members Present:Grace Napolitano, Christopher Dunn, Glenn Larose, Christine Madore Members Absent:Dean Rubin Decision:To approve the project pending successful completion of DRB review and pursuant to the DRB Recommendation. Referenced Plans and Documents: - Plan set titled, '292 Essex Street Roof Replacement', prepared by Andrew M. Brockway & Associates, 209 Parker Street, Acton, MA 01720, submitted June 23, 2025. Conditions of Approval: - Validity of Approval: This approval is valid for two years from the date of the meeting. The approval shall no longer be valid if a substantial use and/or construction has not commenced except for good cause within this two-year period. - Consistency with Approved Design/Plans: Should the applicant determine that the project may not be completed as presented and conditioned herein, he/she/they shall return to the SRA to review proposed modifications prior to making any changes in the field. - There are no special conditions for this project. Findings: - The Authority found that the project as proposed and conditioned here in will not have a detrimental impact on the Downtown Renewal Area and is consistent with the design standards and guidelines. The members support the Salem Historical Commission's recommendation to further setback the additional height of the metal fascia to 4-inches from the orginally-proposed 2-inches. Signature of the SRA: By the signature below, I certify that this recommendation accurately reflects the actions of the Salem Redevelopment Authority Board. Tom Daniel, AICP, Executive Director Date Signed: July 25, 2025 SRA-25-5 7/28/25, 3:50 PM about:blank about:blank 1/1 292 Essex Street