SHA Roof Repair Small Project ReviewDecision
Small Project Review - SRA-25-5
Address of Project: 292 ESSEX STREET
Meeting Date:July 9, 2025
Members Present:Grace Napolitano, Christopher Dunn, Glenn Larose, Christine Madore
Members Absent:Dean Rubin
Decision:To approve the project pending successful completion of DRB review and pursuant to the DRB Recommendation.
Referenced Plans and Documents:
- Plan set titled, '292 Essex Street Roof Replacement', prepared by Andrew M. Brockway & Associates, 209 Parker Street, Acton, MA 01720,
submitted June 23, 2025.
Conditions of Approval:
- Validity of Approval: This approval is valid for two years from the date of the meeting. The approval shall no longer be valid if a substantial use
and/or construction has not commenced except for good cause within this two-year period.
- Consistency with Approved Design/Plans: Should the applicant determine that the project may not be completed as presented and conditioned
herein, he/she/they shall return to the SRA to review proposed modifications prior to making any changes in the field.
- There are no special conditions for this project.
Findings:
-
The Authority found that the project as proposed and conditioned here in will not have a detrimental impact on the Downtown Renewal Area and is
consistent with the design standards and guidelines.
The members support the Salem Historical Commission's recommendation to further setback the additional height of the metal fascia to 4-inches
from the orginally-proposed 2-inches.
Signature of the SRA: By the signature below, I certify that this recommendation accurately reflects the actions of the Salem Redevelopment
Authority Board.
Tom Daniel, AICP, Executive Director Date Signed: July 25, 2025
SRA-25-5
7/28/25, 3:50 PM about:blank
about:blank 1/1
292 Essex Street