Loading...
57 HIGHLAND AVENUE - PROPERTY CARD (3)r . GATE OF PERMIT PESRMIT NO. OWNER LOCATION - Oct 141,1959 1342 I North Shore Babies & Childrenfs �iospital 57 Highland Ave. ' II 1 DWELLING MATERIAL DIMENSIONS. NO.OFSTORIES NO.OFFAMILIES WARD BUIfDER' 'r,COST % N 3 I Columbia` ConsCo. 912,000. OTHER BLDGS. MATERIAL I DIMENSIONS NO.OF STORIES BUILDER POCKET FOLDER Con 4 s spital II I PLAN I NO.SHEETS 1965 #319 New elevator, plaster shaft ,new cooling tower 7 .11 .69 ##220 Locate trailer for office 7.23.70 #263 Temporary facilities for Young Adult Health Center $19,000 10/1/74 #270 Relocate nursing station;provide room for storage and patiae rooms and upgrade 3rd floor.#Rxa8rm $ 65,000. 02.5/7_i6.' #234 Remodel: Nurse's station,treatment room and linen storage areas will be affected,for better utilization purposes. 85,000. 3 7/30/76 #304 Transform pad 9/14/76 #387 Increase lighting and ventilation in existing conference room 9/14/76 #388 Remodel for better space,xnai ftakiE ¢ utilization in Admitting office replace worn out finishes. 7/8/77 ' #280 Remodel section of ground floor,lay. and offices,misc.- mill work of 1st flr 3/20/78 #56 Alterations to ground floor laboratory;remove non-bearing walls,install partitions and laboratory casework. (OVER) 7/13/78 #288 Alteration & to 4th floor-Phase I---Remove partitions and replace with new partition. l / 12/22/78 #544 Relocation of 4th floor - $84,000.00 7/12/79 #274 4th fl.-Convert to office & waiting rm.-2nd fl playroom g convert 2 bedrooms to..playroom & 2 bedrooms to 4 bedroom unit Ground floor - convert storage to therapy room. 3/26/80 #90 2nd floor-new residence ,quarters - 4th floor -new diagnostic evaluation center. 3/12/81 #81 Remodel existing (2) suite offices into (2) offices & (2) secretarial offices. 6/8/81 #222 Alterations - and new front entrance. 4/25/84 #166 Renovate some of 2nd and 3rd floors 7/17/84 #345 Alterations to 4th floor ventilation system 4/23/85 #223 Erect Sign 4/23/85 #224 Erect Sign BOARD OF APPEAL: 4/24/85 - GRANTED - SpecialPermit to construct an addition. 7/31/85--#512--work to include dry wall partitions, ceiling, new flooring, plumbing, hvac. , and electrical work (RADIOLOGY ADDITION)