Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
17 ECLIPSE LANE New Development - BUILDING PERMIT
UPC 10330 No. 153L HASTINGS. MN POO"' b ort � j � ooh �n ^V r `v-vva � J Z) - J ?112� -V O C) }� � - b f oo � � SOB SITE COPY � CITY OF SALEM BUILDING SALEM, MASSACHUSETTS 01970 PERMIT ' DATE APRIL 28 19 99 PERMITNO. 253-1999 APPLICANT FAFARD DEV CORP. -ADDRESS290 ELIOT STREET 1562 (NO) (STREET) (CONTR'S LICENSE) CITY ASHLAND STATE MA ZIPCODE 01721 TEL.NO. 508-881-1600 PERMITTO NEW BUILDING I-) STORY TWO OR MORE FAMILY DWELLLING UNITS 4 (TYPE OF IMPROVEMENT) NO. (PROPOSED USE) AT(LOCATION) 10017 ECLIPSE LANE DIISTIRCT R„ (NO) (STREET) BETWEEN AND (CROSS STREET) (CROSS STREET) LOT SUBDIVISION MAP 07 LOT 0081 BLOCK 910 SIZE 15. 79 ACRES BUILDING IS TO BE FT.WIDE BY FT.LONG BV FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS: BUILD 4 UNIT CONDOIMIN{?IrUM �AS �PER (PyLAN(S(.� BLDG 178, UNIT B, COACH STYLE. 2Cg C AREA OR all �Ul L ill, L ./ �LLII y PERMIT �� _ 2 VOLUME ESTIMATEDCOST� 85. 862 FEE $ 555. 5 (CUBICISOUARE FEET) OWNER FAFARD R.E. D. C. BUILDING DEPT. ADDRESS 290 ELIOT STREET BY THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLEY OR SIDEWALK OR ANY PART THEREOF,EITHER TEMPORARILY OR PERMANENTLY,ENCROACHMENTS ► ON PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE.MUST BE APPROVED BY THE JURISDICTION.STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL INSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE REQUIRED FOR ALL CONSTRUCTION WORK: POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR I.FOUNDATIONS OR FOOTINGS. ELECTRICAL,PLUMBING AND 2,PRIOR TO COVERING STRUCTURAL CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL MECHANICAL INSTALLATIONS. MEMBERS(READY TO LATH). NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. 3.FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS 1 1 1 2 2 2 BOARD OF HEALTH GAS INSPECTION APPROVALS FIRE DEPT.INSPECTING APPROVALS 1 1 OTHER CITY ENGINEER 2 - 2 WORK SHALL NOT PROCEED UNTIL THE PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD INSPECTOR HAS APPROVED THE VARIOUS NOT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE STAGES OF CONSTRUCTION. AS NOTED ABOVE. OR WRITTEN NOTIFICATION. JOB SITE COPY Nu ,� � CITY OF SALEM BUILDING "•, fro SALEM, MASSACHUSETTS 01970 PERMIT �s DATE APRIL 28 19 99 PERMIT NO. 254-1999 APPLICANT FAFARD DEV CORP. ADDRESS 290 ELIOT STREET 1565 (NO.) (STREET, (CONTR'S LICENSEI CITY ASHLAND STATE MA ZIPCODE 01721 TEL.NO. 508-881-1600 PERMIT TO NEW BUILDINGEROF ( ) STORY TWO OR MORE FAMILY DWELLING UNITS 4 (TYPE OF IMPROVEMENT) N0. (PROPOSED USE) ZONING AT(LOCATION) 00E3 ECLIPSE LANE DISTRICT R3 (NO.) (STREET) BETWEEN AND (CROSS STREET( (CROSS STREET) SUBDIVISION MAP 07 LOT 0081 BLOCK 903 SIE 15. 79 ACRES BUILDING IS TO BE FT.WIDE BY FT.LONG BV FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS: BUILD 4 UNIT CONDOMINIUM AS PER PLANS. BLDG 178, UNIT C, GALLERIA STYLE GGi for t' a31t A�c cc AREA OR J PERMIT _ VOLUME ESTIMATED COST$ 85, 262 FEE $ 555. 25 (CUBICISOUARE FEET) OWNER FAFARD R.E. D. C. BUILDING DEPT. ADDRESS 290 ELIOT STREET BY THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET.ALLEY OR SIDEWALK OR ANY PART THEREOF.EITHER TEMPORARILY OR PERMANENTLY,ENCROACHMENTS ► ON PUBLIC PROPERTY.NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION,STREET OR ALLEY GRADES AS W ELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAYBE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL INSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE REQUIRED FOR ALL CONSTRUCTION WORK: POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR 1.FOUNDATIONS OR FOOTINGS. ELECTRICAL.PLUMBING AND 2.PRIOR TO COVERING STRUCTURAL CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL MECHANICAL INSTALLATIONS. MEMBERS(READY TO LATH). NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. 3.FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS I I 1 2 2 2 BOARD OF HEALTH GAS INSPECTION APPROVALS FIRE DEPT.INSPECTING APPROVALS 1 1 OTHER CITY ENGINEER 2 2 I WORK SHALL NOT PROCEED UNTIL THE PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD INSPECTOR HAS APPROVED THE VARIOUS NOT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE STAGES OF CONSTRUCTION. q$NQTED ABOVE: OR WRITTEN NOTIFICATION. JOB SITE COPY °'T� � BUILDING CITY OF SALEM it 4. SALEM, MASSACHUSETTS 01970 PERMIT ' 9e�TMME�� DATE APRIL 28 19 99 PERMIT NO. M'55-1999 APPLICANT FAFAP.D DEV CORP. -ADDRESS290 ELIOT STREET 1562 (NO.) (STREET) (CONTRS LICENSE) CITY ASHLAND STATE MA ZIPCODE 11721 TEL.NO. 508-881-1600 PERMITTO NEW BUILDING NU DWELLING TWO OR MORE FAMILY NUELLIN4 MBEG UNITS (TYPEOF IMPROVEMENT) N0. (PROPOSED USE) AT(LOCATION) 0021 ECLIPSE LANE ZONING DISTRICT T3 (N0.) (STREET) BETWEEN AND (CROSS STREET) (CROSS STREET) LOT SUBDIVISION MAP 07 LOT 0081 BLOCK 912 SIZE 15. 79 ACRES BUILDING IS TO BE FT.WIDE BV FT.LONG BV FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS: BUILD 4 UNIT CONDOMINIUM AS PER PLANS. BLDG 178, UNIT D. GALLERIA STYLE. AREA OR C-411 101 3 'vi ( ), ' J'✓� . cc PERMIT VOLUME ESTIMATED COST.p 8v, 86c FEE ,QQ� p 555. 1-5 (CUBIGSOUARE FEET) OWNER FAFARD R E D C BUILDING DEPT. ADDRESS 290 ELIOT STREET BY THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLEY OR SIDEWALK OR ANY PART THEREOF,EITHER TEMPORARILY OR PERMANENTLY,ENCROACHMENTS ON PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION,STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL INSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE REQUIRED FOR ALL CONSTRUCTION WORK: POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR 1.FOUNDATIONS OR FOOTINGS. ELECTRICAL.PLUMBING AND 2.PRIOR TO COVERING STRUCTURAL CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL MECHANICAL INSTALLATIONS. MEMBERS(READY TO LATH). NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. 3.FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS 1 1 1 2 2 2 BOARD OF HEALTH GAS INSPECTION APPROVALS FIRE DEPT.INSPECTING APPROVALS 1 1 OTHER CITY ENGINEER 2 2 WORK SHALL NOT PROCEED UNTIL THE PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD INSPECTOR HAS APPROVED THE VARIOUS NOT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE STAGES OF CONSTRUCTION. AS NOTED ABOVE, OR WRITTEN NOTIFICATION. JOB SITE COPY oil BUILDING aT CITY OF SALEM "•, . tea. SALEM, MASSACHUSETTS 01970 PERMIT' 9eC/MINED DATE APRIL 27 19 99 PERMIT NO. 32-1999 APPLICANT FAFARD DEV CORP. ADDRESS 290 ELIOT STREET 1562 (N0.) (STREET) (CONTE S LICENSE) CITY ASHLAND STATE MA ZIPCODE 01721 TEL.No. 508-881-1600 NUMBER OF PERMIT TO NEW BUILDING sroav TWO OR MORE FAMILY DWELLING UNITS 4 (TYPE OF IMPROVEMENT) NO. (PROPOSED USEI ZONING AT(LOCATION) 0011 ECLIPSE LANE DISTRICT R3 INO) (STREET) BETWEEN AND (CROSS STREET) (CROSS STREET) LOT SUBDIVISION MAP 07 LOT 0081 BLOCK 908 SIZE—15. 79 ACRES BUILDING IS TO BE FT.WIDE BV FT.LONG BV FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS: BUILD 4 UNIT CONDOMINIUM AS PER PL{fANS. BLDG 179, UNIT A, ULTRA COACH, 1 1- AREAOR +J C+I. IUI i3\,i °31 vV-```3"l PERMIT VOLUME ESTIMATEDCOST$ 90, 450 FEE $ 589. 25 (CUBICISOUARE FEET) OWNER FAFARD R E D C BUILDING DEPT. ADDRESS 90 ELIOT STREET BY THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLEY OR SIDEWALK OR ANY PART THEREOF,EITHER TEMPORARILY OR PERMANENTLY,ENCROACHMENTS ON PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE.MUST BE APPROVED BY THE JURISDICTION,STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL INSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE REQUIRED FOR ALL CONSTRUCTION WORK: POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR L FOUNDATIONS OR FOOTINGS. ELECTRICAL.PLUMBING AND 2.PRIOR TO COVERING STRUCTURAL CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL MECHANICAL INSTALLATIONS. MEMBERS(READY TO LATH). NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. 3.FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS I I t 2 2 2 BOARD OF HEALTH GAS INSPECTION APPROVALS FIRE DEPT.INSPECTING APPROVALS t t OTHER CITY ENGINEER 2 2 WORK SHALL NOT PROCEED UNTIL THEPERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD INSPECTOR HAS APPROVED THE VARIOUS NOT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE STAGES OF CONSTRUCTION. AS NOTED ABOVE. OR WRITTEN NOTIFICATION. JOB SITE COPY `° � � BUILDING CITY OF SALEM SALEM, MASSACHUSETTS 01970 PERMIT' 7 �s 9gQ�rnHeo°� DATE APRIL 57 19 99 PERMIT NO. 233-1999 APPLICANT FAFARD DEV CORP. ADDRESS 290 ELIOT STREET 1565 (NO.) (STREET) (CONTR'S LICENSE) CITY ASHLAND STATE MA ZIPCODE 01721 TEL.NO 508-BBI-1600 MBER OF PERMITTO NEW BUILDING NUELLING (TYPE OF IMPROVEMENT) ( N0. ) STORV TWO ❑R MORE USE) MILY DWELLING UNITS 4 AT(LOCATION) 0009 ECLIPSE LANE DISTRICT RS (NO.) (STREET) BETWEEN AND (CROSS STREET) (CROSS STREET) SUBDIVISION MAF, 07 LOT 0081 BLOCK 907 SIZE 15. 79 ACRES BUILDING IS TO BE FT.WIDE BY FT.LONG BY FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS: BUILD 4 UNIT CONDOMINIUM AS PER PLANS. BLDG 179, UNIT B, ULTRA COACH. 'S AREAOR o � ;''il � V PERMIT Call � C j 9Q. 45ZQ SB9. cJTVOLUME ESTIMADCOS (CUBICISOUARE FEET) OWNER FAFARD P.. E. D. C. BUILDING DEPT. ADDRESS 590 ELIDT STREET BY lop. THISPERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET.ALLEY OR SIDEWALK OR ANY PART THEREOF.EITHER TEMPORARILY OR PERMANENTLY.ENCROACHMENTS ON PUBLIC PROPERTY.NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION,STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENTOF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL INSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT I WHERE APPLICABLE SEPARATE REQUIRED FOR ALL CONSTRUCTION WORK: POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR t.FOUNDATIONS OR FOOTINGS. ELECTRICAL.PLUMBING AND 2.PRIOR TO COVERING STRUCTURAL CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL MECHANICAL INSTALLATIONS. MEMBERS(READY TO LATH). NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. 3.FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS I 1 1 2 2 2 BOARD OF HEALTH GAS INSPECTION APPROVALS FIRE DEPT.INSPECTING APPROVALS 1 t OTHER CITY ENGINEER 2 2 WORK SHALL NOT PROCEED UNTIL THEPERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD INSPECTOR HAS APPROVED THE VARIOUS NOT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE STAGES OF CONSTRUCTION. AS NOTED ABOVE. OR WRITTEN NOTIFICATION. JOB SITE COPY BUILDING - > % CITY OF SALEM too. SALEM, MASSACHUSETTS 01970 PERMIT' DATE APRIL 27 19 99 PERMITNO_ 8+4-1999 APPLICANT FAFARD DEV CORP. ADDRESS 890 ELIOT STREET 1562 (NO.) (STREET) (CONTR'3 LICENSE) CITY ASHLAND STATE MA ZIPCODE 01721 TEL.No 508-881-1600 PERMIT TO NEW BUILDING NU4 sroav Tb10 OR MORE FAMILY DWEELLINGLLING UNITS (TYPE OF IMPROVEMENT) NO. (PROPOSED USE) ZONING AT(LOCATION) 0015 ECLIPSE LANE DISTRICT RG (NO.) (STREET) BETWEEN AND (CROSS STREET) (CROSS STREET) SUBDIVISION MAP 07 LOT 0081 BLOCK 906 SIZE 15. 79 ACRES BUILDING IS TO BE FT.WIDE BV FT.LONG BV FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS: BUILD 4 UNIT CONDOMINIUM AS PER PLANS. BLDG 179, 1UNIT C. ULTRA COACH-. 3f j l � S�yM',L In n^^ AREA OR -' c i: 'i t i r,J 7� 1 ' �� PERMIT VOLUME ESTIMATED COST'$' I 90. 450 FEE $589. 25 (CUBICISOUARE FEET) OWNER FAFARTI F D C BUILDING DEPT. ADDRESS qO FI TOT STREET BY THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLEY OR SIDEWALK OR ANY PART THEREOF.EITHER TEMPORARILY OR PERMANENTLY.ENCROACHMENTS 110. ON PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION,STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL INSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE REQUIRED FOR ALL CONSTRUCTION WORK: POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR 1.FOUNDATIONS OR FOOTINGS. ELECTRICAL.PLUMBING AND 2.PRIOR TO COVERING STRUCTURAL CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL MECHANICAL INSTALLATIONS. MEMBERS(READY TO LATH). NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. 7.FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS I 1 1 2 2 2 BOARD OF HEALTH GAS INSPECTION APPROVALS FIRE DEPT.INSPECTING APPROVALS 1 1 OTHER CITY ENGINEER 2 2 WORK SHALL NOT PROCEED UNTIL THE [PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD INSPECTOR HAS APPROVED THE VARIOUS OT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE STAGES OF CONSTRUCTION. S NOTED ABOVE. OR WRITTEN NOTIFICATION. SOB SITE COPY BUILDING � CITY OF SALEM '�fjS�a SALEM, MASSACHUSETTS 01970 PERMIT 9BcryrNt;oo�� DATE APRIL 27 19 99 PERMIT NO. 235-1999 APPLICANT FAFARD DEV CORP. ADDRESS 290 ELIOT STREET 1562 (N0.) (STREET) (CONTR'S LICENSE) CITY ASHLAND STATE MA ZIPCODE 01 721 TEL.NO. 508-881-1600 PERMITTO NEW BUILDING0. TWO OR MORE FAMILY NUMBEROF 4 (TYPE OF IMPROVEMENT) ( N ) STORY (PROPOSED USE) DWELLING UNITS AT N) 0013 ECLIPSE LANE DISTRICT R'-' (NO) (STREET) BETWEEN AND (CROSS STREET) (CROSS STREET) LOT SUBDIVISION MAG' 07 LOT 0081 BLOCK 905 SIZE 15. 79 ACRES BUILDING IS TO BE FT.WIDE BV FT.LONG BY FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS, BUILD 4 UNIT CONDOMINIUM AS PER PLANS. BLDG 179, UNIT D, ULTRA COACH, 4 C11 ]^3�+ F/�VV_ ��11 orrrf'''����'t 3 11 � V1V17 l� �o /V'JL' ;JjJ AREA OR $ 9l+ 450 PERMIT 589. 2-5 VOLUME ESTIMATED COST FEE (CUBIC/SQUARE FEET) OWNER FAFARD R.E. D. C. BUILDING DEPT. ADDRESS 290 ELIOT STREET BY THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET.ALLEY OR SIDEWALK OR ANY PART THEREOF.EITHER TEMPORARILY OR PERMANENTLY.ENCROACHMENTS ON PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION,STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL INSPECTIONS APPROVEDPLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE REQUIRED FOR ALL CONSTRUCTION WORK: POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR 1.FOUNDATIONS OR FOOTINGS. ELECTRICAL.PLUMBING AND 2,PRIOR TO COVERING STRUCTURAL CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL MECHANICAL INSTALLATIONS. MEMBERS(READY TO LATH(. NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. 3.FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS I 1 1 2 2 2 BOARD OF HEALTH GAS INSPECTION APPROVALS FIRE DEPT.INSPECTING APPROVALS 1 1 OTHER CITY ENGINEER 2 2 WORK SHALL NOT PROCEED UNTIL THE PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD INSPECTOR HAS APPROVED THE VARIOUS NOT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE STAGES OF CONSTRUCTION. AS NOTED ABOVE. OR WRITTEN NOTIFICATION. JOB SITE COPY BUILDING r CITY OF SALEM lf�a SALEM, MASSACHUSETTS 01970 PERMIT APRIL 27 99 236-1999 FAFARD DEV CORP. DATE IJOT_- .Rer EtMITNO. l5be APPLICANT ADDRESS (NO.) (STREET) (CONTR'S LICENSE) ASHLAND MR 01721 508-881-1600 CITY STATE ZIPCODE TEL.NO. NEW BUILDING TWO OR MORE FAMILY NUMBER OF 4 PERMIT TO (—) STORY DWELLING UNITS (TYPE OF IMPROVEMENT) NO. (PROPOSED USE) 0003 ECLIPSE LANE ZONING R3 A7(LOCATION) DISTRICT (NO.) (STREET) BETWEEN AND (CROSS STREET) ICROBB STREET) MAP 07 0081 904 LOT 15. 79 ACRES SUBDIVISION LOT BLOCK SIZE BUILDING IS TO BE FT.WIDE BV FT.LONG BY FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS: BUILD 4 UNIT CONDOMINIUM AS PER PLANS. BLDG 180, UNIT A, GALLERIA STYLE l� IVI rVI i] ;II 1� AREA Nj B5 B6G 4 PERMIT SSS. 5 VOLUME VOLUME ESTIMATED COST$ FEE (CUBIGSOUARE FEET) OWNER FAFARD R. E. D. C. _ TREET BUILDING DEPT. ADDRESS ` BY THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLEY OR SIDEWALK OR ANY PART THEREOF,EITHER TEMPORARILY OR PERMANENTLY.ENCROACHMENTS ON PUBLIC PROPERTY.NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE.MUST BE APPROVED BY THE JURISDICTION,STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL INSPECTIONS APPROVEDPLAN$MUST BE RETAINED ON JOB AND THIS CARD KEPTWHERE APPLICABLE SEPARATE REQUIRED FOR ALL CONSTRUCTION WORK: POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PER ARE REOUIRED FOR 1.FOUNDATIONS OR FOOTINGS. ELECTRICAL.PLUMBING AND 2.PRIOR TO COVERING STRUCTURAL CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL MECHANICAL INSTALLATIONS. MEMBERS(READY 70 LATH). NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. 3.FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS t 1 1 2 2 2 BOARD OF HEALTH GAS INSPECTION APPROVALS FIRE DEPT.INSPECTING APPROVALS 1 t OTHER CITY ENGINEER 2 2 WORK SHALL NOT PROCEED UNTIL THEPERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD INSPECTOR HAS APPROVED THE VARIOUS NOT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE STAGES OF CONSTRUCTION. AS NOTED ABOVE. OR WRITTEN NOTIFICATION. SOB SITE COPY CITY OF SALEM BUILDING v��CONUIT� d SALEM, MASSACHUSETTS 01970 PERMIT �s vzr 9�ca�ooN DATE APRIL 27 Ig 99 PERMIT NO. 237-1999 APPLICANT FAFRRD DEV CORP. ADDRESS •=50 ELIOT STREET 156E (NO) (STREET) (CONTR'S LICENSE) CITY ASHLAND STATE MA ZIPCOOE 01721 TEL.NO. 508—BBI-1600 NUMBEROF PERMIT TO NEW BUILDING sToav TWO OR MORE FRMILY DWELLINGUNITS 4 (TYPE OF IMPROVEMENT) N0. (PROPOSED USE) ZONING AT(LOCATION) 10001 ECLIPSE LANE DISTRICT R3 (NO.) (STREET) BETWEEN AND (CROSS STREET) (CROSS STREET) LOT SUBDIVISION MAF, 07 LOT 101081 BLOCK 903 SIZE 15. 79 ACRES BUILDING IS TO BE FT.WIDE BY FT.LONG BV FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS: BUILD 4 UNIT CONDOMINIUM AS PER PLANS. BLDG 180. UNIT B. GALLERIA STYLE (Inlitnr 1�j - oY � -f �l-f-linAREA �, UY� PERMIT VOLUMOE ESTIMATED COST$ 85, 862 FEE $ 555, c5 (CUBIC/SQUARE FEET) OWNER FAFARD R. E. D. C. BUILDING DEPT. ADDRESS 290 ELIOT STREET BY THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLEY OR SIDEWALK OR ANY PART THEREOF,EITHER TEMPORARILY OR PERMANENTLY,ENCROACHMENTS ON PUBLIC PROPERTY,NOTSPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THEJURISDICTION,STREET OR ALLEY GRADESASWELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL INSPECTIONS APPROVEDPLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE REQUIRED FOR ALL CONSTRUCTION WORK: POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR I.FOUNDATIONS OR FOOTINGS. ELECTRICAL,PLUMBING AND 2,PRIOR TO COVERING STRUCTURAL CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL MECHANICAL INSTALLATIONS. MEMBERS(READY TO LATH). NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. 3.FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS 1 i I 2 2 2 BOARD OF HEALTH GAS INSPECTION APPROVALS FIRE DEPT.INSPECTING APPROVALS I 1 OTHER CITY ENGINEER 2 2 WORK SHALL NOT PROCEED UNTIL THE PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD INSPECTOR HAS APPROVED THE VARIOUS NOT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE STAGES OF CONSTRUCTION. AS NOTED ABOVE. OR WRITTEN NOTIFICATION. JOE SITE COPY 1��`°NDTA�� BUILDING CITY OF SALEM SALEM, MASSACHUSETTS 01970 PERMIT `= DATE APRIL 27 IS 99 PERMIT NO. 238-1999 APPLICANT FAFARD DEV CORP. ADDRESS 90 ELIOT STREET 1562 (NO.) (STREET) (CONTR'S LICENSE) CITY ASHLAND STATE MA ZIPCODE 01721 TEL.No. 508-881-1600 PERMIT TO NEW HU I LD I NGNUMBER OF sroav TWO OR MORE FAMILY DWELLING UNITS 4 (TYPE OF IMPROVEMENT) NO. (PROPOSED USE) ZONING AT N) 0007 ECLIPSE LANE DISTRICT R3 (NO.I (STREET) 1 BETWEEN AND (CROSS STREET) )CROSS STREET) LOT SUBDIVISION MAP 07 LOT 0081 BLOCK 902 SIZE 15. 79 ACRES BUILDING IS TO BE FT.WIDE BV FT.LONG BV FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS. BUILD 4 UNIT CONDOMINIUM AS PER PLANS. BLDG 180, UNIT C-. COACH STYLE. 3 ' vv� AREA OR i. i 5 PERMIT$@ 555 VOLUME ESTIMATED COST 8.�• 8Fi2. FEE .p JJJ. 25 (CUBICISOUARE FEET) OWNER FAFARD R.E. D. C. BUILDING DEPT. ADDRESS 290 ELIOT STREET BY THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLEY OR SIDEWALK OR ANY PART THEREOF.EITHER TEMPORARILY OR PERMANENTLY,ENCROACHMENTS 110, ON PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION,STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL INSPECTIONS APPROVEDPLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE REQUIRED FOR ALL CONSTRUCTION WORK. POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR 1.FOUNDATIONS OR FOOTINGS. CERTIFICATE OF OCCUPANCY IS REQUIRED.SUCH BUILDING SHALL ELECTRICAL.PLUMBING AND 2.PRIOR TO COVERING STRUCTURAL MECHANICAL INSTALLATIONS. MEMBERS(READY TO LATH). NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. 3.FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS 1 1 1 2 2 2 BOARD OF HEALTH GAS INSPECTION APPROVALS FIRE DEPT.INSPECTING APPROVALS 1 t OTHER CITY ENGINEER 2 2 WORK SHALL NOT PROCEED UNTIL THE [ASSERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD INSPECTOR HAS APPROVED THE VARIOUS OT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE STAGES OF CONSTRUCTION. NOTED ABOVE. OR WRITTEN NOTIFICATION. JOB SITE COPY BUILDING CITY OF SALEM SALEM, MASSACHUSETTS 01970 PERMIT ��L7ME 09�� DATE APRIL 27 19 99 PERMIT NO. 239-1999 APPLICANT FAFARD DEV CORP. ADDRESS 290 ELIOT STREET 1582 (NO) (STREET) (CONTRS LICENSE) CITY ASHLAND STATE MA ZIPCODE 01721 TEL NO. 508-881-1600 PERMITTO NEW BUILDING NU4 sToav TWO OR MORE FAMILY DWEELLINGLLING UNITS (TYPE OF IMPROVEMENT) N0. (PROPOSED USE) AT(LOCATION) 0005 ECLIPSE LANE ZONING DISTRICT R' (NO.) (STREET) BETWEEN AND (CROSS STREET) (CROSS STREET) SUBDIVISION MAP 07 LOT 0081 BLOCK 901 SIZE 15. 79 ACRES BUILDING IS TO BE FT.WIDE BV FT.LONG BY FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS BUILD 4 UNIT CONDOMINIUM AS PIER PLANS. BLDG1' 180. UNIT D, COACH STYLE. 4 r 'or I �I 1n ncci l AREAOR �61� ILJI Y/) I11i � i„ �ee/v✓I'-' , PERMIT Q �� _ VOLUME ESTIMATED COST$ 85, 862 FEE $ 555. 25 (CUBICISQUARE FEET) OWNER FAFARD R E D C BUILDING DEPT. ADDRESS PRVI El IDT STREET By THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLEY OR SIDEWALK OR ANY PART THEREOF.EITHER TEMPORARILY OR PERMANENTLY,ENCROACHMENTS ON PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED By THE JURISDICTION.STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL INSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE REQUIRED FOR ALL CONSTRUCTION WORK: POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR 2 PRIOR TOICOVONS OR FOOTINGS. CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL ELECTRICAL.PLUMBING AND 2.PRIOR TO COVERING STRUCTURAL MECHANICAL INSTALLATIONS. MEMBERS(READY TO LATH). NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. 9.FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS I 1 I 2 2 2 BOARD OF HEALTH GAS INSPECTION APPROVALS FIRE DEPT.INSPECTING APPROVALS I I OTHER CITY ENGINEER 2 2 WORK SHALL NOT PROCEED UNTIL THE FNOT RMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATEDON THIS CARD INSPECTOR HAS APPROVED THE VARIOUS STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE STAGES OF CONSTRUC710N. NOTED ABOVE. OR WRITTEN NOTIFICATION. JOB SITE COPY 5� `° D'T� BUILDING �r CITY OF SALEM SALEM, MASSACHUSETTS 01970 PERMIT ��TMINE DATE APRIL c8 19 99 PERMIT NO. c5c-19`37 APPLICANT FAFARD DEV CORP. ADDRESS 290 ELIOT STREET 156E (NO) (STREET) (CONTR'S LICENSE) CITY ASHLAND STATE MA ZIPCODE 01721 TEL.NO. 508-881-1600 PERMIT TO NEW BUILDING STORY TWO OR MORE FAMILY NUMBEROF 4 O (TYPE CP IMPROVEMENT) NO. (PROPOSED USE) DWELLING UNITS ZONING AT(LOCATION) 0019 ECLIPSE LANE DISTRICT R. (NO) (STREET) BETWEEN AND (CROSS STREET) (CROSS STREET) LOT SUBDIVISION MAP 1217 LOT 0081 BLOCK 911 SIE 15. 79 ACRES BUILDING IS TO BE FT.WIDE BV FT.LONG BV FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS. BUILD 4 UNIT CONDOMINIUM AS PER PLANS. BLDG 178, UNIT A, COACH STYLE. 1 f'AREA OR �Y '� �l^i '1' (� t ,r ! ,'1\I all l ,7 I @ PERMIT VOLUME ESTIMATED COST.p 85. 864 FEE $ 555. 25 (CUBICISOUARE FEET) OWNER FAFARD R.E. D. C. BUILDING DEPT. ADDRESS 290 ELIOT STREET BY THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLEY OR SIDEWALK OR ANY PART THEREOF.EITHER TEMPORARILY OR PERMANENTLY,ENCROACHMENTS ON PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION.STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAYBE OBTAINED FROM THE DEPARTMENTOF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL INSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE REQUIRED FOR ALL CONSTRUCTION WORK: POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR 1.FOUNDATIONS OR FOOTINGS. ELECTRICAL,PLUMBING AND 2.PRIOR TO COVERING STRUCTURAL CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL MECHANICAL INSTALLATIONS. MEMBERS(READY TO LATH). NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. 3.FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS 1 1 1 2 2 2 BOARD OF HEALTH GAS INSPECTION APPROVALS FIRE DEPT.INSPECTING APPROVALS 1 1 OTHER CITY ENGINEER 2 2 WORK SHALL NOT PROCEED UNTIL THE FPERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD INSPECTOR HAS APPROVED THE VARIOUS T STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE STAGES OF CONSTRUCTION. NOTED ABOVE. OR WRITTEN NOTIFICATION. k25 co-el B@I@ 10 l �? 1Z I � ' W _ r o OI+O PHASE IV I OO GREEN DOLPHIN NLUAOE' 4 ��� / \ \ , L ' CB / I . L `6` <<— So QQx 1 S� .a U ti �r INYk U,J- V �F UN No. City of Salem 2� Ward Ul3i3Y � ,� SS X153- ,, T3 Ys3' iia st p C �9aYSY� '44 oru � Y5' 7 - 00 V3 Dia r f S7�yS5i/Sara s3 i12 , 00V3 - ��� or 31 APPLICATION CATION s? = �� �y3 PERMIT TO BUILD ADDITION, MAKE ALTERATIONS OR NEW CONSTRUCTION IMPORTANT-Applicant to complete all Items in sections:1, 11, /it, 1V, and IX. ZONING I. AT(LOCATION) r I /Q DISTRICT LOCATION 1NOl s nEEn OF BETWEEN CA=STREET AND% ICROSSSTREEO BUILDING LOT SUBDIVISION LOT_BLOCK SIZE 11. TYPE AND COST OF BUILDING -All applicants complete Parts A _ D A. TYPE OF IMPROVEMENT D. PROPOSED USE•FOR"DEMOUTION••USE MOST RECENT USE 1 ®, New building Reeltlentlal Non voldendal 2 ❑ Atltllifon rlf re5dennd/,enter number of new 12 ❑ One IamJy 18 ❑ Amwarnenl,recreational nousrng units added.R any,in pan 0. 13) 19 ❑ Chr ch.other religious 13 ❑ Two a more lemily•Enter nurnb0fIriduistriall �*��ge 3 ❑ ANeralgn above) (Sea 7 of U." __—_�—__-- _ 4 ❑ Reoav repacemanl 14 ❑ Tremont hotel.motel or domftry• 22 ❑ Service statfon repair 9araw Enter number of units __---_-- 23 ❑ Hospital,inl4ulforal 5 C3 Wredtng(NmuttAemA'residenaa(enter number of units,n building in Pan 0. 13) 15 ❑ Garage 24 ❑ Office.bank ploleaeimW w +- 6 ❑ Mowng Irefocation) 16 ❑ Carport 25 ❑ Public utility 26 ❑ School,library,other educational 7 C] Foundation only 17 ❑ Other•scecity 27 ❑ Stores,lnemantile B.OWNERSHIP 28 ❑ 73-1(3.lowers 8 ❑ PDvale nndi rdual.corporalion.nonprolit 29 ❑ Other•specify inslduti etc.) 9 ❑ Pubic(Federal.Stale.or focal government C.COST (Omit cents) Nonresidential•Describe in detail proposed use,of buildings,e.g.food Proceseig Plant. marhf-e shoo.laundry bui at hosPita4 elementary school.secondary school.college. parochial school,parldge for deparbr18n1t store,rental office building.office Dodding 10. Cost of improvement _ �____— S at irldmirw plant N 1r ssing budding is being charged.enlerynopoeed use. To be installed but not included in the above costV a. Electrical—__— --_ v 19u D. Plumbing___-- o'LU 0 d U C Heath&ail cordNbnirg t d. Odor WWAlitor.etc.).— — I 1S TOTAL COST OF IMPROVEMENT : 3 D CHARACTERISTICS OF BUILDIN r new buildings and additions, complete Parts E-L:demolition, onl Parts J 8 M, all others ski to IV TYPE OF FRAME F. PRINCIPAL TYPE OF IEATNG FUEL G. TYPE OF SEWAGE DISPOSAL I. TYPE OF MECHANICAL onry(wall bearing) 35 Gas 40 fliol'Public a Private company will there Da central air coroNlonvg7 d frame J8 OJ 41 ❑ PrMale lseptfo tardt alcl hsal steal 37 ❑ Electricity44 yes 45 ❑ t4o N. TYPE OF WATER SUPPLY Wui there Dy en eNvetc(!orced concrete 38 ❑ Coe) riy 34 ❑ Other SpepYy 39 ❑ OtherSpell' 42 Public or prlveb otMltpMY 48 ❑ Yea" 47 I A No 43 ❑ PrMate(wall,clsfem) TT Ward City of Salem C/ o�LDS /S7 7 TGL1t �a (. 1 r G l tea TS fol �rf �irG � Aq �flTTkniti yS0 - Aq BarZl)p TRUCTION `7L 7 La�� APPLIoAORNEWCONSFt �' G't)eq 4�1 KE ALTERATIONS ADDITION, MA Ions; I, u, ul, Iv,and IX. zoNlNc UILD complete all Items in Sem NINA",& 3MIT -To B Ilcan ?o comP�c d g 157 Lo IMPORTANT APP dosssmEen SOT AT tt.00ATIONI C ,"s U! ` ( .rc ICK CZE ,1 ATION 6 / �[ / { �j i - 8ETy1EEN�—r � /1� JILDING5t eory s ON �� St RECEM USE OF BUI DING TYPE COST ❑AND ' . 1 '7 I /J isCh,,,KOther wg0t+' .. /� - ❑ � A. TYPE OF IMPROVEMENT .� l �� ❑ I,�duatr,al t 1 p Neer ou4dln9 _ 1 'Y' r of nev _ _ "Byape numoe ) J ' I21 ❑1. Oars 1 ❑ Addttlon ,I Mrs, Id. eny' D13) ` L ��!'�( y Service SMOOM r°� 1 2 ends so d anY.'n I22❑ �kc i fto nal rpuSnq ,e' !, IVIOS 23 ❑ orolessdr,el ❑ Aneraton Isco 2 aoo J ❑ ��e.bank• ii. 2A 3F"w.0mcoment - _ 125 ❑ PutAle utility oU,er educational 40 �(p na,edamN nsdentiel.sore/rwm - __ School•4br, rw_ 5 ❑ N Pan D.17) © Slaves•m01r�rtie 5 m bergin9 '-�- 27 d units .f- ❑ TanMs towe'e fy 28 6 ❑ F ... ..e only 1T ❑ •specify 29 ❑ Other speedy ❑ �yr,datron only. _ . 7 a•OWNERSHIP 8 ❑ "to ludrnduw•cVP0MkV^ u�d building',cg-loud M°�een)tcol. lege, n0 an oil inst4uew,.etc.l ,went � ���...t in detait oroW e j W.secor buidirq t state.a tonal Oo°0m Nomw"'- w-Des 2din0 st rosoilea,elernteantwe•renbl o8ice Cu�,ed use. s ❑ Publ. tTederd. Loma conn) "chop shoo.laundry. g.y91ofldepann'en eherged. oa,od,blenter 0l C.COST .,QAI eiatrn9�� ___. -. at'ud V_ r 10. Cpsl of / N To bo insrelbd Wtnot included L' V �v in the above(;OSI p Plumbwlg— e, p ddbnM --� E_ L:demolitbn, NbB �0 complete Parts d. Otsw te�e„etu,elcl—"-'��— D bUildin9s and additions. 1. TYPE OF MECHANICAL s rnew ISM F BUILDING fO t.TOTAL COST OFC RACTEPallotSO to IV T11lC+FUEL G. 7YPEOFSEWAGE ,corit At W2ltheb�penrela. parts J& M. all others skl 7YP'E of FFa P�;c a v^'fd1e GOmI'anv GO"da'°"b7? A5 ❑ N 111. Com efe nC a F, PRwjcrAL 40btank.etcl 44 3 Yea Trp£OF FRAMtE Gas ❑ Phnab lseW W4lttem by or,ew toA 35 at E. PRINCTPN• 4T�1 1 �yYy twill beann9l 3e ❑ Od H. TYPE OF WATER SUPP� ❑ ❑ 60 ^ i 1d ,Ayod trarro 37 ❑steel 38 0� 42 ❑ �d or Wl'rate oornps^y ' 31 lel- i.cl dorm 32 ❑ SIS oprele 9 C3W,er-S7edW d3 ❑ Pd'i+b lwel 33 0 ReAcr� — JCB SITE COPY BUILDING CITY OF SALEM SALEM, MASSACHUSETTS 01970 �s9ee � PERMIT DATE - 19 - PERMIT NO. APPLICANT 1 - - ��'-j L1-,,7+17' ADDRESS -- _ - _- - - (NO.) (STREET) (CONTRS LICENSE) CITY STATE—' ZIP CODE .I7 1. TEL NO. PERMIT '" _-1- t ' ' ( ) STORY ") I-- lij — t-� NUMBERDWELLING UOF NITS (TYPE OF IMPROVEMENT) � ) NO (PROPOSED USE) AT(LOCA ) '•' -t, —I ,�'_ _ '_'. t - DISTRICT. - (NO.j - (STREET) BETWEEN AND (CROSS STREET) (CROSS STREET) LOT I - SUBDIVISION - - LOT '=I'�'""-= BLOCK - _ = SIZE �' '�'-"''_M BUILDING IS TO BE FT.WIDE BV FT.LONG BY FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS: - •.I!. 1?r ....'.-" _ -: .:.-., 4 L..I;,, .: :.: c: L 4 =''.1J� .- ._ AREA OR PERMIT - VOLUME ESTIMATED COST FEE $ 1 C- (CUBICISQUARE FEET) OWNER BUILDING DEPT. -.-...- ..---__.._ . ADDRESS =-'etc c_. �.'.J -. :-� . �.;-.i.-. ! BY T_.T_S: THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLEY OR SIDEWALK OR ANY PART THEREOF,EITHER TEMPORARILY OR PERMANENTLY,ENCROACHMENTS ON PUBLIC PROPERTY.NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION,STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENTOF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL INSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE REOUIRED FOR ALL CONSTRUCTION WORK: POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR I FOUNDATIONS OR FOOTINGS. ELECTRICAL,PLUMBING AND 2 PRIOR TO COVERING STRUCTURAL CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL MECHANICAL INSTALLATIONS. MEMBERS(READY TO LATH). NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. 3 FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS 1 1 2 2 2 BOARD OF HEALTH GAS INSPECTION APPROVALS FIRE DEPT.INSPECTING APPROVALS 1 I OTHER CITY ENGINEER 2 2 wOR :SHALL NOT PROCEED UNTIL THEPERMiT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK ISi INSPECTIONS INDICATED ON THIS CARC INSPEC'JP SAS APPROVED THE VARIOUS NOT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE STAGES O'-CONSTRUCTION AS NOTED ABOVE. OR WRITTEN NOTIFICATION. ! c-,-- f-1 CITY OF SALEM BUILDING PERMIT '3 1`9 SALEM, MASSACHUSETTS 01970 o DATE 23 19 PERMIT NO. APPLICANT �(-(' %'- ADDRESS _ - - (NO) (STREET) (CONTR'S LICENSE) CITY '.� 'I r, STATE ZIPCODE i -- TEL NO PERMIT TO - STORY DWELLING UNITS _ NUMBEROF _ '(TYPE OF IMPROVEMENT) ( NO ) (PROPOSED USE) r ;.-. _.;-., ZONING (L ATOCATION) wo.) IS TREET) _ - - -- DISTRICT BETWEEN AND (CROSS STREET) (CROSS STREET) LOT SUBDIVISION LOT BLOCK SIZE BUILDING IS TO BE FT.WIDE BV FT.LONG BV FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS: n, ) AREA ORE 75, PERMIT VOLUME ESTIrWED'COST`$1 i j FEE CUBICISOUARE FEET) OWNER - '- BUILDING DEPT. ADDRESS = _. r'..c BY T J S THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET.ALLEY OR SIDEWALK OR ANY PART THEREOF,EITHER TEMPORARILY OR PERMANENTLY,ENCROACHMENTS pop. ON PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE.MUST BE APPROVED BY THE JURISDICTION.STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAYBE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL NSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE REQUIRED FOR ALL CONSTRUCTION WORK: POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR 1 FOUNDATIONS OR FOOTINGS. ELECTRICAL.PLUMBING AND 2 PRIOR TO COVERING STRUCTURAL CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL MECHANICAL INSTALLATIONS. MEMBERS iREADY TO LATH), NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. 3 FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS 1 1 2 2 2 BOARD OF HEALTH GAS INSPECTION APPROVALS FIRE DEPT.INSPECTING APPROVALS 1 1 OTHER UTIENGINEER 2 2 aJCR•:SHAL_NOT PROCEED UNTIL THEPERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD INSPECTOR AS APPROVED THE VARIOUS NOT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE ST_.C,_S OF CCNSTRUCTION AS NOTED ABOVE. OR WRITTEN NOTIFICATION. 7--7- BUILDING CITY OF SALEM SALEM, MASSACHUSETTS 01970 K� PERMIT DATE 19 PERMIT NO. APPLICANT ADDRESS (NO) (STREET) (CONTE'S LICENSE) CITY STATE ZIPCODE 7i 2�TEL NO. NUMBEROF PERMIT TO STORY-� DWELLING UNITS 7 (TYPE OF IMPROVEMENT)- -N-0- (PROPOSED USE) ZONING AT(LOCATION) DISTRICT (No (STREET) BETWEEN AND (CROSS STREET) (CROSS STREET) LOT SUBDIVISION LOT BLOCK SIZE BUILDING IS TO BE-FT.WIDE BY FT.LONG BY FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTICII, TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS AREAOR t'u PERMIT VOLUME ESTIMATED COST$ FEE $ (CUBICISQUARE FEET) p OWNER BUILDING DEPT. ADDRESS BY- T.J.S. THIS PERMIT CONVEYS NO RIGHT TOOCCUPY ANY STREET.ALLEY OR SIDEWALK OR ANY PART THEREOF,EITHER TEMPORARILY OR PERMANENTLY,ENCROACHMENTS ON PUBLIC PROPERTY NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION.STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAYBE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL INSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE PEOUIRED FOR ALL CONSTRUCTION WORK POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR I FOUNDATIONS OR FOOTINGS CERTIFICATE OF OCCUPANCY IS REQUIREDSUCH BUILDING SHALL ELECTRICAL,PLUMBING AND 2 PRIOR TO COVERING STRUCTURAL CERI . MECHANICAL INSTALLATIONS. MEMBERS(READY TO LATH) NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. 3 FINAL INSPECTION BEFORE OCCUPANCY POST THIS CARD SO IT IS VISIBLE FROM STREET EUILOING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS 1 1 2 2 2 BOARD OF HEALTH GAS INSPECTION APPROVALS FIRE DEPT INSPECTING APPROVALS 1 1 OTHER CITY ENGINEER 2 2 V.'OR.;SHALL NOT PROCEED UNTIL THE-1PERMIT WILL BECOME NULL AND VOID IF CONS I INSPECTIONS INDICATED ON THIS CARO 4S APPROVED THE VARIOUS NOT STARTED WITHIN SIX MONTHS OF DATE THE CAN BE ARRANGED FOR BY TELEPHONE S TAGES 0,-CO�rSTRUCTICN AS NOTED ABOVE. OR WRITTEN NOTIFICATION cowl CITY OF SALEM BUILDING I SALEM, MASSACHUSETTS 01970 PERMIT DATE PERMIT NO T =" APPLICANT )iADDRESS t, (NO,) )STREET) (CONTR S LICENSE) CITY STATE ZIP CODE TEL NO NUMBER OF PERMIT TO STORY DWELLING UNITS (TYPE OF IMPROVEMENT) NO (PROPOSED USE) ZONING AT(LOCATION) DISTRICT (NO.I (STREET) BETWEEN AND (CROSS STREET) (CROSS STREET) 7 7 LOT SUBDIVISION LOT BLOCK SIZE BUILDING IS TO BE-FT.WIDE BVFT.LONG BY-FT IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS: Ci I Ilii( AREA ORPERMIT VOLUME ESTIMATED COST$ FEE $ (CIJBIC)SOUARE FEET) OWNER- BUILDING DEPT. ADDRESS BY T.J.S. THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET.ALLEY OR SIDEWALK OR ANY PART THEREOF,EITHER TEMPORARILY OR PERMANENTLY,ENCROACHMENTS ON PUBLIC PROPERTY.NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION.STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAYBE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL INSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE REQUIRED FOR ALL CONSTRUCTION WORK. POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR I FOUNDATIONS OR FOOTINGS. ELECTRICAL.PLUMBING AND 2 PRIOR TO COVERING STRUCTURAL CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL MECHANICAL INSTALLATIONS. MEMBERS(READY 70 LATH) NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. 3 FINAL INSPECTION BEFORE OCCUPANCY POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS 2 2 2 BOARD OF HEALTH GAS INSPECTION APPROVALS FIRE DEPT INSPECTING APPROVALS OTHER CITY ENGINEER 2 2 ViORK SHALL,:OT PROCEED UNTIL THE PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD it.S'-C 7CP -S APPROVED THE VARIOUS NOT STARTED WITHIN SIX MONTHS OF DATE THE PERPCAN BE ARRANGED FOR BY TELEPHONE STAI.FS 07 CONSTRUCTION AS NOTED ABOVE. OR WRITTEN NOTIFICATION. BUILDING i - ,ffa ` j CITY OF SALEM SALEM, MASSACHUSETTS 01970 PERMIT _ DATE '- -"� '" --"_ 19 - " PERMIT NO. '- 1 ..ri!) _:. _ JC'L APPLICANT ' ADDRESS r -' "' - (NO.) (STREET) (CONTE S LICENSE) CITY �1,.� i.; STATE _) ZIP CODE - " "'-- TEL.NO. r ti'-'--i.c,l:L -,.-} L.�i' - - NUMBEROF PERMIT TO O STORY G - - _ - DWELLING UNITS y (TYPE OF IMPROVEMENT) N0. (PROPOSED USE) ZONING -- AT(LOCATION) DISTRICT (N0.) (STREET) BETWEEN AND (CROSS STREET) (CROSS STREET) Ti� _ l LOT SUBDIVISION LOT "�^ BLOCK - SIZE BUILDING IS TO BE FT.WIDE BV FT.LONG BY FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS: _ ._. _ ._. . — �. .. f ,,r AREA OR ll 1.1r PLi1�lI �?� �! 1 , - - PERMIT -- VOLUME E TIM TE'6 FEE .p -- (CUBIGSOUAREFEET) OWNER - BUILDING DEPT. ADDRESS - _ -- - BY T.J.S. THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLEY OR SIDEWALK OR ANY PART THEREOF,EITHER TEMPORARILY OR PERMANENTLY,ENCROACHMENTS ON PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION,STREET OR ALLEY GRADES AS WELL AS DEPTH AN D LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. M INIM UNI OF THEE E CALL INSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AN D THIS CARD KEPT WHERE APPLICABLE SEPARATE REQUIRED FOR ALL CONSTRUCTION WORK: POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR I FOUNDATIONS OR FOOTINGS. ELECTRICAL,PLUMBING AND 2 PRIOR TO COVERING STRUCTURAL CERTIFICATE OF OCCUPANCY IS REOUIRED,SUCH BUILDING SHALL MECHANICAL INSTALLATIONS. MEMBERS(READY TO LATH). NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. 3.FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS 1 1 2 2 2 BOARD OF HEALTH GAS INSPECTION APPROVALS FIRE DEPT.INSPECTING APPROVALS 1 OTHER CITY ENGINEER 2 2 WORK SHALL NOT PROCEED UNTIL THE PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD INSPECTG R-...:S APPROVED THE VARIOUS NOT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED CAH BE ARRANGED FOR BY TELEPHONE STAGES OF CCr;STRUCTION AS NOTED ABOVE. OR WRITTEN NOTIFICATION. v CITY OF SALEM BUILDING <<o` SALEM, MASSACHUSETTS 01970 PERMIT DATE 19 PERMIT NO. APPLICANT ADDRESS (NO.) (STREET) (GONTR S LICENSE) CITY STATE ZIPCODE TEL NO. NUMBEROF PERMITTO- STORY- DWELLING UNITS TYPE OF IMPROVEMENT) NO. (PROPOSED USE) ZONING AT(LOCATION) DISTRICT (NO) (STREET) BETWEEN AND (CROSS STREET) (CROSS STREET) L07 SUBDIVISION LOT BLOCK SIZE BUILDING IS TO BE FT.WIDE BV FT.LONG BYFT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) -F, REMARKS: AREA OR All for Permit to Ouppy 1 71 PERMIT VOLUME ESTIMATED COST FEE (CUBIC/SOUARE FEET) OWNER BUILDING DEPT. ADDRESS BY T.S.S. THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET.ALLEY OR SIDEWALK OR ANY PART THEREOF,EITHER TEMPORARILY OR PERMANENTLY,ENCROACHMENTS ON PUBLIC PROPERTY NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION,STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL INSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE REQUIRED FOR ALL CONSTRUCTION WORK: POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REOUIRED FOR 1 FOUNDATIONS OR FOOTINGS ELECTRICAL.PLUMBING AND 2 PRIOR TO COVERING STRUCTURAL CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL MECHANICAL INSTALLATIONS. MEMBERS(READY TO LATH) NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. 3 FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS 2 2 2 BOARD OF HEALTH GAS INSPECTION APPROVALS FIRE DEPT INSPECTING APPROVALS CTHFR CITI ENGINEER 2 2 VIOR•,S-+ALL NOT PROCEED UNTIL THEPERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD lt,SPE.-70A-FROVED THE VARIOUS NOT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE ST.tC,I-S Cr CLI.I:STPJCTION AS NOTED ABOVE OR WRITTEN NOTIFICATION JUr, n_ I a L,uI V BUILDING CITY OF SALEM SALEM, MASSACHUSETTS 01970 PERMIT �9e�/MLNF, DATE - - 19 PERMIT NO. APPLICANT 'T) -- ADDRESS (N0.) (STREET) (CONTR'S LICENSE) CITY - STATE ZIP CODE TEL NO. - . IL� r;- y; n;= F NUMBER OF PERMIT TO '�-' ENO STORY : `- t DWELLING UNITS (TYPE OF IMPROVEMT) NO. (PROPOSED USE) .rin ZONING - AT(LOCATION) - :`5 _ .ter. _.i-1 = '+i DISTRICT '�- (No I (STREET) BETWEEN_ AND (CROSS STREET) (CROSS STREET) OT - - SUBDIVISION '� LOT �'- -' BLOCK SIZE _ 'i -_ BUILDING IS TO BE FT.WIDE BY FT.LONG BV FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTIOP TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS : -- __ G,.SI3! int� Lar �;r,+ � Ya ``^I^I Y AREAOR �3 slid u; • VOLUME @@ 1. . �]I-;,`i PERMIT @@ F_; - VOLUME ESTIMATED COST.P FEE .p (CUBIGSOUARE FEET) OWNER BUILDING DEPT. ADDRESS - - - BY T.J.S. THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLEY OR SIDEWALK OR ANY PART THEREOF,EITHER TEMPORARILY OR PERMANENTLY.ENCROACHMENT£ ► ON PUBLIC PROPERTY.NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE.MUST BE APPROVED BY THE JURISDICTION,STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAYBE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL NSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE REQUIRED FOR ALL CONSTRUCTION WORK: POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR I FOUNDATIONS OR FOOTINGS. ELECTRICAL.PLUMBING AND 2 PRIOR TO COVERING STRUCTURAL CERTIFICATE OF OCCUPANCY IS REQUIRED.SUCH BUILDING SHALL MECHANICAL INSTALLATIONS. MEMBERS(READY TO LATH). NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. 3 FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS 1 1 1 2 2 2 BOARD OF HEALTH GAS INSPECTION APPROVALS FIRE DEPT.INSPECTING APPROVALS 1 I OTHER CITY ENGINEER 2 2 WCR,,SHALL NOT PROCEED UNTIL THE PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INOICATED ON THIS CARL INSPD-TO:-HSS -PROVED THE VARIOUS NOT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE ST„GS�JF CONSTRUCTION AS NOTED ABOVE- OR WRITTEN NOTIFICATION. SGP. 3I?E CG 'Y BUILDING a� CITY OF SALEM SALEM, MASSACHUSETTS 01970 PERMIT s 9�OTMINE�� DATE E 21 19 PERMIT NO. _ APPLICANT .'. ''- ADDRESS .�i' .._ _ (NO.) (STREET) (CONTR'S LICENSE) CITY "' .i% STATE ZIPCODE ---- TEL NO I. r ._'a_. _. NUMBER OF PERMIT TO O STORY '- - DWELLING UNITS (TYPE OF IMPROVEMENT) N0. (PROPOSED USE) . - --::, ZONING ...': AT(LOCATION) "...f"I _ DISTRICT "- ANO.) (STREET) - BETWEEN AND (CROSS STREET) (CROSS STREET) _ -' LOT SUBDIVISION LOT BLOCK -' SIZE '--- BUILDING IS TO BE FT.WIDE BV FT.LONG BY FT.IN HEIGHT AND SHALLCONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS: ... . _. y _ 'C� �n L n P AREA OR ��I) IVI 7 'v�3i X11. �i.� JL'v PERMITFEE $ -- VOLUME ESTIMATED COST CUBIC/SQUARE FEET) OWNER -I BUILDING DEPT. ADDRESS BY T.J.S. THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLEY OR SIDEWALK OR ANY PART THEREOF.EITHER TEMPORARILY OR PERMANENTLY.ENCROACHMENTS ON PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION,STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAYBE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL INSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE REQUIRED FOR ALL CONSTRUCTION WORK: POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR I.FOUNDATIONS OR FOOTINGS. ELECTRICAL.PLUMBING AND z.PRIOR TO COVERING STRUCTURAL CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL MECHANICAL INSTALLATIONS MEMBERS(READY TO LATH). NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. 3.FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS I 2 2 2 BOARD OF HEALTH GAS INSPECTION APPROVALS FIRE DEPT.INSPECTING APPROVALS t t OTHER CITv ENGINEER 2 2 WORK S:-;ALL I.OT PROCEED UNTIL THEPERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONS INDICATED ON THIS CARD IF.SPEC TOR aS:PPROVED THE VARIOUS NOT STARTED WITHIN SIX MONTHS OF DATE THE PEHP:IIT IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE STAGES OF CONSTRUCTION AS NOTED ABOVE. OR WRITTEN NOTIFICATION. Mariners Village Condos G132-140-2000 COMMONWEALTH OF MASSACHUSETTS CITY OF SALEM GIS#: 10205 Map: Block: GAS PERMIT Lot: Permit: Gas Category: - Permit# G132-140-2000 PERMISSION IS HEREBY GRANTED TO: Project# JS-2001-0520 Es[. Cost: $0.00 Contractor: License: � Fee: $1,000.00 Tango Plumb g&- 'ating Dlumbing/Gas-#10578-M #of Fixtures: OWV er: American Properties Inc Applican : an o-Piurnbin eating AT: Mariners Village Condos ISSUED ON. 24-Oct-2000 EXPIRES ON: 24-Apr-2001 TO PERFORM THE FOLLOWING WORK: 2 bldgs#186 a,b,c,d& 187 a,b,c,d/each-basement 1 furnace,water heater,dryer. 1st floor- 1 range 1 fireplace.2nd floor- 1 fireplace THIS PERMIT MAY BE REVOKED BY THE CITY OF SALEM UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Signature: Fee Type: Receipt No: Date Paid: Check No: Amount: GAS REC-2001-000632 03-Oct-00 01 $1,000.00 GeoTMS®1998 Des Lauriers&Associates,Inc. ��•�OND1T,� � C YSgVE AO 1 CITY OF SALEM BUILDING PERMIT DATE OF PERMIT PERMIT Ne. OWNER 110.7-0029-M LOCATION R3 (change name MARINERS VILLAGE AMERICAN PROPERTIES INC. � Condo Mana ement) SULICTLIBE MATERIAL DIMENSIONS No.OF STORIES lN@.OF FAMILIES WARfY COST r BUILDER FAFARD DEVELOPMENT CORP. MANAGEMENT COMPANY IS AMERICAN PROPERTIES INC 500 WEST CUMMINGS PARK WOBURN, MA 781-935-4200 USE MAP/LOT 1107-0029-840 for permits in which the condo management pays 1/11/00 11953-00 REPLACE DECKS: 118, 9, 11 HIBERNIA 6 112, 4 GRAND TURK. est. 28,000.00 fee 285.00 T.J.S. i . I . d ^ New Fafard Condos in FY1999 07/08/1999 Map Lot Suff No. Addr. Bldg 07 081 801 001 Cavendish Circle 176D 07 081 813 002 Cavendish Circle 174A 07 081 802 003 Cavendish Circle 1760 07 081 816 004 Cavendish Circle 174B 07 081 805 005 Cavendish Circle 1756 07 081 822 006 Cavendish Circle 173A 07 081 806 007 Cavendish Circle 175A 07 081 821 008 Cavendish Circle 1736 07 081 807 009 Cavendish Circle 175D 07 081 830 010 Cavendish Circle 171C 07 081 808 011 Cavendish Circle 175C 07 081 829 012 Cavendish Circle 171D 07 1 081 896 013 Cavendish Circle 181D 07 081 832 014 Cavendish Circle 171A 07 081 893 015 Cavendish Circle 181C 07 081 831 016 Cavendish Circle 1718 07 081 900 017 Cavendish Circle 182D 07 081 828 018 Cavendish Circle 170A 07 081 897 019 Cavendish Circle 182C 07 081 827 020 Cavendish Circle 1708 07 081 886 021 Cavendish Circle 1848 07 081 838 022 Cavendish Circle 168C 07 081 887 023 Cavendish Circle 184A 07 081 837 024 Cavendish Circle 168D 07 081 890 025 Cavendish Circle 183B 07 081 834 026 Cavendish Circle 169C 07 081 891 027 Cavendish Circle 183A. 07 081 833 028 Cavendish Circle 169D 07 081 892 029 Cavendish Circle 183D 07 081 836 030 Cavendish Circle '169A 07 081 889 031 Cavendish Circle 183C 07 081 835 032 Cavendish Circle 1698 07 081 883 033 Cavendish Circle 1858 07 081 840 034 Cavendish Circle 168A 07 081 884 035 Cavendish Circle 185A 07 081 839 036 Cavendish Circle 1688 07 081 881 1 037 Cavendish Circle 185D 07 081 846 038 Cavendish Circle 166C 07 081 882 039 Cavendish Circle 185C 07 081 845 040 Cavendish Circle 166D 07 081 888 041 Cavendish Circle 184D 07 081 842 042 Cavendish Circle 167C 07 1 081 885 043 Cavendish Circle 184C 07 081 841 044 Cavendish Circle 167D 07 081 879 045 Cavendish Circle 186B 07 081 844 046 Cavendish Circle 167A 07 081 880 047 Cavendish Circle 186A 07 081 843 048 Cavendish Circle 1678 07 081 877 049 Cavendish Circle 186D 07 081 848 050 Cavendish Circle 166A 07 081 878 051 Cavendish Circle 186C 07 081 847 052 Cavendish Circle 1666 07 081 875 053 Cavendish Circle 1878 07 081 850 054 Cavendish Circle 165C 07 081 876 055 Cavendish Circle 187A 07 1 081 849 056 Cavendish Circle 165D New Fafard Condos in FY1999 07/08/1999 ` 07 081 873 057 Cavendish Circle 187D . 07 081 852 058 Cavendish Circle 165A' 07 081 874 059 Cavendish Circle 1870` 07 081 851 060 Cavendish Circle 165B 07 081 871 061 Cavendish Circle 188B 07 081 854 062 Cavendish Circle 164C 07 081 872 063 Cavendish Circle 188A 07 081 853 064 Cavendish Circle 164D 07 081 811 065 Cavendish Circle 177B 07 081 856 066 Cavendish Circle 164A 07 081 812 067 Cavendish Circle 177A 07 081 855 068 Cavendish Circle 1648 07 081 858 070 Cavendish Circle 163C 07 081 857 072 Cavendish Circle 163D 07 081 860 074 Cavendish Circle" 163A 07 081 859 076 Cavendish Circle1638 07 081 864 078 Cavendish Circle 162C 07 081 863 080 Cavendish Circle 162D 07, 081 862 082 Cavendish Circle 162A 07 081 861 084' Cavendish Circle 162B 07 081 868 086 Cavendish Circle 161C 07 081 867 088 Cavendish Circle' 161D 07 081 866 090 Cavendish Circle 161A 07 081 865 092 Cavendish Circle 1618 07 081 903 001 Eclipse Lane 180B 07 081 895 002 Eclipse Lane 181A 07 081 904 003 Eclipse Lane 180A 07 081 894 1 004 Eclipse Lane 1818 07 081 901 005 Eclipse Lane 180D 07 081 899 006 Eclipse Lane 182A 07 081 902 007 Eclipse Lane 180C 07 081 898 008 Eclipse Lane 182B 07 1 081 907 009 Eclipse Lane 179B 07 1 081 870 010 Eclipse Lane 188C 07 081 908 011 Eclipse Lane 179A 07 081 869 012 Eclipse Lane 188D 07 081 905 1 013 Eclipse Lane 179D 07 081 906 015 Eclipse Lane 179C 07 081 910 017 Eclipse Lane 178B 07 081 911 019 Edipse Lane 178A 07 081 912 021 Eclipse Lane 178D 07 081 909 023 Eclipse Lane 178C 07 081 814 001 Fortune Way 174D 07 081 815 003 Fortune Way 174C 07 081 1 823 005 Fortune Way 173D 07 081 824 007 Fortune Way 173C 07 081 825 009 Fortune Way 170D 07 081 826 011 Fortune Way 170C 07 081 819 013 Fortune Way 172D 07 081 820 0151 Fortune Way 172C 07 081 809 1491 Whalers Lane 177D 07 081 810 151 Whalers Lane 177C 07 081 803 153 Whalers Lane I 1768 07 081 804 155 Whalers Lane 176A 07 081 817 177 Whalers Lane 172B 07 1 081 1 818 179 Whalers Lane 172A ¢o JOB SITE CC.-li'Y BUILDING CITY OF SALEM s l �`a SALEM, MASSACHUSETTS PERMIT: DATE .TPNI IGlRV 1 1 19 00 PERMITNO. _1210 APPLICANT MACE= IIQSTRI ICT T ON ADDRESS16 '" vim' � . - - (NO.) (STRE (COiPMICENSE) .CITY - MARBLEHEAD STATE MA ZIPCODE V11 `-34`:=; TEL.NO. MBEROF PERMIT TO REPAIR REGLAGEIYIEN NUELLING "(TYPE OF IMPROVEMENT) (NO ) STORY TWO 11 r7 (PROOSED USE) V DWELLING UNITS `: ii A7(LOCATION) 0 ZONING 0OJ AugnRA �i LINF I IA7T) i DISTRICT B (NO.)'__.(STREED _ _ _ BETWEEN. - AND (CROSS STREET) (CROSS STREET) LOT 'SUBDIVISION ML1D 177 LOT 1717=-r+� BLOCK 5414 SIZE 3 , 42 PERE2 BUILDING IS TO BE FT.WIDE BV FT.LONG BV F7.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS:CR F FI ( f) ( Kq__ #A_tl_ i 7 (aT F'tF TiU Y'G R. t41� 4 (a R('}I11[) '"I I({I+ T j _ 7 AREA ORcc PERMIT cc VOLUME ESTIMATED COST$ ^_G GAO@ FEE $ 28= 00 (CUBICISOUARE FEET) - `OWNER'- AMFR TGf-1NG�!'1tlG1FRTT F'4TNf' BUILDING DEPT. ADDRESS F•VI171 WFr;7 ('I IMMITNRR. Gq R4! - BY j�'r c THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLEY OR SIDEWALK OR ANY PART THEREOF,EITHER TEMPORARILY OR PERMANENTLY,ENCROACHMENTS ON PUBLIC PROPERTY;NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION,STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE-DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. - MINIMUM OFTHREE CALL INSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE `REQUIRED FOR ALL CONSTRUCTION WORK: POSTED UNTIL FINAL INSPECTION HAS BEEN'MADE. WHERE A PERMITS ARE REQUIRED FOR 1.FOUNDATIONS OR FOOTINGS. : ELECTRICAL,PLUMBING AND 2.�PRIOB TO COVERING STRUCTURAL" .CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL MECHANICAL INSTALLATIONS. MEMBERS(READY 70 LATH). - NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE, 3.FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS - PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS 1 )RTAN : An inspection is REQUIRED IF u on completion bfwork, please call 745-9595 Ext. 385 2.. 2 2 BOARD OF HEALTH: GAS INSPECTION APPROVALS FIRE DEPT.INSPECTING APPROVALS OTHER CITY ENGINEER . 2 2 WORK SHALL NOT PROCEED UNTIL THE .AS PERMIT WILL BECOME NULL AND VOID IF CONSTRUCTION WORK IS INSPECTIONSTNDICATEDON THIS CARD. INSPECTOR HAS APPROVED THE VARIOUS NOT STARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED 'CACI BE ARRANGED FOR BY TELEPHONE 'ST AGES OF CONSTRUCT ION� ; OR WRITTEN NOTIFICATION.,' - , ' � - Cl itp ofaYrrm, a� a� u�Qtt� PLANS MUST BE FILED AND APPROVED BY THE 'e5 '31 11 �+ ` 4 &q. INSPECTOR PRIOR TO A PERMIT BEING GRANTED -4 6-r J ice^ Location of Building Building Permit Application For: �C rcle whichever appligs) Roof, Reroof, Install Sidin onstruct Deck, hed,Pool Wrecking % Addition Alteratio epair/Rep ace ou ation Only, g Other: PLEASE FILL OUT LEGIBLY & COMPLETELY TO AVOID DELAYS IN PROCESSING m� )�o� \ To the Inspector of Buildings: The undersigned herebapplies for a permit to build according to the following specifications: Owners Name:! c �o er � Contractor: City Street) Streetl�ggJJ p d) _ �^ ( � ) C OC)L-0 CD Q State,/_ W Phone � �O) S3� ` Slate/ 1 a Phon (� Architect: !`y (C-I c-� _ City of Salem Licl Street Cit} State Lic# 6aq-7S 7 HIP# it's 7 State Phone ( ) Homeowners Exempt Form_yes ✓tto Structure: (please circle) Single Family, Iti Family# Other (D0, e c3 / Estimated Cost of job$ i Will building confirm to law.mss no Asbestos?__yes_no Description of work to be done: 4o e D Submitted:_ esl 1 .' noI Mail Permit to: X 0tv4P� X Sigrrature of cation, SIGNED UNDER THE PENALTY OF PERJURY CONSTRUCTION TO BE COMPLETED WITHIN SIX (6)MONTHS OF PERMIT ISSUED DATE co Department use only: Permit#�U Zoning Map/Lot .0c) Permit fee$ _ COMMENTS: 0074 CAVENDISH CIRCLE 1245-2000 GIS#:,"' l0119'.� � „y , COMMONWEALTH OF MASSACHUSETTS Map , s :u, 07 1 iz 7n 'AL3 ,u CITY OF SALEM Block:1 0081 ; Lot _. .,5" : r 860 .L Permlt a Budding ;; Categoryi id 102 New Single BUILDING PERMIT gle faul 1245-2000 Project# 4€JS-2000-0097 mss,; ; Est Cost , e; $107,17500 Fee $l;073.0Vh PERMISSION IS HEREBY GRANTED TO: Const. Class:, t kl. ;r ,,( Contractor: License. �7se Group J Fafard Development Corporation General Contractor-052848 Lot Size(sq.`ft) ,. r;n Owner: Fafard Development Corporation Zonurg ��,; ' E 9r as h Applicant: Fafard Development Corporation Units Gained:y P ..'. Units Lost AT. 0074 CAVENDISH CIRCLE ISSUED ON. 24-May-2000 EXPIRES ON. 24-Nov-2000 TO PERFORM THE FOLLOWING WORK: Bldg#163 .Unit A . Super Gallaria Style Construct 4 unit condominium building as per plans.T.J.S. POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Inspector of Buildings Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Final: Final: Rough Frame: Fireplace/Chimney: Gas Fire Department Board of Health Insulation: Rough: Oil: Final: Final: Smoke: Treasury: THIS PERMIT MAY BE REVOKED BY THE CITY OF SALEM UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Signature: Fee Type: Receipt No: Date Paid: Check No: Amount: BUILDING REC-2000-000101 24-May-00 01 $1,073.00 GeoTMS®2000 Des Lauriers Municipal Solutions,Inc. t New Fafard Condos in FY1999 04/06/1999 Map Lot Suff No. Addr. Bldg 07 081 801 001 Cavendish Circle 176B 07 081 813 002 Cavendish Circle 174A 07 081 802 003 Cavendish Circle 176A 07 081 816 004 Cavendish Circle 174B 07 081 805 005 Cavendish Circle 175D 07 081 822 006 Cavendish Circle 173A 07 081 806 007 Cavendish Circle 175C 07 081 821 008 Cavendish Circle 1736 07 081 807 009 Cavendish Circle 175B 07 081 830 010 Cavendish Circle 171A 07 081 808 011 Cavendish Circle 175A 07 081 829 012 Cavendish Circle 171B 07 081 896 013 Cavendish Circle 181D 07 081 832 014 Cavendish Circle 171C 07 081 893 015 Cavendish Circle 181C 07 081 831 016 Cavendish Circle 171D 07 081 900 017 Cavendish Circle 182D 07 081 828 018 Cavendish Circle 170A 07 081 897 019 Cavendish Circle 182C 07 081 827 020 Cavendish Circle 170B 07 081 886 021 Cavendish Circle 184B 07 081 838 022 Cavendish Circle 168A.. 07 081 887 023 Cavendish Circle 184A 07 081 837 024 Cavendish Circle 168B 07 081 890 025 Cavendish Circle 183B 07 081 834 026 Cavendish Circle 169A 07 081 891 027 Cavendish Circle 183A 07 081 833 028 Cavendish Circle 169B 07 081 892 029 Cavendish Circle 183D 07 081 836 030 Cavendish Circle 169C 07 081 889 031 Cavendish Circle 183C 07 081 835 032 Cavendish Circle 169D 07 081 883 033 Cavendish Circle 185B 07 081 840 034 Cavendish Circle 168C 07 081 884 035 Cavendish Circle 185A 07 081 839 036 Cavendish Circle 168D 07 081 881 037 Cavendish Circle 185D 07 081 846 038 Cavendish Circle 166A 07 081 882 039 Cavendish Circle 185C 07 081 845 040 Cavendish Circle 166B 07 081 888 041 Cavendish Circle 184D 07 081 842 042 Cavendish Circle 167A 07 081 885 043 Cavendish Circle 184C 07 081 841 044 Cavendish Circle 167B 07 081 879 045 Cavendish Circle 186B 07 081 844 046 Cavendish Circle 167C 07 081 880 047 Cavendish Circle 186A 07 081 843 048 Cavendish Circle 167D 07 081 1 877 1 049 Cavendish Circle 186D C New Fafard Condos in FY1999 04/06/1999 07 081 848 050 Cavendish Circle 166C 07 081 878 051 Cavendish Circle 186C 07 081 847 052 Cavendish Circle 166D 07 081 875 053 Cavendish Circle 187B 07 081 850 054 Cavendish Circle 165A 07 081 876 055 Cavendish Circle 187A 07 081 849 056 Cavendish Circle 165B 07 081 873 057 Cavendish Circle 187D 07 081 852 058 Cavendish Circle 165C 07 081 874 059 Cavendish Circle 187C 07 081 851 060 Cavendish Circle 165D 07 081 871 061 Cavendish Circle 188B 07 081 854 062 Cavendish Circle 164A 07 081 872 063 Cavendish Circle 188A 07 081 853 064 Cavendish Circle 164B 07 081 811 065 Cavendish Circle 177D 07 081 856 066 Cavendish Circle 164C 07 081 812 067 Cavendish Circle 177C 07 081L85 068 Cavendish Circle 164D 07 081 070 Cavendish Circle 163A 07 081 072 Cavendish Circle 1636 07 081 074 Cavendish Circle 163C 07 081076 Cavendish Circle 163D 07 081 078 Cavendish Circle 162A 07 081 080 Cavendish Circle 162B 07 081 862 082 Cavendish Circle 162C 07 081 861 084 Cavendish Circle 162D 07 081 868 086 Cavendish Circle 161A 07 081 867 088 Cavendish Circle 161 B 07 081 866 090 Cavendish Circle 161C 07 081 865 092 Cavendish Circle 161D 07 081 903 001 Eclipse Lane 180B 07 081 895 002 Eclipse Lane 181A 07 081 904 003 Eclipse Lane 180A 07 081 894 004 Eclipse Lane 181B 07 081 901 005 Eclipse Lane 180D 07 081 899 006 Eclipse Lane 182A 07 081 902 007 Eclipse Lane 180C 07 081 898 008 Eclipse Lane 182B 07 081 907 009 Eclipse Lane 179D 07 081 870 010 Eclipse Lane 188C 07 081 908 011 Eclipse Lane 179C 07 081 869 012 Eclipse Lane 188D 07 081 905 013 Eclipse Lane 179B 07 081 906 015 Eclipse Lane 179A 07 081 910 Ol7 Eclipse Lane 178B 07 081 911 019 Eclipse Lane 178A 07 081 912 021 Eclipse Lane 178D 07 081 909 023 Eclipse Lane 178C 07 1 081 814 001 Fortune Way I 174D New Fafard Condos in FY1999 04/06/1999 i 07 081 815 003 Fortune Way 174C 07 081 823 005 Fortune Way 173D 07 081 824 007 Fortune Way 173C 07 081 825 009 Fortune Way 170D 07 081 826 011 Fortune Way 170C 07 081 819 013 Fortune Way 172D 07 081 820 015 Fortune Way 172C 07 081 809 149 Whalers Lane 177B 07 081 810 151 Whalers Lane 177A 07 081 803 153 Whalers Lane 176D 07 081 804 155 Whalers Lane 176C 07 081 817 177 Whalers Lane 172B 07 081 818 179 Whalers Lane 172A l i I l� c N�4Y•ar� �,, I: ; , I 40 JJ N,�' V '� T w ✓: ,'�,A 1� ° V♦ ^ �� � 1 { ;� it II g . x 0�w `I ° ° ��' V 0 A �Oe x. m ♦ �� fMf vl t ti r Mf i31 , WETLAND i All ;7 A 6 DRi I So ul �� ♦ dU b s . 7 ' i , r � , ° A ♦ ; • A° � � i�Iii Xj Ca -Cl I Z, PHASE IV B M "GREEN DOLPHIN ''I. • tet VILLAGE" Q� ) ` � li', �� • � 3 � I�j� Imo- N' . � D m ,�` t' I �0.�� WETLAND N / - • ' �; i CP NO. City of Salem Lj�� Ward 7� �sa""' COQ�if uH.cwa O n Cmt� r>`l A r'4ruen 'r o9 cw i3' Coach s APPLICATION °? �a Ilei ' a s FOR PERMIT TO BUILD ADDITION, MAKE ALTERATIONS OR, W CONSTRUCTION IMPORTANT-Applicant toAr— complete all Items in sectlo/n/s:'1 ill, 111, 1V, and IX- 1. AT(LOCATIOM ��1/P1/V'H= /� DIISTRICT LOCATION NO' OF BETWEEN AND iu+osssmUn 1cRos3sTmn BUILDING 1.LOT SUBDIVISION LOT_BLOCK SIZE IL TYPE AND COST OF BUILDING -All applicants complete PartslW D A. TY,,�rPAAE OF IMPROVEMENT - D. PROPOSED USE-FOR—DEMOLITION"USE MOST RECENT USE 1 0 Naw Wilding ReeMMtlal Nonrealdandal 2 ❑fr-- 1, � Addlifon rd Rsdeneal,anter number of new 12 ❑' One famnY 18 ❑ Amuueemenk nerieatgMl housing units added,d any,a part D.13) �� /' 19 Chruch other rel 13 ❑6TH or ore lamely•En number ❑ p 3 ❑ Aaemtan(Sin 2 aboel 20 hdustrial 21 ❑jParkin0gge d ❑ Planar rspaurthem 14 t hotN,motel,or dormitory \vEnsvnumbwof units zz ❑ SwviusutlonroW+ganga 5 C3Wmd,.V M musdan*nasileneaL enter number ) , 23 ❑ Hpapitak Institutional d units a building m Part D. 13) ,,I1\`I1,\••.15/{,'❑. eGaraga 24 C] Otrict.bank.pmlesacnel 6 C] Wkrong(relocation) \\J�(�!\V i'8'❑ 25 ❑ Pudic utility 7 [3Foundaton only �\ ❑ 26 ❑ School,ebnary.other edtr®tiorul RR 17 Other•specify 27 ❑ Stores,mercantile B.OWNERSHIP " 28 ❑ Tanks,towers 8 Primate landniduaL corporation,nonprolil29 ❑ Other.Specdy nstitution,etc) 9 ❑ Public tFederal.Slate.or local m goueme; y" C.COST �A (oma cents) Nonresidential-Oescnbe in detail proposed use of buildings.e.0.food procenaig Wank machinep shop,laundry Wading at hwvitak elementary school.secondary echool,college. 10. Cost of imppmemont Ni S parochial sUnocl,parking gareage for departr t store.rental office budding,office building ///////// Fd at Industrial plant d use d existing Wadig is bang changed.enter proposed use. To be intoned but not included// in a above cost /J� I! a Eluosncal ,,,t b. Plumbing D :/ 'cLj� ' /// r Q Hinting.ar coddbning 0 (1✓'`pp �U d. COW(elevator,etc.) 11. TOTAL COST OF IMPROVEMENT III. SELECTED CHARACTERISTICS OF BUILDING -For new buildings and additions, complete Parts E-L;demolition, complete only Parts J& M, all others skip to IV E. PRINCIPAL TYPE OF FRAME F. PRINCIPAL TYPE OF HEATING FUEL G. TYPE OF SEWAGE DISPOSAL I. TYPE OF MECHANICAL 30 Cl MasonY(wan bw") 35 [Z Gas 40 Lel Public or private company will Neve be central ail 31 H Wood tame 36 C] Oil 41 E] PMab(septic tank Gk_) cadaMn07 32 ❑ Structural ateel - 37 ❑ Electricity 44X Yes 45 [:] No 33 I^I1.Reinforced concrete 38 Elcoal H. TYPE OF WATER SUPPLY Will there by an eleva,y) 34 I U Ot7w•Snarly 39 ❑ 06w-Specify 42 Public or W.I.g nV y 48 ❑ Yes- 47.,[No I7 43 ❑ Pdvab twelk cistem) FAFFARD UPC 10330 N HASTINGS. NN GREEN DOLPHIN VILLAGE MARINER VILLAGE �e/1 1/40 =� 71 BRITTANIA CIRCLE SALEM, MA 01970 TOAlz�_ 'l � t�_� c�4ar rc' Company: � Phone: 57?q/1let rn5T'e /n Fax: From: HARRY MACK Company: FRE BUILDING COMPANY,INC. Phone: (978) 740-0122 Fax: (978) 740-4463 Date: 61-:311 Pages including this cover page: Comments: /eez S P F//I Q r 7,2_ G P'rj � ,a 7 61 / 7c Prr rs iIT Rtf rl77 i i4 ,0 /7 511 else ra �� j.. 14� j — . DAILY FIELD REPORT REPORT NO. 286 PROJECT MARINER VILLAGE DATE 11 MAY 1999 SALEM, MASSACHUSETTS PAGE 1 of 2 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 60's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. The blasting subcontractor (Akerley Drilling and Blasting) continued drilling and blasting activities on site. Blasting activities and blast induced ground vibrations and air overpressures were not monitored by Haley & Aldrich, Inc. 2. Continued installing form work for the boulder wall footing along First Street from the east end of the wall to approximately the center of the wall. The forms were tied to rock dowels inserted along the wall footing. A steel mesh was installed at several locations in the area where the base of the footing slopes down toward Swampscott Road parallel to the wall. The mesh was installed vertically and perpendicular to the front of the forms in order to restrain the concrete from running down the slope during placement. 3. Cleaned the rock surface in the area where concrete will be placed today using a water hose. 4. C&B's concrete contractor, Duggan concrete foundations, poured 44 cy of concrete for the eastern 50 ft (at upslope side of wall, furthest away from Swampscott Road) of the boulder wall footing at a 1V:6H pitch sloping down toward the proposed buildings. Also poured areas in the remaining (western) portion of the wall nearest the front forms to reduce the height of tomorrow's concrete pour. Rocks were installed at the western-most end of today's pour to create additional sliding resistance for base boulders placed on the sloping portion of the footing. Eight sample cylinders were taken by Universal Testing Service of Stoneham, Massachusetts. 5. Placed armor stone in a 1H:1V slope covering placed and compacted rockfill along Swampscott Road in an area approximately 150 to 200 ft from the corner of the rockslope as indicated on the attached site sketch. Two ropes attached to toe stones on the bottom of the slope and a wood stake at the top of the slope were used to maintain the correct slope. 6. Using a CAT 330 L Excavator, placed rockfill in the rockslope along Swampscott Road, approximately 300 to 400 ft from the corner of the rock slope (near intersection of First Street and Swampscott Road). No Compaction equipment was used. 1I. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Met with Mr. Bruce Ross (C&B Construction) to discuss Rock fill placement methods. The field representative noted that rockfill had been placed as described above since the last site visit. Informed Mr. Ross that rockfill needs to be placed and compacted in lifts starting at the base of the slope. Mr. Ross stated that the lower portion of the wall was constructed by placing and compacting rockfill in lifts, and the present upper portion (approximately in the center of the proposed rockslope) was compacted using a vibratory roller. The remaining area in the middle could not be constructed in the same way due to access and limited space related issues. Instead, the rockfill was placed using an Excavator, and was tamped in using the DAILY FIELD REPORT REPORT NO. 285 PROJECT MARINER VILLAGE DATE 10 MAY 1999 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 60's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. The blasting subcontractor (Akerley Drilling and Blasting) continued drilling and blasting activities on site. Blasting activities and blast induced ground vibrations and air overpressures were not monitored by Haley & Aldrich, Inc. 2. Installed form work for the boulder wall footing along First Street from the east end of the wall to approximately the center. The forms were tied to rock dowels inserted along the wall footing. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Met with Mr. Bruce Ross (C&B Construction) to discuss project schedule and further cleaning of the rock surface. Requested that the rock surface be washed with water to remove dust and soil particles from rock surface. Also requested that rock dowels be cut prior to pouring concrete below the level of the concrete so dowels will receive approximately 3 in. of coverage. The dowels that have forms tied to them and cannot be cut now need to be cut as close as possible to the concrete and covered to protect the dowels from corrosion. Mr. Ross stated that the portion that was formed today will be poured tomorrow (11 May 1999) at noon time and cylinder samples will be taken to be sent out for compressive strength testing. Attachments: - none FIELD REPRESENTATIVES) TIME ON SITE REPORT O. Holmstrom 1300-1430 hrs. 0.50 4.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Ann.: Mr. Harold Mack /2 F:\11878\DFR'S\DFR285.WPF Haley & Aldrich, Inc. DAILY FIELD REPORT 7REPORT NO. 284 PROJECT MARINER VILLAGE DATE 6 MAY 1999 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: OVERCAST TEMP. 50's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Excavated loose, fractured rock from the proposed bottom of machine build dry stone retaining wall and placed large (>400 Ib) base stones in the area indicated on the attached site sketch (approx 400-450 ft from corner of First Street and Swampscott Road). 2. The blasting subcontractor (Akerley Drilling and Blasting) continued drilling and blasting activities along Swampscott Road and elsewhere on site. Blasting activities and blast induced ground vibrations and air overpressures were not monitored by Haley & Aldrich, Inc. 3. Laid out approximate limits of the boulder wall base along First Street. Marked minimum concrete footing thickness on the installed dowels with ribbons and string. 4. Constructed small (5 - 10 ft in height) boulder wall near unit 178. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Met with Mr. Bruce Ross (C&B Construction) to discuss project schedule and further cleaning of the rock surface. Attachments: - none FIELD REPRESENTATIVE(S) TIME ON SITE REPORT O. Holmstrom 0945-1215 hrs. 0.50 4.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Ann.: Mr. Harold Mack F:\11878\DFR'S\DFR284.WPF Haley &�_ch, Inc. . ' DAILY FIELD REPORT REPORT NO. 283 PROJECT MARINER VILLAGE DATE 5 MAY 1999 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: PARTLY CLOUDY TEMP. 50's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Excavated loose, fractured rock from the proposed bottom of machine build dry stone retaining wall and placed large (>400 Ib) base stones in the area indicated on the attached site sketch (approx 400-450 ft from corner of First Street and Swampscott Road). 2. The blasting subcontractor (Akerley Drilling and Blasting) continued drilling and blasting activities along Swampscott Road and elsewhere on site. Blasting activities and blast induced ground vibrations and air overpressures were not monitored by Haley & Aldrich, Inc. 3. Laid out approximate limits of the boulder wall base along First Street. Marked minimum concrete footing thickness on the installed dowels with ribbons and string. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Met with Mr. Bruce Ross (C&B Construction) and C&B surveying personnel to discuss requirements for boulder wall footing location and extent. Attachments: - Site Sketch A FIELD REPRESENTATIVE(S) TIME ON SITE REPORT O. Holmstrom 0800-0930, 1315-1445 hrs. 0.50 4.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Attn.: Mr. Harold Mack FA 1878\DFR'S\DFR283.WPF Haley & Aldrich, Inc. DAILY FIELD REPORT 7REPORT NO. 282 PROJECT MARINER VILLAGE DATE 4 MAY 1999 SALEM, MASSACHUSETTS PAGE I of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: RAIN TEMP. 50's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Cleaned rock surface at the proposed boulder wall footing location with shovel and broom. 2. Excavated loose, fractured rock from the proposed bottom of machine build dry stone retaining wall and placed large (>400 lb) base stones in the area indicated on the attached site sketch (approx 400-450 ft from corner of First Street and Swampscott Road). 3. The blasting subcontractor (Akerley Drilling and Blasting) continued drilling and blasting activities along Swampscott Road and elsewhere on site. Blasting activities and blast induced ground vibrations and air overpressures were not monitored by Haley & Aldrich, Inc. 4. Laid out approximate limits of the boulder wall base along First Street. Marked minimum concrete footing thickness on the installed dowels with ribbons and string. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Met with Mr. Bruce Ross (C&B Construction) and C&B surveying personnel to discuss requirements for boulder wall footing location and extent. Attachments: - Site Sketch A FIELD REPRESENTATIVE(S) TIME ON SITE REPORT O. Holmstrom 1300-1530 hrs. 0.50 4.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Attn.: Mr. Harold Mack - � 1 F:\11878\DFR'S\DFR282.WPF Haley & Aldrich, Inc. DAILY FIELD REPORT REPORT NO. 281 PROJECT MARINER VILLAGE DATE 3 MAY 1999 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: MOSTLY CLOUDY, OCCASIONAL DRIZZLE TEMP. 50's L CONTRACTOR'S EARTHWORK ACTIVITIES: 1. The blasting subcontractor (Akerley Drilling and Blasting) continued drilling and blasting activities along Swampscott Road and elsewhere on site. Blasting activities and blast induced ground vibrations and air overpressures were not monitored by Haley & Aldrich, Inc. 2. Excavated loose, fractured rock from the proposed bottom of machine built dry stone retaining wall and placed large (>400 lb) base stones in the area indicated on the attached site sketch (approx 350-400 ft from corner of First Street and Swampscott Road). 3. Placed armor stone in a IH:IV slope covering placed and compacted rockfill along Swampscott Road in the area indicated on the attached site sketch. Two ropes attached to toe stones on the bottom of the slope and a wood stake at the top of the slope were used to maintain the correct slope. 4. Laid out approximate limits of the boulder wall base along First Street. Marked minimum concrete footing thickness on the installed dowels with ribbons and string. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Met with Mr. Bruce Ross (C&B Construction) to discuss project progress and schedule. Mr. Ross stated that more of the rock surface surrounding the proposed boulder wall will be cleaned as soon as it has been laid out. Mr. Ross stated that a ramp will be constructed tomorrow to allow construction vehicle access to behind the base stones placed along Swampscott to begin placing and compacting rockfill in the area. 3. Recommended to Mr. Ross that the footings for a portion of building No. 166 be lowered such that the back of the boulder wall remains 3 ft away from a 1H:1 V line starting at the bottom outer edge of the building footing. Alternatively, lean concrete fill can be placed under the footing, resting on suitable bearing material, sufficiently to ensure that the back of the boulder wall remains 3 ft away from a 1H:IV line starting at the bottom outer edge of the building footing. Attachments: Site Sketch A FIELD REPRESENTATIVEISI TIME ON SITE REPORT O. Holmstrom 0800 - 1545 hrs. 0.50 8.25 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Atm.: Mr. Harold Mack FAI1878\DFR'S\DFR281.WPF HaI6 & Aldrich, Inc. DAILY FIELD REPORT REPORT NO. 280 PROJECT MARINER VILLAGE DATE 29 APR 1999 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: OVERCAST TEMP 40's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. The blasting subcontractor (Akerley Drilling and Blasting) continued drilling and blasting activities on site. Blasting activities and blast induced ground vibrations and air overpressures were not monitored by Haley & Aldrich, Inc. 2. Removed approximately 8 trailer loads of blast rock from the site between 0800 and 1415. 3. Excavated loose, fractured rock from the proposed bottom of machine build dry stone retaining wall and placed large (>400 Ib) base stones in the area indicated on the attached site sketch. 4. Installed 11, 6 to 8 ft long 1-in. diameter (118) bars in holes drilled along First street. The holes were filled with grout prior to inserting the bars, and the bars were vibrated by hand. 5. Placed armor stone in a 1H:1V slope covering placed and compacted rockfill along Swampscott Road in the area indicated on the attached site sketch. Two ropes attached to toe stones on the bottom of the slope and a wood stake at the top of the slope were used to maintain the correct slope. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Met with Mr. Bruce Ross to discuss site activities. The field representative informed Mr. Ross that all loose rock at the bottom of the rock slope along Swampscott Road is to be removed prior to placing base stones for the armor stone wall. Also requested that part of a tree trunk and surrounding soil in the rock slope along Swampscott Road be removed prior to placing additional rockfill in the area. Attachments: - Site Sketch A FIELD REPRESENTATIVE(S) TIME ON SITE REPORT O. Holmstrom 0800 - 1415 his. 0.50 6.75 his. total DISTRIBUTION, Fafard Real Estate and Development Corporation; Arm.: Mr. Harold Mack F:\11678\DFR'S\DFR280.WPF Haley Aldrich, Inc. DAILY FIELD REPORT REPORT NO. 279 PROJECT MARINER VILLAGE DATE 28 APR 1999 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 50's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT D8 Bulldozer, placed and compacted 15 in. minus blastrock near the proposed location of building 166, as shown on the attached site sketch. Blastrock was placed in 20-in. thick lifts. Compactive effort was applied to lift with 6 to 8 passes of a Bomag BW 172 D-2 Single Drum Vibratory Roller in area indicated on the attached site sketch. 2. The blasting subcontractor (Akerley Drilling and Blasting) continued drilling and blasting activities on site. Blasting activities and blast induced ground vibrations and air overpressures were not monitored by Haley & Aldrich, Inc. 3. Using a CAT 330L with hoe-ram attachment, excavated small amount (<5 cy) of bedrock at the proposed bottom of the machine built dry stone retaining wall along Swampscott Road. 4. Removed approximately 2 trailer loads of blast rock from the site. 5. Excavated loose, fractured rock from the proposed bottom of machine built dry stone retaining wall and placed large (>400 lb) base stones in the area indicated on the attached site sketch. 6. Delivered 6, No. 8 Grade 60 steel bars to the site for use as rock dowels along First Street. 7. Placed armor stone in a 1H:1V slope covering placed and compacted rockfill along Swampscott Road in the area indicated on the attached site sketch. Two ropes attached to toe stones on the bottom of the slope and a wood stake at the top of the slope were used to maintain the correct slope. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Located 6 points along the boulder gravity wall footing alignment and requested that North Shore Survey determine elevation and location of the points to aid in locating the face of the gravity wall footing. Attachments: - Site Sketch A FIELD REPRESENTATIVE(S) TIME ON SITE REPORT O. Holmstrom 0800 - 1600 hrs. 0.50 8.5 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Arm.: Mr. Harold Mack FAI1878\DFR'S\DFR279.WPF c Haley c Aldrich, Inc. DAILY FIELD REPORT REPORT NO. 278 PROJECT MARINER VILLAGE DATE 27 APR 1999 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: MOSTLY SUNNY TEMP. 50's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. The blasting subcontractor (Akerley Drilling and Blasting) continued drilling and blasting activities on site. Blasting activities and blast induced ground vibrations and air overpressures were not monitored by Haley & Aldrich, Inc. 2. Removed approximately 10 trailer loads of blast rock from the site along Swampscott Road from 0830 to 1100. 3. Placed armor stone in a 1H:1V slope covering placed and compacted rockfill along in corner of slope near the intersection of Swampscott Road and First Street in the area indicated on the attached site sketch. Two ropes attached to toe stones on the bottom of the slope and a wood stake at the top of the slope were used to maintain the correct slope. H. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Met with Mr. Bruce Ross (C & B Construction) regarding boulder wall footing construction. Mr. Ross stated that additional N8 bars will be delivered and installed tomorrow. Formwork for the footing may not be installed until Friday 30 April 1999. 3. Spoke with Mr. Harry Mack (Fafard) in a telephone conversation at 1100. Informed Mr. Mack about C&B's planned activities today. Mr. Mack stated that no field representative was required the rest of the day since no rockfill will be placed and no work on the boulder wall along First Street will be performed. Attachments: - Site Sketch A FIELD REPRESENTATIVE(S) TIME ON SITE REPORT O. Holmstrom 0830 - 1100 hrs. 0.50 4.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Arm.: Mr. Harold Mack al F:\11878\DFR'S\DFR278.WPF Haley & Aldrich, Inc. DAILY FIELD REPORT REPORT NO. 277 PROJECT MARINER VILLAGE DATE 26 APR 1999 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: PARTLY CLOUDY, OCCASIONAL DRIZZLE TEMP. 60's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Stockpiled blastrock suitable for use as rockfill near the loam stockpile in the approximate location indicated on the attached site sketch. 2. Installed 49, 6 to 8 ft long 1-in. diameter (!/8) bars in holes drilled along First street. Two 3/4- in. (J/6) bars were paired in three of the holes. The holes were filled with grout prior to inserting the bars, and the bars were vibrated in place by hand. 3. The blasting subcontractor (Akerley Drilling and Blasting) continued drilling and blasting activities along Swampscott Road and elsewhere on site. Blasting activities and blast induced ground vibrations and air overpressures were not monitored by Haley & Aldrich, Inc. 4. Removed approximately 20 trailer loads of blast rock from the site from 0800 to 1600. 5. Placed armor stone in a 1H:1V slope covering placed and compacted rockfill along Swampscott road in the area indicated on the attached site sketch. Two ropes attached to toe stones on the bottom of the slope and a wood stake at the top of the slope were used to maintain the correct slope. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Met with Mr. Bruce Ross (C & B Construction) regarding boulder wall footing construction. Mr. Ross stated that the area will be cleaned today with shovel and broom, and will be hosed off once the grout around the dowels has cured. The field representative requested that two cylinder samples of the grout be taken and tested for compressive strength. Mr. Ross stated that when the footing is poured, and samples of concrete are taken, C&B will mix a batch identical to what was used today, and use it for compressive strength testing. 3. Met with Mr. Ron Bartolini (Fafard) regarding wall footing along First Street. Mr. Bartolini asked what was required as far as removing soil and loose rock within the footing footprint. The field representative stated that the entire area that will receive concrete shall be cleaned with shovels and brooms, and preferably washed with water. The field representative confirmed that the Contractor plans to do so. Attachments: - Site Sketch A FIELD REPRESENTATIVE(S) TIME ON SITE REPORT O. Holmstrom 0800 - 1600 hrs. 0.50 8.5 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Atm.: Mr. Harold Mack FM 1878\DFR'S\DFR277.WPF Haley & Aldrich, Inc. DAILY FIELD REPORT REPORT NO. 276 PROJECT MARINER VILLAGE DATE 23 APR 1999 SALEM, MASSACHUSETTS PAGE 1 of I CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: RAINY TEMP. 50's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT 330 excavator with hoe-ram attachment, fractured large boulders to conform to rockfill maximum particle size specifications (15 in.). 2. Stockpiled blastrock suitable for use as rockfill near the loam stockpile in the approximate location indicated on the attached site sketch. 3. The blasting subcontractor (Akerley Drilling and Blasting) continued drilling and blasting activities along Swampscott Road and elsewhere on site. Blasting activities and blast induced ground vibrations and air overpressures were not monitored by Haley & Aldrich, Inc. 4. Removed approximately 7 trailer loads of blast rock from the site prior to 10:30 (field representative left the site at 10:30). 5. Placed armor stone in a 1H:1V slope covering placed and compacted rockfill along Swampscott road in the area indicated on the attached site sketch. Two ropes attached to toe stones on the bottom of the slope and a wood stake at the top of the slope were used to maintain the correct slope. Placement of the first level above the base stones only was observed by the field representative. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Met with Mr. Bruce Ross (C & B Construction) regarding project progress and schedule. He stated that they will continue working on the boulder wall along Swampscott Road all day today. Mr. Ross also stated that dowels will not be inserted and grouted in the drilled holes along First Street until Monday 26 April. 3. Spoke with Mr. Harry Mack (Fafard) in a telephone conversation. Informed Mr. Mack about C&B's planned activities today. Mr. Mack stated that no field representative was required the rest of the day since no rockfill will be placed and no work on the boulder wall along First Street will be performed. Attachments: - Site Sketch A FIELD REPRESENTATIVE(S) TIME ON SITE REPORT O. Holmstrom 0800 - 1030 hrs. 0.50 4.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Attn.: Mr. Harold Mack F:\11878\DFR'S\DFR276.WPF Haley & Aldrich, Inc. MM DAILY FIELD REPORT 7REPORT NO. 275 PROJECT MARINER VILLAGE DATE 22 APR 1999 SALEM, MASSACHUSETTS PAGE I of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: OVERCAST TEMP. 50's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT 330 excavator with hoe-ram attachment, fractured large boulders to conform to rockfill maximum particle size specifications (15 in.). 2. Stockpiled blastrock suitable for use as rockfill near the loam stockpile in the approximate location indicated on the attached site sketch. 3. The blasting subcontractor (Akerley Drilling and Blasting) continued drilling and blasting activities along Swampscott Road and elsewhere on site. Blasting activities and blast induced ground vibrations and air overpressures were not monitored by Haley & Aldrich, Inc. 4. Removed approximately 12 trailer loads of blast rock from the site. 5. Placed armor stone in a 1H:1V slope covering placed and compacted rockfill along Swampscott road in the area indicated on the attached site sketch. Two ropes attached to toe stones on the bottom of the slope and a wood stake at the top of the slope were used to maintain the correct slope. 6. Delivered 16, No. 8 Grade 60 steel bars to the site for use as rock dowels along First Street. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Met with Mr. Bruce Ross (C & B Construction) regarding project progress and schedule. He stated that they will continue working on the boulder wall along Swampscott Road tomorrow. Mr. Ross also stated that dowels will not be inserted and grouted in the drilled holes along First Street until tomorrow. Informed Mr. Ross that the diameter of the holes drill for dowels is smaller than 3 in., as shown on the detail in a Haley & Aldrich Memorandum dated 16 April 1999. Attachments: - Site Sketch A FIELD REPRESENTATIVE(S) TIME ON SITE REPORT O. Holmstrom 0815 - 1530 hrs. 0.50 7.75 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Atm.: Mr. Harold Mack 17 Y F:\11878\DFR'S\DFR275.WPF Hafey & Aldrich, Inc. DAILY FIELD REPORT REPORT NO. 274 PROJECT MARINER VILLAGE DATE _ 21 APR 1999 SALEM, MASSACHUSETTS PAGE 1 of 2 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 50's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT D8 Bulldozer, placed and compacted 15 in. minus blastrock near corner of Swampscott Road and First Street, as shown on the attached site sketch. Blastrock was placed in 20-in. thick lifts. Compactive effort was applied to lift with 6 to 8 passes of a Bomag BW 172 D-2 Single Drum Vibratory Roller in area indicated on the attached site sketch. 2. Using a CAT 330 excavator with hoe-ram attachment, fractured large boulders to conform to rockfill maximum particle size specifications (15 in.). 3. Stockpiled blastrock suitable for use as rockfill near the loam stockpile in the approximate location indicated on the attached site sketch. 4. The blasting subcontractor (Akerley Drilling and Blasting) continued drilling and blasting activities along Swampscott Road and elsewhere on site. Blasting activities and blast induced ground vibrations and air overpressures were not monitored by Haley & Aldrich, Inc. 5. The blasting subcontractor drilled 28, 1.5-in. diameter (approximately), 4-ft deep holes in locations laid out by C & B construction personnel. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Noted that the holes for rock dowels along First Street were not drilled in the locations as planned. Holes were drilled 1 to 10 ft closer to the building than the planned location. Recommended additional holes be drilled in areas where the slope of the bedrock exceeds 20° (toward First Street). 3. Met with Mr. Bruce Ross (C & B Construction) regarding project progress and schedule. He stated that they will continue working on the boulder wall along Swampscott Road tomorrow. Mr. Ross also stated that dowels will be inserted and grouted in the drilled holes along First Street tomorrow. DAILY FIELD REPORT REPORT NO. 273 PROJECT MARINER VILLAGE DATE 20 APR 1999 SALEM, MASSACHUSETTS PAGE 1 of I CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 60's 1. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT D8 Bulldozer, placed and compacted 15 in. minus blastrock near corner of Swampscott Road and First Street, as shown on the attached site sketch. Blastrock was placed in 20-in. thick lifts. Compactive effort was applied to lift with 6 to 8 passes of a Bomag BW 172 D-2 Single Drum Vibratory Roller in area indicated on the attached site sketch. 2. The blasting subcontractor (Akerley Drilling and Blasting) continued drilling and blasting activities along Swampscott Road and elsewhere on site. Blasting activities and blast induced ground vibrations and air overpressures were not monitored by Haley & Aldrich, Inc. 3. The blasting subcontractor drilled thirty-six 1.5-in.-diameter (approximately), 4-ft deep holes in locations laid out by C & B construction personnel. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Noted that the holes for rock dowels along First Street were not drilled in the locations as planned. It appears the rock slope has been scaled to remove loose rock, creating a steep slope in the original boulder gravity wall location. Holes were drilled 1 to 10 ft closer to the building than the planned location. 3. Met with Mr. Bruce Ross (C & B Construction) regarding project progress and schedule. He stated that they will continue working on the boulder wall along Swampscott Road tomorrow. Mr. Ross also stated that Akerley will return tomorrow to drill the remaining 4-ft deep holes for dowels along First Street tomorrow. The field representative informed Mr. Ross that the relocation of the wall may require reinforcement of the boulder wall should the back base of the wall be within 3 ft of a IH:1V line down and toward the street from the bottom of footings of building 166. 4. Met with Mr. Harold Mack (FAFARD Real Estate and Development Corp.) to discuss project progress. Mr. Mack stated that Haley & Aldrich is not expected to monitor blasting activities. The field representative confirmed with Mr. Mack that Haley & Aldrich should be on-site during wall construction and backfilling operations near the intersection of First Street and Swampscott Road. Attachments: Site Sketch - A FIELD REPRESENTATIVE(S) TIME ON SITE REPORT 0. Holmstrom 0800 - 1600 hrs. 0.50 8.5 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Ann.: Mr. Harold Mack i F:\11878\DFR'S\DFR273.WPF Ha ey & Aldrich, Inc. DAILY FIELD REPORT 7REPORT NO. 272 PROJECT MARINER VILLAGE DATE 19 APR 1999 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 50's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. None observed. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Met with Bruce Ross (C & B Construction) regarding today's site activities and future schedule. He stated that no work will be done at the corner of First Street and Swampsoctt Street today. Tomorrow C & B plans to remove soil and loose rock from the rock slope, perform layout, and begin installation of dowels for the concrete footing, as discussed in the 16 April 1999 Haley & Aldrich memorandum. No rockfill will be placed and compacted within building footprints today. Attachments: - None FIELD REPRESENTATIVES) TIME ON SITE REPORT O. Holmstrom 0800 - 0900 hrs. 0.0 4.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Arm.: Mr. Harold Mack FM 1878\DFR'S\DFR272.WPF Haley &Aldrich, Inc. .j DAILY FIELD REPORT REPORT NO. 271 PROJECT MARINER VILLAGE DATE 02 APR 1999 SALEM, MASSACHUSETTS PAGE 1 of I CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: CLOUDY TEMP. 50's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Removed blastrock and transported material to an on-site blastrock stockpile. 2. Using a CAT D8 Bulldozer and a CAT 330L excavator, placed and compacted a 12- to 16-in.- thick lift of off-site processed gravel at the site of building No. 172, as shown on the attached site sketch. Compactive effort was applied to the lift with 6 to 8 passes of a Bomag BW 172 D- 2 Single Drum Vibratory Roller. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Met with Bruce Ross (C & B Construction) regarding today's site activities and future schedule. He stated that he would be in contact with Haley & Aldrich when he needed a field representative on site. Attachments: - Site Sketch-A FIELD REPRESENTATIVES) TIME ON SITE REPORT S.Leighton 0800 -1600 hrs. 0.0 8.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Atm.: Mr. Harold Mack 7 . a F:\11878\DFR'S\DFR271.WPF Haley & Aldrich, Inc. �. DAILY FIELD REPORT REPORT NO. 270 PROJECT MARINER VILLAGE DATE 01 APR 1999 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 60's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Removed blastrock from area shown on attached sketch and transported material to the site of building No. 172. 2. Using a CAT D8 Bulldozer, placed and compacted 15 in. minus blastrock for building No. 172, as shown on the attached site sketch. Blastrock was placed in 20-in. thick lifts. Compactive effort was applied to lift with 6 to 8 passes of a Bomag BW 172 D-2 Single Drum Vibratory Roller. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Met with Bruce Ross (C & B Construction) regarding today's site activities and future schedule. Attachments: - Site Sketch-A FIELD REPRESENTATIVE(S) TIME ON SITE REPORT S.Leighton 0800 -1600 hrs. 0.0 8.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Ann.: Mr. Harold Mack F:\11878\DFR'S\DFR270.WPF Haley & Al ri�c DAILY FIELD REPORT REPORT NO. 269 PROJECT MARINER VILLAGE DATE 31 MAR 1999 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 60's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Removed blastrock from area shown on attached sketch and used material to construct a temporary road to access the site of building No. 172. 2. Using a CAT D8 Bulldozer, placed and compacted 15 in. minus blastrock for the construcction access road, as shown on the attached site sketch. Blastrock was placed in 20-in. thick lifts. Compactive effort was applied to lift with 6 to 8 passes of a Bomag BW172 D-2 Single Drum Vibratory Roller in area indicated. 3. A 12 to 16 in. thick lift of off-site processed gravel was placed on the blastrock surface at the site of building 173. Compactive effort was applied to the lift by 6 to 8 passes of a Bomag BW 172 D-2 Single Drum Vibratory Roller. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. Attachments: - Site Sketch-A FIELD REPRESENTATIVE(S) TIME ON SITE REPORT S.Leighton 0800 -1600 hrs. 0.5 8.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Attn.: Mr. Harold Mack 12 17 � F:\11878\DFR'S\DFR269.WPF Ha ey & Aldrich, Inc. r . DAILY FIELD REPORT REPORT NO. 268 PROJECT MARINER VILLAGE DATE 29 MAR 1999 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 60's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. At building No. 173, compactive effort was applied to lift of rock fill that was placed before field representitive arrived on site with 6 to 8 passes of a Bomag BW172 D-2 Single Drum Vibratory Roller. 2. Using a CAT D8 Bulldozer, placed and compacted 15 in. minus blastrock for building No. 173, as shown on the attached site sketch. Blastrock was placed in 20-in. thick lifts. Compactive effort was applied to lift with 6 to 8 passes of a Bomag BW 172 D-2 Single Drum Vibratory Roller in area indicated. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. Attachments: - Site Sketch-A FIELD REPRESENTATIVES) TIME ON SITE REPORT S. McDonough 1245-1600 hrs. 0.0 4.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Ann.: Mr. Harold Mack F:\11878\DFR'S\DFR268.WPF Haley & Aldrich, Inc. DAILY FIELD REPORT REPORT NO. 267 PROJECT MARINER VILLAGE DATE 22 FEB 1999 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 40 to 50 I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a Caterpillar 330B excavator, completed placement of 11/2 inch crushed stone as a subbase for proposed building pad No. 174. Compactive effort was applied to each lift by 4 to 5 passes of a Bomag BW172 D-2 Single Drum Vibratory Roller. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. The field representative observed the condition of the compacted subbase material and judged that it was acceptable for building construction. Attachments: - Site Sketch-A FIELD REPRESENTATIVE(S) TIME ON SITE REPORT J. Peasley 0900-1200 hrs. 0.0 4.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Attn.: Mr. Harold Mack / \ nc F:\11878\DFR'S\DFR267.WPF Haley & Aldrich, Inc. DAILY FIELD REPORT REPORT NO. 266 PROJECT MARINER VILLAGE DATE 18 FEB 1999 SALEM, MASSACHUSETTS PAGE 1 of I CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 40 to 50 I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a Caterpillar 330B excavator, placed 1 1/2 inch crushed stone as a subbase for proposed building pad No. 174, as shown on the attached sketch. Compactive effort was applied to each lift by 4 to 5 passes of a Bombag BW 172 D-2 Single Drum Vibratory Roller. 2. Removed midsized blastrock using Bently-Warren dumptrailers. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. Attachments: - Site Sketch-A FIELD REPRESENTATIVE(S) TIME ON SITE REPORT J. Peasley 0900-1600 hrs. 0.0 7.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Attn.: Mr. Harold Mack F:\11878\DFR'S\DFR266.WPF Haley &. Aidrlch, Inc. _ I DAILY FIELD REPORT REPORT NO. 265 PROJECT MARINER VILLAGE DATE 17 FEB 1999 SALEM, MASSACHUSETTS PAGE I of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 40 to 50 I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a Caterpillar 330B excavator, excavated for boulder wall in area south of the proposed building pad No. 161, as shown on the attached site sketch. Excavated to acceptable bearing material for wall toe. Placed boulders and fill to construct wall east of the proposed building pad No. 161. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. Attachments: - Site Sketch-A FIELD REPRESENTATIVE(S) TIME ON SITE REPORT J. Peasley 1200-1600 hrs. 0.0 4.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Ann.: Mr. Harold Mack 4� �a F:\11878\DFRx\DFR265.WPF Haley & Aldrich, Inc. MM DAILY FIELD REPORT REPORT NO. 264 PROJECT MARINER VILLAGE DATE 16 FEB 1999 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 40 to 50 I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a Caterpillar 330B excavator began placement of boulders to construct wall south of the proposed building pad No. 161, as shown on the attached sketch. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed Contractor's activities as described above. Noted that building foundations adjacent to the wall bear outside of the influence area of the boulder wall. Attachments: - Site Sketch-A - Footing Sketch -B FIELD REPRESENTATIVE(S) TIME ON SITE REPORT J. Peasley 0900-1300 hrs. 0.0 4.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Ann.: Mr. Harold Mack F:\11878\DFR'S\DFR264.WPF Haley'& Aldrich, Inc. m DAILY FIELD REPORT REPORT NO.263 PROJECT MARINER VILLAGE DATE 12 FEB 1999 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 40's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT 330B excavator, excavated for boulder wall south of the proposed building pad No. 161, as shown on the attached site sketch. Excavated to acceptable bearing material for contruction of the toe of the wall. H. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. Noted that building foundations adjacent to the wall bear outside of the influence area of the boulder wall. Attachments: - Site Sketch A FIELD REPRESENTATIVES) TIME ON SITE REPORT J. Peasley 0900-1200 hrs. 0.0 4.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Ann.: Mr. Harold Mack F Q18MDFR'S\DFR263.WPF Haley & Aldrich, Inc. UNDERGROUND ENGINEERING& ENVIRONMENTAL SOLUTIONS Haley&Aldrich, Inc. 465 Medford Street Suite 2200 Boston, MA 02129-1400 Tel:617 886,7400 5 February 1999 Fax:617886.7600 ® File No. 11878-000 Email: BOSQHaIeyAldrich.com Fafard Real Estate Development Corporation 101 Whalers Lane Salem, Massachusetts 01970 Subject: Mariner Village - Building 177 Salem, Massachusetts Attention: Mr. Harold Mack Gentlemen: In accordance with your request, we have prepared this letter to confirm that Haley & Aldrich, Inc. monitored the preparation of the building foundation pad for Building 177 at Mariner Village in Salem. The pad preparation work included preparation of the natural soil and rock subgrades and placement of compacted structural rock fill to form the pad. Our observations of the work are documented in daily field report No. 256 dated 22 January 1999. In our opinion, the work observed by Haley & Aldrich, Inc. was conducted in accordance with acceptable construction practices and the requirements of the current Massachusetts State Building Cade. OFFICES Cleveland Please do not hesitate to contact us if you require additional information. Ohio Denver Sincer yours, Color'Wo HA Y ALDRICH, INC. Hartford Cmmrilicut Los Angeles califonllo Ste en R. Kraemer, P.E. Senior Vice President ,Mnncltester New 1'10111pgme F:\11878\CORESPON\LETTERS\MARINR22.WPE Newark Nrrr Jrr:�re I'nrtl.\nd main" "I,hcster 'JrnPark ti,ui Dien CidiI�Ilnill ',,III Francisco 4V'adli melon I Iil rirl nl Gdvulbia UNDERGROUND ENGINEERING& ENVIRONMEMf AL SOLUTIONS Haley&Aldrich, Inc. 465 Medford Street Suite 2200 Boston, MA 02129-1400 Tel: 617.886.7400 5 February 1999 Fax:617.886.7600 ® File No. 11878-000 Email: BOS©HaleyAldrich.com Fafard Real Estate Development Corporation 101 Whalers Lane Salem, Massachusetts 01970 Subject: Mariner Village - Building 176 Salem, Massachusetts Attention: Mr. Harold Mack Gentlemen: In accordance with your request, we have prepared this letter to confirm that Haley & Aldrich, Inc. monitored the preparation of the building foundation pad for Building 176 at Mariner Village in Salem. The pad preparation work included preparation of the natural soil and rock subgrades and placement of compacted structural rock fill to form the pad. Our observations of the work are documented in daily field report No. 239 dated 15 December 1998. In our opinion, the work observed by Haley & Aldrich, Inc. was conducted in accordance with acceptable construction practices and the requirements of the current Massachusetts State OFFICES Building Code. Cleveland 0l11„ Please do not hesitate to contact us if you require additional information. Denver C„lolado Since yours, Hartford HA_.EY & ALDRICH, INC. Gnon:ctmit Loc An,,clesK�-.__..—,__.� G1111o)Tilt St ven R. Kraemer, P.E. Mnnchcstcr N u, Hawp,hiw Senior Vice President Newark P:\11878\CORESPON\LETTERS\MARINR2I.WPF N,m pr.rq rorthnd Mein" Rochester Nrro 1`ork San Dido Glliibrnia S,ul Francisco C�dih'i nia 14,l.hintitnn I Ti�II iiY nl�iiluorhin I � DAILY FIELD REPORT REPORT N0. 262 PROJECT MARINER VILLAGE DATE 5 FEB 1999 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 40's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT 330B excavator, placed 11/2 inch crushed stone as subbase at building pad No. 175. Compactive effort was applied to each lift by 4 to 5 passes of a Bomag BW172 D-2 Single Drum Vibratory Roller. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. The contractor's earthwork activity as described above was performed prior to the arrival of the Haley & Aldrich field representative on site. Upon arrival, the field representative observed the condition of the compacted subbase material and judged that it was acceptable for building construction. Attachments: - Site Sketch A FIELD REPRESENTATIVES) TIME ON SITE REPORT J. Peasley 1000-1200 hrs. 0.0 DISTRIBUTION: 4.0 hrs. total Fafard Real Estate and Development Corporation; Attn.: Mr. Harold Mack �� FM1878VDFR'SVDFR2G2.WPF Haley 4f � h 1nN-�-��"' DAILY FIELD REPORT REPORT NO. 261 PROJECT MARINER VILLAGE DATE 3 FEB 1999 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 40's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT D8 Bulldozer, placed and compacted 15 in. minus blastrock within the area around the proposed building pad No. 172, as shown on the attached site sketch. Blastrock was placed in 20-in.-thick lifts. Compactive effort was applied to each lift by 6 to 8 passes of a Bomag BW172 D-2 Single Drum Vibratory Roller. 2. Contractor ran out of blastrock material for at approximately 11:00am. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. Attachments: - Site Sketch-A FIELD REPRESENTATIVE(S) TIME ON SITE REPORT J. Peasley 0830-1230 hrs. 0.0 4.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Attn.: Mr. Harold Mack F:\11878\DFR'S\DFR261.WPF Haley & Aldrich, Inc. DAILY FIELD REPORT REPORT NO. 260 PROJECT MARINER VILLAGE DATE 2 FEB 1999 SALEM, MASSACHUSETTS PAGE 1 of I CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: CLOUDY/SNOW TEMP. 30's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT D8 Bulldozer, placed and compacted 15 in. minus blastrock within the area of Cavanedish Circle roadway from approximately Sta. 118+00 to Sta. 120+00. 2. Using a CAT D8 Bulldozer, placed and compacted 15 in. minus blastrock within the area shown on the attached site sketch. Blastrock was placed in 20-in.-thick lifts. Compactive effort was applied to each lift by 6 to 8 passes of a Bomag BW 172 D-2 Single Drum Vibratory Roller. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. Attachments: - Site Sketch A - Site Sketch B FIELD REPRESENTATIVE(S). TIME ON SITE REPORT J. Peasley 0830-1600 hrs. 0.0 7.5 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Ann.: Mr. Harold Mack F:\11878\DFR'S\DFR260.WPF Haley & Aldrich, Inc, 0-0 DAILY FIELD REPORT REPORT NO. 259 PROJECT MARINER VILLAGE DATE 29 JAN. 1999 SALEM, MASSACHUSETTS PAGE 1 of I CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: CLOUDY/SNOWING TEMP. 30's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT D8 Bulldozer, continued placement and compaction of 15 in. minus blastrock within the area around proposed building pad No. 172, as shown on the attached site sketch. Blastrock was placed in 20-in.-thick lifts. Compactive effort was applied to each lift by 6 to 8 passes of a Bomag BW 172 D-2 Single Drum Vibratory Roller. 2. Contractor ran short of blastrock material to backfill and stopped backfilling activities at approximately 1200. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. Attachments: - Site Sketch-A FIELD REPRESENTATIVES) TIME ON SITE REPORT J. Peasley 1000-1200 hrs. 0.0 4.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Attn.: Mr. Harold Mack F:\11878\DFR'S\DFR259.WPF `� Haley & Aldrich, Inc. DAILY FIELD REPORT REPORT NO. 258 PROJECT MARINER VILLAGE DATE 28 JAN 1999 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: CLOUDY TEMP. 30's 1. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Placed blastrock in order to create construction roadway allowing access to proposed building pad No. 172, as shown on the attached site sketch. 2. Using a CAT D8 Bulldozer, placed and compacted 15 in. minus blastrock within the area around proposed building pad No. 172, as shown on the attached site sketch. Blastrock was placed in a 20-in.-thick lift. Compactive effort was applied to each lift by 6 to 8 passes of a Bomag BW172 D-2 Single Drum Vibratory Roller. 3. Using CAT 330B excavator, removed loam and topsoil from area around proposed building pad No. 170, as shown on attached site sketch. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. Attachments: - Site Sketch-A FIELD REPRESENTATIVE(S) TIME ON SITE REPORT J. Peasley 0900-1600 hrs. 0.0 7.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Attn.: Mr. HaroldMack F:\11878\DFR'S\DFR258.WPF Haley & Aldrich, Inc. DAILY FIELD REPORT REPORT NO. 257 PROJECT MARINER VILLAGE DATE 25 JANUARY 1999 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO.11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: CLOUDY TEMP. 30's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT D8 Bulldozer, placed and compacted 15 in. minus blastrock within the area between proposed building pads No. 173 and 174, as shown on the attached site sketch. Blastrock was placed in 20-in.-thick lifts. Compactive effort was applied to each lift by 6 to 8 passes of a Bomag BW 172 D-2 Single Drum Vibratory Roller. 2. Bently Warren trucks hauled midsized blastrock off site. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. Attachments: Site Sketch-A FIELD REPRESENTATIVE(S) TIME ON SITE REPORT J. Peasley 0930-1600 hrs. 0.0 6.5 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation, Ann.: Mr. Harold Mack F:\11878\DFR'S\DFR257wPF H ey & Aldrich, Inc. DAILY FIELD REPORT REPORT NO. 256 PROJECT MARINER VILLAGE DATE 22 JANUARY 1999 SALEM, MASSACHUSETTS PAGE 1 of I CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO.11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 30's 1. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT 330B excavator, placed 1 1/2 in. crushed stone as a base for proposed building pad No. 177, as shown on the attached site sketch. Compactive effort was applied to each lift by 4 to 5 passes of a Bomag BW172 D-2 Single Drum Vibratory Roller. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Visually observed placement and compaction of crushed stone and judged to be acceptable for building construction. Attachments: Site Sketch-A FIELD REPRESENTATIVE(S) TIME ON SITE REPORT J. Peasley 0800-1200 hrs. 0.0 4.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Arm.: Mr. Harold Mack F911878\DFR'S\DFR256.WPF Haley-&Aldrl h, Inc. MM DAILY FIELD REPORT REPORT NO. 255 PROJECT MARINER VILLAGE DATE 21 JANUARY 1999 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO.11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 30's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT D8 Bulldozer, continued to place and compact 15 in. minus blastrock within the area between proposed building pads No. 173 and 174, as shown on the attached site sketch. Blastrock was placed in a 20-in.-thick lift. Compactive effort was applied to each lift by 6 to 8 passes of a Bomag BW172 D-2 Single Drum Vibratory Roller. 2. Bently Warren trucks hauled midsized blastrock off site. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. Attachments: Site Sketch-A FIELD REPRESENTATIVES) TIME ON SITE REPORT J. Peasley 0800-1600 hrs. 0.0 8.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation, Arm.: Mr. Harold Mack FAI 1878\DFR'S\DFR255.WPF Hale Aldrich, Inc. } DAILY FIELD REPORT REPORT NO. 254 PROJECT MARINER VILLAGE DATE 20 JANUARY 1999 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO.1187 8-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP 30's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Water was pumped out of fill area between proposed building pads No. 173 and 174. Excavated saturated material to expose the natural till. 2. Using a CAT D8 bulldozer, placed and compacted 15 in. minus blastrock within the area between proposed building pads No. 173 and 174, as shown on the attached site sketch. Blastrock was placed in a 20-in.-thick lift. Compactive effort was applied to each lift by 6 to 8 passes of a Bomag BW172 D-2 Single Drum Vibratory Roller. II. FIELD REPRESEN'TATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Observed natural glacial till material and judged to be acceptable for placement of compacted blastrock. Attachments: Site Sketch-A FIELD REPRESENTATIVE(S) TIME ON SITE REPORT J. Peasley 0800-1530 hrs. 0.0 7.5 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation, Ann.: Mr. Harold Mack F:\I 1878\DFR'S\DFR254.WPF c Haley & Aldrich, Inc. DAILY FIELD REPORT 7 REPORT NO. 253 PROJECT MARINER VILLAGE DATE 8 JANUARY 1999 SALEM, MASSACHUSETTS PAGE I of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO.11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP 20's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. No backfilling activities were performed on site. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Was informed by C&B Construction superintendent that structural fill will not be placed on site today or for the next week. Discussed future schedule with Mr. Harold Mack (Fafard Real Estate and Development Corp.) prior to leaving the site. Attachments: None FIELD REPRESENTATIVE( ) TIME ON SITE REPORT S. Gately 0800-0900 hrs. 0.0 1.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Ann.: Mr. Harold Mack c. F:\11878\DFR'S\DFR253.WPF Haley Aldrich, Inc. MM DAILY FIELD REPORT REPORT NO. 252 PROJECT MARINER VILLAGE DATE 7 JANUARY 1999 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO.11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 20's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Structural fill was not backfilled on site today. 2. Topsoil was hauled offsite. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed the above mentioned activities until it became apparent that no structural fill would be placed today. Discussed future schedule with Mr. Harold Mack (Fafard Real Estate and Development Corp.) prior to leaving the site. Attachments: None FIELD REPRESENTATIVE(S) TIME ON SITE REPORT S. Gately 0800-1300 hrs. 0.0 5.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Arm.: Mr. Harold Mack F:\I 1878\DFR'S\DFR252.WPF Hal6y- & Aldrich, Inc. urnm Ramp 7 DAILY FIELD REPORT REPORT NO. 251 PROJECT MARINER VILLAGE DATE 6 JANUARY 1999 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO.11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 20's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. No work was performed on site today due to servicing of CAT 330 Excavator. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed the above mentioned activities until it became apparant that no structural fill would be placed today. Discussed future schedule with Mr. Harold Mack (Fafard Real Estate and Development Corp.) prior to leaving the site. Attachments: None FIELD REPRESENTATIVES) TIME ON SITE REPORT S. Gately 0800-1000 hrs. 0.0 2.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Ann.: Mr. Harold Mack / f� F:\11878\DFR'S\DFR251.WPF Haley & Aldrich, Inc. DAILY FIELD REPORT REPORT NO. 250 PROJECT MARINER VILLAGE DATE 5 JANUARY 1999 SALEM, MASSACHUSETTS PAGE l of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO.1187 8-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 20's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT 330 Excavator, placed and compacted 15 in. minus blastrock along the side of the haul road in the area between proposed building pads No. 164 and 165, as shown on the attached site sketch. Placed blastrock along the side of the road in 20-in.lifts. Compactive effort was applied to each lift by 6 to 8 passes of a Bomag BW172 D-2 Single Drum Vibratory Roller. Blastrock was also placed on a bench cut down-slope from this area. This blastrock has not yet been spread and compacted. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. Attachments: Site Sketch-A FIELD REPRESENTATIVE(S) TIME ON SITE REPORT S. Gately 0800-1600 hrs. 0.0 8.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Arm.: Mr. Harold Mack --f g= F:A11878VDFR'SVDFR251.WPF Haley & Aldrich, Inc. DAILY FIELD REPORT REPORT No. zav PROJECT MARINER VILLAGE DATE 4 JANUARY 1999 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO.11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 40's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT 330 Excavator, placed boulders in rip-rap wall. See attached site sketch for approximate location. 2. Contractor placed stockpiles of 15 in. minus blastrock fill along temporary construction roadway. Material was not spread or compacted due to bulldozer breakdown. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. Attachments: Site Sketch-A FIELD REPRESENTATIVES) TIME ON SITE REPORT J. Bode 0800-1400 hrs. 0.0 6.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Ann.: Mr. Harold Mack F:\11878\DFR'S\DFR249.WPF Haley & Alarich, Inc. MM DAILY FIELD REPORT REPORT NO. 248 PROJECT MARINER VILLAGE DATE 31 DEC 1998 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY, WINDY TEMP. 10's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Contractor was not onsite. No work was performed today. H. FIELD REPRESEN'TATIVE'S ACTIVITIES: 1. Field representative remained onsite until it was apparent that contractor was not working. Attachments: None FIELD REPRESENTATIVE(S) TIME ON SITE REPORT J. Bode 0800-1200 hrs. 0.0 4.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Ann.: Mr. Harold Mack Z- F:\11878\DFR'S\DFR248.WPF Haley & Aldrich, Inc. DAILY FIELD REPORT REPORT NO. 247 PROJECT MARINER VILLAGE DATE 30 DEC. 1998 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO.11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 30's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT D8 Bulldozer, placed and compacted 15 in. minus blastrock within the ravine area, as shown on the attached site sketch. Blastrock was placed in 20-in.-thick lifts. Compactive effort was applied to each lift by 6 to 8 passes of a Bomag BW 172 D-2 Single Drum Vibratory Roller. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Recorded number of loads of rockfill (25) and oversized material (0), as requested by Mr. Harry Mack. 3. Due to back injury, left the site at 1400. Attachments: - Site Sketch-A FIELD REPRESENTATIVES) TIME ON SITE REPORT J. Peasley 0800-1400 hrs. 0.0 6.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Attn.: Mr. Haar�rolldddJ Mack F:\11878\DFR'S\DFR247.WPF Haley & Aldrich, Inc. 1.M DAILY FIELD REPORT REPORT NO. 246 PROJECT MARINER VILLAGE DATE 29 DEC. 1998 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO.11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 30's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Continued mechanical work on Bulldozer. 2. Using a CAT D8 Bulldozer, placed and compacted 15 in. minus blastrock within the ravine area, as shown on the attached site sketch. Blastrock was placed in 20-in.-thick lifts. Compactive effort was applied to each lift by 6 to 8 passes of a Bomag BW 172 D-2 Single Drum Vibratory Roller. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. Attachments: - Site Sketch-A FIELD REPRESENTATIVES) TIME ON SITE REPORT J. Peasley 0800-1600 hrs. 0.0 8.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Attn..: Mr. Harold Mack F:\11878\DFR'S\DFR246.WPF Haley & Aldrich, I r DAILY FIELD REPORT 7REPORT NO. 245 PROJECT MARINER VILLAGE DATE 28 DEC. 1998 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 30's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT D8 Bulldozer, placed and compacted 15 in. minus blastrock within the ravine area, as shown on the attached site sketch. Blastrock was placed in 20-in.-thick lifts. Compactive effort was applied to each lift by 6 to 8 passes of a Bomag BW 172 D-2 Single Drum Vibratory Roller. 2. Removed blastrock off site using Bently-Warren dumptrucks. 3. Note: Track on Bulldozer broke today. H. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities described above. 2. Recorded number of loads of rockfill (27) and oversized material (11), as requested by Mr. Harry Mack. Attachments: - Site Sketch-A FIELD REPRESENTATIVE(S) TIME ON SITE REPORT J. Peasley 0800-1430 hrs. 0.0 6.5 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Attn.: Mr. Harold Mack F:\11878\DFR'S\DFR245.WPFHale & Aldrich, Inc. DAILY FIELD REPORT REPORT NO. 244 PROJECT MARINER VILLAGE DATE 23 DEC. 1998 SALEM, MASSACHUSETTS PAGE I of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO.11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 40's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT D8 Bulldozer, placed and compacted 15 in. minus blastrock within the ravine area, as shown on the attached site sketch. Blastrock was placed in 20-in.-thick lifts. Compactive effort was applied to each lift by 6 to 8 passes of a Bomag BW 172 D-2 Single Drum Vibratory Roller. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Recorded number of loads of rockfill (24) and oversized material (7), as requested by Mr. Harry Mack. Attachments: - Site Sketch-A FIELD REPRESENTATIVES) TIME ON SITE REPORT L Peasley 0800-1600 hrs. 0.0 8.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Ann.: Mr. Harold Mack FAI1878\DFR'S\DFR244.WPF Haley & Aldrich, Inc. -� W DAILY FIELD REPORT REPORT NO. 243 PROJECT MARINER VILLAGE DATE 22 DEC. 1998 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO.11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 30's-40's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT D8 Bulldozer, placed and compacted 15 in. minus blastrock within the ravine area, as shown on the attached site sketch. Blastrock was placed in 20-in.-thick lifts. Compactive effort was applied to each lift by 6 to 8 passes of a Bomag BW 172 D-2 Single Drum Vibratory Roller. 2. Removed topsoil off site from existing on-site stockpile shown on the attached site sketch. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Recorded number of loads of rockfill (24) and oversized material (5), as requested by Mr. Harry Mack. Attachments: - Site Sketch-A FIELD REPRESENTATIVE(S) TIME ON SITE REPORT J. Peasley 0800-1600 hrs. 0.0 8.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Auto.: Mr. Harold Mack _/'!%-Gw✓ .Cly-5 F:\11878\DFR'S\DFR243.WPF Haley & Aldrich, Inc. , DAILY FIELD REPORT REPORT N0. 242 PROJECT MARINER VILLAGE DATE 21 DEC. 1998 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 30's-40's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT D8 Bulldozer, placed and compacted 15 in. minus blastrock within the area of the ravine, as shown on the attached site sketch. Blastrock was placed in 20-in.-thick lifts. Compactive effort was applied to each lift by 6 to 8 passes of a Bomag BW 172 D-2 Single Drum Vibratory Roller. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Recorded number of loads of rockfill (23) and oversized material (1), as requested by Mr. Harry Mack. Attachments: - Site Sketch-A FIELD REPRESENTATIVE(S) TIME ON SITE REPORT J. Peasley 0800-1600 hrs. 0.0 8.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Atm.: Mr. Harold Mack 70- F:\11878\DFR'S\DFR242MPF Haley & Aldrich, Inc. 0M DAILY FIELD REPORT REPORT NO. 241 PROJECT MARINER VILLAGE DATE 18 DEC. 1998 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 30's-40's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT D8 Bulldozer, placed and compacted 15 in. minus blastrock within the Area shown on the attached site sketch. Blastrock was placed in a 20-in.-thick lift. Compactive effort was applied to each lift by 6 to 8 passes of a Bomag BW 172 D-2 Single Drum Vibratory Roller. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Recorded number of loads of rockfill (44) and oversized material (6), as requested by Mr. Harry Mack. Attachments: - Site Sketch-A FIELD REPRESENTATIVES) TIME ON SITE REPORT J. Peasley 0800-1530 hrs. 0.0 7.5 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Attn.: Mr. Harold Mack 41i�' Z FAI1878\DFR'S\DFR241.WPF HaAldrich, Inc. DAILY FIELD REPORT REPORT NO. 240 PROJECT MARINER VILLAGE DATE 16 DEC. 1998 SALEM, MASSACHUSETTS PAGE l of I CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP 40's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT D8 Bulldozer, placed and compacted 15 in. minus blastrock within the ravine area, as shown on the attached site sketch. Blastrock was placed in 20-in.-thick lifts. Compactive effort was applied to each lift by 6 to 8 passes of a Bomag BW 172 D-2 Single Drum Vibratory Roller. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Recorded number of truckloads of rockfill (41) and oversized material (12), as requested by Mr. Harry Mack. Attachments: - Site Sketch-A FIELD REPRESENTATIVE(S) TIME ON SITE REPORT J. Peasley 0800-1600 hrs. 0.0 8.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Attn.: Mr. Harold Mack FA118781DFR'S\DFR240.WPF Haley & Aldrich, Inc. . 1 DAILY FIELD REPORT REPORT NO. 239 PROJECTMARINER VILLAGE DATE 15 DEC. 1998 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 40's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT D8 Bulldozer, placed and compacted 15 in. minus blastrock within the area of the ravine, as shown on the attached site sketch. Blastrock was placed in 20-in.-thick lifts. Compactive effort was applied to each lift by 6 to 8 passes of a Bomag BW 172 D-2 Single Drum Vibratory Roller. 2. Removed topsoil off site from existing on-site stockpile shown on the attached site sketch. 3. Placing and compacting granular fill in the footprint of Unit 176. Compactive effort was applied by 4 to 5 passes of a Bomag BW 172 D-2 Single Drum Vibratory Roller. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Performed six (6) field unit weight tests using a Nuclear Density Gauge on compacted fill in the Unit 176 footprint. Test results and approximate locations are shown on the attached Site Sketch-B and the Daily Summary of Field Unit Weight Test. Attachments: - Site Sketch-A - Site Sketch-B - Summary of Field Unit Weight Tests FIELD REPRESENTATIVES) TIME ON SITE REPORT J. Peasley 0800-1600 hrs. 0.0 8.0 hrs. total DISTRIBUTION, Fafard Real Estate and Development Corporation; Atm.: Mr. Harold Mack F:\11878\DFR'S\DFR239.WPF Haley & Aldrich, Inc. DAILY FIELD REPORT REPORT NO. 23S PROJECT MARINER VILLAGE DATE 14 DEC. 1998 SALEM, MASSACHUSETTS PAGE 1 of I CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 40's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT D8 Bulldozer, placed and compacted 15 in. minus blastrock within the area of the ravine, as shown on the attached site sketch. Blastrock was placed in 20-in.-thick lifts. Compactive effort was applied to each lift by 6 to 8 passes of a Bomag BW 172 D-2 Single Drum Vibratory Roller. 2. Removed topsoil off site from existing on-site stockpile shown on the attached site sketch. 3. Removed blastrock off site. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Recorded number of truckloads of rockfill (23) and oversized material (22), as requested by Mr. Harry Mack. Attachments: - Site Sketch-A FIELD REPRESENTATIVES) TIME ON SITE REPORT J. Peasley 0800-1600 hrs. 0.0 8.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Attn.: Mr. Harold Mack � �,7 F:\11878\DFR'S\DFR238.WPF Haley & k1drich, Inc. r . DAILY FIELD REPORT REPoRT No. 237 PROJECT MARINER VILLAGE DATE 12 DEC. 1998 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 40's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT D8 Bulldozer, placed and compacted 15 in. minus blastrock within the area of the ravine. Blastrock was placed in 20-in.-thick lifts. 2. Stockpiled oversized material. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Recorded number of truckloads of rockfill (18) and oversized material (20), as requested by Mr. Harry Mack. FIELD REPRESENTATIVES) TIME ON SITE REPORT D. Sleeper 0800-1600 hrs. 0.0 8.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Arm.: Mr. Harold Mack v F:\11878\DFR'S\DFR237.WPF Raley & Aldrich, Inc. T. DAILY FIELD REPORT 7 REPORT NO. 236 PROJECT MARINER VILLAGE DATE 11 DEC. 1998 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 40's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Removed unsuitable topsoil from the base of the ravine within the fill area shown on the attached site sketch. Excavated through topsoil to glacial till or rock. 2. Using a CAT D8 Bulldozer, placed and compacted 15 in. minus blastrock within the ravine area, as shown on the attached site sketch. Blastrock was placed in 20-in.-thick lifts. Compactive effort was applied to each lift by 6 to 8 passes of a Bomag BW 172 D-2 Single Drum Vibratory Roller. 3. Removed topsoil off site from existing on-site stockpile shown on the attached site sketch. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Recorded number of truckloads of rockfill (32) and oversized material (0), as requested by Mr. Harry Mack. Attachments: - Site Sketch-A FIELD REPRESENTATIVE(S) TIME ON SITE REPORT J. Peasley 0800-1600 hrs. 0.0 8.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Attn.: Mr. Harold Mack F:\11878\DFR'S\DFR236.WPF Haley & Aldrich, Inc. DAILY FIELD REPORT REPORT NO. 235 PROJECT MARINER VILLAGE DATE 10 DEC. 1998 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 40-50's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT D8 Bulldozer, placed and compacted 15 in. minus blastrock within the area of the ravine, as shown on the attached site sketch. Blastrock was placed in a 20-in.-thick lifts. Compactive effort was applied to each lift by 6 to 8 passes of a Bomag BW 172 D-2 Single Drum Vibratory Roller. Measurement of the elevation of the fill is not practical, as the fill area is on a slope. 2. Stockpiled large rock material for future use in construction of the rock slope. 3. Removed topsoil off site from existing on-site stockpile shown on the attached site sketch. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Recorded number of truckloads of rockfill (59) and oversized material (1), as requested by Mr. Harry Mack. Attachments: - Site Sketch-A FIELD REPRESENTATIVES) TIME ON SITE REPORT J. Peasley 0900-1600 hrs. 0.0 7.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Ann.: Mr. Harold Mack F:\11878\DFR'S\DFR235.WPF Haley & Aldrich, Inc. .= DAILY FIELD REPORT REPORT NO. 234 PROJECT MARINER VILLAGE DATE 9 DEC. 1998 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 40-50's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT D8 Bulldozer, placed and compacted 15 in. minus blastrock within the area of the ravine, as shown on the attached site sketch. Blastrock was placed in 20-in.-thick lifts. Compactive effort was applied to each lift by 6 to 8 passes of a Bomag BW 172 D-2 Single Drum Vibratory Roller. 2. Stockpiled large rock material for future use in construction of the rock slope. 3. Removed topsoil off site from existing on-site stockpile shown on the attached site sketch. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Reported to the site at 0900 at the request of the Contractor. 2. Observed and noted Contractor's activities as described above. 3. Recorded number of truckloads of rockfill (15) and oversized material (5), as requested by Mr. Harry Mack. Attachments: - Site Sketch-A FIELD REPRESENTATIVES) TIME ON SITE REPORT J. Peasley 0900-1600 hrs. 0.0 7.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Ann.: Mr. Harold Mack FA11878\DFR'S\DFR234.WPF Haley & Aldrich, Inc. DAILY FIELD REPORT 7REPORT NO. 233 PROJECT MARINER VILLAGE DATE 8 DEC. 1998 SALEM, MASSACHUSETTS PAGE I of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 50's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT D4 Bulldozer, placed and compacted 15 in. minus blastrock within the area of the ravine, as shown on the attached site sketch. Blastrock was placed in 20-in.-thick lifts. Compactive effort was applied to each lift by 6 to 8 passes of a Bomag BW172 D-2 Single Drum Vibratory Roller. 2. Stockpiled large rock material for future use in construction of the rock slope. 3. Removed topsoil off site from existing on-site stockpile shown on the attached site sketch. II. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Recorded number of truckloads of rockfill (21) and oversized material (10), as requested by Mr. Harry Mack. 3. At the request of Harry Mack, left the site at 1400 after Contractor ceased operations for the day. Attachments: - Site Sketch-A FIELD REPRESENTATIVES) TIME ON SITE REPORT J. Peasley 0800-1400 hrs. 0.0 6.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Ann.: Mr. Harold Mack F:\11878\DFR'S\DFR233.WPF Haley & Aldrich, Inc. DAILY FIELD REPORT REPORT NO. 232 PROJECT MARINER VILLAGE DATE 7 DEC. 1998 SALEM, MASSACHUSETTS PAGE 1 of 1 CLIENT: FAFARD REAL ESTATE AND DEVELOPMENT CORP. FILE NO. 11878-000 CONTRACTOR: C & B CONSTRUCTION (Natick, Mass.) WEATHER: SUNNY TEMP. 50's I. CONTRACTOR'S EARTHWORK ACTIVITIES: 1. Using a CAT D4 Bulldozer, placed and compacted 15 in. minus blastrock within theravine area, as shown on the attached site sketch. Blastrock was placed in 20-in.-thick lifts. Compactive effort was applied to each lift by 6 to 8 passes of a Bomag BW 172 D-2 Single Drum Vibratory Roller. 2. Stockpiled large rock material for future use in construction of the rock slope. 3. Removed topsoil off site from existing on-site stockpile shown on the attached site sketch. f H. FIELD REPRESENTATIVE'S ACTIVITIES: 1. Observed and noted Contractor's activities as described above. 2. Recorded number of truckloads of rockfill (43) and oversized material (6), as requested by Mr. Harry Mack. Attachments: - Site Sketch-A FIELD REPRESENTATIVE(S) TIME ON SITE REPORT J. Peasley 0800-1600 hrs. 0.0 8.0 hrs. total DISTRIBUTION: Fafard Real Estate and Development Corporation; Attn.: Mr. Harold Mack / FA11878\DFR'S\DFR232.WPF Fraley & Aldrich, Inc. sem., ���e.P crrr OF SA!_M BUILDING �� _ cEX ONE SALEM G=R==N SAL=M,MA5St1Lf-I11SF`7S D7970 TELEPHONE (978) 745-9595 %385 FAX (978) 740-9846 FAX CDVER SHEET DATE: FROM: TO: C1 �Y ( (kmca ATTN: SUBJECT: G COMMEN cs 1411 THANK YOU, VIE ARE TRANSMITTING THIS COVER SHEET AND PAGES. IF YOU HAVE ANY PROBLEMS OR QUESTIONS PLEASE CONTACT US AT THE ABOVE TELEPHONE NUMBER. 95/04/2088 09:17 9707404463 FAFARD PAGE B1 >a 6l TOerLu p IM d ���� i l � se we- / CP m Tv � . � . C! � Y� • UNDERGROUND ENGINEERING& ENVIRONm[ENNTAL SOLUTIONS Haley&Aldrich,Inc. 58 Charles Street Cambridge,MA 02141-2147 Tel:617.494.1606 so Fax:617.577.8142 ® 4 June 1997 Email:BOS@HaleyAldrich.mrri File No. 11878-000 Fafard Real Estate Development Corporation 101 Whalers Lane Salem, Massachusetts 01970 S M Attention: Mr. Harold Mack Subject: Building 147 Mariner Village F Salem, Massachusetts k Gentlemen: In accordance with your request, we have prepared this letter to confirm that Haley& Aldrich, Inc:monitored the preparation of the building foundation pad for Building 147 at Mariner Village.in Salem. ; The area of Building 147.had been filled, apparently during Mariner Village Phase 11 construction in the early 1980's. The upper fill material in this area was found to contain blasted rock mixed with glacial till soil and small amounts of topsoil, organic matter, and construction debris. Haley&Aldrich judged this upper fill material unsuitable for direct support of the building foundations. The unsuitable upper fill materials were removed but site constraints including the existing adjacent roads, utilities, and existing townhouse units made full-depth removal of some lower fill material impractical. oITIclrs To provide suitable foundation support over the remaining fill, a geogrid reinforced, Cleveland compacted; structural rock fill pad-was-designed and installed beneath the buildings This Ohio same procedure`was used beneath Buildings 143 and 145. Pad preparation work included the Denver following steps: Colorado Hartford ❑ removal of previously-placed fill materials from within the zone of influence of the Connecticut foundations and floor slab to a depth of at least ten feet below the bottom elevation of Los Angeles the future foundations California Manchester ❑ preparation of the natural soil, rock, or previous fill subgrades by removal of New Hampshire unsuitable materials and proof compaction with a heavy self-propelled vibratory roller tl Porand . . .. ._ Maine ❑ placement of the geogrid-reinforced, compacted structural rock fill pads. Geogrid is Rochester a high-strength flexible polyester geotechnical reinforcing grid material designed to New York .. - San Francisco California Washington nictrirt of Columbia Fafard Real Estate Development Co 4 June 1997 rPoration Page 2 reinforce and stabilize eartheof geogrid n materials. Three layers selected elevations within the compacted rock fills. were Placed at 0 placement of a non-woven geotextile over the rock fill and then 12 inches of compacted granular fill beneath the footings. t Our observations of the work have been documented dated 2 May 1997 through 4 June 1997. in daily field reports P Nos. 48 through 67 In our opinion, the work obsetved b with acceptable construction Y Haley.&Aldrich, Inc. was conducted in a Building Code, and the reinforced stn and the requirements of the current Massachusetts State ccOrdance Proposed buildings. sttucmra! rock fill Pads are suitable for support of the Please do not hesitate to contact us if you require additional informati Since yours, on. I'&ALDRICH, INC. Ste en R. Kraemer, P.E. Senior Vice President F:1II8MCORM IIWItb.WFP 1, i !fi C . . _ lY'7 v � l�'�© � 1�6a May 6, 1997 Mr. John Jennings Salem Building Department Salem Town Hall Salem, Massachusetts 01970 Re: Control Construction Certificate to Occupy Dear Mr. Jennings: I, Ray A. Renzoni, Registered Architect in Massachusetts, certify that I have performed the necessary professional services; observed the construction; was present on the construction site as required under Section 127 of the State Code; and made periodic observations and reports. To the best of my knowledge, I have determined that the work proceeded in accordance with regulations, permits and the submitted documents approved for the building permit. Therefore, I request that a Certificate of Occupancy be issued for 42 Brittania Circle, Salem, Massachusetts, Unit 154 A. I thank you for your cooperation. Sincerely,,j FIE e I� No.'4019 BERLIN. it p MASS, ay A. Renzoni Zq4OF NiPSSpGaJ Registered Architect NCARB/ASID Main Office Architectural Innovations ■ 44 Central St. ■ Berlin, MA 01503 ■ (508) 838-2976 ■ 19 South St. ■ Berlin, MA 01503 May 6, 1997 Mr. John Jennings Salem Building Department Salem Town Hall Salem, Massachusetts 01970 Re: Control Construction Certificate to Occupy Dear Mr. Jennings: I, Ray A. Renzoni, Registered Architect in Massachusetts, certify that I have performed the necessary professional services; observed the construction; was present on the construction site as required under Section 127 of the State Code; and made periodic observations and reports. To the best of my knowledge, I have determined that the work proceeded in accordance with regulations, permits and the submitted documents approved for the building permit. Therefore, I request that a Certificate of Occupancy be issued for 44 Brittania Circle, Salem, Massachusetts, Unit 154 B. I thank you for your cooperation. `�pC V.M raj 0/ REN Q Zoe - Sincerely, x � No. 4019 / o ,3 BERLIN. MA55, \o2�FgCTif OF MNSSPca y A. Renzoni Registered Architect NCARB/ASID Main Office Architectural Innovations . 44 Central St. . Berlin, MA 01503 . (508) 838-2976 ■ 19 South St. ■ Berlin, MA 01503 May 6, 1997 Mr. John Jennings Salem Building Department Salem Town Hall Salem, Massachusetts 01970 Re: Control Construction Certificate to Occupy Dear Mr. Jennings: I, Ray A. Renzoni, Registered Architect in Massachusetts, certify that I have performed the necessary professional services; observed the construction; was present on the construction site as required under Section 127 of the State Code; and made periodic observations and reports. To the best of my knowledge, I have determined that the work proceeded in accordance with regulations, permits and the submitted documents approved for the building permit. Therefore, I request that a Certificate of Occupancy be issued for 46 Brittania Circle, Salem, Massachusetts, Unit 154 C. I thank you for your cooperation. P, RE/V 0 Sincerely, s No. LIN. BERLIN. +- . \J MASS, J 2 a 04�rH`F%.1?Q ay A. Renzoni Registered Architect NCARB/ASID Main Office Architectural Innovations . 44 Central St. . Berlin, MA 01503 . (508) 838-2976 ■ 19 South St. ■ Berlin, MA 01503 May 6, 1997 Mr. John Jennings Salem Building Department Salem Town Hall Salem, Massachusetts 01970 Re: Control Construction Certificate to Occupy Dear Mr. Jennings: I, Ray A. Renzoni, Registered Architect in Massachusetts, certify that I have performed the necessary professional services; observed the construction; was present on the construction site as required under Section 127 of the State Code; and made periodic observations and reports. To the best of my knowledge, I have determined that the work proceeded in accordance with regulations, permits and the submitted documents approved for the building permit. Therefore, I request that a Certificate of Occupancy be issued for 48 Brittania Circle, Salem, Massachusetts, Unit 154 D. I thank you for your cooperation. btu"Kc, Sincerely, No. 4019 3 BERLIN. � MASS. �m� �Gsa ay A. Renzoni Fq�TH OF!�F'Si' Registered Architect NCARB/ASID Main Office Architectural Innovations . 44 Central St. . Berlin, MA 01503 . [5081838-2976 111 19 South St. In Berlin, MA 01503 FA I May 6, 1997 Mr. John Jennings Salem Building Department Salem Town Hall Salem, Massachusetts 01970 Re: Control Construction Certificate to Occupy Dear Mr. Jennings: I, Ray A. Renzoni, Registered Architect in Massachusetts, certify that I have performed the necessary professional services; observed the construction; was present on the construction site as required under Section 127 of the State Code; and made periodic observations and reports. To the best of my knowledge, I have determined that the work proceeded in accordance with regulations, permits and the submitted documents approved for the building permit. Therefore, I request that a Certificate of Occupancy be issued for 34 Brittania Circle, Salem, Massachusetts, Unit 152 A. I thank you for your cooperation. / ,idU AA'cti, Sincerely,?`'"////// No. 4019 3 BERLIN, - \\)y� MASS, V�Jy ay A. Renzom X 419 H oF 10ASP Registered Architect NCARB/ASID Main Office Architectural Innovations ■ 44 Central St. ■ Berlin, MA 01503 ■ (508) 838-2976 ■ 19 South St. ■ Berlin, MA 01503 L=j May 6, 1997 Mr. John Jennings Salem Building Department Salem Town Hall Salem, Massachusetts 01970 Re: Control Construction Certificate to Occupy Dear Mr. Jennings: I, Ray A. Renzoni, Registered Architect in Massachusetts, certify that I have performed the necessary professional services; observed the construction; was present on the construction site as required under Section 127 of the State Code; and made periodic observations and reports. To the best of my knowledge, I have determined that the work proceeded in accordance with regulations, permits and the submitted documents approved for the building permit. Therefore, I request that a Certificate of Occupancy be issued for 36 Brittania Circle, Salem, Massachusetts, Unit 152 B. I thank you for your cooperation. _ /�P P• RE Sincerely, 'o No. 4019 H 3 BERLIN. 0 MASS. O Uvl. 2�Fq`OF ?SSPGa ay A. Renzoni Registered Architect NCARB/ASID Main Office Architectural Innovations ■ 44 Central St. ■ Berlin, MA 01503 ■ 15081838-2976 ■ 19 South St. ■ Berlin, MA 01503 May 6, 1997 Mr. John Jennings Salem Building Department Salem Town Hall Salem, Massachusetts 01970 Re: Control Construction Certificate to Occupy Dear Mr. Jennings: I, Ray A. Renzoni, Registered Architect in Massachusetts, certify that I have performed the necessary professional services; observed the construction; was present on the construction site as required under Section 127 of the State Code; and made periodic observations and reports. To the best of my knowledge, I have determined that the work proceeded in accordance with regulations, permits and the submitted documents approved for the building permit. Therefore, I request that a Certificate of Occupancy be issued for 38 Brittania Circle, Salem, Massachusetts, Unit 152 C. I thank you for your cooperation. RENj �F�, 1nCerely, No. 4019 3 BERLIN. MASS, e4 OF MPSSP`a y A. Renzoni egistered Architect NCARB/ASID Main Office Architectural Innovations . 44 Central St. . Berlin, MA 01503 . (5081838-2976 ■ 19 South St. ■ Berlin, MA 01503 L=j May 6, 1997 Mr. John Jennings Salem Building Department Salem Town Hall Salem, Massachusetts 01970 Re: Control Construction Certificate to Occupy Dear Mr. Jennings: I, Ray A. Renzoni, Registered Architect in Massachusetts, certify that I have performed the necessary professional services; observed the construction; was present on the construction site as required under Section 127 of the State Code; and made periodic observations and reports. To the best of my knowledge, I have determined that the work proceeded in accordance with regulations, permits and the submitted documents approved for the building permit. Therefore, I request that a Certificate of Occupancy be issued for 40 Brittania Circle, Salem, Massachusetts, Unit 152 D. I thank you for your cooperation. K z Sincerely, O Noo . 4019 1 �iL '" U �Z BERLIN, � p MASS, y�Fq�r\`IV OF MPI SSP°aJ ay A. Renzoni Registered Architect NCARB/ASID Main Office Architectural Innovations . 44 Central St. ■ Berlin, MA 01503 . 15081838-2976 ■ 19 South St. ■ Berlin, MA 01503 L=j May 6, 1997 Mr. John Jennings Salem Building Department Salem Town Hall Salem, Massachusetts 01970 Re: Control Construction Certificate to Occupy Dear Mr. Jennings: I, Ray A. Renzoni, Registered Architect in Massachusetts, certify that I have performed the necessary professional services; observed the construction; was present on the construction site as required under Section 127 of the State Code; and made periodic observations and reports. To the best of my knowledge, I have determined that the work proceeded in accordance with regulations, permits and the submitted documents approved for the building permit. Therefore, I request that a Certificate of Occupancy be issued for 32 Brittania Circle, Salem, Massachusetts, Unit 150 D. I thank you for your cooperation. Re ``'%. incerely, ePy oil Com. s No. 4019? I BER��ry, ti Z MASS, A. Renzoni OF MP,*j egistered Architect NCARB/ASID Main Office Architectural Innovations . 44 Central St. . Berlin, MA 01503 . (508) 838-2976 ■ 19 South St. ■ Berlin, MA 01503 L=j May 6, 1997 Mr. John Jennings Salem Building Department Salem Town Hall Salem, Massachusetts 01970 Re: Control Construction Certificate to Occupy Dear Mr. Jennings: I, Ray A. Renzoni, Registered Architect in Massachusetts, certify that I have performed the necessary professional services; observed the construction; was present on the construction site as required under Section 127 of the State Code; and made periodic observations and reports. To the best of my knowledge, I have determined that the work proceeded in accordance with regulations, permits and the submitted documents approved for the building permit. Therefore, I request that a Certificate of Occupancy be issued for 18 Brittania Circle, Salem, Massachusetts, Unit 148 A. I thank you for your cooperation. �Kt0 A'CHT Sincerely REN 20 No. 4019 I BERLIN. h y�1 MP55. P��J ay A. Renzoni t N OF�°SS Registered Architect NCARB/ASID Main Office Architectural Innovations . 44 Central St. ■ Berlin, MA 01503 ■ (508) 838-2976 ■ 19 South St. ■ Berlin, MA 01503 L=j May 6, 1997 Mr. John Jennings Salem Building Department Salem Town Hall Salem, Massachusetts 01970 Re: Control Construction Certificate to Occupy Dear Mr. Jennings: I, Ray A. Renzoni, Registered Architect in Massachusetts, certify that I have performed the necessary professional services; observed the construction; was present on the construction site as required under Section 127 of the State Code; and made periodic observations and reports. To the best of my knowledge, I have determined that the work proceeded in accordance with regulations, permits and the submitted documents approved for the building permit. Therefore, I request that a Certificate of Occupancy be issued for 20 Brittania Circle, Salem, Massachusetts, Unit 148 B. I thank you for your cooperation. Mato���y RENT ��F cerel , � 02 No. 4019 BERLIN. \� MAS J \�F\q rH 4Ap OF SSpc A. Renzom � egistered Architect NCARB/ASID Main Office Architectural Innovations . 44 Central St. . Berlin, MA 01503 n (508) 838-2976 ■ 19 South St. ■ Berlin, MA 01503 L.j May 6, 1997 Mr. John Jennings Salem Building Department Salem Town Hall Salem, Massachusetts 01970 Re: Control Construction Certificate to Occupy. Dear Mr. Jennings: I, Ray A. Renzoni, Registered Architect in Massachusetts, certify that I have performed the necessary professional services; observed the construction; was present on the construction site as required under Section 127 of the State Code; and made periodic observations and reports. To the best of my knowledge, I have determined that the work proceeded in accordance with regulations, permits and the submitted documents approved for the building permit. Therefore, I request that a Certificate of Occupancy be issued for 22 Brittania Circle, Salem, Massachusetts, Unit 148 C. I thank you for your cooperation. J\7�ciitJ Nk y 4A P Ri//V 2 �i Sincerely, 0o. 4019[N. 3 BERLIN, p MASS. y Of MP`'SPGaJ ay A. Renzoni . , Registered Architect NCARB/ASID Main Office Architectural Innovations . 44 Central St. . Berlin, MA 01503 . (508) 838-2976 ■ 19 South St. ■ Berlin, MA 01503 May 6, 1997 Mr. John Jennings Salem Building Department Salem Town Hall Salem, Massachusetts 01970 Re: Control Construction Certificate to Occupy Dear Mr. Jennings: I, Ray A. Renzoni, Registered Architect in Massachusetts, certify that I have performed the necessary professional services; observed the construction; was present on the construction site as required under Section 127 of the State Code; and made periodic observations and reports. To the best of my knowledge, I have determined that the work proceeded in accordance with regulations, permits and the submitted documents approved for the building permit. Therefore, I request that a Certificate of Occupancy be issued for 24 Brittania Circle, Salem, Massachusetts, Unit 148 D. I thank you for your cooperation. `,�thhu iipG Y P REN �rF incere , g No. 4019 �+ BERLIN. MASS. y oy�F PcaJ y A. Renzoni 4 TH OF MA Registered Architect NCARB/ASID Main Office Architectural Innovations . 44 Central St. ■ Berlin, MA 01503 . (508) 838-2976 111 19 South St. ■ Berlin, MA 01503 May 6, 1997 Mr. John Jennings Salem Building Department Salem Town Hall Salem, Massachusetts 01970 Re: Control Construction Certificate to Occupy Dear Mr. Jennings: I, Ray A. Renzoni, Registered Architect in Massachusetts, certify that I have performed the necessary professional services; observed the construction; was present on the construction site as required under Section 127 of the State Code; and made periodic observations and reports. To the best of my knowledge, I have determined that the work proceeded in accordance with regulations, permits and the submitted documents approved for the building permit. Therefore, I request that a Certificate of Occupancy be issued for 10 Brittania Circle, Salem, Massachusetts, Unit 146 A. I thank you for your cooperation. d Z. H <1 REry2 FCS, Sincerely, No. 401 BERUIN. W � MASS. J y A. Renzom egistered Architect NCARB/ASID Main Office Architectural Innovations ■ 44 Central St. ■ Berlin, MA 01503 ■ (508) 838-2976 ■ 19 South St. ■ Berlin, MA 01503 May 6, 1997 Mr. John Jennings Salem Building Department Salem Town Hall Salem, Massachusetts 01970 Re: Control Construction Certificate to Occupy Dear Mr. Jennings: I, Ray A. Renzoni, Registered Architect in Massachusetts, certify that I have performed the necessary professional services; observed the construction; was present on the construction site as required under Section 127 of the State Code; and made periodic observations and reports. To the best of my knowledge, I have determined that the work proceeded in accordance with regulations, permits and the submitted documents approved for the building permit. Therefore, I request that a Certificate of Occupancy be issued for 12 Brittania Circle, Salem, Massachusetts, Unit 146 B. I thank you for your cooperation. J, EK�u a h Sincerely, /j P RENZ $ No. 4019 h i BERLIN. W p MASS, y y A. Renzoni �A I OF MpSgP egistered Architect NCARB/ASID Main Office Architectural Innovations a 44 Central St. . Berlin, MA 01503 . [5081838-2976 111 19 South St. ■ Berlin, MA 01503 L=j May 6, 1997 Mr. John Jennings Salem Building Department Salem Town Hall Salem, Massachusetts 01970 Re: Control Construction Certificate to Occupy Dear Mr. Jennings: I, Ray A. Renzoni, Registered Architect in Massachusetts, certify that I have performed the necessary professional services; observed the construction; was present on the construction site as required under Section 127 of the State Code; and made periodic observations and reports. To the best of my knowledge, I have determined that the work proceeded in accordance with regulations, permits and the submitted documents approved for the building permit. Therefore, I request that a Certificate of Occupancy be issued for 14 Brittania Circle, Salem, Massachusetts, Unit 146 C. I thank you for your cooperation. yy ✓J�1t1(EU ry��Cy 4f P' RfnZ2 incerely, a /o No. 4019 -�� BERLIN, i O MASS, j1� i J of MPSy A. Renzoni Registered Architect NCARB/ASID Main Office Architectural Innovations n 44 Central St. . Berlin, MA 01503 . (508) 838-2976 ■ 19 South St. ■ Berlin, MA 01503 May 6, 1997 Mr. John Jennings Salem Building Department Salem Town Hall Salem, Massachusetts 01970 Re: Control Construction Certificate to Occupy Dear Mr. Jennings: I, Ray A. Renzoni, Registered Architect in Massachusetts, certify that I have performed the necessary professional services; observed the construction; was present on the construction site as required under Section 127 of the State Code; and made periodic observations and reports. To the best of my knowledge, I have determined that the work proceeded in accordance with regulations, permits and the submitted documents approved for the building permit. Therefore, I request that a Certificate of Occupancy be issued for 16 Brittania Circle, Salem, Massachusetts, Unit 146 D. I thank you for your cooperation. a incerel , e 2 No. 4019 3 BERLIN, 9a MASS. �s a 'TH OF MPS A. Renzonl egistered Architect NCARB/ASID Main Office Architectural Innovations ■ 44 Central St. ■ Berlin, MA 01503 ■ (508) 838-2976 ■ 19 South St. ■ Berlin, MA 01503 May 6, 1997 Mr. John Jennings Salem Building Department Salem Town Hall Salem, Massachusetts 01970 Re: Control Construction Certificate to Occupy Dear Mr. Jennings: I, Ray A. Renzoni, Registered Architect in Massachusetts, certify that I have performed the necessary professional services; observed the construction; was present on the construction site as required under Section 127 of the State Code; and made periodic observations and reports. To the best of my knowledge, I have determined that the work proceeded in accordance with regulations, permits and the submitted documents approved for the building permit. Therefore, I request that a Certificate of Occupancy be issued for 4 Brittania Circle, Salem, Massachusetts, Unit 144 B. I thank you for your cooperation. incerel , .�rcP P REryZ 1f�T O a No. 4019 s BERLIN. \ 7 MASS, y A. Renzoni 'Vif OF M egistered Architect NCARB/ASID Main Office Architectural Innovations n 44 Central St. . Berlin, MA 01503 . (5081838-2976 ■ 19 South St. ■ Berlin, MA 01503 LWj May 6, 1997 Mr. John Jennings Salem Building Department Salem Town Hall Salem, Massachusetts 01970 Re: Control Construction Certificate to Occupy Dear Mr. Jennings: I, Ray A. Renzoni, Registered Architect in Massachusetts, certify that I have performed the necessary professional services; observed the construction; was present on the construction site as required under Section 127 of the State Code; and made periodic observations and reports. To the best of my knowledge, I have determined that the work proceeded in accordance with regulations, permits and the submitted documents approved for the building permit. Therefore, I request that a Certificate of Occupancy be issued for 6 Brittania Circle, Salem, Massachusetts, Unit 144 C. I thank you for your cooperation. REN�O�r. incerel �Ci No. 4019 ti BERLIN. �\J MASS, J5 Renzoni �rH of MPSSP Registered Architect NCARB/ASID Main Office Architectural Innovations . 44 Central St. . Berlin, MA 01503 . (508) 838-2976 ■ 19 South St. ■ Berlin, MA 01503 Chit of #alrm, Massar4usctts Public Propertq Department Nuilbing Ilepartment (One dalem (6rren 508-745-9595 Fxt. 380 Leo E. Tremblay Director of Public Property Inspector of Building Zoning Enforcement Officer March 11 , 1997 Fafard Construction 290 Elliot Street Ashland, Mass . 02119 RE : Retaining Wall To Whom it May Concern : This letter is to confirm that the documentation we asked for has been received. As of 8 : 00 a .m. on March 11 , 1997 all construction on Building 142 may continue . Building 143 may continue once retaining wall has been completed. Thank you for your cooperation in this matter . SFhn y, J . Je�i ings i Local Buil` ng Inspector JJJ: scm LEGAL NOTICE • \v � � ltl� x. 1 1. :<c � � ., q It r LEGAL � NCIICE too . Titu of 0 Maltm, Massac4usetts Public Pruperttl Department Nuilbing Department Mne dalem Green 508-745-9595 Ext. 380 Leo E. Tremblay Director of Public Property Inspector of Building Zoning Enforcement Officer March 10 , 1997 Fafard Construction 290 Elliot Street Ashland, Mass . 02119 RE : Retaining Wall To Whom it May Concern: On March 3 , 1997 through March 7 , 1997 blasting was done on your property adjacent to Swampscott Road. This blasting is approximately 200 to 300 yards down hill from Building 142 and Building 143 . On March 4, 1997 the retaining wall in back of building 143 collapsed. As a result of this , the back half of this foundation was removed . An inspection was conducted and was photographed. It is my opinion that it is a shear crack approximately 4 feet in vertical distance . At this time the Salem Building Department places a Stop Work order on Building 142 and 143 pursuant to Article 1 , Section 122 . 1 and Article 1 Section 113 . 6 and Section 113 . 7 of the Massachusetts State Building Codes . No further work shall be performed until the proper engineering work has been submitted to this office pursuant to Article 1 , Section 113 . 6 and 113 . 7 . Thank you for your anticipated and immediate attention in this matter . john J . J >nnangs fi J \ Local B 1 lin Insp4ctor JJJ: scm September 26, 1996 MINUTES OF MEETING Present: Date: 9/23/96 Leo Tremblay, Salem Building Inspector Time: 10:00 a.m. Harry Mack, Fafard Companies Place: Salem Town Hall Scott Mitchell, Fafard Companies Ray Renzoni, Architectural Innovations 1. Harry and Scott stated that the fire department accepted the sprinkler drawings. Leo saw the copy and asked if the storage spaces were going to be sprinklered,.to which Harry and Scott answered in the affirmative. A full set of sprinkler drawings will be sent to Leo for his records and review. 2. Since the sprinklers will be installed in the attic storage spaces there will be no need to run the fire rated sheet rock 4'-0"down the underside of the rafters from the one hour fire rated unit separation walls. 3. The Short Ell is the 1,600 sf unit. The Short Ell Ultra is the 1,800 sf unit. The Short Ell Super is the 1,900 sf unit. 4. Ray will send Harry copies of the above units on 8 1/2x11 sheets for their use. 5. Leo requires that all storage areas be equipped with sprinkler heads. 6. Harry received permission to build Building 154 which has two 1,800 sf units and two 1,900 sf units after he submits the 8 1/2x11 drawings for a permit. 7. Ray asked Leo to define weather-tight. He feels that TYVEK or a similar material, windows and a shingled roof is considered weather-tight. Leo feels that clapboards need to be installed. Ray wants to know where the answer to this question is stated in the Massachusetts State Code. Leo feels that TYVEK or a similar material has a limited ultra-violet duration and Architectural Innovations• 19 South Street 9 Berlin, MA 01503 •(508) 838-2976 •(508)838-2967-FAX r y f t Page 2 of 2 September 26, 1996 wants Harry to submit the manufacturers' recommendations and specifications on the ultra-violet erosion. Leo believes that if the TYVEK is left open to ultra-violet exposure for too long that suffers damage. 8. Cutting Through the Sub Floor Sheathing for a Continuous One Hour Unit Fire Separation Wall: The one hour fire rated unit separation wall does not have to be continuous through the floors provided the floor system has 1/2" or 5/8"fire rated gypsum board for a ceiling and the floor is one hour fire rated as well. However, if the ceiling does not have the fire rated gypsum board, the gypsum board on the one hour fire rated separation wall unit has to run to the underside of the sub floor sheathing. 1 UNITED STATES BANKRUPTCY COURT WESTERN DISTRICT OF MASSACHUSETTS In the matter of ) Chapter 11 Ledgemere Land Corporation; ) Case No. 90-40962-JFQ Ledgemere Condominium Corporation; ) through Greenhouse Acres Development, Inc. ) 90-40968-JFQ Marine Charter and Storage Ltd. , Inc. ) Econdo Manufacturing Corporation; ) H.A. Fafard & Sons Construction, Inc. ) Howard A. Fafard ) Debtors-in-Possession. ) Jointly Administered NOTICE OF HEARING Notice is hereby given that a hearing on the Third Interim Application for Compensation and Reimbursement of Expenses of Harold B. Murphy and Hanify & King, Professional Corporation, in the sum of $180,070 . 80 has been scheduled for October 16, 1991 at 10:00 a.m. before the Honorable James F. Queenan, Jr. , Chief Bankruptcy Judge, Courtroom 1, United States Bankruptcy Court, Worcester Division, 10 Mechanics Street, Worcester, Massachusetts . All parties are advised that the Court will consider the amount of compensation requested as compared to the available assets and will act accordingly on the applications . Copies of the Third Application for Interim Compensation and Reimbursement of Expenses of Harold B. Murphy and Hanify & King, Professional Corporation are available for inspection at the offices of Hanify & King, Professional Corporation, 100 Franklin Street, Boston, MA during regular business hours. AROLD B. `MCjRPHY HAK HANIFY & G Professio al Corporation 100 Franklin Street Boston, MA 02110 (617) 423-0400 q bma 02306 DATED CAS2639 UNITED STATES BANKRUPTCY COURT DISTRICT OF MASSACHUSETTS WESTERN DIVISION IN RE: ) CHAPTER 11 LEDGEMERE LAND CORP. , ) LEDGEMERE CONDOMINIUM CORP. , ) ECONDO MANUFACTURING, INC. , ) CASE NOS. 90-40962-JFQ GREENHOUSE ACRES DEVELOPMENT CORP. , ) THROUGH 90-40968-JFQ MARINE CHARTER AND STORAGE LTD. , INC. , ) H.A. FAFARD & SONS CONSTRUCTION, INC. , ) HOWARD A FAFARD, ) JOINT ADMINISTRATION DEBTORS-IN-POSSESSION. ) NOTICE OF HEARING ON SECOND APPLICATION FOR INTERIM COMPENSATION OF BARRY M. PORTNOY, LENA G. GOLDBERG AND SULLIVAN & WORCESTER NOTICE is hereby given that a hearing will be held to consider the Second Application For Interim Compensation of Barry M. Portnoy, Lena G. Goldberg and the Law Firm of Sullivan & Worcester, seeking interim fees in the amount of $193 ,853 . 55 and expenses in the amount of $33 , 887 . 02 , on October 16, 1991, at 10: 00 a.m. in Courtroom 1, United States Bankruptcy Court, Worcester Division , 10 Mechanics Street, Worcester, Massachusetts 01608 Objections to said Application must be received by the Clerk's office and the Applicants by 4 :00 p.m. , October 14 , 1991. Copies of the Second Application For Interim Compensation of Barry M. Portnoy, Lena G. Goldberg and the Law Firm of Sullivan & Worcester are available for inspection at the offices of Sullivan & Worcester, One Post Office Square, Boston, MA 02109, during normal business hours. Dated: September 18, 1991 Respectfully submitted, BARRY M. PORTNOY LENA G. GOLDBERG SULTJVAN & WORC •STER Barbara D. Gilmore (BMA #01937) SULLIVAN & WORCESTER One Post Office Square Boston, MA 02109 (617) 338-2800 UNITED STATES BANKRUPTCY COURT DISTRICT OF MASSACHUSETTS In the matter of ) Chapter 11 Ledgemere Land Corporation; j Case No. 90-40962-JFQ Ledgemere Condominium Corporation; ) through Greenhouse Acres Development, Inc. ) 90-40968-JFQ Marine Charter and Storage Ltd. , Inc. ) Econdo Manufacturing Corporation; ) H.A. Fafard & Sons Construction, Inc. ) Howard A. Fafard ) Debtors-in-Possession. ) Jointly Administered NOTICE OF HEARING Notice is hereby given that a hearing on the Application for Fee and Affidavit of Thomas F. Quirk & Whittier Partners for Compensation in the sum of $11, 500 . 00 has been scheduled for September 27, 1991 at 10:00 a.m. before the Honorable James F. Queenan, Bankruptcy Judge, Courtroom 1, 2nd Floor, 10 Mechanic Street, Worcester, MA. All parties are advised that the Court will consider the amount of compensation requested as compared to the available assets and will act accordingly on the applications . Copies of the application for fees and expenses are available from Harold B. Murphy, Esq. , Hanify & King, 100 Franklin Street, Boston, MA 02110 and are on file with the United States Bankruptcy Court, 10 Mechanic Street, Worcester, MA. Objections, if any, to the compensation or reimbursement of expenses requested, must be filed in writing with the Clerk' s Office of the United States Bankruptcy Court, with copies to Harold B. Murphy, Esq. , all at their above-stated respective addresses . Copies of any such objections should also be served upon any other interested parties entitled to notice in this case. Any such objections shall state with specificity the bases therefor. Parties who object to the application will be expected to be present at the hearing. ill HAR LD B. PHY HANIFY & NG Professional Corporation 100 Franklin Street Boston, MA 02110 (617) 423-0400 DATED: ?/64 bma 02306 MUR:4213 °N City of 6alem, Baggacbtioettg 3 r a s r Public Propertp Department e 3guitbing Department One fpatem &teen 745-9595 ext. 380 William H. Munroe Director of Public Property Inspector of Buildings Zoning Enforcement Officer December 12, 1990 Mr. Brian Buhler American Properties 442 Main Street Malden, MA. 02148-5105 RE: ZCLZTdgeme`re-Countzy_Condominiums---J Salem, MA. Dear Mr. Buhler: In reference to your letter to this office dated December 5, 1990, the City of Salem does not take responsibility of the above property. The construction responsiblity lies with the architect/engineer and contractor of the project. Enclosed you will find a copy of Codeword, a letter issued periodically by the State Board of Building Regulations and Standards. The sections I feel you should be dealing with have been hi- lighted. If I may be of any further assistance, please contact me at this office. Sincerely, James D. �-c Qe Santo--J— "n Assistant Building Inspector JDS/jmh c.c. City Solicitor David Shea Citp of Eaten 0aaacbUoettO Public Propertp Department �3uilbing Department One 6alem Oreen 745-9595 GCxt. 380 William H. Munroe Director of Public Property Inspector of Buildings Zoning Enforcement Officer December 3, 1990 Mr. Brian Buhler American Properties Team, Inc. 442 Main St. Malden, MA. 02148-5105 RE: Ledgemere Country Condominium Salem, MA. Dear Mr. Buhler: This is in answer to your letter dated November 28, 1990 to this office. We believe the people you should be writing to would be the Fafard Companies and their architects. The project (above referenced) was under construction control Section 127 of the Massachusetts State Building Code. See sample report letter and section of code enclosed. If we may be of further assistanc, please contact this office. Sincerely, aures D. Santo Assistant Building Inspector JDS/jmh THE FAFARC7 00MRANQ7���ti l 250c `9:yea i- Arh.Q'y-VAG T'"' WT-'i. 6�a-ae -�eoo ❑o.+soe-ens-eei❑ DEC 29 419 PM '88 RECEIV A CITY OF SAL e ,-Es a« rPPretion Incen ore of ?own Lne Asscuwzes. lac, 2W, 1,n9 Building Inspector City of Salem One Salem Green Salem, MA 01970 P.E: LEZGEMERE COUNTRY II DEVELOPMENT UNIT 261) Dear Mr. Munroe: This letter is to inform you that pursuant to the requirements of Section 127.2.3 of the Massachusetts Building Code, I have inspected the above referenced unit. To the best of my knowledge, the unit has been satisfactorily completed in compliance with the Massachusetts Building Code and is ready for occupancy. Any exceptions are noted on an attached sheet. Very truly yours, FAFARD & SONS CONSTRUCTION, INC. J seph Trolla ice President Licence No., 016373 JT/ps w I I THE FAFARD COMPANIES, 290 Elaut Sweet/ASNand.-MA 017211 617-881=1600 Fax OC17-881-6231 H.A.Fafard&Sons Construction,Inc. Ledgemere Land Corporation Fafard Real Estate Interiors -Town Line Associates,Ina Building Inspector City of Salem One Salem Green Salem, MA 01970 RE fLedgemere Country II Development unit( �1 Dear Mr. Munroe: This letter is to inform you that pursuant to the requirements of Section 127.2.3 of the Massachusetts Building Code, I have inspected the above referenced unit'. To the best of my knowledge, the unit(oT has/ham been satisfactorily completed in compliance with the Massachusetts Building Code and is/37,- ready for .occupancy. Any exceptions are noted on an attached sheet. Yours truly, Robert Thomson, AIA Staff Architect Dated: J& Jv�J6 Attachments: /JOJE Crockett Associates, Inc. Struc{i)ral Engineers DEC . I L88 5 Wal0l" Street, Norwood, MA 02062 (617) 70d,2020 November 25, 1988 Mr Robert Thompson ArMhItact TH• Fafard Companies 2dq Elliot Street - 2nd Floor 01721 Adhland, MA _. Re: The Sanctuary ` Salemo MA ;tlddr Bob: per your request, this office performed an inspection at tpy above mentioned site. The purpose of this visit was to Syisw the as-built conditions of certain stone and Cast-in- t/ce concrete retaining walls and cast-in-place concrete t walls +THy Building Units and items reviewed are as follows: a. e5X Regency; Cast-in-place concrete retaining wall . b. 25X Regency; Stone retaining wall between 25X and 26. c. 32C Long "L" ; Stone retaining wall . d 320 Long "L" ; Stone retaining wall . a. 130 Regency; Cast-in-place concrete basement wall . f. 133 Regency; Cast-in-place concrete retaining wall . I Thd large stone retaining wall between Building Units 25X and -26 appears to have been constructed properly. Thd stone retaining walls at Building Units 32C and 320 were dadpaged, according to the Project Superintendent, by the o0Bration of a back-hoe. Similar stone retaining walls in tHAt area appear to be sufficient. In our opinion these two walls should be re-constructed from the base in the same fg*hion .as the remaining stone retaining walls. THd exterior cast-in-place concrete retaining walls have not uNdwrgone excessive rotation. The cold joint formed at the adge of the retaining wall and the building foundation is ndk a structural Concern, however this Joint should be sealed to prevent water infiltration and damage. CROCKETTITHOMPSON November 25, 1988 Pg. 2 of 2 - The cold joints formed in the cast-in-place concrete basement walls do not appear to provide any loss to their structural integrity if the walls have been doweled into their abutments. Again, these joints should be cut-out and sealed to prevent water infiltration and damage. - In general , the stone and cast-in-place concrete retaining walls should be monitored through thewinter on for lateral movement and/or rotation. If you have any questions or require additional information on the data discussed , please do not hesitate to call . `Sincerely, S K. C ETT ASSOCIATES, INC s "Step K. Crockett , P.E. PrIe 1 ent SKC/hcl File: #8869 _ P.S.: The stone retaining walls at Building 224reinspected and tedonsufficiea November 25, m as These walls appeared to be properlyconstructed gravity retaining walls. _ FRk G� C� I � �l DEC I 1988 1 , 'd K I ' i February, 7, 1989 Building Inspector City of Salem One Salem Green Salem, MA 01970 RE: HAMLET, 5 Patriot's Lane UNIT 28D Dear Mr. Munroe: This letter is to inform you that pursuant to the requirements of Section 127.2.3 of the Massachusetts Building Code, I have inspected the above referenced unit. To the best of my knowledge, the unit has been satisfactorily completed in compliance with the Massachusetts Building Code and is ready for occupancy. Any exceptions are noted on an attached sheet. Very truly yours, H A. FAFAAR�RD & SONS CONSTRUCTION, INC. /l J seph Trolls ice President License No. 016373 JT/ps i UNITED STATES BANKRUPTCY COURT DISTRICT OF MASSACHUSETTS In the matter of ) Ledgemere Land Corporation; ) Chapter 11 Case No.Ledgemere Condominium Corporation; ) through 90-40962-JFQ Greenhouse Acres Development, Inc. g Marine Charter and Storage Ltd. , Inc. ) 90-90968-JFQ Econdo Manufacturing Corporation; ) H.A. Fafard & Sons Construction, Inc. ) Howard A. Fafard ) Debtors-in-Possession. ) Jointly Administered JOINT NOTICE OF HEARIN PLEASE TAKE NOTICE that a hearing will be held on November 6, 1990 at 10:00 a.m. before the Honorable James F. Queenan, United States Bankruptcy Court, 10 Mechanic Street, Worcester, Massachusetts on the following Motions: 1. Joint Motion (i) to Extend Exclusivity Period for Filing Joint Reorganization Plan and To Solicit Acceptances of Plan, (ii) For Emergency Hearing, and (iii) for Ex Parte Order Extending Exclusivity Period; 2. Motion to Approve Memorandum Agreement with Citicorp Real Estate, Inc. and for Authority to (i) Convey Certain Property; (ii) Borrow Funds on a Superpriorty Basis; (iii) Assume the Dunkin' Donuts Lease; (iv) Assume the Spec Building Lease; and (v) Discharge Certain Indebtedness; 3 . Debtors ' Motion for Authority to Sell Personal Property Valued at Less than $10, 000 without Further Order of the Court. Ledgemere Land Corp. , et al . Howa d A. Fafard By its counsel, By is counsel, GAYLE EHRLICH bma /6133 D NISE M. PAPP bma 03113 LENA LDBERG bma 01915 HAROLD B. MURP bma 02306 SULLIVAN & WORCESTER HANIFY fi KING One Post Office Square Professional Corporation Boston, MA 02109 100 Franklin Street (617) 338-2800 Boston, MA 02110 DATED: October 18, 1990 UNITED STATES BANKRUPTCY COURT DISTRICT OF MASSACHUSETTS In the matter of ) Chapter 11 Ledgemere Land Corporation; ) Case No. 90-40962-JFQ Ledgemere Condominium Corporation; ) through Greenhouse Acres Development, Inc. ) 90-40968-JFQ Marine Charter and Storage Ltd. , Inc. ) Econdo Manufacturing Corporation; ) H.A. Fafard 5 Sons Construction, Inc. ) Howard A. Fafard ) Debtors-in-Possession. ) Jointly Administered CERTIFICATE OF SERVICE Suffolk, ss . Boston, MA October 18, 1990 I, Denise M. Pappalardo, Esq. , hereby certify that I have this day served a copy of the Joint Notice of Hearing by first class mail, postage prepaid on all parties listed on Exhibit "A" attached hereto. I have also served a copy of the following documents listed below to all of the creditors listed on Exhibit "B" attached hereto. 1. Joint Motion (i) to Extend Exclusivity Period for Filing Joint Reorganization Plan and To Solicit Acceptances of Plan, (ii) For Emergency Hearing, and (iii) for Fj Parte Order Extending Exclusivity Period; 2 . Motion to Approve Memorandum Agreement with Citicorp Real Estate, Inc. and for Authority to (i) Convey Certain Property; (ii) Borrow Funds on a Superpriorty Basis; (iii) Assume the Dunkin' Donuts Lease; (iv) Assume the Spec Building Lease; and (v) Discharge Certain Indebtedness; 3 . Debtors ' Motion for Authority to Sell Personal Property Valued at Less than4DN , 0 without Further Order of the Court; and 4 . Joint Notice of Hearing. SE M. PAPP jt HANIFY 5 KING / Professional Corporation 100 Franklin Street Boston, MA 02110 (617) 423-0400 UNITEIS"STATES BANKRUPTCY COURY ` DISTRICT OF MASSACHUSETTS In the matter of ) Chapter .11 Ledgemere Land Corporation; ) Case No. 90-40962-JFQ Ledgemere Condominium Corporation; ) through Greenhouse Acres Development, Inc. ) 90-40968-JFQ Marine Charter and Storage Ltd. , Inc. ) Econdo Manufacturing Corporation; ) H.A. Fafard & Sons Construction, Inc. ) Howard A. Fafard ) Debtors-in-Possession. ) Jointly Administered JOINT MOTION (i) TO EXTEND EXCLUSIVITY PERIOD FOR FILING JOINT REORGANIZATION PLAN AND TO SOLICIT ACCEPTANCES OF PLAN, (ii) FOR EMERGENCY HEARING, AND (iii) FOR EX PARTE ORDER EXTENDING EXCLUSIVITY PERIOD UNTIL THE HEARING Now come the above-captioned jointly administered debtors (the "Debtors") ,and move, pursuant to Bankruptcy Code S 1121(d) , for a 120 day extension of the exclusivity period of Bankruptcy Code S 1121(c) (2) during which only the Debtors may file a plan of reorganization (the "Exclusivity Period") and a 180 day extension of time to solicit acceptances of the plan pursuant to Bankruptcy Code S 1121 S(c) (3) . In addition, the Debtor's request an Emergency Hearing on this Motion and an 43 parte order extending the Exclusivity Period until the Court ' s determination of this Motion. In support of this Motion the Debtors state as follows: 1. On June 15, 1990 the Debtors filed voluntary petitions for relief under Chapter 11 of the Bankruptcy Code. Each a,? 3 .3 61990 j HANIFY& K!';G, P.C. Debtor continues to operate and manage its business as a debtor-in-possession pursuant to Bankruptcy Code S§-1107 and 1108. , 2. The Exclusivity Period for filing a plan of reorganization expires on October 15, 1990. The period within which the Debtors may solicit acceptances of a plan expires on December 12, 1990. 3 . The joint cases involve twenty-eight (28) secured creditors and eighty (80) loans and development projects. 4 . Since the commencement of the Chapter 11 cases, the Debtors and their counsel have met and conferred with the numerous secured creditors in an attempt to reach agreements with respect to the treatment of each secured claim under a plan of reorganization. 5. The Debtors have reached agreements with certain of the secured creditors and have submitted proposals to the remaining secured creditors. 6 . The Debtors intend to incorporate into the plan of reorganization the agreements which have been reached with certain secured creditors, as well as, the proposals presented to other secured creditors. 7. The Debtors anticipate that they will file a joint plan of reorganization by October 26, 1990, but because of the size and complexity of the case seek an extension of 120 days for the Exclusivity Period. 8. Since the Debtors may not be able to obtain acceptance of the plan within the 180 days provided under the Bankruptcy -2- Code § 1121(c) (3) the Debtors also seek to extend that period for an additional 180 days pursuant to 1121(d) . WHEREFORE, the Debtors respectfully request that the Court: 1. Enter an gK parte Order pursuant to Bankruptcy Code §1121(d) and Local Rule 26(C) , extending the Exclusivity Period through and including the date the Court acts on this Motion; 2. Either allow this Motion without a hearing or schedule a hearing as soon as the Court's calendar permits; 3. Enter an Order, pursuant to Bankruptcy Code § 1121(d) extending the Exclusivity Period for 120 days and extending the time within which the Debtors may solicit acceptances of a plan of reorganization for 180 days. 4 . Grant such other and further relief as the Court deems just and appropriate. LEDGEMERE LAND CORP. , et Al HOWARD A. FAFARD By their attorneys, By h's attorney, 4 LENA.POLDBERG HAROLD B. MUR GAYLE EHRLICH DENISE M. PAP RDO SULLIVAN & WORCESTER9 HANIFY & KING One Post Office Squares ra 100 Franklin Street Boston, MA 02109 l` "0� Boston, MA 02110 (617) 338-2800 (617) 423-0400 bma # 01915 bma # 02306 bma # 01,833 bma # 03113 1079PAPPA `L C}•1(i� try % "' Asa✓ 32 / Y JN UNITED STATES BANKRUPTCY COURT DISTRICT OF MASSACHUSETTS In the matter of ) LEDGEMERE LAND CORP. , ) CHAPTER 11 LEDGEMERE CONDOMINIUM CORP. , ) CASES NOS. 90-40962 ECONDO MANUFACTURING, INC. , ) THROUGH 90-40968 GREENHOUSE ACRES DEVELOPMENT CORP. , ) JOINT ADMINISTRATION MARINE CHARTER & STORAGE LTD. , INC. , ) H. A. FAFARD & SONS CONSTRUCTION, INC. ) and HOWARD A. FAFARD, ) Debtors-In-Possession. ) DEBTORS' MOTION FOR AUTHORITY TO SELL PERSONAL PROPERTY VALUED AT LESS THAN $10. 000 WITHOUT FURTHER ORDER OF THE COURT To the Hon. James F. Queenan United States Bankruptcy Judge Ledgemere Land Corp. , et Al. , (the "Debtors") , by their respective attorneys, hereby move for an Order of this Court, pursuant to Section 363 of the Bankruptcy Code (11 U.S.C. § 101 et sec . ) , authorizing them to sell personal property of the estate valued at $10,000 or less without further order of the Court, to the extent such property is not subject to any liens, and only after giving written notice of the intended sale to counsel for the Unsecured Creditors' Committee. In support of this motion, the Debtors represent as follows: 1. On June 15, 1990, the Debtors commenced these proceedings by filing voluntary petitions for relief under Chapter 11 of the Bankruptcy Code. The Court has allowed a motion to administer the proceedings jointly. The Debtors are operating v i ;t -2- their business as and managing their properties as Debtors-In- Possession, pursuant to Sections 1107 and 1108 of the Bankruptcy Code. 2. The Debtors are, and have been, engaged primarily in the development of commercial and residential real estate located in The Commonwealth of Massachusetts. 3 . From time to time, the Debtors have the opportunity to sell certain items of unused and unneeded personal property. Most recently, Debtor H. A. Fafard & Sons Construction, Inc. received an offer to purchase a used trailer it owns for $7 , 880. A copy of this offer is attached hereto as Exhibit A. The value of this equipment does not exceed the amount offered, and Fafard Construction has no present need for the trailer. There are no liens or security interests asserted against this piece of equipment, nor do the Debtors believe that the amount of the offer justifies the expense of invoking the sale procedures of the Bankruptcy Code otherwise applicable to the sale of property outside of the ordinary course of business. The Debtors believe that time is often of the essence in such small transactions and that delays would hinder their ability to liquidate unneeded pieces of personal property. 4. The Debtors seek general authority from the Court to sell unused and unneeded items of personal property valued at less than $10,000, in which no party has or alleges to have a lien or security interest, and only after giving written notice of the intended sale to counsel for the Unsecured Creditors' Committee. Y -3- WHEREFORE, the Debtors Ledgemere Land Corp. , et al . , by their attorneys, respectfully request that this Court (1) authorize them pursuant to Section 363 of the Bankruptcy Code to sell items of personal property not subject to any alleged security interest or lien, to the extent that the value of the property which is the subject of the intended sale does not exceed $10, 000, and only after giving written notice to counsel for the Unsecured Creditors' Committee, and (2) enter such other and further relief as appropriate. HOWARD A. FAFARD LEDGEMERE LAND CORP. , et al . , By his attorney, By their attorneys, Harold B. Murphy- BMA f LerTa G. Goldberg BMA #01951 HANIFY & KINGj' Patrick P. Dinardo BMA #03078 100 Franklin Street SULLIVAN & WORCESTER Boston, MA 02110 One Post Office Square (617) 423-0400 Boston, MA 02109 (617) 338-2800 October , 1990 EXHIBIT A � •a • U 1 A7 �''� y j( rLJ �l v � v � a � v a• 11rCe•W♦IO re.n1 'x wUfq.y♦� aq. � NUINNIIr TOWN OF FRAMINGHAM, MASS. Thi"umbF must apt»ar on, �C earsaaDordmn,lnvolat,q� (r yy,, Town rftw"right to rsfuw D+ymant t ntoranea ars omlttW from IM WM uQVl.�,4�67 _ Ito. Address Shipment To__ SANITAT�QN DEPT.iNT WAvrc py' " - �-- Da,. BSFPT MSFn \n Terms NET F.O. B. F'AMINGHAK MASS. ln,oloa In'fNIPUCATE moat W calk FAFARD CO. —► DRNElr TOWN OF FRAMINGHAM 290 ELIOT STREET IMMED DEPT. OF PUBLIC Wont ASHLAND, MA. 01721 CONFIRMING MEMORIAL BUILDING L FRAMINGHAM, MA 01701 7SALES Iscutttor ,�,trHtt !'4Ct TOtAt t11C15 HIEL TRAILER MODEL 6500 IAL / 250192 7, 880. 0 TAX EXEMPT NO. E046 001 181 tEOU,f,TION AVTNOlKFD t1. - DEYf:— SANITATTnra NCTTOTAL I 7 880, 0 I6NED ... Wf ACCOUNT_ M 0 CLASS: C a 1PP .IPA __— 100-3102-52006-3340 TO. /GtD FROM /G wo/LK,j DATE /► FAX OF W'fLs if NO, PARES PG io FAXt: ••'1Te'„0/J.l r►' PHONE R.10NV THIS PAGE 'q eio n•� iATIle j ���wra •��SIS � r `L i\ 1 y • ti '♦ t r rr • i UNITED STATES BANKRUPTCY COURT DISTRICT OF MASSACHUSETTS ) In the matter of ) Chapter 11 Ledgemere Land Corporation; ) Case No. 90-40962-JFQ Ledgemere Condominium Corporation; ) through Greenhouse Acres Development, Inc. ) 90-40968-JFQ Marine Charter and Storage Ltd. , Inc. ) Econdo Manufacturing Corporation; ) H.A. Fafard & Sons Construction, Inc. ) Howard A. Fafard Debtors-in-Possession. ) Jointly Administered MOTION TO APPROVE MEMORANDUM AGREEMENT WITH CITICORP REAL ESTATE, INC. AND FOR AUTHORITY TO (i) CONVEY CERTAIN PROPERTY; (ii) BORROW FUNDS ON A SUPERPRIORITY BASIS; (iii) ASSUME THE DUNKIN' DONUTS LEASE; (iv) ASSUME THE SPEC BUILDING LEASE; AND (v) DISCHARGE CERTAIN INDEBTEDNESS Now come Howard A. Fafard ('Fafard') , H.A. Fafard Construction Company, Inc. ('Fafard Construction') , Indian Development Corp. ('Indian') , Paul J. Beattie as he is Trustee of Granite Park Realty Trust (the 'Nominee Trust') , and Citicorp Real Estate, Inc. ('CRE') , (collectively the *Movants') , by their attorneys, and respectfully move this Court for an Order Approving the Memorandum Agreement with Citicorp Real Estate, Inc. and for Authority pursuant to 11 U.S.C. SS 363, 364 and 365 and Bankruptcy Rule 9019 to (i) Convey Certain Property; (ii) Borrow Funds on a Superpriority Basis; (iii) Assume the Dunkin' Donuts Lease; (iv) Assume the Spec Building Lease; and (v) Discharge Certain Indebtedness. In support of this Motion, the Movants submit as follows: 1. On or about June 15, 1990, Fafard, Pafard Construction and certain related Debtors filed petitions to reorganize under Chapter 11 of the Bankruptcy Code. 2. On October 5, 1990 and after extensive negotiations, the Movants entered into a Memorandum of Agreement (the 'Agreement') which provides for a comprehensive settlement of the obligations due to CRE. A copy of the Memorandum of Agreement is attached hereto as Exhibit A. 3. In this Motion, the Movants will provide a summary of some of the salient features of the Agreement and the obligations of the parties thereto. However, the Movants respectfully refer all parties to the Agreement because all of the terms will not, in the interest of brevity, be repeated in this Motion. 4 . The property owned by Fafard that is the subject of the Agreement is as follows : (i) Approximately 150 acres of vacant land located in and adjacent to Granite Park on and off Fortune Boulevard, Milford, Massachusetts (the 'Granite Park property') . (ii) A building and improvements thereon located at Lot 19, Granite Park, Milford, Massachusetts (the 'Dunkin' Donuts property') . (iii) vacant land known as Chestnut Park, Ashland, Massachusetts (the 'Chestnut Park property') . —2— 5. The Nominee Trust is the owner of a lot improved by a vacant commercial building known as Lot 16A at Granite Park, Milford, Massachusetts (the 'Spec Building property') which is leased by Fafard to the Nominee Trust pursuant to a long tern► ground lease (the 'Spec Building lease') . Fafard is the sole beneficiary of the nominee trust. 6. Indian is a Massachusetts corporation in which Fafard is a 52♦ shareholder. Indian is not a Debtor in these proceedings. Fafard 's ownership interest in Indian is however an asset of Fafard's estate. Indian is the owner of the Williamsburg Heights Condominium Project in Marlborough, Massachusetts (the 'Condo Project') . 7. The Dunkin' Donuts property is leased in its entirety to Dunkin' Donuts Northeast Distribution Center, Inc. ('Dunkin' Donuts') under a lease arrangement which required Fafard to assume certain lease obligations to Dunkin' Donuts ' former landlord, VHS Realty. Under the Dunkin' Donuts lease, Fafard is obligated to pay to VHS Realty the rent that would otherwise be due from Dunkin' Donuts to VHS in the approximate sum of $20,000 per month through November 30, 1992 . Dunkin' Donuts is presently setting off against the rent payable under the Dunkin' Donuts lease approximately $20,000 per month to reimburse Dunkin' Donuts for amounts paid to VHS that were not paid or being paid by Fafard. -3- a. The Condo Project presently consists of approximately G� 53 units which have been constructed and are substantially complete. Approximately 41 units have been sold and permits are in place to build an additional 47 units. Fafard Construction has acted as general contractor for the construction of the first 53 units. Requests for loan advances are now pending with CRE for approximately $600,000 (exclusive of retainage) . Funding of the pending requisitions and the payment of substantial operating and construction costs to third parties are required in order to continue the viability of the Condo Project. 9. As of June 15, 1990, the following amounts were due and owing to CRE and said amounts are cross-collateralized pursuant to the mortgage and loan documents executed by Fafard, the Nominee Trust and Indian: Granite Park Property $6,481, 676 . 56 Spec Building Property and Lease 2,652, 790.06 Chestnut Park Property 2, 862, 678. 60 Condo Project 5, 814,861. 17 Dunkin' Donuts Property 2, 876,320. 11 CRE's loan on the Condo Project has been paid down as the result of the sale of units since June 15, 1990 and the amount presently due to CRE on account of its loans to the Condo Project is approximately $1, 170, 757. All amounts due and payable to CRE with respect to the aforesaid obligations are hereinafter collectively referred to as the 'Obligations'. -4- 10. As is more fully set forth in the Agreement, Fafard } and CRE have agreed to resolve the Obligations as follows: (i) Fafard and the Nominee Trust shall transfer, convey and assign to CRE's nominee the Granite Park property, the Spec Building property and the Chestnut Park property together with all personal property located thereon free and clear of all liens, claims and encumbrances other than the obligations to CRE and certain other obligations specified in the Agreement. (ii) Indian shall transfer, convey and assign to CRE's nominee the Condo Project together with all personal property free and clear of liens, claims and encumbrances other than the obligations to CRE and certain other obligations specified in the Agreement. (iii) CRE shall lend Fafard up to $400, 000 (less amounts previously set off by Dunkin' Donuts against rent payable under the Dunkin' Donuts lease) in order to (A) provide funds to settle and cure the dispute with VHS Realty and (B) an amount sufficient to pay interest arrearages to CRE under the Dunkin' Donuts loan. CRE will agree to extend the Dunkin' Donuts loan for an additional 5 years at the interest rate specified in the Agreement, plus additional interest equal to 754 of the net cash flow after debt service plus 754 of the net proceeds of the sale or appraised -5- value of the property at the end of five (5) years. �! Subject to certain limitations set forth in the Agreement, CRE has further agreed to indemnify Fafard, the Nominee Trust, Indian and Fafard Construction with respect to (a) real estate taxes not yet due and payable on the Spec Building property, Granite Park property and Chestnut Park property; (b) past due taxes on the foregoing properties up to a maximum of $100,000; (c) accounts payable with respect to the Spec Building and Dunkin' Donuts property up to a maximum of $75,000; (d) road and site work which is required to be performed in the Granite Park and Chestnut Park properties. 11. For a period of 2 years from the transfer of the Granite Park property and the Chestnut Park property, Fafard shall retain a right first offer under which CRE's nominee shall advise Fafard of the price at which these 2 properties or any portion thereof are to be offered for sale and Fafard shall thereafter have a period of 30 days to notify CRE's nominee that he intends to purchase the property and 15 days thereafter to actually purchase said property. Fafard and Fafard Construction also shall maintain a license revocable on 60 days notice to store gravel and other building materials within specified areas at the Chestnut Park and Granite Park properties. -6- 12. Fafard Construction and Indian will also retain a residual interest in the Condo Project sa Follows: (i) Fafard Construction shall be entitled to receive a contingent payment in an amount equal to the net profits realized by CRE's nominee which exceeds $1.8 million but do not exceed $2 million, and Indian shall receive a contingent payment in an amount equal to 35% of any such net profits to CRE which are in excess of $2 million. Upon repayment of the condo loan and the sale of the 100 units, CRE shall transfer to Indian the remaining existing condominium development rights. 13 . The foregoing Agreement represents an expeditious and advantageous resolution of approximately $16 million of secured debt on which Fafard is either a guarantor or primary obligor with no deficiency claim against the Chapter 11 estates. The Agreement disposes of two parcels of vacant real estate, the Granite Park property and the Chestnut Park property, which have direct loans in excess of $9 million at a time in which there does not appear to be any readily available buyer for these properties. The Agreement also provides for conveyance of the Spec Building which is vacant. The Agreement provides for the payment of the outstanding claims of contractors and suppliers on the Condo Project which are in excess of $600,000 and provides funding for the continued construction and sale of -7- loo units, at which time the remaining development units will be returned to Indian. 14. The Agreement requires that approval be obtained no later than November 13, 1990 otherwise the obligations of the parties thereto will terminate and CRE will be entitled to exercise its rights under the loan documents subject to the provisions of the Bankruptcy Code. Accordingly, it is respectfully requested that a hearing on this Motion be scheduled prior to November 13, 1990. wherefore, Fafard, Fafard Construction, Nominee Trust and CRE respectfully move this Court pursuant to 11 U.S.C. §§ 363, 364 and 365 for an Order: 1. Approving this Motion and the Agreement attached hereto as Exhibit A. 2. Authorizing the conveyance of the Granite Park property, the Chestnut Park property, the Spec Building property and the Condo Project to CRE's nominee in accordance with the terms and conditions set forth in the Agreement. 3. Authorizing CRE to lend to Fafard on a superpriority basis up to $400,000 to resolve the dispute with VHS Realty and Dunkin' Donuts and to pay interest arrearages due to CRE on account of its loan against the Dunkin' Donuts property all in accordance with the terms and conditions set forth in the Agreement. -B- 4 . Authorizing the assumption of the Dunkin' Donuts lease in accordance with the Agreement. S. Authorizing the assumption of the Spec Building lease. 6. Discharging the CRE indebtedness as provided for in the Agreement; and 7. For such other and further relief as is just and appropriate. Respectfully submitted, Howard A. Fafard By: , .Clf i, Y,(1� iE�G fli z-C H.A. Fafard Construction Company, Inc.. 11 Indian Development Corp. By: N�. vlyy Citicorp Real Estate Inc. By: Granite Park Realty Trust By: to F � 11 MUR:2727 -9- EXHIBIT "A" D?=IONALLY OMr= FOR A COPY PLEASE OONfACf EITHEP GAYLE EHRLICH DEMISE M. PAPPALARDO SULLIVAN & woRmsT HANIFY & KING One Post Office Square 100 Franklin Street Boston, MA 02109 Boston, MA 02110 (617) 338-2800 (617) 423-0400 FEB 27 'Sy 10x. 18 FFFAF.D.ASHLGrdD FG #ei -SP1-5E 11 P.c 131 -- S.K. Crockett Associates, Inc. Structural Englneers 5 Walpole Street, Norwood, MA 02062 (617) 769.2020 February 22 . 1989 r ._7aSepti Trolla�-- A. FafarC&_So-ns_Construction Co . , -Inch � M 290-61iot Street - 2nd Floor Ashland , MA 01721 Re: The Sanctuary Phases I and II Salem, MA Dear Mr . Trolla : As per your request , this office performed Site Inspections at the above mentioned on November 20 , 1988 and again on February 2, 1989 . The purpose of these visits was to review and record the ,as-built " conditions of the stone and cast- in-place concrete retaining and certain cast-in-place concrete basement walls . The Suildinas and Items inspected are as follows : Building 31 Item 22 Dry Stone Retaining Walls . 24 Dry Stone Retaining Walls . 25 Cast'In-Place Concrete Retaining Walls . 26 Dry Stone Retaining Walls . � Dry_Stone_Retairing X22 Cast-In-place iQnrrete Retaining Wali-S. 3P � Dry-�tona'Rstaning"Wal'1s :- 3` Dry Stone Retaining Walls . 130 Cast-In-Flace Concrete Basement Walls . 133 Cast-In-Place Concrete Retaining Walls . The cast-in-place concrete retaining walls have not undergone excessive deflection ar rotation . The cold-joirt at the edge of the retaining wall and the buildi19 ' 5 foundation does not affect the structural integrity o` the retaining wall prcvided that the foundation wall i5 net intended as a restraint to the retaining wall . `his ,cirt should , in any case , Ca pr_oerl , sealed to „>-9vant water infiltration and lama;e . FEB " '69 17: 19 FAFRRD,NCHLHhID Fr' .#Ci7-o81-Cc31 P. CROCKETT/TROLLA February 22 , 1989 Pg . 2 The cold joints in the cast-in-place concrete basement walls do not appear to impede their structural integrity provided that the walls ' reinforcing is properly doweled into its abutments. Where the joints occur in exterior walls , the joints should be properly sealed to prevent water infiltration and damage . In general , the stone retaining walls appear sufficient to act as gravity wails to support the earth tack-fill . As per, your office , all the stones in the walls will be mortared to prevent the removal of individual stones by children. The walls will also receive a concryte cap . Both the mortaring and capping , in our opinion, are necessary and should be performed after the winter season . Just prior to this work , the walls should be checked for loose and overhanging stones and bowing and be repaired as required . If you have any questions or require additional information on the items discussed , please to not hesitate to call . Sincerely 4 tMOF � 4� S.K. CR EpS� TES, INC . CROCKES No UNM H C Step PIE . Pr i nt SKC/ lam File : #8869 THE FAFARD COMPANIES 290 Eliot Street/Ashland MA 01721 617-881-1600 Fax#617-881-6231 H.A.Fafard 6 Sons Construction,Inc. Ledgemere Land Corporation Fafard Real Estate Interiors Town Line Associates,Inc. Building Inspector City of Salem One Salem Green Salem, MA 01970 RE: r Ledgemere Country II Development:' `—,Unit( Dear Mr. Munroe: This letter is to inform you that pursuant to the requirements of Section 127.2.3 of the Massachusetts Building Code, I have inspected the above referenced unit( To the best of my knowledge, the unit( has/trade been satisfacto ily completed in compliance with the Massachusetts Building Code and is/aye ready for occupancy. Any exceptions are noted on an attached sheet. Yours truly, — Robert Thomson, AIA Staff Architect Dated: I� JU,J6F 9K Attachments: IJpJE HAY 16 '99 13:57 P.4i5 T-HE-FAFAgp_COMPANIE$ 280 Ecce rt,.,, I AeNano.MA Ot7$1 'JO6^661.1500 Fa. 908-07"aio t .A. Cafa,c 6 So,a Conanruavl . Ync. LoOse " Land Corporpnlon .'018,0 Gaal EiLBGG Irn8n0,s Town Lina Aaaoolerea Inc. May 160 1989 m C) Building Inspector r, — z City of Salem rn< One Salem Breen m r po T„ m Salem, MA 01970 a y N ccs �REi_�HAMLET, UNiT 288 - Dear Mr. Munroet This letter is to inform you that pursuant to the requirements of Section 127.2.3 -of the Massachusetts Building Code, I hdve inspected the above referenced unit. To the best of my knowledge, the unit has been satisfactorily completed in compliance with the Massachusetts Building Coda and is ready for occupancy, Any exceptions are noted on an attached sheet. Very truly yours, H, A. FAFARD 6 SONS CONSTRUCTION, INC. i i Jeteph Trolla Vice President License No, 016373 JT/ps FEB _i' '89 10: 18 FAFAR11,SHLAPiD FAX#E1'-881-5231 P.__, 3 4 S.K. Crockett Associates, Inc. Structural Englneers 5 Walpole Street, Norwood, MA 02062 (617) 769.2020 February 22 , 1989 FZ p < C:);17 ® r Mr_._JosePh Trolls — cel C-) _ — n,n z H.A. Fafa_rC_ & .Sons Cgn5trurticn _Cg .` Inc . ':Z 290 Elliot Street - 2nd Floor c rn Ashland , MA 01721 � CO Re: The Sanctuary Phases I and II Salem. MA Dear Mr . Trolla : As per your request , this office performed Site Inspections at the above mentioned on November 20 , 1998 and again on February 2, 1969 . The purpose of these visits was to review and record the "as-built" conditions of the stone and cast- in-place concrete retaining and certain cast-in-place concrete basement walls . The Buildings and Items inspected are as follows : Building # Item P2 Dry Stone Retaining Walls . 24 Dry Stone Retaining Wails . 25 Cast-In-Place Concrete Retaining Walls , 26 Dry Stone Retaining Walls . 27 Dry Stone Re:air.ing Wails . 22 Cast-jr-place Concrete Retaining Wails . 32 Dry Stone Retaining Walls . _ _ pry Stone_ Retainning_Wa:_ls . 1 130 Cast-In Flace'-Concrete 8asemert Walls . 133 Cast-In-Face Cancrete Retaining Wal Is . The Cast-in-place concrete retaining walls have not undergone excessive deflection or rotation . The cold-joint at the edge of the retaining wall and the building ' s foundation does not affect the structural integrity g' the retaining wail prcvided that the foundation wall is nct lnterndeo a5 a restraint to the retaining Wali . This jcint should . in any case , be prooerly sealed to ::'-6vent Water infiltration. 3rd damage . FEB 27 '69 10: 19 FaFHRD,PcHLHND P.3i CROCKETT/TROLLA February 22 , 1989 Pg . 2 The cold joints in the cast-in-place concrete basement walls do not appear to impede their structural integrity provided that the walls ' reinforcing is properly doweled into its abutments . Where the joints occur in exterior wails . the joints should be properly sealed to prevent water infiltration and damage . In general , the stone retaining walls appear sufficient to act as gravity walls to support the earth back-fill . As per your office , all the stones in the walls will be mortared to prevent the removal of individual stones by children. The walls will also receive a concrete cap . Both the mortaring and capping , in our opinion, aro necessary and should be performed after the winter season, Just prior to this work , the walls should be checked for loose and overhanging stones and bowing and be repaired as required . If you have any questions or require additional information on the items discussed , please do not hesitate to call . Sincerely �MOFy � +R• S. K . CR 1pr35>< TES, INC . CROCKFIT N0.32MS O Step F .E . Pr i tit CPlat �°6 SKC/ lam File: #8869 THE FAFARO COMPANIES 290 Eliot Street/Ashland.MA 01721 506-661-1600 i#506-1375-8610 H.A. Fafard &Sons Construction, Inc. Ledgemere Land Corporation Fafard Real Estate Interiors Town Line Associates, Inc. November 30, 1988 c C= Building Inspector m rn t City of Salem r One Salem Green =rn q Salem, MA 01970CAP T9 vt � RE LEDGEMERE COUNTRY II DEVELOPMENT UNIT 130D Dear Mr. Munroe: This letter is to inform you that pursuant to the requirements of Section 127.2.3 of the Massachusetts Building Code, I have inspected the above referenced unit. To the best of my knowledge, the unit has been satisfactorily completed in compliance with the Massachusetts Building Code and is ready for occupancy. Any exceptions are noted on an attached sheet. Very truly yours, H. A. FAFARD & SONS CONSTRUCTION, INC. cwa— J seph Trolla Vice President License No. 016373 JT/ps �? � �, C�Iitp i�f ��1Eiii, C�t'�55iIC111I5E�f5 r'3T' (4F 1 1aiming Nparb (@nr !�,HIFnt (6rrrn FORM A - DECISION T K r = A m r M c+a s v, Ms. Josephine Fusco > City Clerk z City Hall Salem, MA 01970 r m C30 Dear Ms. Fusco: At a regularly scheduled meeting of the Sale-. Planning Board held on June 2 7988 it was voted to endorse "n_proval Under Sub- division Control Law Not Required" on the following described plan: 1. Applicant: David Madsen 11C First Street Salem, MA 01970 2. Location and Description - 3 lots of land on Barnes Road Deed of property records in Essex South District Registry. Sincerely, Walter Power III Chairman WP/sm AUG 28 '69 10:06 P.2i2 r 7HE FAFARD COMPANIES '�.. 280,Elide-9ervv4%A;.H,.,•d.MA 01721--- O17�ae1-i 000 FBM +817•a75-9910 i H-A, Fafard 6 Sone Cans4r�tlon, Imp. .. .. Ledgemare Lamp Carperetim FBfsmd Aael Estate Intarvr August 26, 1989 Town une Aasoaletes, Imo Building Inspector City of Salon One Salem Breen Salear MA 01970 REi IEDSEMERE_000NTRY_I_I_DgNT 'UNIT'26A- Dear Mr. Munrcej This letter is to inform you that pursuant to the requiee3 of the Massachusetts Buireeents of Section referenced unit. lding Code, I have inspected the above ref To the best of my knowledge, the unit has been satisfactorily Completed in compliance with the MassaChusetts Building Code and is ready for occupancy. Any exceptions are noted on an attached sheet, very truly yours, Al FAFARD 'ON$ CONSTRUCTION, INC, J a h p Trolls ce President License No, 016373 JT/ps ^n m U O m< o m_ J (, THE FAFARD COMPANIES 290 Eliot Street/Ashland,MA 09721 508-BBI-1600 Fax#509-975-8610 HA Fafard 6 Sons Construction. Inc. Fafard Real Estate C) 9+ C July 14, 1989 0 o c M r cnn O D lo, Building Inspector o City of Salem One Salem Green y co Sale.;:, Y" 01970 Re: HAMLET, UNIT 25C Dear Mr. Monroe: This letter is to inform you that pursuant to the requirements of Section 127.2.3 of the Massachusett Building Code, I have inspected the above referenced unit. k To the best of my knowledge, the unit has been satisfactorily completed in compliance with the Massachusetts Building Code and is ready for occupancy. Any exceptions are noted on an attached sheet. Very truly yours, . A. FAFARDS CONSTRUCTION, INC. 6:t�- Joseph Trolla Vice President License Nu. 016373 JT/lk THE FAFARD COMPANIES 290 Elloc Street/Aehlend.MA 01721 506-BBl-1600 Fax k 509-875-BB10 H A. Fafard 6 Sons Constroction, Inc. Fafard Real Estate July 14, 1989 Building Inspector City of Salem One Salem Gres Salem, MA 01970 Re: HAM=, UNIT 25D Dear Mr. Monroe: This letter is to inform you that pursuant to the requirements of Section 127.2.3 of the Massachusett Building Code, I have inspected the above referenced unit. Th the best of my knowledge, the unit has been satisfactorily completed in compliance with the Massachusetts Building Code and is ready for occupancy. Any exceptions are noted on an attached sheet. Very truly yam. . A. FAF & SONS OONSTfBJCPION, INC. ' =s r ,rte J ph Trolla ice Prsident " t— License No. 016373 C 1 < � �9 JT/lk y � u t» —' va � THE FAFARD COMPANIES 29C Eliot Street/Ashland,MA 01721 50B-BBb1BCC Fax#5CB-875-8610 _ H.A. Fafard 6 Sons Construction, Inc. Ledgemere Land Corporation Fafard Real Estate Interiors April 5, 1989 _ Town Line Associates, Inc. Building Inspector City of Salem One Salem Green Salem, MA 01970 RE: HAMLET, UNIT 22C Dear Mr. Munroe: This letter is to inform you that pursuant to the requirements of Section 127.2.3 of the Massachusetts Building Code, I have inspected the above referenced unit. - - To the best - of my knowledge, the unit has been satisfactorily completed in compliance with .the Massachusetts Building Code and is ready for occupancy. Any exceptions are noted on an attached sheet. Very truly yours, H. A. WARD & ONS CONSTRUCTION, INC. o ph Trolla -~t � `— Vice President o ' License No. 016373 toocoz JT/ps m CO � a m m � fn y � CO FEB 27 '89 10: 19 FAFAP,D,ASHLAND FAX#.617-SSI-G231 P.c.'3 S.K. Crockett Associates, Inc. Structural Englneers 5 Walpole Street, Norwood, MA 02062 (617) 769.2020 February 22 , 1969 Mr . Joseph Trolla H.A. Fafard 6 Sons Construction Co . , Inc . 290 Elliot Street - End Floor Ashland , MA 01721 Re: The Sanctuary Phases I and II Salem, MA Dear Mr . Trolla : As per your request , this office performed Site Inspections at the above mentioned on November 20, 1988 and again on February 2, 1969. The purpose of these visits was to review and record the "as-built" conditions of the stone and case- in-place concrete retaining and certain cast-in-place concrete basement walls . The Buildings and Items inspected are as follows : c ! j r Building 1/ Item oo IF � 22 Dry Stone Retaining Walls . > CYb a 24 Dry Stone Retaining Walls . 25 Cast-In-Place Concrete Retaining Walls . �'� 9 26 Dry Stone Retaining Walls . 27 Dry Stone Retaining Walls , y c� 26 Cast-In-Place Concrete Retaining Wails . 32 Dry Stone Retaining Walls . 3"_. Dry Stone Retaining Walls . 130 Cast-ln-Place Concrete Basement Wails . 133 Cast-In-Place Concrete Retaining Walls . The cast-in-place concrete retaining walls have not undergone excessive deflection or rotetien . The cold-joint at the edge of the retaining wall and th= building ' s foundation does not affect the structural integrity of the retaining wall provided that the foundation wall is rct intendea as a restraint to the retaining wail . This joint should . in any case , be properly se>_ed to :--event v+at2r infiltration and aama e . FEB 27 '69 10: 15 FHFHRD•ASHLHHD FR #617-821-6c81 P. _,,, CROCKETT/TROLLA February 22, 19e9 Pg . 2 The cold joints in the cast-in-place concrete basement walls do not appear to impede their structural integrity provided that the walls ' reinforcing is properly doweled into its abutments . Where the joints occur in exterior walla , the joints should be properly sealed to prevent water infiltration and damage . In general , the stone retaining walls appear sufficient to act as gravity walls to support the earth tack-fill . As per your office, all the stones in the walls will be mortared to prevent the removal of individual stones by children. The walls will also receive a concrete cap . Both the mortaring and capping , in our opinion, are necessary and should be performed after the winter season , Just prior to this work , the walls should be checked for loose and overhanging stones and bowing and be repaired as required , If you have any questions or require additional information on the items discussed , please do not hesitate to call . Sincerely �"OF,N S.K . CR TEp TES, INC , McKErr No-Us" H Step P .E. Pr i nt ONnL SKC/ lam File : #e869 THE FAFARD COMPANIES t.� .290 Eliot S_tre_e_t_/_Aa_h_land_,_M_A 01721 505-861-1600 Fax#50B-B75-6610 — H.A. Fafard &Sons Construction, Inc. Ledgemere Land Corporation Fafard Real Estate Interiors Town Line Associates, Inc. April 5, 1989 Building Inspector City of Salem One Salem Green Salem, MA 01970 RE: HA.MLET,—UNLT_22B Dear Mr. Munroe: This letter is to inform you that pursuant to the requirements of Section 127,2.3 of the Massachusetts Building Code, I have inspected the above referenced unit. To the best of my knowledge, the unit has been satisfactorily completed in compliance with the Massachusetts Building Code and is ready for occupancy. Any exceptions are noted on an attached sheet. Very truly yours, H. A. FAFARD& SONS CONSTRUCTION, INC. cc J seph Trolla ice President ti n n License No. 016373 nra G2) z rn•c r n JT/ps C) H. W FEB 27 'SS 10: 13 FFFaPD.HSHLkll) FRX#b1 -631-6-31 P. /3 S.K. Crockett Associates, Inc. a Structural Engineers 5 Walpole Street, Norwood, MA 02062 , (617) 769.2020 n m G7 February 22 , 1969 0 N M M_r_._Joseph=T-r_o_1 I_a_ M:2 rn H.A. Fafand & Sons Construction Co .;Inc . ?co 290 Elliot Street - 2rd`F1dvr r. Ashland , MA 01721 H p Re• The SanctuarPhases-1—and 11 Salem, MA --f Dear Mr . Trolla : Asper your request , this office performed Site Inspections at the above mentioned on November 20 , 1988 and again on February 2, 1989. The purpose of these visits was to review and record the "as-built " conditions of the stone and cast- in-place concrete retaining and certain cast-in-place concrete basement walls . The Buildings and Items inspected are as follows : Building # Item 22 Dry Stone Retaining Walls . 24 Dry Stone Retaining Walls . 25 Cast-In-Place Concrete Retaining Walls . 26 Dry Stone Retaining Walls . 27 Dry Stone Retair"ing Walls . 2e Cast-In-place ,cncrete Retaining Wails . 32 Dry Stone Retaining Walls . 3'_. Dry Stone Retaining Wails . 130 Cast.-In-Place Concrete Basement Wails . 133 Cast-In-Place Concrete Retaining Walls . The cast-in-place concrete retaining walls have not undergone excessive deflection or rotetien . The cold-Jgirt at the edge of the retaining wall and the building ' s foundation tees not affect the structural integrity c' the retaining wall prcvided that the foundation wall is no' intendeg as a restraint to the retaining wail . -his joint should . in anv Case , pe rrcoerly sealed to :: -svart v:ate:- infiitration and damace . FEB c'. "89 10: 18 FRFRFD,RSHLRND FAX#617-881-62=1 CROCKETT/TROLLA February 22 , 19e9 Pg . 2 The cold joints in the cast-in-place concrete basement walls do not appear to impede their structural integrity provided that the walls ' reinforcing is properly doweled into its abutments . Where the joints occur in exterior walls , the joints should be properly sealed to prevent water infiltration and damage . In general , the stone retaining walls appear sufficient to act as gravity walls to supoort the earth tack-fill . As per your office , all the stones in the walls will be mortared to prevent the removal of individual stones by children. The walls will also receive a concrete cap . Both the mortaring and capping , in our opinion, are necessary and should be performed after the winter season. Just prior to this work , the walls should be checked for loose and overhanging stones and bowing and be repaired as required . If you have any questions or require additional information on the items discussed , please do no: hesitate to call . SincerelyytwcFu S.K . CR 106� TES, INC . CROCKM No.32M H O c� rn Step P .E . CU Pr i nt K ru oA m c 'gym r SKC/ lam ern a File: #8869 Mo 0' o g m A H � V1 C7 . C.Q. EL; P. Febxuaary, 7, 1989 n -1 rn -i CA W O A oD — T .n f _ O Building Irn+aper-°tow` mm — a City of Salem m< e �m o Gnu Sklieht Green 4alezm, ML Ci970 n N � (n n7 CO RF; HAMLET, 5 Patriot's Larce Qmmar:f Dear Mr. Munrwi: This let=er .is to ijfornr you ith ;t +ar>a2er'., to the aor--,on 12".2.3 tzP tFie Sa sachusntts Euild+,ng Code, I havc 1nEct.:LL:1 t'ne f '- we referenced unit. Tc+ the nest of my knowleege, the unit ha, Lean vatF.s;,:,Cturily coujjewtWd an coa"piisnce with the Mraaaachusatta Ei, ;+:ing Cada and is rw,.1Y r�r cC .7;.:x1,,. Ps+y _°:xcsptiona arg noted on, an attached sheet. Vary truly yours, EAFMD & SONS CONSTRUCTION, XNC« %'Jr�seph Tral.la .#ice President License No. 015373 JT/pa . I I THE FAFARO COMPANIES 290 Eliot Street/Ashland,MA 01721 617-881-1600 i Fax 1617-881-6231 H.A.Fafard&Sons Construction,Inc. Ledgemere Land Corporation Fafard Real Estate Interiors Town Line Associates.Inc. Building Inspector City of Salem One Salem Green rn`' Salem, MA 01970 'c m Co o � c -.1 rrnn r- cn r, O RE: Le_dgemere Country II Development � I-rn -- z Unit( _ ntv m. r Cl) ° o g za m N CXD GO Dear Mr. Munroe: This letter is to inform you that pursuant to the requirements of Section 127.2.3 of the Massachusetts Building Code, I have inspected the above referenced unit'. To the best of my knowledge, the unit(sl has/ha-vfe been satisfactorily completed in compliance with the Massachusetts Building Code and is/9,pir ready for .occupancy. Any exceptions are noted on an attached sheet. Yours truly, / J Robert Thomson, AIA Staff Architect Dated: Attachments: �J okjE THE FAFARD COMPANIwt `� T` 290 Eliot Street/Ashland.MA 01721' 617-881-1600 . Fax 9517-q@ 1-62:3 UEC C9 4 29 PH '88 RECEIVEj! ? Sons Construction,Inc. at' 1 CITY OF S �. Ledgemere Land Corporation Fafard Real Estate Interiors Town Line Associates,Inc. Building Inspector City of Salem One Salem Green Salem, MA 01970 RE: Ledgemere Country II Development Unit( Z6 - l� Dear Mr. Munroe: This letter is to inform you that pursuant to the requirements of Section 127.2.3 of the Massachusetts Building Code, I have inspected the above referenced unitse. To the best of my knowledge, the urit(al has/ha to been satisfactorily completed in compliance with the Massachusetts Building Code and is/5x� ready for occupancy. Any exceptions are noted on an attached sheet. Yours truly, Robert Thomson, AIA Staff Architect Dated: /(fl jvj6 Attachments: N DAZE THE FAFARD COMPANIES 290 Elioc Screei%Ashland;MA 01721 SOB-891-1600 Fex#508-675,0610 H.A. Faferd &Sons Construction, Inc. Ledgemere Land Corporation Fafard Real Estate _ Interiors Town Line Associates, Inc. November 30, 1988 Building Inspector City of Salem One Salem Green Salem, MA 01970 RE: LEDGE_MERE-COUNTRY,II_DEVELOPMENT�7 jljiUNIT 130" Dear Mr. Munroe: This letter is . to inform you that pursuant to the requirements of Section 127.2.3 of the Massachusetts Building Code, I have inspected the above referenced unit. To the best of my knowledge, the unit has been satisfactorily completed in compliance with the Massachusetts Building Code and is ready for occupancy. Any exceptions are noted on an attached sheet. Very truly yours, H. A. FAFARD & SONS CONSTRUCTION, INC. Trolla Vice President License No. 016373 JT/ps .K. Crockett Associates, Inc. Structural Engineers r 5 Walpole Street, Norwood, MA 02062 (617) 769.2020 f November 25, 1998 Mr . Robert Thompson Arc;hitact_ The Fafard_Compan s-�� 290 Elliot Street=" 2nd Floor Ashland , MA 01721 Re: The Sanctuary Salem, MA Dear Bob : As per your request , this, Office performed an inspection at the above mentioned site. The purpose of this visit was to review the as-built conditions of certain stone and cast-in- place concrete retaining wails and cast-in.-place concrete basement walls. The Building Units and items reviewed are as follows: a. 25X Regency; Cast-in-place concrete retaining wall . b . 25X Regency; Stone retaining wall between 25X and 26. C . 32C Long "L Stone retaining wall . d . 320 Long "L" ; Stone retaining wall . Reyency_1.,_Cast-in-place concrete basement wall , f. 133 eR gency ; Cast-in-plata concrete retaining wall . The large stone retaining wall between Building Units 25X and 26 appears to have been constructed properly. The stone retaining w8115 at Building Units 32C and 320 were damaged, according to the Project Superintendent , by the operation of a backhoe. Similar stone retaining walls in the area appear to be sufficient . In our opinion these two wails should be re-constructed from the base in the same fashion as the remaining . stone retaining walls. The exterior cast-in-place concrete retaining walls have not undergone excessive rotation. The Cold joint fa+' med at the edge of the retaining wall and the building £OundatiOn is not a structural concern, however this joint should be sealed to prevent water infiltration and damage . F CROCKETT/THOMPSON November 250 1458 Pg. 2 of 2 The cold joints formed in the Cast-in--place concrete basement walls do not appear to provide any loss to their structural integrity if the walls nave been doweled into their abutments. Again, these joints should be tut--out And sealed to prevent water infiltration and damage. l In general , the stone and cast-in-place concrete retaining walls should be monitored through the winter season for lateral movement and/or rotation. If you have any questions or require additional information on the data discussed , please do not hesitate to call . Sincerely , 4S.K. 0ETT ASSOCIATES, INC Crockett , P.E. SKC/hcl File: gee69 P.S. : The stone retaining walls at Building 24 were inspected on NcveTa)e25, 1M. These walls appeared to l-- prolerly constract—ed and sufficient to perforin as gravity retaining walls. y K O T-NE FAFARD..COMPANIES� 290 Eliot Street/Ashland,MA-01721 617-BB1-1600 Fax a 617-1375-8610 H.A. Fafard 6 Sons Construction, Inc. Ledgemere Land Corporation Fafard Real Estate Interiors Town Line Associates, Inc. August 11, 1988 -4 m e TA .m r Building Inspector n�' rrtC31 z City of Salem m:�E o n One Salem Green v t Go Salem, MA 01970 n Vf +i 22 GO RE: LEDGEMERE COUNTRY II DEVELOPMENT UNIT 27C Dear Mr. Munroe: This letter is to inform you that pursuant to the requirements of Section 127.2.3 of the Massachusetts Building Code, I have inspected the above referenced unit. To the best of my knowledge, the unit has been satisfactorily completed in compliance with the Massachusetts Building Code and is ready for occupancy. Any exceptions are noted on an attached sheet. Very truly yours, H. A. FAFARD & SONS CONSTRUCTION, INC. J s ph Trolla Vice President License No. 016373 JT/ps .CoN�,�b Ctu o �1PIlt, c�58�iC uSP##8 a Public Vrnpertp Pepartineut s j �p JAfO,MME��'Sr ll villin(; Depurtntent (our *mnlear (hirrrn 7.13-0213 William H. Munroe Director of Public Property Maurice M. Martineau, Ass't Inspector Inspector of Buildings Edgar J. Paquin, Ass't Inspector Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp. May 6, 1988 Rick Bodziony Project Manager The Fafard Companies Whalers Lane Salem, Ma. 01970 Dear Rick, You asked if the use of glass blocks instead of a window can be used in the Regency basement in compliance with State code. The answer is that Code sections 502.0, 506.0 and 811.0 all refer to that question. Glass blocks can be used, but with some reservations. The most important section is 502,0 which provides for standards of natural light. If these standards can be followed, then section 811 provides for the manner in which they must be attached. Please refer the question of standards with your architect or engineer for guidance. I hope that this will provide _you with the information you need to solve this problem. Very truly yours, e0j--vV -; ' wn-� Roger L. Halle Ass't. Building Inspector ,r %I ME FAFARD COMPANIES_= 290 Eliot Street/Ashland.MA 01721 617-881-1600 Fax#617-881-6231 H.A.Fafard&Sons Construction,Inc. Ledgemere Land Corporation Fafard Real Estate Interiors Town Line Associates,Inc. June 23, 1988 C— Mr . William Monroe City Building Inspector r, City of Salem One Salem Green = + Salem, MA 01970E -- _ Dear Mr. Monroe , X'o This is to formally request an approved copy of the Fafard building plan, the Castle 8 plex . This copy will be returned within the five days you specified. Thank you for your cooperation inthis matter. If you require any further information in this matter please do not .hesitate to call me at 741-1948 . inceerreQly, Scott McInnis Project Manager �oNaT,, Citp of 6atem, ,laggacbugettg Public Propertp Department �3uitbing oepartment One 6alem green 745-9595 ext. 380 William H. Munroe Director of Public Property Inspector of Buildings Zoning Enforcement Officer June 30, 1988 The Fafard Companies 290 Eliot St. Ashland, Nla. 01721 Dear Sir: This is to acknowledge the return of the Fafard Building Plan, the Castle 8 plex, to this office. Thank you for your prompt reply. Roger Halle Asst. Building Inspector - .r;� r ��lcittlhltl� SEP {6 9 tag77 ?.% LI1P �calrItt 6rrrit � 8 -- rILE#. FORM A - DECISION CITY CLERK.SAtEF{, MASS. Ms. Josephine Fusco City Clerk City Hall Salem, MA 01970 Dear Ms. Fusco: At a regularly scheduled meeting of the Salem Planning Board held on September 17, 1987, it was voted to endorse "Approval Under Sub- division Control Law Not Required" on the following described plan: 1. Applicant: Hillcrest Realty Trust 107 Brimbal Avenue Beverly, MA 01915 2. Location and Description - First Street ( .a public way) Salem MA Parcel A lot 6, Ward 3 Deed of property records in Essex South District Registry. Sincerely, Walter Power III Chairman WP/sm co%v11 BOARD OF ASSESSORS SON, 1143 ijur n fi 93 WASHINGTON STREET, CITY HALL. SALEM, MASSACHUSETTS 01970 (61 7) 744-0660 x -41 (l8 N, 8� January 6, 1987 CITY OF Mrs. Josephine R. Fusco City Clerk` City of Salem Salem, MA 01970 Dear Mrs. Fusco: Please be advised that the following street addresses have been assigned to the new Salem Housing Authority project on First St. (Assessors' parcel 1113-0007) as follows: Building Ill 1117 First Street Units A, B, C & D Building 112 1119 First Street Units A, B, C & D Building 113 1121 First Street Units A, B, C & D Building Ill is that closest to First St. , while Building 113 is that furthest from First St. Unit letters for each build- ing will run from left to right, with Unit A in each building being on the left and nearest to First St. Very truly ,{yours, P M. Caron Chief Assessor PMC:mjg cc: Kenneth B. Cahill, Postmaster Chief Joseph F. Sullivan, Fire Department Margaret R. Hagerty, Principal Clerk, Water Dept. v[dilliam H. Munroe, Inspector of Buildings Engineering Dept. , City of Salem Salem Housing Authority, 27 Charter St. , Salem Ctv of Public Property Pepartitte t i_6 J N I JA�aIMML��nSV �uillilig �epttr 13te4 �$i-t,,rq L'L (H)ne74i1021(�iree nJJY OF S LLri,?', 55. William H. Munroe Director of Public Property Maurice M. Martineau, Ass't Inspector Inspector of Buildings Edgar J. Paquin, Ass't Inspector Zoning Enforcement Officer Join L. LeClerc, Plumbing/Gas Insp. i RE: CONSTRUCTION CONTROL: Permit # Gentlemen: Please be advised that the construction authorized under the above stated permit is subject to section 127, CONSTRUCTION CONTROL, of the Massachusetts State Building Code. All construction documents, including but not limited to working drawings, shop drawings and specifications shall be prepared and approved by a registered professional architect or engineer. These documents shall be submitted to the Building Department for permit review purposes. Progress reports shall be submitted by a registered professional j architect or engineer to the Building Department on a by-weekly basis. j i Reports shall contain all information regarding the readiness of the f project to proceed and any comments pertinent to problems encountered on the site that effect compliance with any and all codes. Deviations from approved plans shall be brought to the attention of the Building Department. At the completion of the project, a report shall be prepared by the registered professional architect or engineer commenting on the readiness of the project for occupancy and listing any pertinent deviations from the approved building permit documents. Also, at the completion of the project, the general contractor recorded on the permit shall certify to the best of his knowledge the the work has been performed in accordance with the approved construction documents and in a safe and satisfactory manner in accordance with all applicable local, state and federal statutes and regulations. Failure to produce reports shall result in a cease and desist order placed upon your project within five (5) days after an established due date has passed. Please feel free to contact this office if there are any questions. Respectfully, i William H. Munroe Inspector of Buildings WHM:bms CONSTRUCTION CONTROL PROJECT NUMBER: 'FOLD 705-3 PROJECT TITLE: rAM11,'q NDUhInILn '6AL_'y_M MaA PROJECT LOCATION: QS( �5( �LiALF.N1 NAME OF BUILDING: NATURE OF PROJECT: GpNS(Q!f/�'�AI OF T}Vf&jj; -tjAjo 5-f0R.� bVbOD �I�ICIMaF� LI11Lt0►�I(�S 1 gfCO55 �d9Z IaiLF/1 15' 60UAQ_6� i. IZ C�WLUdll/n VY1Yfr5 IN ACCORDANCE WITH SECTION 127.0 OF THE,MASSACHUSETTS STATE BUILDING CODE, I, Registration No. g $ BEING A REGISTERED PROFESSIONAL ENGINEER/ARCHITECT HEREBY CERTIFY THAT I HAVE PREPARED 'µ OR DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS, COMPUTATIONS AND SPECIFICA- TIONS CONCERNING: ENTIRE PROJECT ARCHITECTURAL STRUCTURAL FIRE PROTECTION -ELECTRICAL MECHANICAL OTHER (specify) FOR THE ABOVE NAMED PROJECT AND THAT, -TO. THE BEST OF MY KNOWLEDGE, SUCH PLANS, COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE, ALL ACCEPTABLE ENGINEERING PRACTICES AND APPLICABLE LAWS AND ORDINANCES FOR THE PROPOSED USE AND OCCUPANCY. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE PRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING - PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 127.2.2: 1 . Review of stop dreaming, samples and other submittals of the contractor as required by the construction contract doaxmts as submitted for building permit, and approval for conformance to the design concept. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Special architectural or engineering professional inspection of critical construction oargxnents requiring controlled materials or construction specified in the accepted engineering practice standards listed in Appendix B. PURSUANT `TO' SECTION .127.2.3, I SHALL SUBMIT PERIODICALLY, A PROGRESS REPORT TOGETHER WITH PERTINENT COMMENTS TO THE eiT BUILDING INSPECTOR. UPON COMPLETION OF THE WORK, I SHALL SUBMIT A FINAL REPORT AS TO THE SATISFACTORY COMPLETION AND RiADINESS OF THE PROJECT FOR OCCUPANCY.._ { S GNAT !F; . SUBS IBED AND SWORN TO BEFORE ME THIS` DAY OF g/9 ril rf r n/ 19 2,-7 -.� TARY PURI. r. MY rnMMTS4TnN FXPTRF,,, /? � P 154 217 407 RECEIPT FOR CERTIFIED MAIL NO INSURANCE COVERAGE PROVIDED NOT FOR INTERNATIONAL MAIL (See Reverse) a Sent to Street a d No. At"A& o P. State and ZIP Code O!9 '7 o d Postage g d � Certified Fee Special Delivery Fee Restricted Delivery Fee Return Receipt Showing ._ to whom and Date Delivered m Return receipt showing to whom, M Date,and Address of Delivery id TOTAL Postage and Fees i` LL c 67 Postmark or Date E IL to a 1 STICK POSTAGE STAMPS TO ARTICLE TO COVER FIRST-CLASS POSTAGE, CERTIFIED MAIL FEE,AND CHARGES FOR ANY SELECTED OPTIONAL SERVICES.(see front) 1. If you want this receipt postmarked,stick the gummed stub on the left portion of the address side of the article leaving the receipt attached and present the article at a post office service window or hand it to your rural carrier. (no extra charge) 2. If you do nM want this receipt postmarked,stick the gummed stub on the left portion of the address side of the artio,"le, date,detach and retain the receipt, and mail the article. 3. tt,you want a return receipt,write the certified mail number and your name and address on a return receipt card, Form 3811,and attach it to the front of the article by means of the gummed ends if space permits.Otherwise,affix to hack of article. Endorse front of article. RETURN RECEIPT REQUESTED adjacent to the number. 4. If you want delivery restricted to the addressee, or to an authorized agent of the addressee, endorse RESTRICTED DELIVERY on the front of the article. 5. Enter fees for the services requested in the appropriate spaces on the front of this receipt.If return receipt is re- quested,check the applicable blocks in item 1 of Form 3811. 6. Save this receipt and present it if you make inquiry. TitV of �IPm, s�tt�IpzsOff� �� : -��, F _� �u61iz �rupPrtg �P3S2frtTITPItt a d' �lil�tTlt� �PiJAIfL'tP1Tt William H. Munroe January 23, 1986 One Salem Green 745-0213 Mr. John Chabot // Fafard Construction TO First St. -(Site Trailer) _ Salem, Ma. RE: Water, Pressure - Highland Ave. Area Dear John, It has c-ome -to my attention that the water pressure on your projects may be too excessive. Installation of pressure reducing valves on all water mains entering the Buildings is mandatory. ;Re:!ecrfully yours, John LeClerc, Plumbing Inspector JL:hmc r t Tit II{ c c�IETti� C�11�55c�LLISEfI� 1 nblic �3rErtti �s �rtmFnt l,*illia_m H. Munroe January 23, 1986 One Salem Green 745-0213 1'r. John Chabot -afard Construction LlQ irst St. .(Site Trailer) _ Salem, Iia. RE: Water,Pressure - Y.ighland Ave. Area Dear John, It.has c'ome 'to my attention that the water pressure on your projects may be too excessive. Installation of pressure reducing valves on all water mains entering the -u; !6irgs is mandatory. Respectfully urs, John LeClerc, Plumbing Inspector (2/28/86) DELIVERED IN HAND THIS DATE SIGNED----- SALEM POLICE DEPARTMENT r r of �IFm, c1Z�a5�L�11I5�ii� _` ublis jrOFnztr �F rrt rt h7illia_m H. Munroe January 23, 1986 One Salem Green 745-0213 2'.r. John Chabot Pafard Construction Vo _irst St. .(Site Trailer)-_ Salem, Ma. RE: Water, Pressure - Highland Ave.. Area Dear John, It.has come -to my attention that the water pressure on your projects may be too excessive. Installation of pressure reducing valves on all water mains entering the uiia'_ngs is mandatory. Re*ecttulYours, L Jona LeClerc, plulbing Inspector (2/28/86) DELIVERED INTHIS TE. r SIGNED----- F97rFGF�B£rliftRYl$N'I'"`�"` � �. LEIN SEP '�, • ��� �Iazincru� �ffttr� g t l I6 H `85 @r[F �ttlrm Grzrr CITY RECEfUED , S LE,19,MASS. September 4, !985 Mr. George M. Seeley Director of.Engineering Services The Fafard Companies 290 Eliot Street Ashland, MA. 01721 Dear George: As we discussed yesterday, it is the opinion of the Planning Board to require "as-built" plans, stamped by a Registered Engineer or Land Surveyor, for completed projects. It is the consensus of the Board that no further_occupanc-y--permits-wrll-be-granted- until plans are received for Hea t.1.a.nd D.r_ug_a.nd-par-ce-Ls-Land 2 on First, Stet. I will be happy to discuss this with you further if you wish. Sin rely yours, , Dale E. Yale Staff Advisor cc: Paul Niman Bill Munroe Ron Tiberi APPLICATION FOR EXCEPTION TO PRE-BLAST SURVEY a � a 'IT tv II M�PItt, c�£8ttC�1LI5P �� s a�` r Aire department Xtabiluarters ROBERT J. CROWLEY 48 Pfitigette *trect wchiai alem, tt. 01970 C-E-R-T-17F- 1-C-A-T-E Date April 24, 1984 As an essential part of Application to the City of Salem, Massachusetts for a��sting Permit to perform blasting operations at m — __ _ _ _T_ — =T adefs—� in said City of Salem, Massachusetts, 1t s hereby certified by the owner o7 record of said property, or his authorized agent: �� 22 See attached page,. with grids showing areas greater struct0efe� bldgs. 1 . That all blasting for which applicant seeks a permit will occur w Fthln me boundaries of the real estate owned by said person, firm or corporation, as shown on a plot plan attached to this Certificate and made a part hereof by reference; 2. That there Is set forth on .the attached plan all the area or areas to be blasted under the Permit herein applied for; 3. That none of the area or areas to be blasted are within 250 feet of any structure or wall not owned by said person, firm or corporation executing this Certificate as shown by a line on said plan setting forth the, circumference of a circle with radius or 250 feet from the area or areas to be blasted This Certificate is executed to establish that the Applicant' s proposed blasting operations on the property afore-said is exempt from the Pre-Blast Survey provisions of Chapter 12, Section 12-71 . 1 , of the Ordinances Of the City of. Salem, and to induce the City of Salem to issue a Blasting Permit based upon the representations herein set forth. Approved by: H.A. Fafard & Sons Construction, Inc. Bu� Inspector Y Person, Firm or Corporation Owner Building Permit # Approved by: � ir�i+�rzt, Address: 290 Eliot Street, Ashland, MA s ton ErV'tCe4ACT/NG C/yy ENl'/yEE,P Approved as to Form: 1 v City Solicitor ' ..3 Grids More Than 250 Feet From Any Building 8-N 17-M 23-0 8-0 17-N 23-P 9-M 17-0 23-Q 9-N 17-P 23-R 9-0 17-Q 24-N 10-L 18-F 24-0 10-M 18-G 24-P 10-N 18-H 24-Q 10-0 18-I 24-R 11-L 18-J 25-0 11-M 18-K 25-P 11-N 18-M 25-Q 12-M 18-N 25-R 12-N 18-0 25-S 13-M 18-P 25-T 13-N 18-Q 25-U 14-M 19-F 25-V 14-N 19-N 26-T 15-M 19-0 26-L' 15-N 19-P 26-V 15-0 19-Q 27-T 16-M 22-G 27-U 16-N 22-0 27-V 16-0 22-P 28-T 16-P 22-Q 28-U 16-Q 23-H 28-V 17-L 29-U 29-V See Plan of Blasting Area, Highland Acres, 1" = 100' f Pre-Blast Survey List 8-H 17-E 8-I 17-F 8-J 17-G 9-H 17-H 9-I 17-I _ 9-J 17-J 10-I 17-K 10-J 18-C 10-K 18-D 11-I 18-E 11-J 19-C ll-K 19-D 12-I 19-E 12-J 21-C 12-K 21-D 12-L 22-C 13-I 22-D 13-J 22-E 13-K 22-F 13-L 23-F 14-J 23-G 14-K 24-F 14-L 24-G 15-G 24-H 15-H 24-I 15-I 24-J 15-J 24-K 15-K 24-L 15-L 24-M 16-D 25-F 16-E 25-G 16-F 25-H 16-G 25-I 16-H 25-J 16-I 25-K 16-J 25-L 16-K 25-M 16-L 25-N 17-D THE FAFARO COMPANIES 290 Eliot Street/Ashland,MA 01721 617-BB1-1600 Fax a 617-875-8610 H.A. Fafard 6 Sons Construction, Inc. Ledgemere Land Corporation Fafard Reel Estate Interiors Town Line Associates, Inc. April 26, 1989 Building Inspector City of Salem One Salem Green Salem, MA 01970 RE: LEDGEMERE COUNTRY II DEVELOP24ENT UNIT 133-C Dear Mr. Monroe: This letter is to inform you that pursuant to the requirements of Section 127.2.3 of the Massachusetts Building Code, I have inspected the above referenced unit. To the best of my knowledge, the unit has been satisfactorily completed in compliance with the Massachusetts Building Code and is ready for occupancy. Any exceptions are noted on an attached sheet. 9A.truly ursFAFARD & SONS CONSTRUCTION, INC. Joseph Trolla Vice President License No. 016373 JT/par FEB 27 '39 10: 19 FHFAR ,,HSHLHHP FRX#E17-831-62231 P,3.�3 S.K. Crockett Associates, Inc. Structural Engineers ' 5 Walpole Street, Norwood, MA 02062 (617) 769.2020 February 22 , 1989 Mr . Joseph Trolla H.A. Fafard & Sons Construction Co . , Inc . 290 Elliot Street - 2nd Floor Ashland , MA 01721 Re: The Sanctuary Phases I and II Salem, MA Dear Mr . Trolla : As per your request , this office performed Site Inspections at the above mentioned on November 20 , 1988 and again on February 2, 19e9 . The purpose of these visits wa to review and record the "as-built " conditions of the stone and cast- in-place concrete retaining and certain cast-in-place concrete basement walls. The Buildinas and Items inspected are as follows: Building # Item 22 Dry Stone Retaining Walls . 24 Dry Stone Retaining Walls , 25 Cast-In-Place Concrete Remaining Walls , 26 Dry Stone Retaining Walls . 27 Dry Stone Retairing Walls . 22 Cast-In-Place Concrete Retaining Walls . 32 Dry Stone Retaining Walls . 3'- Dry Stone Retaining Walls . 130 Cast-Ir-Place Concrete Basement Wails . 133 Cast-In-Place Concrete Retaining Walls . The cast-in-place concrete retaining walls have not undergone excessive deflection ar " rotatlen. The Cold-joint at the edge of the retaining wall and the building ' s foundation does not affect the structural integrity cf the retaining wall prcvided that the faundatlon wall is net intended as a restraint to the retai„ing wall . This jcint should , in any Case , be :^_Der1 sealed tO C event H:ate'," infiltration and 3amagm . _ FEB J9 :10: 19 FPFRRD,i;' HLRID FR; #Ei7-Rat-5c'1 P. =, CROCKETT/TROLLA February 22, 1989 Pg . 2 The cold joints in the cast-in-placa concrete basement waill% do not appear to impede their structural integrity provided that the walls ' reinforcing is properly doweled into its abutments. Where the joints occur in exterior walls , the joints should be properly sealed to prevent water infiltration and damage . In general , the stone retaining wails appear sufficient to act as gravity walls to support the earth back-fill . As per your office , all the stones in the walls will be mortared to prevent the removal of individual stones by children. The walls will also receive a concrete cap . Both the mortaring and capping , in our opinion, are necessary and should be performed after the winter season . Just prior to this work , the walls should be checked for loose and overhanging stones and bowing and be repaired as reouired . If you have any questions or require additional information on the items discussed , please do not hesitate to call . SincerelyjNOF�Q �f� S.K . CR en TES , INC . CHOCKM N0.92sa H O Step P .E . Pr i nt� OALIL SKC/ lam File : #8869 THE FAFARO COMPANIES 290 Eliot Street/Ashland,MA 01721 617-861-1600 Fax n 617-875-B61 O H.A. Fafard 6 Sons Construction, Inc. Ledgemere Lend Corporation Fafard Real Estate Interiors Town Line Associates, Inc. April 26, 1989 r Building Inspector City of Salem One Salem Green Salem, MA 01970 RE: LEDGEMERE COUNTRY II DEVELOPMENT �LUNIT 133AF Dear Mr. Monroe: This letter is to inform you that pursuant to the requirements of Section 127.2.3 of the Massachusetts Building Code, I have inspected the above referenced unit. To the best-of my knowledge, the unit has been satisfactorily completed in compliance with the Massachusetts Building Code and is ready for occupancy. Any exceptions are noted on an attached sheet. Very truly yours, *j FAFA_ SONS CONSTRUCTION, INC. o pPh Trolla V'ce resident License No. 016373 ST/par FEB 27 189 161:18 FAFARD,ASHLAND FRX#617-831-6231 F.Z,3 .K. Crockett Associates, Inc. Structural Englneers 5 Walpole Street, Norwood, MA 02062 (617) 769.2020 February 22, 1989 Mr . Joseph Trolla H.A. Fafard & Sons Construction Co . , Inc . 290 Elliot Street - 2nd Floor Ashland , MA 01721 Re: The Sanctuary Phases I and II Salem, MA Dear Mr . Trolla : As per your request , this office performed Site Inspections at the above mentioned on November 20 , 1988 and again on February 2, 1989 . The purpose of these visits was to review and record the ,as_built,, conditions of the stone and cast- in-place concrete retaining and certain cast-in-place concrete basement walls . The Buildings and Items inspected are as follows : Building # Item 22 Dry Stone Retaining Walls . 24 Dry Stone Retainina Wails . 25 Cast-In-Place Concrete Retaining Walls . 26 Dry Stone Retaining Walls . 27 Dry Stone Retaining Walls . 22 Cast-In-Place Concrete Retaining Walls . 32 Dry Stone Retaining Walls . 3'' Dry Stone Retaining Wails . 130 Cast-In-Place Concrete Basement Wails . 133 Cast-In-Place Concrete Retaining Walls . The Cast-in-place concrete retaining walls have not undergone ex-essive deflection or rotation . The Cold-joint at the edge of the retaining wall and the building ' s foundation does not affect the structural integrity cf the retaining wail prgvided that the foundation Wal ; is net intendea as a restraint to the retaining wail . This jcirt should . in any case , be prcoerly Sealed `c -event wate':- infiltration and iama;u . FEE. 7 `G9 10: iS FHFHFD,HEHLHHD Fr'i; #Ei ' 81-Gc 1 F. 1; CROCKETT/TROLLA February 22 , 19e9 Pg . 2 The cold joints in the cast-in-place concrete basement walls do not appear to impede their structural intmgrity provided that the walls ' reinforcing is properly doweled into its abutments . Where the joints occur in exterior walla, the joints should be 'properly sealed to prevent water infiltration and damage . In general , the stone retaining walls appear sufficient to act as gravity walls to supcort the earth back-fill . As per your office , all the stones in the walls will be mortared to prevent the removal of individual stones by children. The walls will also receive a concrete cap . Both the mortarinc and capping , in our opinion, are necessary and should be performed after the winter season . Just prior to this work , the walls should be checked for loose and overhanging stones and bowing and be repaired as required . If you have any questions or require additional information On the items discussed , please do not hesitate to call . Sincerely jAOFN 41� S.K . CR erA�K TES, INC . CHOCKM NO-32M H Step P .E . Pr i n ONAL SKC/ lam File : #8669 FEB -7 'e9 10: 18 FAFARD,ASHLAND FAX#61'-881-62:31 p, -;3 S.K. Crockett Associates, Inc. Structural Engineers 5 Walpole Street, Norwood, MA 02062 (617) 769.2020 February 22 , 1989 Mr .__Joseph Trol_la H.A. Fafard_ & Sons Construction Co . , Inc . _ 290 Elliot Street - End Floor Ashland , MA 01721 Re: The Sanctuary Phases I and II Salem, MA Dear Mr . Trolla : As per your request , this office performed Site Inspections at the above mentioned on November 20 , 1988 and again on Fmbruary 2, 1989 . The purpose of these visits was to review and record the ".as-built" conditions of the stone and case- in-place concrete retaining and certain cast-in-place concrete basement walls. The Buildings and Items inspected are as follows : Building #1 Item • r2E:j Dry Stone Retaining Walls . 24 Dry Stone Retaining Walls. 25 Cast-In-Place Concrete Remaining Walls . 26 Dry Stone Retaining Walls . 27 Dry Stone Retaining Walls . 28 Cast-Ir-Place Concrete Retaining Wails . 32 Dry Stone Retaining Walls . 3i, Dry Stone Retaining Walls . 130 Cast-In-Place Concrete Basement Walls . 133 Cast-In-Place Concrete Retaining Walls . The cast-in-place concrete retaining walls have not undergone excessive deflection or rotation . The Cold-joirt at the edge of the retaining wall and the building ' s foundation does not affect the structural integrity e` the retaining wall provided that the foundatlon Wall is net intended as a restraint to the retaining wail , This joint should . in anv case , oe r _oerly sealed to Z�svent V;ate�- infiltraticn and damage . :1'fl FEB 27 '69 10: 19 FRFPRD,PSHDRID FRX#r17- 81-hc31 P• _,.S CROCKETT/TROLLA February 22 , 19e9 Pg . 2 The cold joints in the cast-in-place concrete basement wails do not appear to impede their structural integrity provided that the walls ' reinforcing is properly doweled into its abutments . Where the joints occur in exterior walls , the joints should be properly sealed to prevent water infiltration and damage . In general , the stone retaining wails appear sufficient to act as gravity walls to support the earth tack-fill . As per your office , all the stones in the walls will be mortared to prevent the removal of individual stones by children. The walls will also receive a concrete cap . Both the mortaring and Capping , in our opinion, are necessary and should be performed after the winter season , ,lust prior to this work , the walls should be checked for loose and overhanging stones and bowing and be repaired as required . If you have any questions or require additional information on the items discussed , please do not hesitate to call . Sincerely `„V As ••a, ""1 S.K . CR fpg� TES, INC . CRCCKM N0.13518 O Step P .E . Pr i n t OAlat SKC/lam File : #8869 otg of �xlFnl x�> s�zrluz�e z� A 12 2 5i F.. 81 —� �itr �rA�rt;t (s�rerlt CITY ;! ...,.L1WA S. Januar-: 9 . 1987 ;r . Ronald Killian The ,Fafard rompanlec. 290 Eliot Street Ashland . `74 01721 PE : n J D -- Parcels 1 & 2. First Street Dear Mr . Killian: 1n accordance with Section VI"-0 of the City of Salem' s Zoning Ordinance , the Planning Board , on January 8, 1987 . approved the Certificate of Compliance for Parcels 1 and II on First Street , c;ith,plf-e conditions as stated in the decision dated January 2222 , 1985 . Sincerely, Walter B. Power , III Chairman 01021 �GtpL!31°l ad.n qT � - J,,ta�vru i -` - (IT JU Z- ham_ J�Iamihtg.33varl MAY ZZ II 49 Rif °Ro r`�ciK>s� 4 �riP _15§HIPIIt (Srkett RECEIVED ' CITY OF S LEN, HASS. FORM A -'-DECISION j i May 21, 1986 Ms. Josephine Fusco City Clerk City Hall Salem, MA 01970 Dear Ms. Fusco: At a regularly scheduled meeting of t:.e Salmi. ?fanning Board held on May 15, 1986 it was voted to endorse ,A??roval Under .Sub- division Control Law Not Required" .on the following described plan: 1. Applicant: John R. Serafini, Attorney Highland Realty Trust 65 Federal Street ' Salem, MA. 01970 2. Location and Description - Land located on the south easterly side of First Street and easterly side of_Swampscott_Road, identified as Ptiase I o"Site Plan Ledgemere Country II", revised April 3, 1986, Book 5292 Page 734 Deed of property records in Essex South District Registry. Sincerely, Qy, �p � l VQU ^ lUwu �ima ' Walter Power III`',y10 Chairman WP/sm Ctu of '$Ufem, f ussarhusdis Planning Puarb - g 2g AM its Gli*g Blau pear 13 Salew, lglaeearhusgue Dt97D FIIE� 5 V C`riiv. ys1.Et1,MA5 CIT ` NOTICE TO BE ATTACHED TO FORM "A"APPLICATIONS See Form "A" applications for. complete instructions for filing. All insertions shall be typewritten or printed neatly in ink. Date: May 12, 1986 City Clerk Salem, Massachusetts 01970 Dear Sir: I hand you herewith two copies of Form A, an application submitted by me this day to the Plan- ning Board of the City of Salem requesting a determination and an endorsement on a plan filed with said application that Planning Board approval under the Subdivision Control Rules and Regulations is not required. The land shown on the accompanying plan is located at ---—-------First Strand — -- e -------et---------------------------- --------Whaler's Lane --- -- — in Ward -------- 3 — — —-------------------- (insert street and street numbers here) Signature of Owner _ ___ i =, — —='�==C '=L C =---------------- ', /o Serafini & Serafini7 Street Address -----_- 65 Federal Street City/Town & State ---Salem, Massachusetts 01970 Telephone Number --- —-- ------------------------------------------ Ctu of Ien>, �ssttcl�usetts Planning ?3aarb R"emm�e. a ' CHU Mull lsalem, Anesachusetts 01970 FORM A APPLICATION FOR ENDORSEMENT OF PLAN BELIEVED NOT TO REQUIRE ' APPROVAL In accordance with provisions of Section II-B, the applicant must file, by delivery or registered mail, a Notice with the City Clerk stating the date of sub- mission for such determination. The notice shall be �..i attached to two copies of this Form A application. 1 The notice and both copies of the application must be "date stamped" by the City Clerk and then one copy of this Form A, with the Plan, filed with the Planning Board by the applicant. All notices and applications shall be typewritten or neatly printed in ink. y Salem, Mass., May-12'........................ -86 'rF To the Planning Board: The undersigned, believing that the accompanying plan of his property in the City of Salem does not constitute a subdivision within the meaning of the Subdivision Control Law because (See Sect. II-A and state specific reasons) -_the site has street frontage and otherwise meets the - ------------------------------------------------------------------------------------------------------ q Salem zoning and subdivision ordinances. ----------------------------------•---------------------------------------------------------------------- S-0 - - ------------------ and herewith submits said plan for a determination and endorsement that Planning Board approval under the Subdivision Control Law is not required. ;a 1. Name of Owner --Highland Realty Trust, c/o John R. Serafini Sr. - --------------- — - - 65 Federal Street, Salem, MA 01970 Address ---------------------------------- 1 ---------------------------------------------------------------------------- DavC _ Garcelon,__The_Fafard Companies 2. Name of Engineer or Surveyor ________id-____- ._ - i Address-----------290_Eliot_S treet�__Ash land,__MA-----01721-----------_ -------------------- property Essex South District Registry 3. Deed ofrecords in -------------_-_-----------___--------_---_ Book _5292 Page ----- 734---------- — } 4. Location and Description of Property: Land located on the southeasterly side of i Eizsi__SLx�eS--ramd--Qas-ter15 --S-ade_o_f_Syamp$cot _Road_,__%d_ez�t3€_aeO-aa-Phage-1--- on "Site Plan, Ledgemere_ Country II, Planned Unit Development in Salem, Mass. , revised April 3, 1986", prepared by The Fafard Companies, and approved { - --- ------ --------- -- -------- - - - -- - - - -by the Salem_ Planning Board on April 3 and April 17, 1986; part-of the 69--_72+ acre: tract shown on a plan entitled "Plan of Land Located in Salem, Mass, Properties - ------------- ---------------------------------------------------------------- of Highland Realty Trust and Howard A. Fafard, Scale 1" = 100' , February 2, 1984", - - - -- ------------------------------------------------------------------ - .--recorded--with--Es-sex South District Registry, Plan Book 185/32. ---------------------------------------------------------------------------------------------------------------------------------------------- 5. All streets and abutting lot lines shall be ShOwnX the Plan together with the names of the Owners ' of the abutting lots. Signature of Owne --- -------- ` - = c L - c/o SeraYini & Serafini� 65 Fe�eral Street Address-------- - -------------------------------------------------- Salem, MA 01970 Telephone Number ---------------------------744-0212------------------------------ DRAIN EASEMENT CITY of SALEM \ V47 3-9'28"E 77027103"E ' CONSERVATION COMMISSION �(\ \ 43.73' fl64.63' �\ S36026.76E r15p0 �� 30 00' 1 E o o �\ C / TY OF SALEM 1 R=30.00 R=250.00' NON TANGENT CURVE v cv. L= 29.15'pa ° CHORD=S59 0558„W L=51.5/' C'g N_ d= 6°40'49” T-3474T� w � =/4.59' m , 0 0 w w FOR REGISTRY USE ONLY .Q T 1' TR E � po2,g2 FIRS w 2 � 1V AREA =8.56AcREs e 60260. N NOTE FOR WyA[ERS LANE PARCEL 4A,PARCEL 49, RoA� R=288.00' + HIGHLAND �T DRAIN EASEMENT PARK h S�Q ( 4= 58`38'0/" AND APPURTENANT GRAIN EASEMENTS, SEE o SWAM R-30.00' R=238.00' _' L- 299' rQ S d=B6 //'S/" , T= 161. 73' PLAN 67 IN PLAN BOOK /9B AT THE ESSEX V 50 L=45./3' /, 5838 OI' \\ 4g1 02 h T=28 07' L -243.96 _ � DRAIN EASEMENT Zp 5 T GOON G T Y OF DEEDS. 3. 6 Y E S 5 I'� ;:...: T l cli Q n1 Z. 1 1 6 6 ,o a �Sa9 stq� /� \ .1000, o � N \ N N 0 o O U7w p o � ZzhA, �Z ,f CITY OF SALEAl �+ �" / 10 AREA=13,5'3ACRES ! � DR41NEASEMENT oo [JOIiVS' PLAN / 6 F V `t N SCALE 400 '•. Q DRAIN EASEMENT Z � J Amo R=239.00' .ryi U � � 4 69 04658 N, n L= 29/.09 o CL T=166 68' Z R=289.00' 4= 46°36'12" d=69"4658" rr\ L = 236.69' L=351.98, T= 125331 T=201.54' 6 w� 6, Nsr DRAIN EASEMENT 9- 14) `C Al • -L.pw'o r3� 0 539"/0'35"E 1 o\� o.; DRAIN 0 d EASEMENT \v �� r�' ,„ 00 0925 a 0 NI GNL AND REALTY TRUST �\tio2' sem- s- PARCEL 4A 6 I r 14115PLANO REALTY TRUST PARCEL 48 I CERTIFY THAT THIS PLAN HAS BEEN PREPARED IN APPROVAL UNDER THE SUBDIVISION CONTROL PHASE 2 CONFORMITY i Y WITH THE RULES AND REGULATIONS OF LAW NOT REQUIRED. THE REGISTERS OF DEEDS OF THE COMMONWEALTH OF SALEM PLANNING BOARD ;J - / / / N L � OGEM RAE COU , J �R Y lie MASSACHUSETTS . IN L. w SALEM , MASS. DAVID C.GARCELON, P.L.S. " SCALE =111= 100' APRIL 1, 1986. DATE 0WNE0 BY: GRACE S.MC GETTR/CK, TRUSTEE HIGHLAND REALTY TRUST 0 50 100 200 400 500 FEET PREPARED 8Y: THE FAFARD COMPANIES ".--` 290 EL/OT STREET 0 25 50 100 METERS ASHLAND , MASS. 0/72/ DATE 104 7-03 �_ /JUL-19, t-96 FRI 08.41 AM P. 01 MARINER DEVELOPMENT CORP, 101 Whalers Lane Salem, MA 01970 Sales: (508) 745-1099 Const: (508) 740-0122 Fax! (508) 740-4463 e Mr. Leo Tremblay 1 Salem Green Salem, MA 019"'0 Dear Leo, Attached are the building permit applications for Buildings 146, 148, 150 and 152. It is our plan to appeal the interpretations that our buildings require sprinklers. If we lose the appeal, we will sprinkle the buildings if that is what is required, by law, for passing. I spoke to Inspector LaPointe in regard to review of the plans. When I told hira of our intention to appeal the requirement for sprinklers, he asked "to whom", said "it was a shame" and refused to review them. I i Sincerely yours, Harry Mack Project Ma a r 1�1lI'rcmbWy r JUL-19-96 FRI 08:41 RM T. 01 MARINER DEVELOPMENT CORP. 101 Whalers Lane Salem, MA 01970 Sales. (508) 745-1099 Const: (508) 740-0122 Faz: (508) 740-4463 Mr. Leo Tremblay 1 Salem Green Salem, MA 01970 Dear Leo, Attached are the building permit applications for Buildings 146, 148, 150 and 152. It is our plan to appeal the interpretations that our buildings require sprinklers. If we lose the appeal, we will sprinkle the buildings if that is what is required, by law, for passing. I spoke to Inspector LaPointe in regard to review of the plans. When I told him of our intention to appeal the requirement for sprinklers, he asked "to whom", said "it was a shame" and refused to review them. Sincerely yours, -� ... / Harry Mack Project Ma t4 a , 3 (situ ofttlem. tttostt� uo�tto tlublic Prapertg Department iguilbing i9epartment Wne *alem Grren 508-745-9595 Ext. 380 Leo E. Tremblay Director of Public Property Inspector of Building Zoning Enforcement Officer July 25 , 1996 City of Salem Fire Department Lafayette Street Salem, Mass . 01970 RE : LFafard Project Swampscott Road Dear Chief Turner : The Fafard Construction Firm has filed for building permits for building #146 , x/148 , #150 , and #152 for a total of 16 units at the above mentioned project . It has been relayed to me by Harry Mack their project manager that your fire prevention office has refused to review the drawings on the condition that the buildings were not going to have sprinklers installed . Firefighter Mr. Norman LaPoint refused to review said drawings . I have received a letter from Harry Mack stating that the construction firm is pursuing a legal appeals process against the use of sprinklers in a building classified R-3 use group . If this appeals process fails , the owners would be required to install sprinklers in the building that are being permitted under permit # Bld . x/146 ( 414-96 ) #148 ( 415-96 ) - / 150 ( 416-96 ) - #152 ( 417-96 ) . Per receiving said letter from the firm of Fafard, I will be issuing building permits so that the project can keep progressing in an orderly fashion . If this office can be of any further assistance in this matter , please do not hesitate to call . ,r Sinceerely, Leo E . Tremblay - Inspector of Buildings LET: scm cc: David Shea Harry Mack Fire Prevention Councillor Donahue , Ward 3 r � it��ry .. r 6ity o f cSaLm, 4�-,flassacfiusetts t 9i tE 2�F-#a it n2Ent '�d"ter✓ �1 4S lafayEttE --Shed [) -Sa&m, --,1Na11ac4U1Ett1 01970-3695 ci\o�iEtt �1�� �uanE2 �7d506-744-1235 ��itE �iEVErstiwz (�Sae 506-745-4646 EUSEau 50S-744-6990 500-745-7777 July 3, 1996 Mr. Leo Tremblay, Inspector of Buildings City of Salem One Salem Green Salem, Ma 01970 Dear Leo: I have received and read the June 27th Official Interpretation of the Impacts of the Sprinkler Legislation from the State Board of Building Regulations and Standards. These statutes are local option and have been adopted by the City of Salem. Based upon the interpretation by the Board, I have determined that the four plex condominiums being constructed by the Fafard Corporation are subject to the provisions of Massachusetts General Laws Chapter 148 Section 261 by design and definition. Should there be any dispute arising from this determination, the building permit applicant is provided an avenue of administrative appeal through the State Fire Marshal or the Sprinkler Appeals Board. Also based upon this determination, I will expect to see included within the plans for such buildings a plan for the design and installation of a system of automatic sprinklers in accordance with the appropriate standard referenced for the installation of said automatic sprinkler systems. Should submitted plans fail to include the sprinkler system, said application shall be denied based upon non compliance with Section 113 of the Massachusetts State Building Code. Should an appeal be taken based upon a denial of the permit, you, as Building Inspector, may issue a permit in part and shall in writing, concurrently notify the Fire Chief and the applicant clearly identifying the limits placed upon the construction. I hope this determination eliminates the confusion and conflict previously encountered in the permitting and inspection process. The intent of the law is to better protect the inhabitants of multiple family construction and as such is supported strongly by this Department. Sincerely, i Robert W. Turner, Chief of Department wpdocs\admin\148§26i.wpd cc: Robert A. Ledoux Fire Prevention Division file Enclosure ' k a � �lty of eSa�em, !�a�.�.ac�ius.Fffs � � a �LZE L�e�azEmenf y 4.6 fafaycttc cStacct S.&m, _ 1auacfiuieffa 0197'-3695 'I ✓`o�e2F jq� �u1nEa 508-,74,;-1235 giiE AEVEation erxiEf `fax 50S-745-4646 Bureau 5oS-'/44-6990 50S-745-7777 July 3, 1996 Mr. Leo Tremblay, Inspector of Buildings City of Salem One Salem Green Salem, Ma 01970 Dear Leo: I have received and read the June 27th Official Interpretation of the Impacts of the Sprinkler Legislation from the State Board of Building Regulations and Standards. These statutes are local option and have been adopted by the City of Salem. Based upon the interpretation by the Board, I have determined that the four plex condominiums being constructed by the Fafard Corporation are subject to the provisions of Massachusetts General Laws Chapter 148 Section 261 by design and definition. Should there be any dispute arising from this determination, the building permit applicant is provided an avenue of administrative appeal through the State Fire Marshal or the Sprinkler Appeals Board. Also based upon this determination, I will expect to see included within the plans for such buildings a plan for the design and installation of a system of automatic sprinklers in accordance with the appropriate standard referenced for the installation of said automatic sprinkler systems. Should submitted plans fail to include the sprinkler system, said application shall be denied based upon non compliance with Section 113 of the Massachusetts State Building Code. Should an appeal be taken based upon a denial of the permit, you, as Building Inspector, may issue a permit in part and shall in writing, concurrently notify the Fire Chief and the applicant clearly identifying the limits placed upon the construction. I hope this determination eliminates the confusion and conflict previously encountered in the permitting and inspection process. The intent of the law is to better protect the inhabitants of multiple fiamily construction and as such is supported strongly by this Department. Sincerely, C ;Lt.J Robert W. Turner, Chief of Department wpdocs\admin\148§26i.wpd cc: Robert A. Ledoux Fire Prevention Division file Enclosure V Ctv of Aiassac4use#s g a mow. , �� �l�ttutitt� marl JUL (011e § Falr it (6rrrn b Decision SITE PLAN REVIEW THE FAFARD COMPANIES 290 Eliot Street Ashland, MA 01721 RE: PHASE 4 - Whalers Lane On Thursday, April 4, 1996, the Planning Board of the City of Salem opened a public hearing regarding the application of the Fafard Real Estate and Development Corp. (applicant), 290 Eliot St., Ashland, MA, under Section 7-18, Site Plan Review, of the Salem Zoning Ordinance, with respect to the construction of one hundred twenty units (120) within Phase 4 of a development plan entitled, "Green Dolphin Village, Phase 4 of Ledgemere Country, in Salem, MA dated March 1, 1996, revised through June 1, 1996. The public hearing was closed on May 30, 1996. At a regularly scheduled meeting of the Planning Board held on June 20, 1996, the Board voted by a vote of seven (7) in favor, none (0) opposed, to approve the application as complying with the requirements of Site Plan Review as stated in the February 7, 1986 Planned Unit Development Special Permit, subject to the following conditions: 1. Conformance with Plan Work shall conform to plan entitled "Green Dolphin Village, Phase 4 of Ledgemere Country, in Salem, MA" prepared by the Fafard Real Estate and Development Corp., dated March 1, 1996, revised through June 1, 1996, containing sheets 1-7. (Site Plan) 2. Amendments Any amendments to the above referenced Site Plan or waiver of conditions contained herein shall require the approval of the Planning Board. 3. Curbine Sloped granite curbing shall be installed along both sides of Dockside Circle, Nautical Drive, and at each driveway entrance along Whalers Lane. The granite curbing shall extend beyond the radius at the driveway entrance and shall be chamfered to allow construction of handicapped ramps. - 1 - ~ 4. Maintenance a. The applicant shall employ an acceptable method or means for the holding and disposal of trash after site development with a copy of this method sent to the Planning Department and Health Department in writing for their approval. b. Refuse removal, road, storm drainage system, ground maintenance, and snow removal shall be the responsibility of the applicant, his successors or assigns. C. Winter snow in excess of the snow storage areas on the site shall be removed off site. 5. Utilities Utility installation shall be reviewed and approved by the City Engineer prior to the issuance of building permits. ,h w 6. Landscaping Landscaping shall be in accordance with plan entitled, "Green Dolphin Village, Phase 4 of Ledgemere Country, in Salem, MA" prepared by the Fafard Real Estate and Development Corp., dated March 1, 1996, revised through June 1, 1996 containing sheets 1-7. a. Maintenance of landscape vegetation shall be the responsibility of the applicant, his successors or assigns. b. After all project landscaping is completed, the applicant shall be required to add further landscaping if such is required by the City Planner. C. The applicant shall flag all trees to be removed in Phase 4. All trees which are being removed and are over 5" in caliper shall be approved by the City Planner with input from the City of Salem Landscape Architect. It is understood that in every instance where a tree over 5" in caliper can be saved it will be the expressed interest of the applicant and the City of Salem to save such tree. d. The approval of Site Plan Review for Phase 4 shall amend all earlier conditions of the approvals as stated in Conditions 9 and 10 of this Decision, solely as effecting Phase 4, which require the completion and perpetual maintenance of the "Ancient Trail". The Planning Department shall work with the applicant to determine the feasibility of locating a new trail head on First Street. The location of the trail head, as well as any and all necessary regulatory permits, shall be obtained by the Planning Department. The cost for the improvements to the trail head shall be borne by the applicant. e. The applicant shall install a fence, a minimum of 40" high, along the top of the entire Swampscott Road rip-rap slope. The detail of the fence shall be reviewed and approved in writing by the City Planner. - 2 - ~ f. The applicant shall work with the City of Salem's Landscape Architect to ensure that the riprap slope and the slope surrounding the vista meets aesthetic standards which are acceptable to the City. The landscape design shall be approved in writing by the City Planner. The rip-rap slope along Swampscott Road shall be treated with a wild flower mix. In addition, groupings of mass forming shrubs shall be planted. A final planting plan for these slopes shall be reviewed by the City of Salem's Landscape Architect and approved in writing by the City Planner. g. Deciduous trees shall be planted along Swampscott Road at the base of the rip-rap slope to minimize the appearance of the height of the slope. The trees shall be a minimum of 31/2" caliper, planted 50 feet on center. The species of trees shall be reviewed by the City of Salem's Landscape Architect and approved in writing by the City Planner. The Applicant shall provide a one year guarantee on all new deciduous street trees. It. The applicant shall submit a revised planting plan for the top of the rip-rap slope. The plan shall include the massing of different species of evergreen trees as well deciduous trees..in the line between buildings. The plan shall be reviewed by the City of Salem's Landscape Architect and approved in writing by the City Planner. i. The applicant shall work with the Planning Department to develop appropriate landscaping for the units close to Dockside Circle and Nautical Drive to allow for adequate snow removal and snow storage. j. The applicant shall agree to provide a bond, cash security, or covenant in an amount determined to equal the cost of landscaping, sidewalks, paving and tree plantings, inclusive of Whalers Lane. Amounts shall be determined by the City Planner. k. The applicant, his successors or assigns shall maintain the cleanliness of the ledge face along First Street from Whalers Lane to Swampscott Road. 1. The applicant shall be responsible for the restoration of disturbed land, should Phase 4 not be started or completed. The work shall include the clean-up, grading to natural topography of area, and seeding with grass and leave area to take on a natural state. 7. Chimneys . All chimneys in Phase 4 shall be constructed of solid masonry with 2'/s" thick brick exposed to the exterior. S. Exterior Siding Material Exterior siding material shall be reviewed and approved in writing by the City Planner prior to the issuance of a Building Permit. - 3 - r 9. "Overall" PUD Special Permit All applicable conditions set forth in the "Overall" Planned Unit Development Special Permit dated February 7, 1986, shall be strictly adhered to. 10. Phase 1. Phase 2. Phase 3A and Phase 3B Approvals All conditions set forth in both Phase IA and IB approval dated March 26, 1986, and April 17, 1986, Phase 2 approval, dated April 16, 1987, the Phase 3A approval dated May 25, 1995, and the Phase 3B approval dated March 14, 1996, which are pertinent to Phase 4 shall be strictly adhered to. 11. Construction Vehicle Access/Construction Parking and Staeine Area a. Construction vehicles shall utilize the North Access Road to Swampscott Road until such time that the road is removed due to construction of units in that location within Phase"3B. Construction vehicles shall then be allowed to utilize only the portion of Whalers Lane from First Street to the third driveway in Phase 4. The Applicant shall work with the Planning Department to develop a construction access road from First Street in order to minimize impact on neighbors. b. Construction parking and staging area shall be located within Phase 4 or an un-built area within Phase 3B. C. The applicant shall include a restriction in all subcontractors contracts stating that subcontractors must adhere to the access and parking requirements of this Decision. d. There shall be no parking on Whalers Lane by any construction vehicle or passenger vehicles of contractor or subcontractors. 12. Whalers Lane Completion a. Sidewalks on outer loop of Whalers Lane along Phase 4, shall be completed immediately upon completion of Phase 4, weather permitting, or June 30, 1997, whichever is earlier. b. Street trees shall be planted along Whalers Lane by June 30, 1997. Trees shall be a minimum of 31h"caliper and planted 50 feet on center. Species of trees shall be reviewed by the City Salem's Landscape Architect and approved in writing by the City Planner. The Applicant shall provide a one year guarantee on all new deciduous street trees. C. If Whalers Lane is damaged during construction of Phase 4, the applicant shall restore the pavement to the satisfaction of the City Planner. 13. Open Space Area a. The applicant shall create a passive recreational area with access, a walkway, and fencing, if such fencing is required by the State Building Code or by the Planning Department, on top of the slope within Phase 4. The design of such area shall be reviewed and approved in writing by the City Planner prior to the issuance of any building permits for Phase 4. - 4 - a b. The applicant, his successors or assigns shall maintain the access to the open area and control erosion to the area, if any, and be responsible for trash pick up and general maintenance of the open area. 14. Building Lhilitinz The applicant shall utilize long-life bulbs in the exterior building lights. Such lights shall be approved in writing by the City Electrician and City Planner prior to installation. 15. Central Watering System The applicant shall work with the Certified Property Manager and the City Planner to develop a method for the watering of the common areas in Phase 4. 16. Professional Certified Property Manager w The applicant shall hire a Certified Property Manager (CPM) as managing agent for Phase 4 following completion of Phase 4. 17. Blastine All blasting to be done in accordance with 527 CMR 13 and City of Salem Blasting Ordinance. 18. Fill Material All fill material shall be in accordance with the regulations of the Board of Health. 19. Board of Health All work shall comply with the requirements of the Board of Health. 20. Fire Department All work shall comply with the requirements of the Salem Fire Department. 21. Building Inspector All work shall comply with the requirements of the City of Salem Building Inspector. 22. Clerk of Works A Clerk of Works shall be provided by the City and paid for by the applicant as deemed necessary by the City Planner. The Clerk of Works shall report to the Building Inspector on any problems he believes may be in violation of the building code. - 5 - 23. Assurance of Adherence to Conditions of this Decision A financial assurance system shall be established to ensure that the conditions contained in this decision are adhered to. The assurance system shall collect funds from the applicant if certain conditions contained herein are not met. The donation will be set at $100.00 per offense, to be paid within 14 days of notice of such offense, with a total ceiling for all donations not to exceed $15,000. In addition, outstanding fees for offenses shall be paid prior to the issuance of Certificates of Occupancy. The financial assurance system shall be under the administration of the Salem City Solicitor. The donations shall relate only to conditions relating to contractor and subcontractor access and parking, blasting notification, street sweeping, work-hours and cleanliness of existing roadways. Upon completion of Phase 4, any donations which are collected shall be distributed on a pro-rated share, among the Condominium Associations of the preceding phases of this development and shall be used at the discretion of the Condominium Associations. 24. Swampscott Road Improvements The applicant shall fulfill their responsibility for improvements to Swampscott Road which the applicant agreed to in the Overall Planned Unit Development Special Permit, dated February 7, 1986, Condition IIA - Traffic which states "An easement, to be defined by the Planning Board, shall be granted for the widening of Swampscott Road along the southerly side of the developer's property to allow for an increase in roadway capacity. Such easement shall be provided by the developer in a form satisfactory to the City Planner and the City Solicitor. In addition, the developer shall bring to grade the area of said easement to permit the widening, and shall construct an adequate sub-base." The City of Salem Engineering and Planning Department's are currently preparing the design plans for the reconstruction of Swampscott Road. The design will accommodate the future widening of Swampscott Road to four travel lanes, turning lanes at key commercial/industrial sites, and a sidewalk along the northerly side of Swampscott Road. The project is expected to continence in the summer of 1996. The applicant shall work with the City of Salem Planning Department and the Engineering Department to coordinate the work to be completed. In light of this plan for Swampscott Road, the applicant agrees to convey a five (5) foot wide easement to the City of Salem in order to implement this plan. The applicant shall complete the work necessary to improve the site visibility on the southern comer of the intersection of First Street and Swampscott Road. The work shall include, but not be limited to, the removal of ledge to improve site distance and to restore and landscape the area. The intent of this work is to establish a safe site design. The design shall be subject to review and written approval by the City Engineer. - 6 - ~ 25. Construction Practices All construction shall be carried out in accordance with the following conditions: a. No work shall commence before 8:00 A.M. on weekdays and on Saturdays. No work shall continue beyond 5:00 P.M. There shall be no work conducted on Sundays or holidays. Inside work of a quiet nature may be permitted at other times between the hours of 7:00 A.M.-9:00 P.M. Monday-Friday, excepting Saturdays and all day Sunday. b. All reasonable action shall be taken to minimize the negative effects of construction on abutters. Advance notice shall be provided to all abutters in writing at least 72 hours prior to commencement of construction. C. All construction vehicles shall be cleaned prior to leaving the site so that they do not leave dirt and/or debris on roadways as they leave the site. w? d. The applicant shall conduct street sweeping on Whalers Lane on a weekly basis, or as deemed necessary by the City Planner. e. The Applicant shall provide portable restroom facilities on site during the entire construction phase. f. All construction shall be performed in accordance with the rules and regulations of the Planning Board, and in accordance with any and all rules, regulations and ordinances. 26. Violations Violations of any condition of this decision may result in revocation of this permit by the Planning Board in its sole discretion. I hereby certify that a copy of this decision and plans have been filed with the City Clerk and copies are on file with the Planning Board. This decision is rendered in accordance with the site plan review process as outlined in the February 7, 1986 Planned Unit Development Special Permit. �� ec I , Walter B. Power, III B.�. Chairman 7 - jm\bdWafard.p4 I \� ! 't* UNITED STATES POSTAL SERVICE OFFICIAL BUSINESS 1 SENDER INSTRUCTIONS 1+ Print your name,address,and ZIP Code in the u � space below. • Complete items t,2,3,and 4 on the reverse. • AttaCM1 to front of article if space permits, PENALTY FOR PRIVATE otherwise affix to back of article. USE$sco I • Endorse article"Return Receipt Requested" adjacent to number. RETURN TO Name old I o.and Street,Apt.,Suite,P.O. Box or R.D. No.) '(City,State,and ZIP Code) C1 . SENDER: Complete Items 1,2,3 and 4. Q Put your address in the"RETURN 70"space on the 3 reverse side. Failure to do this wiI l prevent this card from t� being returned to you.The return receipt fee will provide you the name of the person delivered to and the date of delivery.For additional fees the following services ere available.Consult postmaster for fees and check boxlesl .� for service( (requested 00a 1. o to whomdate and address of delivery W 2 ❑ Restricted Delivery V m 3 Article Address tl to 4. Type of ServiceArticle Number Rstered El Insured 016,1a1 -/ 1/07 'Certified ❑ COD ❑ Express Mail Always obtain signature of addressee g agent and DATE DELIVERED. O 5 Signature Addressee O X ym 6 Signature Agent F) X M ] Date of Delivery C M s Addressee's Address(ONLYif requestedandTe-e-P-aNT— z M m n m v µ�,a CITY OF SALEM _ BUILDING DEPARTMENT City Hall Annex One Salem Green fr%Q`S 't 1 F 1. cmc SALEM, MASSACHUSETTS 01970 � t� ? Mr. John Chabot Fafard Construction 40 First Street, (Site Trailer) Salem, MA 01970 P 154 217 40-7 ,� w{�^ Pot Notic - `Jr.l ,10 2nd Noti Pefurn � i.�t 1 '� � � ��F � ' �j� � �? 6° 1 �� 9 � � � ,� g3� .� 3.�� � r i --------- _ __ -----. _._-.— G4ND..G9PY..SENT_-FIRST ONE LOST,INMAIL..__ ._.-- Otg of 5alpm, � c�5s22t1�1z5pft 41 William H. Munroe January 23, 1986 One Salem Green 745-0213 Mr. John Chabot Fafard Construction �![S First St. .(Site Trailer; - Salem, Ma. RE: Water. Pressure - Highland Ave. Area Dear John, It.has come 'to my attention that the water pressure on your projects may be too excessive. Installation of pressure reducing valves on all water mains entering the Buildings is mandatory. Re ectfully yours, John LeClerc, Plumbing Inspector J7 :hmc • 1 S O A�Q,�� Citp of *stem, Aa!52;aCbU!5ettg Mepartment of Public �&erbiccg (Due 6alem green (508) 745-9595 (ext. 321 STANLEY I. BORNSTEIN,P.E. City Engineer 1 fax: (508) 745-5877 Director of Public Services 7-14-97 FROM: Stan Bornstein TO: Craig Wheeler RE: FAFARD-Phase 3B During a recent visit to the above referenced project, I could not help but notice the close proximity of the buildings to the top of the slope of the retaining wall. The decision letter from the Planning Board (UNDATED) calls for a fence to be constructed along the top of slope (page 3, item f. ) a minimum of 40 " high. The details to be approved,prior to construction, by the City Planner. I RECOMMEND THAT THIS FENCE BE INSTALLED NO LESS THAN 5 FEET HIGH AND AS SOON AS POSSIBLE. On 7-10-97 we met with the developer and reviewed the progress made rebuilding the wall which collapsed in March of this year. It was agreed that the developers consultant,Haley and Aldridge Inc would remain on site until the wall is completed and certify to the City that it is built to their revised plans and specifications and that the wall is safe and sound. Another situation that should be addressed is that the drainage structures are located near the top of the slope and would be almost impossible to maintain/service should a problem arise. For this reason the ownership of this system must remain with the Condo Association. CC: Leo Trembaly Walter Powers III Dave Shea Mike Collins Beth Debski CITY OF SALEM, MASSACHUSETTS'3'I' f''r PLANNING DEPARTMENT oa�titi @dou 4' 3 a4 PPS '05 GERARD KAVANAUGH "Y RFCEIVrD ONE SALEM GREEN CITY PLANNER r $r, `} CITY OF SkLFf„PIASS• 01970 (617) 744-4580 November 1 , 1985 Mr. George Seeley GThe'=F-aMird_Companies-I 290 Eliot Street Ashland, MA. 01701 Re: +Units 1—B and_2—B, 7 &_9_First Street_—_Cloisters Condominiu`ms � Dear Mr. Seeley: Please consider this letter as my approval for the issuance of Certificates of Occupancy for Units-l=B_and,21B;,7 and}Q=First_Str`eet I understand these units are to be conveyed shortly. This permission does not preclude receiving the necessary approvals from the Inspector of Buildings and the Director of Public Services. I will be happy to discuss this with you further if you wish. Sin ely yobs, Gerar¢ K ' anaugh City /Planner .' cc: Attorney J. R. Serafini Ed McMahon Paul Niman Bill unro �O µICOWW� (1�tt of Sttlent, ttss rl��tse #s z a Public Propertg Bepartineut '�"O�,Hn,cw�� �'.11111�UT� �EpurtriTErit �irharD �. �IrJnme!! One J3alem Green 745-0213 March 20,1985 " H.A. Fafard & Sons Re: 29 First Street 290 Elliott Street Ashland,Ma 01701 c/o George M. Seeley Dear Mr. Seeley: This permit for superstructure (enclosed) is subject to the following condition. The Fire Department(Fire Marshall' sOffice) must make a rough inspection of the framing, so as to determine the location of smoke detectors. You owe the Fire Marshall's office $ 10.00 for plan review. Please call me if you have any questions. Very truly yours, Richard T. McIntosh Inspector of Buildings RTM:mo's cc: Captain Robert Turner CITY OF SALEM, MASSACHUSETTS PLANNING DEPARTMENT NOV 7 f.<O91Lt�' 236 GERARD KAVANAUGH "r l;jjy F`CEPIC0 ONE SALEM GREEN 0197 CITY PLANNER l jyT Su C F�.m4 S( 17)74404500 November 7, 1985 + Mr. George Seeley The Fafard Companies 290 Eliot Street Ashland, MA. 01721 Re: Building Seven; Units A, C, D; Building Nine; Units A,_B,_C,_D;,Building ,Eleven; Units 11-C and 11-D, Cloisters Condominiumg;_Flrst Street Dear Mr. Seeley: Please consider this letter as my approval for the issuance of Certificates of Occupancy for the following units: Building Seven; Units A, C, and D Building Ivne;rUnits A, B, C, and D Building Eleven; Units 11 C and 11 D This does not preclude receiving the necessary approvals from the Inspector of Buildings and the Director of Public Services. Sincer Gerard av naugh' City P n r cc Paul Niman Bill Munroe Ed McMahon Attorn�,y john Serafini CITY OF SALEM, MASSACHUSETTS n F` 1- Y"'r PLANNING DEPARTMENT Nov 7' 226 Ph1 195 f .00T91[l�' CITY PLANNER GH / r .T CITY FRECEIVEDS, ,1 �?��NCCES019M8GNEEN GERARD I'~ ( l7)744-4580 s YyS r�r �cl•mT.� November 7, 1985 0 Mr. George Seeley The Fafard Companies 290 Eliot Street Ashland, MA. 01721 Re: Building Seven; Units A, C, D; Building Nine; Units-A,,B,_C,_D; Building Eleven; Units 11-C and 11-D, Cloisters Condominiums,$First_Str_eet Dear Mr. Seeley: Please consider this letter as my approval for the issuance of Certificates of Occupancy for the following units: Building Seven•, Units A, C, and D Building Nine; Units A, B, C, and D Building Eleven; Units 11 C and 11 D This does not preclude receiving the necessary approvals from the Inspector of Buildings and the Director of Public Services. Sincer Gerard av naugh' City P n r cc Paul Niman Bill Munroe Ed McMahon Attorney John Serafini x Cit U of ' S$att ' 'fflassar utts .1 9 Aire Peparimerd �ieaLynarYerz 48 ?:uzfgeffe free# ROBERT J. CROWLEY wch er �*nlem, 4HU. D197D April 2, 1985 Mr. William Munroe Inspector of Buildings One Salem Green Salem, Ma 01970 Dear Mr. Munroes As-was the-practice--with-the fir-st-residential unit on the Fafard Pr_operty_on_First_First-,,Street, the- Fire Prevention Bureau will make a rough inspection of the units located at 31=33=35 ..9F.rst,Street,�p'ro-r to designating locations for smoke detectors. I feel that this practice will eliminate any source of confusion due to the interior configurations of these units. Following such inspection, plans now on file with this department will be appropriately marked for use with like units in the future. Please advise me of an opportune time to schedule these inspections. Cordially, Robert W. Turner, Fire Marshal LO L1 O g: U.`.il !. C 4C U Rec'd by: Ck#_22N- Cash Cit#g oXezrt, ttcrixett X`ire 11epartment Peabyuarters Robert J. Crowley 48 Pfg9tk �$frftt A/Chief osa6m' 43k 019711 FIRE DEPARTMENT CERTIFICATE OF APPROVAL-FOR BUILDING PERMIT To: Head of Fire Department Dates April 2. 1985 Application for plan approval and Certificate In accordance with the provisions of the Mass. State Building Code and Salem Fire Code, application is hereby made for approval of plans and issuance of a certificate of approval for a building permit, by the Salem Fire Department. (Ref. Section 113. 59 Mass. State Bldg. Code. ) Job Locations #31 First Street Owner or Occupant: H.A. Fafard & Sons General Contractors H.A. Fafard & Sons Address: 290 Eliot St. . Ashland Electrical Contractors Address: Fire Supression Contractors Addresss Notice: Prior to starting work, sub-contractor shall file required form Final inspection is required, prior to issuance of Certificate of Occupancy. Inspections are by appointment only. Signature of Applicant: Phone # Address of City or Applicant: Towns Approval Dates April 2. 1985 Certificate of Approval is hereby granted., on approved plans or sub- mittal of project details, by the Salem Fire Department. All plans are approved solely for identification of type and location of fire protection devices and equipment. All plans are subject to approval of any other authority having jurisdiction. Upon completion the applicant or installers shall request a test or inspection, and the installer shall file a Certificate of Completion, if required. Owner or Occupant: H.A. Fafard & Sons Project Locations #31 First Street Signature of Fire Official This Certificate will Fir �yarshal expire on July 2. 1985 'lisle Applicant shall submit this Certificate of Approval, to Bldg. Insp. Form #81 (Rev. 7/82) s C fg of Salem, fliaelear use##s (ire Pepartnunt Xe4qusrters Robert J. Crowley 48 ?1afgette freet A/Chief Sat m, cmtt. 019711 FIRE DEPARTMENT CERTFICATE OF APPROVAL FOR BUILDING PERMIT In compliance with provisions of Section 113 . 5 of the Mass. State Building Code; and under guidelines agreed upon .by the Salem Bldg. Inspector and the Salem Fire Chief; the applicant for a building permit, shall obtain the Certificate of Approval (see reverse side) and stamped plan approval from the Salem Fire Prevention Bureau. Said application and approval is required before a building permit may be issued. The Mass. State Building Code requires compliance approval of the Salem Fire Department, with reference to provisions of Article #4 and Article #12 of the Building Code, • the Salem Fire Code, Mass. General Laws and Mass. Fire Prevention Regulations. The applicant shall submit this application with three (3 ) sets of plans, drawn in sufficient clarity and detail, to obtain stamped approval of the Salem Fire Department. This applies for all new construction; substantial alterations; change of use and/or occupancy; � . and any other approvals required by the Mass. General Laws and the Fire Codes. . Exception : Plans will not be required for structural work, when the . proposed work to be performed under the building permit, will not ; in the opinion of the Building Inspector, require a plan to show the nature and character of the work to be performed. NOTICE: Plans are normally required for fire supr-ession systems ; fire alarm systems; tank installations; and fire code requirements. NOTICE: Under provisions of Article #22, of the Mass. State Bldg. Code; certain proposed projects may not require submission of plans, nor complete compliance with new construction requirements. In these cases, provisions of Article #22, Appendix T, and Tables applicable shall apply. This section shall not however, super- sede the provisions outlined in Salem Fire Prevention Bureau Regulations; Chapter 148, M.G.L. ; or the Mass. Fire Prevention Regulations. i.e. all permits for fire code use and/or occupancy shall apply for the entire structure; fire alarm and/or smoke detector installation, shall apply to the entire structure, based on new A .C . (hardwired) units for all new construction, but the existing structure may comply with regulations applicable for existing structures. NOTICE: Sub-contractors may also be required to file individual appli- cations for a fire department certificate of approval, covering their area of work. Said sub-contractors shall file for Fire Department application to install, prior to commencing any work. i Rec'd bytL , Ck# L�ILCash Chit ofttXe , , sourhase#ts, Department Xe4quarters { Robert J. C row l ey 48 ` 4afgefte Street A/Chief Aa(eut, f a_ 111970 FIRE DEPARTMENT CERTIFICATE OF APPROVAL-FOR BUILDING PERMIT To: Head of Fire Department Date: April 2, 1985 Application for plan approval and Certificate In accordance with the provisions of the Nass. State Building Code and Salem Fire Code, application is hereby made for approval of plans and issuance of a certificate of approval for a building permit, by the Salem Fire Department. (Ref. Section 113. 5, Mass. State Bldg. Code. ) Job Locations #33 First Street Owner or Occupant: H.A. Fafard & Sons General Contractor: H.A. Fafard & Sons Address: 290 Eliot Street, Ashland Ma Electrical Contractor: Address: Fire Supression Contractors Addresss Notice: Prior to starting works sub-contractor shall file required form,( ; Final inspection is required, prior to issuance of Certificate of Occupancy. Inspections are by appointment only. Signature of Applicant: Phone # Address of City or Applicant: Town: Approval Date: April 2. 1985 Certificate of Approval is hereby granted, on approved plans or sub- mittal of project details, by the Salem Fire Department. All plans are approved solely for identification of type and location of fire protection devices and equipment. All plans are subject to approval of any other authority having jurisdiction. Upon completion the applicant or installers shall request a test or inspection, and the installer shall file a Certificate of Completion, if required. Owner or Occupants H.A. Fafard & Sons Project Locations #33 First Street Signature of Fire Official This Certificate will Fire Marshal expire on July 2, 1985 Title Applicant shall submit this Certificate of Approvals to Bldg. Insp. Form #81 (Rev. 7/82) Cott of *alem, Massachusetts Aire PPyartment �1eabquartzrz Robert J. Crowley 48 Tinfgefte *rret A/Chief 1tt1ent, At_ 01970 FIRE DEPARTMENT CERTFICATE OF APPROVAL FOR BUILDING PERMIT In compliance with provisions of Section 113 . 5 of the Mass. State Building Code; and under guidelines agreed upon by the Salem Bldg. Inspector and the Salem Fire Chief; the applicant for a building permit , shall obtain the Certificate of Approval (see reverse side) and stamped plan approval from the Salem Fire Prevention Bureau. Said application and approval is required, before.. a building permit may be issued. The Mass. State Building Code requires compliance approval of the Salem Fire Department, with reference to provisions of Article #4 and Article #12 of 'the Building Code, the Salem Fire Code, Mass. General Laws and Mass. Fire Prevention Regulations. The applicant shall submit this application with three (3 ) sets of plans, drawn in sufficient clarity and detail, to obtain stamped approval of the Salem Fire Department. This applies for all new construction; substantial alterations; change of use and/or occupancy; and any other approvals required by the Mass. General Laws and the Fire Codes. Exception: Plans will not be required for structural work, when the proposed work to be performed under the building permit, will not ; in the opinion of the Building Inspector, require a plan to show the nature and character of the work to be performed. NOTICE: Plans are normally required for fire supression systems ; fire alarm systems; tank installations; and fire code requirements. NOTICE: Under provisions of Article #22, of the Mass. State Bldg. Code; certain proposed projects may not require submission of plans, nor complete compliance with new construction requirements. In these cases, provisions of Article #22, Appendix T, and Tables applicable shall apply. This section shall not however, super- sede the provisions outlined in Salem Fire Prevention Bureau Regulations; Chapter 148, M.G.L..; or the Mass. Fire Prevention Regulations. i.e. all permits for fire code use and/or occupancy shall apply for the entire structure; fire alarm and/or smoke detector installation, shall apply to the entire structure, based on new A .C . (hardwired) units for all new construction, but the existing structure may comply with regulations applicable for existing structures. ` NOTICE: Sub-contractors may also be required to file individual appli- cations for a fire department certificate of approval, covering their area of work. Said sub-contractors shall file for Fire Department application to install, prior to commencing any work. Ree'd by: %.. Ck# L'7� Cash s Chi g of '�$ttXent, A s tte�r�tset#s ire Peyartmerd Xeabquarters Robert J. Crowley 48 ` llafgeW *treet A/Chief 1*61111 cmu. 01971 FIRE DEPARTMENT CERTIFICATE OF APPROVAL-FOR BUILDING PERMIT To: Head of Fire Department Date: April 2. 1985 Application for plan approval and Certificate In accordance with the provisions of the Mass. State Building Code and Salem Fire Code, application is hereby made for approval of plans and issuance of a certificate of approval for a building permit, by the Salem Fire Department. (Ref. Section 113. 59 Mass. State Bldg. Code. ) Job Locations #35 First Street Owner or Occupant: H.A. Fafard & Sons General Contractor: H.A. Fafard & Sons Address: 290 Eliot Street, Ashland Electrical Contractors Address: Fire Supression Contractors Addresss Notice: Prior to starting work, sub-contractor shall file required form, Final inspection is required, prior to issuance of Certificate of Occupancy. Inspections are by appointment only. Signature of Applicant: Phone # Address of City or Applicant: Town: Approval Date: April 2. 198 Certificate of Approval is hereby granted, on approved plans or sub- mittal of project details, by the Salem Fire Department. All plans are approved solely for identification of type and location of fire protection devices and equipment. All plans are subject to approval of any other authority having jurisdiction. Upon completion the applicant or installers shall request a test or inspection, and the installer shall file a Certificate of Completion, if required. Owner or Occupant: H.A. Fafard & Sons Project Locations #35 First Street Signature of Fire Official This Certificate will Fire Marshal expire on July 2. 1985 T171—e Applicant shall submit this Certificate of Approval, to Bldg. Insp. Form #81 (Rev. 7/82) 8 Ctv of "Salem, asoar usdts 11epatimerd Aenbquarterz Robert J. Crowley 48 T�zdgrtf¢ *trat A/Chief o ate, fflzL01970 FIRE DEPARTMENT CERTFICATE OF APPROVAL FOR BUILDING PERMIT In compliance with provisions of Section 113 . 5 of the Mass. State Building Code ; and under guidelines agreed upon by the Salem Bldg. Inspector and the Salem Fire Chief; the applicant for a building permit, shall obtain the Certificate of Approval (see reverse side) and stamped plan approval from the Salem Fire Prevention Bureau. Said application and approval is required before a building permit may be issued. The Mass. State Building Code requires compliance approval of the Salem Fire Department, with reference to provisions of Article #4 and Article #12 of the Building Code, - the Salem Fire Code, Mass. General Laws and Mass. Fire Prevention Regulations. The applicant shall submit this application with three (3 ) sets of plans, drawn in sufficient clarity and detail, to obtain stamped approval of the Salem Fire Department. This applies for all new construction; substantial alterations; change of use and/or occupancy; and any other approvals required by the Mass. General Laws and the Fire Codes. Exception: Plans will not be required for structural work, when the proposed work to be performed under the building permit, will not ; in the opinion of the Building Inspector, require a plan to show the nature and character of the work to be performed. NOTICE: Plans are normally required for•fire supression systems ; fire alarm systems; tank installations; and fire code requirements. NOTICE: Under provisions of Article #22, of the Mass. State Bldg. Code; certain proposed projects may not require submission of plans, nor complete compliance with new construction requirements. In these cases, provisions of Article #22, Appendix T, and Tables applicable shall apply. This section shall not however, super- sede the provisions outlined in Salem Fire Prevention Bureau Regulations; Chapter 148, M.G.L. ; or the Mass. Fire Prevention Regulations. i.e. all permits for fire code use and/or occupancy shall apply for the entire structure,; fire, alarm and/or smoke detector installation, shall apply to the entire structure, based on new A.C . (hardwired) units for all new construction, but the existing structure may comply with regulations applicable for existing structures. NOTICE: Sub-contractors may also be required to .file individual appli- cations for a fire department certificate 'of approval, covering their area of work. Said sub-contractors shall file for Fire Department application to install, prior to commencing any work. .. .. . . . .. . .... . . V CITY OF SALEM, MASSACHUSETTS PLANNING DEPARTMENT Nov 7 236 P, ,COnvlit� II `Q� .r `bP�OE!VL O ONE SALEM GREEN GERARD KAVANA GH. ._." OI TY OF SAL El�j,N(4 S� 01970 CITY K 171 744.4580 e f November 7, 1985 0 Mr. George Seeley The Fafard Companies 290 Eliot Street Ashland, MA. 01721 Re:_Building_Seven; Units_A, C, D, Building Nine;_Units A,_B,,C,.D; Building Eleven; Units 11-C and 11-D, Cloisters Condominiums, First Street Dear Mr. Seeley: Please consider this letter as my approval for the issuance of Certificates of Occupancy for the following units: Building Seven; Units A, C, and D 15uilding Nine; Units A, B, C, and D Building Eleven; Units 11 C and 11 D 9 This does not preclude receiving the necessary approvals from the Inspector of Buildings and the Director of Public Services. Sincer s; Gerard av naugh' City P n r cc Paul Niman Bill Munroe Ed McMahon Attorney John Serafini Az 13 IL, 4,,! 190 circ REr�-ry� UNITED STATES BANKRUPTCY COURT * OF SA ,5 m4 SS. FOR THE DISTRICT OF MASSACHUSETTS In Re : ) LEDGEMERE LAND CORP . ) LEDGEMERE CONDOMINIUM CORP . ) CHAPTER 11 GREENHOUSE ACRES DEVELOPMENT ) CASE NOS . , 90-40962 CORP . , MARINE CHARTER AND ) THROUGH 90-40968 STORAGE LTD . , INC . , ECONDO ) MANUFACT-URING CORP . , ) H,. -.-F-AFARD-&SONS CON.STR— UUCTION, ) JOINTLY INC . , HOWARD A. FAFARD, ) ADMINISTERED DEBTORS ) LIMITED OBJECTION TO MOTION FOR STANDING ORDER AUTHORIZING DEBTORS TO PAY SALES COMMISSIONS FROM SALE PROCEEDS Now comes , SPRINGFIELD INSTITUTION FOR SAVINGS , a secured lender, and by way of Limited Objection to the Debtors ' Motion , says : 1 . That in the several notes more fully described in Exhibits to Motion for Relief From Stay previously filed with Court and incorporated by reference herein as if restated, Springfield Institution for Savings is entitled to a minimum payment of $80 , 000 . 00 or 75% of the sale price of the individual units so long as there are no defaults in the loan documents . To the extent that any sale( s ) and payments of commissions inter alia , will otherwise result 1 in a net reserve to it below these amounts , the Motion should be denied . 2 . Further, there should be no payment of any brokerage commissions , unless and until the Bank receives contemporaneous payment upon its secured claims , in accordance with the terms of the notes . 3 . To the extent that any sales or Broker' s commissions are to be paid, directly or indirectly to the Debtor( s ) , the Motion should be denied . Respectfully Sub ted SPRINGFI D I I TION FOR SAVINGS B STEVEN WE ESQUIRE COOLEY, SHRAIR, ALPERT, LABOVITZ , & DAMBROV, P . C . 1380 Main Street Springfield, MA 01103 ( 413 ) 781-0750 Dated : August ZD—, 1990 bmak02700 00036298 2 UNITED STATES BANKRUPTCY COURT FOR THE DISTRICT OF MASSACHUSET'T'S In Re : ) LEDGEMERE LAND CORP . LEDGEMERE CONDOMINIUM CORP . ) CHAPTER 11 GREENHOUSE ACRES DEVELOPMENT ) CASE NOS . , 90-40962 CORP . , MARINE CHARTER AND ) THROUGH 90-40968 STORAGE LTD . , INC . , ECONDO ) MANUFACTURING CORP . , ) H .A. FAFARD & SONS CONSTRUCTION , ) JOINTLY INC . , HOWARD A. FAFARD, ) ADMINISTERED DEBTORS ) NOTICE OF HEARING ON EMERGENCY MOTION OF SPRINGFIELD INSTITUTION FOR SAVINGS TO RECONSIDER ORDER ON DEBTORS' JOINT EMERGENCY MOTION FOR ORDER AUTHORIZING DEBTORS TO CONTINUE INTERCOMPANY PAYMENT Please take notice that a hearing on the Emergency Motion of Springfield Institution for Savings to Reconsider Order on Debtors ' Joint Emergency Motion for Order Authorizing Debtors to Continue Intercompany Payment for the Honorable James F. Queenan, Jr . has been scheduled for August 17 , 1990 at 2 : 00 p .m. , for Honorable James F . Queenan, Jr . , United States Bankruptcy Court, 10 Mechanic Street, Worcester, Massachusetts . 1 A Respectfully Submitted SPRINGFIELD INSTIT ION FOR SAVINGS BY EVEN W I"SS , ESQUIRE COOLEY , SHRAIR, ALPERT, LABOVITZ , & DAMBROV, P . C . 1380 Main Street Springfield, MA 011.03 ( 413 ) 781-0750 Dated : August 1990 bma#02700 00036388 2 419590 UNITED STATES BANKRUPTCY COURT FOR THE DISTRICT OF MASSACHUSETTS In re: ) LEDGEMERE LAND CORP. , LEDGEMERE ) CONDOMINIUM CORP. , GREENHOUSE ACRES ) CHAPTER 11 DEVELOPMENT CORP. , MARINE CHARTER & ) Case Nos . 90-40962-JFQ STORAGE LTD, INC. , ECONDO ) Through 90-40968-JFQ MANUFACTURING, INC. , H.A. FAFARD ) & SONS CONSTRUCTION, INC. AND HOWARD ) A. FAFARD ) Debtor ) CERTIFICATE OF SERVICE I , Steven Weiss, Esquire, of Cooley, Shrair, Alpert, Labovitz & Dambrov, P. C. , attorneys for Springfield Instit tion for Savings in the above matter, hereby certify that on the day of August 1990, I served the Notice of Hearing on Emergency Motion of Springfield Institution for Savings to Reconsider order on Debtors ' Joint Emergency Motion for Order Authorizing Debtors to Continue Intercompany Payment and Limited Objection to Motion for Standing Order Authorizing Debtors to Pay Sales Commissions from Sale Proceeds by mailing Federal Express copies of above to: Gayle Ehrlich, Esquire Harold Murphy, Esquire SULLIVAN & WORCESTER HANIFY & KING one Post Office Square 100 Franklin Street Boston, MA 02109 Boston, MA 02110 John Doherty Virginia Grieman Office of the U. S . Trustee Office of the U.S . Trustee 44 Front Street 10 Causeway Street Worcester, MA 01608 Boston, MA 02222 Joseph Bodoff, Esquire Richard Hiersteiner, Esquire KAYE, FIALKOW, RICHMOND One Beacon Street & ROTHSTEIN Boston, MA 02108 100 Federal Street Boston, MA 02110 Janet E. Bostwick, Esquire Goldstein & Manello 265 Franklin Street Boston, MA 02110 and by Regular Mail to the following parties: -2- Jeanne P . Darcey, Esq . ( :. inc:� : n National , iEe Csaplar & Bok ❑sur_nce Co . ) One Winthrop Squarea Boston , MA 02110 Maury E. Lederman ( Chief Industries , Inc . ) Roche , Carens & DeGiaccmo One Post OEfice Square Boston , MA 02109 Michael C . Lehane (To%:n of Ashland Murphy , Hesse , Toomey Ashland Water & Sewer Lehane Commission ) Crown Colony Plaza 300 Crown Colony Drive Suite 410 P .O. Box 9126 Quincy , NLA 02269-9126 Richard E . Mikels ( Bank of New England & Paul & Ricotta Bank of New England Mintz , Levin ( Bond ) ) One Financial Center Boston , MA 02111 John Cronin III ( Brokenwood Products Cross Street :nterrat '_cnal & P . O. Box 242 Cuis _ ^e Den1a ) Bennington , NH 03442 Marshall Newman , Esq . (Mu. _en Lumber 84 State Street Creditors Committee ) Boston , MA 02109 Stuart J . Frank Nathanson & Goldberg 10 Union Wharf Boston , NA 02109 William Gordon (Chatham Investment c/o Mitchell Garabedian Trust of Marlborough) Investment ':rust of Marlborough 100 State Street 6th Floor Boston , M-A 02109 Stephen M. Marcus ( Pine Lake Condo Trust 25 Braintree '-till Park and Scottland Yard Suite 101 Condo Trust ) Braintree , M.A 02184 Karen A. Oliveira Horner Millwork Corp . ) Law o"ices cf Richard Hul-D�n ref 1852 Main Road Tiverron , RI 02878 Russell Bath , Jr . ( Raymond A . Allen Cowee & Bath Admins . of the Estate 90 Madison Street of James W . Tyndall ) Suite 606 Worcester , MA 01608 Janet E. Bostwick Shawmut Bank ) Goldstein & Manello 265 Franklin Street Boston , MA 02110 David Phalen ( Bank of Boston ) Kaye Fialkow Richmond & Rothstein 100 Federal Street Boston , MA 02110 Andrew Troop ( Tower Charter & Hutchins & Wheeler Marine Coro . and 101 Federal Street Steven Hoffen'oerg ) Boston, M.4 02110 Mark Berman ( The CIT Groep/EF' ) Jeffrey Snider Hutchins & Wheeler 101 Federal Street Boston , MLA 02110 Georgie Tetler (Mechanics Bank ) Bowditch & Dewey 311 Main Street Worcester , MA 01608 John Drew ( Starlight Village Lane & Altman Condo Trust ) 101 Federal Street Boston, MA 02110 Kevin Burke ( Sanctuary Condo Trust ) Burke , Rvan & Burke 339 Hancock Street Quincy , MA 02171 Sarah A . Stone , Esc . ( NCNB National Bank Mintz Lev '_ n Conn Ferris of Florida ) GlovsKv and Pooec , P . C . One -, ,-.a ; cia '_ Cer,re : Bos-_c7 , '',A 02111 Manley H . Thaler ( NCNB National Bank Thaler & '"haler of Florida ) 700 North Olive Avenue West Palm Beach, FL 33.701 Peter Gens , Esq . Brown , Rudnick , Freed Gesmer One Financial Center Boston , MA 02111 Charles P . Normandin , Esq . ( Nationwide i;ife Ropes & Gray Insurance Company ) One International Place Boston, MA 02110-2624 John Hogan ( Internal Revenue ) District Director Internal Revenue Service 5 Main Street Worcester , ML4 01601 Mitchell Starr ( Peoples Bank ) Mirick , O ' Connell , DeMallie & Lougee 1700 Mechanics Bank Tower Worcester , M�4 01608-1477 Kevin M. Burke , Esq. ( Sanctuary Condo) Burke, Ryan & Burke 33a Hancock Street Quincy, MA 02171 Steven Weiss , Esc. ( SDringfield Institution Cooley, Shrair , Albert , for Savings ) Labovitz & Dambrov P .C. 1380 Main Street Springfield, MA 781-0750 Lucille B . Brennan, Esq. (Worcester County Fletcher , Tilton & IRStr . ) WhiDDle , P .C . 370 Main Street 12th Floor Worcester , MA 01608 Michael W. Merrill ( Spyglass . . . 1 Condo . ) Merrill & McGeary Suite 1200 11 Beacon Street Boston„ MA 02108 Elliot Fine ( 21st Century Roofing ) 55 Leonard Street Foxboro, MA 02035 3radford Townley ( Sachem Rock -'leccric Dailey , Townley & piltz Corp . ) 353 West Center Street P . O. Box. 517 West Bridgewater , MA 02379 F . Bradford Townley (Cochesett Electric ) Dailey , Townley & Hiltz 353 West Center Street P . O . Box. 517 Nest Bridgewater , MA 02379 Lawrence D. Fierman ( Sherrill Mogauro Gitlin , Emmer & Kaplan Trustees of the 20 Melrose Street Cloister Condo . -rust ) Boston, MA 02116 Wil '_ iam C . Wagner ( Secured Creditors Latham & Latham P . C . lists only ) 693 Main Street Reading , MA 01867 Sarah Stone ( NCNB ) Mintz , Levin, Cohn , Ferris , Glovsky & Popeo One Financial Center Boston, !!A 02111 Sterling A. Minor (Movant MTU of Baker , Brown, Sharman & North America ) Parker 1200 Smith Street Suite 3600 ouston, TX 77002 Mr . Charles Kelleher Mass . Electric Company 25 Research Drive Westboro, MA 01582 Mr . Chcistooher Tosti Legatt McCall/Grubb & E; l ' s , Tnc . 95D Winter Street Waltham, MA 02154 Jana Mason , Esq . 24 Union Avenue KA 01701 Richard P . Doucette 160 Mt . Vernon Street 7itch'ourg , MA 01420 Michael R . Makynen , Esq . P .O. Box 394 Milford , MLA 01757 Mr . Louis Guerrie:e Guerriere & Halnon , Inc . P .O. Box 235 333 West Street Milford , MA 01757 Paul Houle , Jr . 204 Old County Road Lancaster , MA 01123 Melvin Hoffman , Esq . Cherwin & Gliockman One International Place Boston, MA 02111 Mr . G . Burton Mullen Mullen Lumber Co . , Inc . 28 Union Avenue Drawer C Sudbury , MA 01776 John Clymer , Eso . Hutchins & Wheeler Federal Street Boston, MA. 02109 Mr . Robert Walker East Coast Electrical Contractors , Inc . 411 Main Street Waltham, MA 02154 Frank Duagan Powell & Minnock Brick Works Metro Park Road Wolf Road Park Albany, NY Edward F . Burke , Jr . Unit Owner Representative 11A Carnatlon. Circle Reading , MA 01967 Jerome E . Rosen Paul E . Curran One Boston Place Trustee of Moderator Boston , MA 02108 Trust Caotain. Edward R . '=ink c/o Ruf & Carsky P . A . 2455 East Sunrise Blvd . PH-7- Fort H-EFort Lauderdale , FL 33304 Charles P . Normandin Sudbury Valley School Ropes & Gray One international Place Boston , MA 02110-2624 Mr . Richard Cranshaw Bank of New England , N . A. 370 Main Street Worcester , MA 01608 Mr . Michael D. Ferrara Eastern Bank 217 Essex Street Salem, MA 01970 Mr . -, rank McGrath Milford Savings Bank 232 Main Street Milford , MA 01757 Mr . Ronald Lubin Shawmut One Federal Street Boston, MA 02110 Mr . Paul Dever Home National Bank Financial Center 100 Medway Road Milford, MSA 01757 Ms . Barbara Swanson NCNB National Bank of Florida 110 East Broward Blvd . Ft . Lauderdale , FL 33301 Worcester County_ TnStitution For Savings 365 Main Street Worcester , MLA 01608 1 ' -8- , John Serafini , Sr . Hicniand Realty frust C/o john Serafini Esq . 63 Federal Street Salem, MA 01970 Mr , Paul Deroche Middlesex Corporation 17 progress Avenue Chelmsford , KA 01829 Charles A . Adams Charles A . & Virginia M . Adams 279 Pleasant Street Reading , MA 01867 Henry F. Adams Henry F . & Marjorie .Adams 217 Pleasant Street Reading , MA 01867 Salvatore J . Gentile Salvatore J . & Patricia L . Gentile , Jr . 268 Pleasant Street Reading , MP. 01867 Euoene Gentile 272 Pleasant Street Reading , MA 01867 Michael Costa Birchwood Investment Trust First Financial Trust Trustee of Birchwood Investment Trust 161 Worcester Road Framingham, NLA 01701 Michael D. Coster Bank of Boston 100 Federal Street Boston, MA 02110 Ms . Dorey Ccnlcn Old Stone Bank Old Stone Sc_uare Providence , RI 02903 Mr . James St . Thomas Eastland Savings Bank 25 Cummings Way Woons'-)cket , RI 02895 Mr . Ronald Lubin Shawmu. Bank of Dost--n One _Federal St ,eet Boston, ALA 02110 Mr . Douglas McClain Fleet Nat '_onal Bank 10 POsL Office Square Boston, ALA 02109 Mr . Gavan ?inlay Framingham Savings Bank, 600 Worcester Road Framingham, MA 01701 Mr . Frank McGrath Milford Savinqs Bank 232 Main Street Milford , MA 01757 Ms . Cristal Davis Hudson National Bank 17 Pope Street Hudson, MA 01749 Mr . Paul Curran Modera=or Trust P .O. Box. 306 Milford , ALA 01757 JoseTDh Rosenfeld P .O. Sox 472 "Hopedale , MA 01747 Mr . Samuel Hokkanen Peooles Savings Bank 120 Front Street Worcester , MA 01608 Mr . Ronald Lubin Shawmut Community Bank 5 Whittier Street Framingham, MA 01701 Mr . Donald Doyle Mechanics Bank 100 Front Street Worcester , MA 01613 1 - 11- -own of Ashland City of Attleboro Tar. Collector Government Center Ashland , !A 0172 '_ 77 Park Street t _e'boro , YA 02703 -own of 3e'_1 '_n0ham Moan of 3ellinCham City Hall Tax Collector Bellingham , MA 02019 Town Hall Bellingham , MA 02019 Toon of Ashland Town of Framingham Collectors O°Tice Collector P . O . Box 627 P . O. Boy: 9183 Ashland , MA 01721 Pramii:gham , [dA 01701 Attn : Barbara Hadley Town of Framingham Town of Framingham Public Works Dept . Building Permits Memorial Bldg . Memorial Buildinq Framingham, MA 01701 Framingham, MA 01701 Town of Holliston Town of Milford Collector of Taxes Tar. Collector Holliston , MA 01746 Milford, MA 01757 Town of Natick Town of Uxbridge Tax Collector Tar. Collector 13 East Central Street P .O. Box 4003 Natick , MA 01760 Worcester , NA 01613 Town of Uxbridge Town of Westboro Town Collector - DPW Tax Collector South Main Street Westboro, MA 01581 Uxbridge , MA 01569 Town of Westboro Town of Ashland Town Hall Water & Sewer Commission West Main Street P . O. Box. 9 Westboro, MA 01581 Ashland, MA 01721 Town of Ashland Town of Hopedale Water Denartment Water & Sewer Dept . Box 15 P .O. Box. 7 Ashland , MA 01721 Hopedale , MA 01747 Robert Andreano City of Salem Town of Milford City Collector Milford, MA 01757 Salem, MA 01970 ,loan _ . Jukins Mary F. Baca City of Salem Town of Uxbridge Salem, MA 01970 P .O. Box 4003 Uxbridge , MA 0, D69 -12- Department of Revenue -own of Reading Commonwealth of Mass . Yun:cipal Licht Deoar -..._ ,.z P .O. 3ox 7027 JS Haver. Street Boston, MA 02204 =reading , MA 01,867 Attn : Stuart Silverstein _ Town of Reading City of Salem [dater Department 7 ' anninq Board 16 Lowell Street One Salem Green Reading , MA 01,967 Salem, MA 01970 Atte : Barbara Hadley Hudson Licht & Power Co. City of Medford Town Collector Ci [y Collector ' s Office Town Hall City Hall Hudson, MA 01749 Medford, MP, 02155 City of Quincy City of Salem Police Dept . Collector of Taxes 17 Central Street 1305 Hancock Street Salem, MA 01970 Quincy, MA 02169 Attn : Officer Boean City of Salem Town of Uxbridge Inspector of Buildings Dept . of Public Works One Salem Green South Main Street Salem, MA 01970 Uxbridge , MA 01569 Town of Weymouth Town of Weymouth Tax Collector Water Dept . , Town Hall Weymouth, MA 02189 75 Middle Street Weymouth, MA 02189 City of Beverly Town of Hudson Tax Collector Tax Collector Beverly , NLA 01915 Hudson , M_A 01749 Robert Szuluk Mary L . Black 21 Royal Crest Drive , Apt . 41 54 Checkerberry Lane Marlboro, MA 01752 Framingham, M.A. 01701 Eugene Capozzoli Jeanne A. Bissonnette 12C Pond Street 52 Donna Lee Lane Ashland , ALA 01721 Ashland, MA 01721 Jean Brady Rita Reni 177 Leland Farm Road 402 Chestnut Street Ashland , MA 01721 Ashland, MA 01721 N -13- Marcy Broden Elsie Brown 12 Gibbs Valley Path 14 Calvin Road Framingham, KA 01701 tiewtonviile , µf, 02160 Domenica DiTullio Thomas Christooher 214 Arrowhead Circle _5 Winter Street Ashland , MA 01721 Salem, MA. 01970 Ann Fredericks Reois O ' Brien 22 Patricia :toad 16 Village Roe Peabody , KA 01960 �_vnnfie1d , MA 01940 Joseph Gregory Elaine Clarke 2915 Arlington Road 182 Harvard Street Woburn , MA 01801 Quincy , MA 02170 Mary Durkin-Smith Bill Needleman 993 Massachusetts Avenue # 206 5 Seaview Avenue Arlington , RA 02174 Marblehead , MA 01945 Craig Metz Janice Fratus Century 21 - Taylor Carlson Real Estate 444 West Central Street 55 Haven Street Franklin , MA 02038 Reading , MA 01867 Carole Tosches Barry Simms Prudential Landmark Property Realty World Suburban West SDecialists 1000 Worcester Road 40 Grove Street Framingham, MA 01701 Wellesley , MA 02181 Cynthia Grenham Joseph Birch DeWolfe Real Estate Century 21 - Realty One 1000 Worcester Road 120 South Main Street Framingham, MA 01701 Uxbridge , MA 01569 Barbara Porro Bob Brochu Ronald Robinson Associates Remax First Choice Real Estate 162 Humphrey Street 276 West Main Street Swampscott , MA 01907 Northboro, MA 01532 Lorraine Manning Julie Tache & Associates 221 Derby Street Salem, MA 01970 STEVEN WEISS, ESQUIRE IRVING D. LABOVITZ COOLEY, SHRAIR, ALPERT, LABOVITZ & DAMBROV, P. C. 1380 Main Street Springfield , MA 01103 (413 ) 781-0750 00036444 Mr . James Gerard C . 1 . T . _180 W. Swedesford Road SOU:.':pO!'1t Two , SlliCe 2a - Berwyn, PA 19312 Ms . Nancy Sweet Caterpillar Financial 10630 L. Patuxent Highway Suite 304 Columbia , MD 21044 Madlyn A . Fafard 1060 Grove Street Framingham, NiA 01701 Rose Murphy 30 Eastbluff Road Ashland , MA. 01721 Mr . Michael D. Ferrara Eastern Bank 217 Essex Street Sa1em, t-:A 01970 Russell K . Ellis Jr . Marvann Ellis 60 Main Street =25 Melrose , MP. 02176 Baybanks 7 New England Executive Parkway Burlington , MA 01803 Citibank One international Place Boston, !✓A 02110 Helen Kerr 100 Lynn Shore Drive Lynn, MA 01902 ;v SULLIVAN &WORCESTER BUILDING DEH ONE POST OFFICE SQUARE BOSTON, MASSACHUSETTS 02109 pp ((�� } Qnnp P IN WASHINGTON,O.C. (617) 338-2800 Aoc 3 I I �j} %EWaaN CITY 1025 CONNECTICUT AVENUE,N.W. ��I111 J6J THIRD AVENUE WASHINGTON,O.C.20036 TELECOPIER NO.617-338-2880 yp( C (202) ]75-6190 TWX: 710-321-1976 DORK,NEW YORK IOOIJ TEIECOPIER NO,202-293-2275 OF SA�FEGE � (2ggy4y ``�F851l5-6200 CITYI] T�I�ORR�NO.'212-]SB-2151 August 1, 1990 OVERNITE MAIL Clerk United States Bankruptcy Court Edwards Building 10 Mechanic Street Worcester, MA 01608 Re: Ledgemere Land Corp. , et al Case Nos. 90-40962 - 90-40968 Dear Sir/Madam: Enclosed herewith for filing please find the following: 1. Motion For Standing Order Authorizing Debtors to Pay sales commissions from Sales Proceeds; 2 . Notice of Hearing; and 2 . Certificate of Service. Also enclosed is an additional copy of each. Kindly acknowledge receipt of same by returning a date-stamped copy of each in the enclosed self-addressed envelope. Thank you in advance for your attention to this matter. Very truly yours, Gayle E�Irlich GAE:am ////// Enclosures cc: All Parties on Certificate of Service UNITED STATES BANKRUPTCY COURT DISTRICT OF MASSACHUSETTS IN THE MATTER OF: ) CHAPTER 11 LEDGEMERE LAND CORP. ) CASE NOS. 90-40962 LEDGEMERE CONDOMINIUM CORP. ) THROUGH 90-40968 GREENHOUSE ACRES DEVELOPMENT CORP. ) MARINE CHARTER AND STORAGE LTD. , INC. ) ECONDO MANUFACTURING CORP. ) H.A. FAFARD & SONS CONSTRUCTION, INC. ) JOINTLY HOWARD A. FAFARD, ) ADMINISTERED DEBTORS-IN-POSSESSION. ) NOTICE OF HEARING PLEASE TAKE NOTICE, that a hearing will be held in the above- referenced proceedings on Motion for Standing Order Authorizing Debtors to Pay Sales Commissions from Sales Proceeds on August 16, 1990, at 11: 00 A.M. , United States Bankruptcy Court for the District of Massachusetts, 10 Mechanic Street, Worcester, MA. L na G. old erg (BMA# 01951) Gayle . Ehrlich (BMA# 01833) SULLIVAN & WORCESTER One Post Office Square Boston, MA 02109 (617) 338-2800 UNITED STATES BANKRUPTCY COURT DISTRICT OF MASSACHUSETTS IN THE MATTER OF: ) CHAPTER 11 LEDGEMERE LAND CORP. ) CASE NOS. 90-40962 LEDGEMERE CONDOMINIUM CORP. ) THROUGH 90-40968 GREENHOUSE ACRES DEVELOPMENT CORP. ) MARINE CHARTER AND STORAGE LTD. , INC. ) ECONDO MANUFACTURING CORP. ) H.A. FAFARD & SONS CONSTRUCTION, INC. ) JOINTLY HOWARD A. FAFARD, ) ADMINISTERED DEBTORS-IN-POSSESSION. ) CERTIFICATE OF SERVICE I , Gayle Ehrlich, an attorney at the law firm of Sullivan & Worcester, certify that on August 1 , 1990 , I caused to be served by First Class Mail , Motion For Standing Order Authorizing Debtors to Pay Sales Commissions from Sales Proceeds and Notice of Hearing for the same to those persons on the attached lists . �Gayl rlich - United States Trustee 10 Causeway Street, Room 472 Boston Federal Office Building Boston, MA 02222 Harold B. Murphy, Esq. (Howard A. Fafard) Hanify & King 100 Franklin Street Boston, MA 02110 Office of the United States Trustee Edwards Building 10 Mechanic Street Worcp � ter , MA 01608 -2- Jeanne P. Darcey, Esq. ( Lincoln National Life Csaplar & Bok Insurance Co. ) One Winthrop Squarea Boston, MA 02110 Maury E. Lederman (Chief Industries , Inc. ) Roche, Carens & DeGiacomo One Post Office Square Boston, MA 02109 Michael C . Lehane (Town of Ashland Murphy, Hesse, Toomey Ashland Water & Sewer Lehane Commission) Crown Colony Plaza 300 Crown Colony Drive Suite 410 P.O. Box 9126 Quincy, MA 02269-9126 Richard E. Mikels (Bank of New England & Paul .& Ricotta Bank. of New England Mintz , Levin (Bond) ) One Financial Center Boston, MA 02111 John Cronin III (Brokenwood Products Cross Street International & P.O. Box 242 Cuisine Denla) Bennington, NH 03442 Marshall Newman, Esq. (Mullen Lumber 84 State Street Creditors Committee ) Boston, MA 02109 Stuart J. Frank Nathanson & Goldberg 10 Union Wharf Boston, MA 02109 William Gordon (Chatham Investment c/o .Mitchell Garabedian Trust of Marlborough) Investment Trust of Marlborough 100 .State Street 6th Floor Boston, MA 02109 Stephen M. Marcus (Pine Lake Condo Trust 25 Braintree Hill Park and Scottland Yard Suite 101 Condo Trust ) Braintree, MA 02184 -3- Karen A. Oliveira (Horner Millwork Corp. ) Law offices of Richard Humphrey 3852 Main Road Tiverton, RI 02878 Russell Bath, Jr . (Raymond H. Allen Cowee & Bath Admins. of the Estate 90 Madison Street of James W. Tyndall) Suite 606 Worcester, MA 01608 Janet E. Bostwick ( Shawmut Bank) Goldstein & Manello 265 Franklin Street Boston, MA 02110 David Phalen (Bank of Boston) Kaye Fialkow Richmond & Rothstein 100 Federal Street Boston, MA 02110 Andrew Troop (Tower Charter & Hutchins & Wheeler Marine Corp. and 101 Federal Street Steven Hoffenberg) Boston, MA 02110 Mark Berman (The CTT Group/EFT ) Jeffrey Snider Hutchins & Wheeler 101 Federal Street Boston, MA 02110 George Tetler (Mechanics Bank) Bowditch & Dewey 311 Main Street Worcester, MA 01608 John Drew (Starlight Village Lane & Altman Condo Trust) 101 Federal Street Boston, MA 02110 Kevin Burke ( Sanctuary Condo Trust) Burke, Ryan & Burke 339 Hancock Street Quincy, MA 02171 1 -4- Sarah -Sarah A. Stone, Esq. (NCNB National Bark Mintz Levin Cohn Ferris of Florida) Glovsky and Popeo, P.C. One Financial Center Boston , MA 02111 Manley H. Thaler (NCNB National Bank Thaler & Thaler of Florida) 700 North Olive Avenue West Palm Beach, FL 33401 Peter Gens , Esq. Brown, Rudnick, Freed & Gesmer One Financial Center Boston, MA 02111 Charles P. Normandin, Esq. (Nationwide Life Ropes & Gray Insurance Company) One International Place Boston, MA 02110-2624 John Hogan ( Internal Revenue ) District Director Internal Revenue Service 5 Main Street Worcester , MA 01601 Mitchell Starr (Peoples Bank ) Mirick, O'Connell , DeMallie & Lougee 1700 Mechanics Bank Tower Worcester , MA 01608-1477 Kevin M. Burke, Esq. ( Sanctuary Condo) Burke, Ryan & Burke 33a Hancock Street Quincy, MA 02171 Steven Weiss, Esq. (Springfield Institution Cooley, Shrair, Alpert, for Savings) Labovitz & Dambrov P.C. 1380 Main Street Springfield, MA 781-0750 Lucille B. Brennan, Esq. (Worcester County Fletcher , Tilton & Instr . ) Whipple, P.C. 370 Main Street 12th Floor Worcester , MA 01608 -5- Michael W. Merrill ( Spyglass Hill Condo. ) Merrill & McGeary Suite 1200 11 Beacon Street Boston, MA 02108 Elliot Fine ( 21st Century Roofing ) 55 Leonard Street Foxboro, MA 02035 F. Bradford Townley (Sachem Rock Electric Dailey, Townley & Hiltz Corp. ) 353 West Center Street P.O. Box 517 West Bridgewater, MA 02379 F. Bradford Townley (Cochesett Electric) Dailey, Townley & Hiltz 353 West Center Street P.O. Box 517 West Bridgewater , MA 02379 Lawrence D. Fierman (Sherrill Mogauro Gitlin, Emmer & Kaplan Trustees of the 20 Melrose Street Cloister Condo. Trust ) Boston, MA 02116 William C. Wagner (Secured Creditors Latham & Latham P.C . lists only) 643 Main Street Reading, MA 01867 Sarah Stone (NCNB) Mintz, Levin, Cohn, Ferris, Glovsky & Popeo One Financial Center Boston, MA 02111 Sterling A. Minor (Movant MTU of Baker, Brown, Sharman & North America) Parker 1200 Smith Street Suite 3600 Houston, TX 77002 Mr . Charles Kelleher Mass . Electric Company 25 Research Drive Westboro, MA 01582 Mr . Christopher Tosti Legatt McCall/Grubb & Ellis , Inc. 95D Winter Street Waltham, MA 02154 -6- Dana L. Mason, Esq. 24 Union Avenue Framingham, MA 01701 Richard P. Doucette 160 Mt . Vernon Street Fitchburg, MA 01420 Michael R. Makynen, Esq. P.O. Box 394 Milford, MA 01757 Mr . Louis Guerriere Guerriere & Halnon, Inc. P.O. Box 235 333 West Street Milford, MA 01757 Paul Houle, Jr . 204 Old County Road Lancaster , MA 01123 . .. Melvin . Hoffman, Esq. Cherwin & Gliockman One International Place Boston, MA 02111 Mr . G. Burton Mullen Mullen Lumber Co. , Inc. 28 Union Avenue Drawer C Sudbury, MA 01776 John Clymer, Esq. Hutchins & Wheeler Federal Street Boston, MA 02109 Mr . Robert Walker East Coast Electrical Contractors, Inc. 411 Main Street Waltham, MA 02154 Frank Duggan Powell & Minnock Brick Works Metro Park Road Wolf Road Park Albany, NY -7- Edward F. Burke, Jr . Unit Owner Representative 11A Carnation Circle Reading, MA 01867 Jerome E. Rosen Paul E. Curran One Boston Place Trustee of Moderator Boston, MA 02108 Trust Captain Edward R. Fink c/o Ruf & Carsky P.A. 2455 East Sunrise Blvd. PH-E Fort Lauderdale, FL 33304 Charles P. Normandin Sudbury Valley School Ropes & Gray One International Place Boston, MA 02110-2624 Mr . Richard Cranshaw Bank of New England, N.A. 370 .Main Street . Worcester , MA 01608 Mr . Michael D. Ferrara Eastern Bank 217 Essex Street Salem, MA 01970 Mr . Frank McGrath Milford Savings Bank 232 Main Street Milford, MA 01757 Mr . Ronald Lubin Shawmut One Federal Street Boston, MA 02110 Mr. Paul Dever Home National Bank Financial Center 100 Medway Road Milford, MA 01757 Ms . Barbara Swanson NCNB National Bank of Florida 110 East Broward Blvd. Ft. Lauderdale, FL 33301 Worcester County Institution For Savings 365 Main Street Worcester , MA 01608 -8- John Serafini , Sr . Highland Realty Trust c/o John Serafini Esq. 63 Federal Street Salem, MA 01970 Mr . Paul Deroche Middlesex Corporation 17 Progress Avenue Chelmsford, MA 01824 Charles A. Adams Charles A. & Virginia M. Adams 279 Pleasant Street Reading, MA 01867 Henry F. Adams Henry F. & Marjorie Adams 217 Pleasant Street Reading, MA 01867 Salvatore J. Gentile Salvatore J. & . Patricia L. Gentile, Jr . 268 Pleasant Street Reading, MA 01867 Eugene Gentile 272 Pleasant Street Reading, MA 01867 Michael Costa Birchwood Investment Trust First Financial Trust Trustee of Birchwood Investment Trust 161 Worcester Road Framingham, MA 01701 Michael D. Coster Bank of Boston 100 Federal Street Boston, MA 02110 Ms . Dorey Conlon Old Stone Bank Old Stone Square Providence, RI 02903 Mr . James St. Thomas Eastland Savings Bank " 25 Cummings Way Woonsocket , RI 02895 -9- Mr . Ronald Lubin Shawmut Bank of Boston One Federal Street Boston, MA 02110 Mr . Douglas McClain Fleet National Bank 10 Post Office Square Boston, MA 02109 Mr . Gavan Finlay Framingham Savings Bank 600 Worcester Road Framingham, MA 01701 Mr . Frank McGrath Milford Savings Bank 232 Main Street Milford, MA 01757 Ms . Cristal Davis Hudson National Bank 17 Pope Street Hudson, MA 01749 Mr . Paul Curran Moderator Trust P.O. Box 306 Milford, MA 01757 Joseph Rosenfeld P.O. Box 472 Hopedale, MA 01747 Mr. Samuel Hokkanen Peoples Savings Bank 120 Front Street Worcester, MA 01608 Mr. Ronald Lubin Shawmut Community Bank 5 Whittier Street Framingham, MA 01701 Mr . Donald Doyle Mechanics Bank 100 Front Street Worcester, MA 01613 a -10- Mr . James Gerard C. I .T. 1180 W. Swedesford Road Southpoint Two, Suite 220 Berwyn, PA 19312 Ms. Nancy Sweet Caterpillar Financial 10630 L. Patuxent Highway Suite 304 Columbia, MD 21044 Madlyn A. Fafard 1060 Grove Street Framingham, MA 01701 Rose Murphy 30 Eastbluff Road Ashland, MA. 01721 Mr . Michael D. Ferrara Eastern Bank 217 Essex Street Salem, MA 01970 Russell K. Ellis Jr . Maryann Ellis 60 Main Street #25 Melrose, MA 02176 Baybanks 7 New England Executive Parkway Burlington, MA 01803 Citibank One International Place Boston, MA 02110 Helen Kerr 100 Lynn Shore Drive Lynn, MA 01902 -11- Town of Ashland City of Attleboro Tax Collector Government Center Ashland, MA 01721 77 park Street Attleboro, :SIA 02703 Town of Bellingham Town of Bellingham City Hall Tax Collector Bellingham, MA 02019 Town Hall Bellingham, MA 02019 Town of Ashland Town of Framingham Collectors Office Tax Collector P.O. Box 627 P .O. Box 9183 Ashland, MA 01721 Framingham, MA 01701 Attn: Barbara Hadley Town of Framingham Town of Framingham Public Works Dept . Building Permits Memorial Bldg. Memorial BuildingA . Framingham, MA 01701 Framingham, M 01701 Town of Holliston Town of Milford Collector of Taxes Tax Collector Holliston, MA 01746 Milford, MA 01757 Town of Natick Town of Uxbridge Tax Collector Tax Collector 13 East Central Street P .O. Box 4003 Natick , MA 01760 Worcester , mA 01613 Town of Uxbridge Town of Westboro Town Collector - DPW Tax Collector South Main Street Westboro, MA 01581 Uxbridge, MA 01569 Town of Westboro Town of Ashland Town Hall Water & Sewer Commission West Main Street P.O. Box 9 Westboro, MA 01581 Ashland, MA 01721 Town of Ashland Town of Hopedale Water Department Water & Sewer Dept . Box 15 P .O. Box 7 Ashland, MA 01721 Hopedale, MA 01747 Robert Andreano City of Salem Town of Milford City Collector Milford, MA 01757 Salem, MA 01970 Joan F. Jukins Mary F. Baca City of Salem Town of Uxbridge Salem, MA 01970 P .O. Box 4003 Uxbridge, MA 0569 G -12- Department of Revenue Town of Reading Commonwealth of Mass . Municipal Light Department P.O. Box 7027 25 Haven Street Boston, MA 02204 Reading, MA 01867 Attn: Stuart Silverstein Town of Reading City of Salem Water Department Planning Board 16 Lowell Street One Salem Green Reading, MA 01867 Salem, MA 01970 Attn: Barbara Hadley Hudson Light & Power Co. City of Medford Town Collector City Collector ' s Office Town Hall City Hall Hudson, MA 01749 Medford, MA 02155 City of Quincy City of Salem Police Dept. . Collector of Taxes 17 Central Street 1305 Hancock Street Salem, . MA 01970 Quincy, MA 02169 Attn: Officer Bogan City of Salem Town of Uxbridge Inspector of Buildings Dept. of Public Works One Salem Green South Main Street Salem, MA 01970 Uxbridge, MA 01569 Town of Weymouth Town of Weymouth Tax Collector Water Dept . , Town Hall Weymouth, MA 02189 75 Middle Street Weymouth, MA 02189 City of Beverly Town of Hudson Tax Collector Tax Collector Beverly, MA 01915 Hudson, MA 01749 Robert Szuluk Mary L. Black 21 Royal Crest Drive, Apt. #1 54 Checkerberry Lane Marlboro, MA 01752 Framingham, MA 01701 Eugene Capozzoli Jeanne A. Bissonnette 120 Pond Street 52 Donna Lee Lane Ashland, MA 01721 Ashland, MA 01721 Jean. Brady Rita Reni 177 Leland Farm Road 402 Chestnut Street Ashland, MA 01721 Ashland, MA 01721 -13- Marcy Broden Elsie L. Brown 12 Gibbs Valley Path 14 Calvin Road Framingham, MA 01701 Newtonville, MA 02160 Domenica DiTullio Thomas Christooher 214 Arrowhead Circle 15 Winter Street Ashland, MA 01721 Salem, MA 01970 Ann Fredericks Regis O' Brien 22 Patricia Road 16 Village Roe Peabody, MA 01960 Lynnfield, MA 01940 Joseph Gregory Elaine Clarke 2915 Arlington Road 182 Harvard Street Woburn, MA 01801 Quincy, MA 02170 Mary Durkin-Smith Bill Needleman 993 Massachusetts Avenue #206 5 Seaview Avenue Arlington, MA 02174 Marblehead, MA 01945 Craig Metz Janice Fratus Century 21 - Taylor Carlson Real Estate 444 West Central Street 55 Haven Street Franklin, MA 02038 Reading, MA 01867 Carole Tosches Barry Simms Prudential Landmark Property Realty World Suburban West Specialists 1000 Worcester Road 40 Grove Street Framingham, MA 01701 Wellesley, MA 02181 Cynthia Grenham Joseph Birch DeWolfe Real Estate Century 21 - Realty One 1000 Worcester Road 120 South Main Street Framingham, MA 01701 Uxbridge, MA 01569 Barbara Porro Bob Brochu Ronald Robinson Associates Remax First Choice Real Estate 162 Humphrey Street 276 West Main Street Swampscott, MA 01907 Northboro, MA 01532 Lorraine Manning Julie Tache & Associates 221 Derby Street Salem, MA 01970 'y UNITED STATES BANKRUPTCY COURT DISTRICT OF MASSACHUSETTS In Proceedings for In the matters of ) Reorganization Under Chapter 11 Ledgemere Land Corp. , ) Ledgemere Condominium Corp. , ) Greenhouse Acres Development Corp. , ) Marine Charter and Storage Ltd. , Inc. ) Case Nos. 90-40962 Econdo Manufacturing Corp. , ) through 90-40968 H.A. Fafard & Sons Construction, Inc. , ) Howard A. Fafard ) (Jointly Administered) Debtors-in-Possession ) MOTION FOR STANDING ORDER AUTHORIZING DEBTORS TO PAY SALES COMMISSIONS FROM SALES PROCEEDS Ledgemere Land Corp. , Ledgemere Condominium Corp. , Econdo Manufacturing Inc. , Greenhouse Acres Development, Inc. , Marine Charter and Storage Ltd. , Inc. , H. A. Fafard & Sons Construction, Inc. and Howard A. Fafard (collectively the "Debtors") respectfully request that the Court allow this Motion and enter a standing order authorizing Debtors to pay sales commissions from sales proceeds pursuant to Sections 105 (a) and 506 (c) of the United States Bankruptcy Code, 11 U.S .C. §§ 101 et seg. (the "Code") or in the alternative, authorize the Debtors to pay sales commissions as an administrative expense, pursuant to Section 503(1) (A) of the Code. In support of this Motion, the Debtors state as follows: 1. On June 15, 1990 , the Debtors each filed a voluntary petition under Chapter 11 of the Code, commencing their Chapter 11 -2- proceedings (the "Proceedings") . The Proceedings are being jointly administered. 2 . Since the commencement of these Proceedings, the Debtors have continued to manage and operate their respective businesses and properties as Debtors-in-Possession, pursuant to Sections 1101 and 1108 of the Code. The Debtors are affiliated enterprises, involved primarily in real estate development, sales and leasing. Howard A. Fafard is the controlling shareholder of each of the other Debtors. In the ordinary course of their business, the Debtors develop, market, lease and sell vacant land, houses, condominiums and other residences, and industrial and commercial properties. Debtors' real estate projects are located primarily in Massachusetts. 3 . During the course of a typical month prior to the commencement of the Proceedings, the Debtors would close approximately ten (10) condominium sales for purchase prices in the range of $89, 000 to $205, 000, and approximately one (1) building lot sale for a purchase price in the range of $25, 000 to $150, 000. The Debtors also generated sales of larger commercial property and land for purchase prices in the range of $200, 000 to $10, 000, 000 approximately six (6) times a year. 4 . As part of their reorganization efforts, the Debtors have to date received Court authority to proceed with sales as follows: -3- (1) a sale to Payless Cashways, Inc. of a build to suit commercial building, for a sales price of $6, 375, 000 ; and (2) the sale of 32 condominium units, for an aggregate sales price of $4 , 102 , 440. 50 (the "Pre-Petition Condominium Agreements") . Pending before the Court, are motions by which the Debtors seek authority to sell Building One, an industrial building located in Ashland, Massachusetts with a sales price of approximately $928 , 500 and the sale of 15 condominium units for an aggregate sales price of approximately $1,730, 000. In addition, on July 26, 1990, the Debtor, H.A. Fafard & Sons Construction, Inc. , served and filed its Notice of an Intended Private Sale to the South Shore Yacht Club, Inc. of certain undeveloped land located on Bridge Street in Weymouth, Massachusetts, for a sale price of $300, 000. 5. The proceeds generated from the sale of Debtors' existing inventory of condominiums and other residential real estate (condominiums and other residential real estate are hereafter referred to as "Residences") , vacant land, industrial and commercial properties are essential to the Debtors' ability to maintain ongoing operations and formulate a viable plan of reorganization. In addition, the sales will eliminate both the expenses involved in maintaining the properties, and the possibility of the Debtors' incurring additional and unnecessary administrative expense claims, including interest accruing on over-secured debt. +. -4- 6. To date, Debtors have sought authority to proceed with sales free and clear of liens, excepting taxes, with valid, properly perfected and non-avoidable liens to attach to sales proceeds to the same extent and in the same order of priority as they attached to the property sold. The sales proceeds constitute property securing those claims previously secured by the property sold. As an interim measure, this system is proceeding on course, while Debtors endeavor to formulate an agreement with secured creditors addressing the distribution of sales proceeds. To date, the Debtors have either closed or are proceeding to close on sales with an aggregate sales price of approximately $13 , 475, 275. Sales commissions have not been paid to those in-house agents and brokers, and outside cooperating brokers (collectively "the Brokers") responsible for generating the sales which have closed. 7 . In order to continue to generate sales, Debtors need to pay sales commissions due to Brokers, as in the ordinary course of business. If Debtors are unable to pay such commissions, the Brokers will discontinue generating sales. Debtors believe that commissions paid in the ordinary course of business with respect to sales are reasonable, and result in significant sales activities. If these commissions are not paid in the ordinary course, valuable in-house Brokers may leave the Debtors and outside Brokers will cease doing business with the Debtors. As a result, sales activity will come to a halt. S ' -5- 8 . Continued sales of Debtors' inventory of real estate is of direct benefit to the entities holding liens thereon. Debtors are attempting to sell real estate in an orderly and profitable manner. Without the cooperation of the Brokers, a decline in both number of sales and the amount of proceeds will occur. Without the sales, claims of lien holders will remain unsatisfied, and interest will continue to accrue on over-secured debt. The Debtors have established an active and effective mechanism for continuing their sales operations during the course of their Chapter 11 reorganization proceedings. The lynchpin to continued orderly sales are the Brokers. 9 . The Brokers generate the sales necessary to satisfy the claims of secured creditors, who in turn receive the greatest and most direct benefit from the efforts of the Brokers. Each secured creditor which will receive the sale proceeds from the real estate sales directly benefits from the Brokers efforts. The Debtors' unsecured creditors also benefit from Brokers' activities because as sales are generated, debt can be paid and the surplus proceeds used to structure a plan. As a result, the Brokers are entitled to be paid their commissions from the sales proceeds, upon the completion of a successful sale, as in the ordinary course of business. 10. In the ordinary course of the Debtors' businesses, commissions paid to Brokers on the sale of Residences are as follows: Residences are sold on the basis of a total commission r ! -6- equal to 5%-6% of the purchase price. These commissions are reasonable and necessary costs of selling the Residences. One of the Debtors acts as the listing broker for the Residences. Madlyn Fafard, the wife of Debtor Howard A. Fafard, is the supervising broker (the "Supervising Broker") overseeing the Debtors' sales division. If an in-house selling agent of the Debtors generates or assists in generating a sale of a Residence, the listing Debtor usually receives a 2 . 5% commission, a 1. 25% commission is usually paid to the selling agent and the Supervising Broker is usually paid a 1. 25% commission. If an outside third party broker generates a sale of a Residence, the listing Debtor usually receives a 1. 25% commission, the outside broker is paid a 2 . 5% commission and the Supervising Broker is paid 1. 25% commission. More than sixty percent (60%) of the Debtors' sales of Residences have to date been attributable to sales generated in-house. 11. With respect to the sale of commercial properties and vacant land for commercial and industrial development, the Debtors typically uses four (4) in-house selling agents and the Supervising Broker. The selling agents and the Supervising Broker each receive fifty percent (50%) of sales commissions paid. Over the last year, market conditions have dictated that commissions be negotiated on a sale by sale basis. The commissions negotiated are reasonable, necessary costs of selling the commercial properties. As a base from which to negotiate commissions, the following formulas are used: -7- Sale of Commercial Properties: 5% of the first $250 , 000 of the final sales price; 3% of the next $500 , 000 of the final sales price; and 2% of the balance of the final sales price. Sale of Vacant Land for Commercial and Industrial Development: 10% of first $75, 000 of the final sales price; and 7% of the balance of the final sales price. 12 . Secured creditors are the most direct and greatest beneficiaries of the sales proceeds resulting from the sales generated by the Brokers. In order to continue to generate sales, the proceeds of which will be applied, inter alia, to satisfy the claims of the lien holders, it is necessary to pay sales commissions, as in the ordinary course of business. 13 . Debtors intend to serve this Motion on all persons who have filed appearances in the proceedings, creditors known by the Debtors to claim mortgages or security interests in the Debtors' inventory of .real estate, each of the members of the Official Unsecured Creditors' Committee and the United States Trustees for the District of Massachusetts. WHEREFORE, Debtors respectfully request authority to pay sales commissions either from sales proceeds, pursuant to Sections 105 (a) and 506 (c) , or in the alternative as an administrative expense, pursuant to Section 503 (1) (A) of the Code, and respectfully request that this Court enter an Order as follows: d 1 A. Finding notice given as set forth in Paragraph 13 above sufficient under the circumstances; B. Authorizing the Debtors to pay sales commissions from the proceeds of each sale, or alternatively as an administrative expense, as in the ordinary course of business and as provided in Paragraphs 10 and 11 herein; and C. Such other and further relief as may be just. Dated: August , 1990 Respectfully submitted, Ledgemere Land Corp. , Ledgemere Condominium Corp. , Green house Acres Development Corp. Marine Charter and Storage, Ltd. , Inc. Econdo Manufacturing Corp. , H.A. Fafard & Sons Construction, Inc. , Howard A. Fafard By their counsel, / ena G Goldberg (BMA # 01951) Gayle P. Ehrlich (BMA# 01833) SULLIVAN & WORCESTER One Post Office Square Boston, MA 02109 (617) 338-2800 Howard A. Fafard By his counsel , Harold B. Murphy Denise M. Pappalardo Hanify & King 100 Franklin Street Boston, Massachusetts 02110 (617) 423-0400 r. US Bankruptcy Court 10 Mechanic Street Worcester, MA 01608 .UNITED -STATES BANKRUPTCY COURT BUIIDMG DDIT District of Massachusetts Z Robert L. Bingham 45 Clerk of the Bankruptcy Court �,. 176t- CITYFr.t-rf -e CITY OF 6tIHI FIASS. 06/28/90 ,' 0233 City Of Salem 173 Inspector Of Buildings Case Number: 90-40968 One Salem Green Salem, MA 01970 Judge: James F. Queenan, Jr. An order for relief under 11 U.S.C. Chapter 11 was entered on 6/15/90 tesT0R'S : ADORERS: Howard A. Fafard, 024-30-9734, dba 500 Australian Avenue Ledgemere Country, fdba Granite Park, Palm Beach, FL 33480 fdba Highlander Plaza, fdba Quarry Square ATTORNEY FOR NESTLE: INTERIM TRUSTEE SHALL BE: Harold B. Murphy 100 Franklin Street Boston, MA 21.10 SECTION A: 341 MEETING SECTION B: DISCHARGE HEARING August 6, 1990 at 11:00 am n/a Office of the U.S. Trustee 44 Front Street 4th Floor Worcester, MA 1608 CREDITORS: FILE YOUR CLAIMS NOW. DISPUTED CLAIMS NOT FILED BY BAR DATE GENERALLY ARE NOT ALLOWED. BAR DATE NOT YET FIXED. Complaint deadline date is 10/05/90 IT IS ORDERED AND NOTICE IS HEREBY GIVEN THAT: 1. A meeting of creditors pursuant to 11 U.S.C. Section 341(a) shall be held at the date, time, and place specified in Section A above at which time creditorsmayfile their claims, and examine the debtor. Creditors are invited, but not required to attend the meeting. 2. The debtor [and joint debtor, if any] and attorney for debtor(s) shall be in attendance at the Section 341(a) meeting. A partnership shall appear by a general partner, a corporation by its president or other executive officer. 3. Failure of the debtor or his attorney to appear at the Section 341(a) meeting or to timely file schedules and statement of affairs may result in dismissal, denial of the debtor s discharge, or other appropriate relief without further notice or hearing. 4. The meeting may be continued or adjourned by notice at the meeting without further written notice to creditors. 5. The debtor has filed or will file a list of creditors and equity security holders. Any creditor holding a listed claim which is not listed as disputed, contingent, or unliquidated as to amount, may but need not file a proof of claim in this case. Creditors whose claims are not listed as disputed, contingent or unliquidated as to amount and who desire to participate in the case or share in any distribution must file their Proofs of claim on or before the last day fixed for filing a proof of claim. Any creditor who desires to rely on the list has the responsibility for determining that he is accurately listed. Claims must be filed with the Clerk at the court address above. A Proof of Claim form is on the reverse side of this notice. 6. The court will not ordinarily allow a voluntary dismissal of a Chapter 11 case unless all fees due and owing the Court and U.S. Trustee have been paid. IN COMPLETING THE PROOF OF CLAIM FORM, PLEASE MAKE SURE TO ENTER DEBTORS NAME AND CASE NUMBER, AND TO SIGN AND DATE THE FORM. AS A RESULT OF THE FILING OF THE PETITION, CERTAIN ACTS AND PROCEEDINGS AGAINST THE DEBTOR AND HIS ESTATE ARE STAYED AS PROVIDED IN 11 U. S.C. SECTION 362 ( a) . [FSC/UANCAP 3320 ma 341 Notice 02/17/80:0021 BOF 19 (Rev 5185) For the District of In re Case No. Debtor* PROOF OF CLAIM 1. [If claimant is an individual claiming for himaejf] The undersigned, who is the claimant herein, resides at** [If claimant is a partnership claiming through a member] The undersigned, who resides at" is a member of ,a partnership, composed of the undersigned and of" and doing business at** and is authorized to make this proof of claim on behalf of the partnership. [If claimant is a corporation claiming through an authorized officer] The undersigned, who resides at" is the of a corporation organized under the laws of , and doing business at** and is authorized to make this proof of claim on behalf of the corporation. [If claim is made by agent] The undersigned, who resides at'" is the agent of of and is authorized to make this proof of claim on behalf of the claimant. 2. The debtor was,at the time of the filing of the petition initiating this case,and still is indebted [or liable]to this claimant,in the sum of$ 3. The consideration for this debt [or ground of liability] is as follows: [If filed in a chapter 7 or 13 case]This claim consists of$ in principal amount and$ in addition charges [or no additional charges]. [Itemize all charges in addition to principal amount of debt, state basis for inclusion and com- putation, and set forth any other consideration relevant to the legality of the charge.] 4. [If the claim is founded on a writing]The writing on which this claim is founded(or a duplicate thereof)is attached hereto [or can- not be attached for the reason set forth in the statement attached hereto]. 5. [If appropriate] This claim is founded on an open account, which became [or will become] due on ,as shown by the itemized statement attached hereto. Unless it is attached hereto or its absence is explained in an attached statement,no note or other negotiable instrument has been receivedfor the account or any part of it. 6. No judgment has been rendered on the claim except _ 7. The amount of all payments of this claim has been credited and deducted for the purpose of making this_proof of claim. 8. This claim is not subject to any setoff or counter-claim except 9. No security interest is held for this claim except [If security interest in the property of the debtor is claimed] The undersigned claims the security interest under the writing referred to in paragraph 4 hereof[or under a separate writing(or a duplicate of which)is attached hereto,or under a separate writing which cannot be attached hereto for the reason set forth in the statement attached hereto]. Evidence of perfection of such security interest is also attached hereto. 10. This claim is a general unsecured clam,except to the extent that the security interest,if any,described in paragraph 9 is sufficient to satisfy the claim. [If priority is claimed, state the amount and basis thereof.] Claim No. Total Full Name of Creditor: (office use Amount only) Claimed Signature Date Penalty for Presenting Fraudulent Claim. Fine of not more than$5,000 or imprisonment for not more than 5 years or both—Title 18, U.S.C., 1152. -Include aff names used by debtor within last 6 years. "State mailing address. US B:01kruptcy Court - 10 Mechanic Street i;JiL�fpd Worcester, 01608 MA 6oe UNITED STATES BANKRUPTCY COURT l G WJE(')'( District of Massachusetts Robert L. Bingham JUL 9 S 17 4H Clerk of the Bankruptcv Court ] OF Sk cpi,WSS 07/05/90 0744 City of Salem 293 Inspector of Buildings Case Number: 90-40967 One Salem Green Salem, MA 01970 Judge: James F. Queenan, Jr. An order for relief under 11 U.S.C. Chapter 11 was entered on 6/15/90 DEBTOR S : ADDRESS H.A. Fafard S Sons Construction, Inc. , 200 East Main Street 04-2473848, dba Metro South Real Estate, Milford, MA 1757 dba Merto West Commercial 6 Industrial Realtors, dba Metro West Realtors, dba Metro West Specialists, dba Allyn ATTORNEY FOR DEBTOR: INTERIM TRUSTEE SHALL BE: Lena G. Goldberg, Esq. One Post Office Square Boston, MA 2109 SECTION A: 341 MEETING SECTION B: DISCHARGE HEARING August 6, 1990 n/a Office of the U.S. Trustee 44 Front Street 4th Floor Worcester, MA 1608 CREDITORS: FILE YOUR CLAIMS NOW. DISPUTED CLAIMS NOT FILED BY BAR DATE GENERALLY ARE NOT ALLOWED. BAR DATE NOT YET FIXED. Complaint deadline date is IT IS ORDERED AND NOTICE IS HEREBY GIVEN THAT: 1. A meeting of creditors pursuant to 11 U.S.C. Section 341(a) shall be held at the date, time, and place specified in Section A above at which time creditors may file their claims, and examine the debtor. Creditors are invited, but not required to attend the meeting. 2. The debtor [and joint debtor, if any] and attorney for deb Lor(s) shall be in attendance at the Section 341(a) meeting. A partnership shall appear by a general partner, a corporation by its president or other executive officer. 3. Failure of the debtor or his attorney to appear at the Section 341ja) meeting or to timely file schedules and statement of affairs may result in dismissal, denial of the debtor s discharge, or other appropriate relief without further notice or hearing. 4. The meeting may be continued or adjourned by notice at the meeting without further written notice to creditors. 5. The debtor has filed or will file a list of creditors and equity security holders. Any creditor holding a listed claim which is not listed as disputed, contingent, or unliquidated as to amount, may but need not file a proof of claim in this case. Creditors whose claims are not listed as disputed, contingent or unliquidated as to amount and who desire to participate in the case or share in any distribution must file their proofs of claim on or before the last day fixed for filing a proof of claim. Any creditor who desires to rely on the list has the responsibility for determining that he is accurately listed. Claims must be filed with the Clerk at the court address above. A Proof of Claim form is on the reverse side of this notice. 6. The court will Not ordinarily allow a voluntary dismissal of a Chapter 11 case unless all fees due and owing the Court and U.S. Trustee have been paid. IN COMPLE'T'ING THE PROOF OF CLAIM FORM, PLEASE MAKE SURE TO ENTER DEBTORS NAME AND CASE NUMBER, AND TO SIGN AND DATE THE FORM. AS A RESULT OF THE FILING OF THE PETITION, CERTAIN ACTS AND PROCEEDINGS AGAINST THE DEBTOR AND HIS ESTATE ARE STAYED AS PROVIDED IN 11 U.S.C. SECTION 362 ( a) . [PJC/Bh4CAP 3320 ma 341 Notice 02/17/88:0021 1;! BOF 19 (Rev 5185) Ui«iiia Otufts Sri ankruorg Tmul 'F For the District of In re Case No. Debtor* PROOF OF CLAIM 1. [If claimant is an individual claiming for himseUl The undersigned, who is the claimant herein, resides at** (If claimant is a partnership claiming through a member] The undersigned, who resides at** is a member of ,a partnership, composed of the undersigned and of** and doing business at** , and is authorized to make this proof of claim on behalf of the partnership. [If claimant is a corporation claiming through an authorized officer] The undersigned, who resides at** is the of a corporation organized under the laws of and doing business at** and is authorized to make this proof of claim on behalf of the corporation. [{f claim is made by agent] The undersigned, who resides at** is the agent of of** and is authorized to make this proof of claim on behalf of the claimant. 2. The debtor was,at the time of the riling of the petition initiating this case,and still is indebted[or liable]to this claimant,in the sum of$ 3. The consideration for this debt [or ground of liability] is as follows: [If filed in a chapter 7 or 13 case]This claim consists of$ in principal amount and$ in - addition charges [or no additional charges]. [Itemize all charges in addition to principal amount of debt, state basis for inclusion and com- putation, and set forth any other consideration relevant to the legality of the charge.] 4. [If the claim is founded on a writing]The writing on which this claim is founded(or a duplicate thereof)is attached hereto[or can- not be attached for the reason set forth in the statement attached hereto]. 5. [If appropriate] This claim is founded on an open account, which became [or will become] due on ,as shown by the itemized statement attached hereto. Unless it is attached hereto or its absence is explained in an attached statement,no note or other negotiable instrument has been received for the account or any part of it. 6. No judgment has been rendered on the claim except 7. The amount of all payments of this claim has been credited and deducted for the purpose of making this proof of claim. 8. This claim is not subject to any setoff or counter-claim except 9. No security interest is held for this claim except [If security interest in the property of the debtor is claimed] The undersigned claims the security interest under the writing referred to in paragraph 4 hereof[or under a separate writing(or a duplicate of which)is attached hereto,or under a separate writing which cannot be attached hereto for the reason set forth in the statement attached hereto]. Evidence of perfection of such security interest is also attached hereto. 10. This claim is a general unsecured claim,except to the extent that the security interest,if any,described in paragraph 9 is sufficient to satisfy the claim. [If priority is claimed, state the amount and basis thereof.] Claim No. Total Full Name of Creditor: (office use Amount only) LTJ Claimed Signature Date Penalty for Presenting Fraudulent Claim. Fine of not more than$5,000 or imprisonment for not more than 5 years or both—Title 18, U.S.C., 1152. *Include all names used by debtor within last 6 years. "State mailing address. US ,Bankruptcy Court 10 Mechanic Street Worcester, MA 01608 UNITED STATES BANKRUPTCY C01�,R[C-- DEPT District of Massachusetts Robert L. Bingham Jug 6 8 32 Clerk of the Bankruptcy Court t\tul [' ASS. `7A.,'t CITY Of St.L_' 06/29/90 0844 City of Salem 293 Inspector of Buildings Case Number: 90-40967 One Salem Green Salem, MA 01970 Judge: James F. Queenan, Jr. An order for relief under. 1.1. U.S.C. Chapter 11was entered on 6/15/90 DEBTOR 5 : A ORF.SS: H.A. Fafard b Sons Construction, Inc. , 200 East Main Street 04-2473848, dba Metro South Real Estate, Milford, MA 1757 dba Forts West Commercial s Industrial Realtors, dba Metro West Realtors, dba Metro West Specialists, dba Allyn ATTORNEY FOR DEBTOR_ INTERIM TROSTEE 9IALL BE Lena G. Goldberg, Esq. One Post Office Square Boston, MA 2109 SECTION A: 341 MEETING SECTION B: DISCRARGE BEARING August 6, TO n/a Office of the U.S. Trustee 44 Front Street 4th Floor Worcester, MA 1608 CREDITORS: FILE YOUR CLAIMS NOW. DISPUTED CLAIMS NOT FILED BY BAR DATE GENERALLY ARE NOT ALLOWED. BAR DATE NOT YET FIXED. Complaint deadline date is IT IS ORDERED AND NOTICE IS HEREBY GIVEN THAT: 1. A meeting of creditors pursuant to 11 U.S.C. Section 341.(x) shall be held at the date, time, and place specified in Section A above at which time creditors may file their claims, and examine the debtor. Creditors are invited, but not required to attend t_he meeting. 2. The debtor [and joint debtor, if any] and attorney for debLor(s) shall be in attendance at the Section 341(a) meeting. A partnership shall appear by a general partner, a corporation by its president or other executive officer. 3. Failure of the debtor or his attorney to appear at the Section 341ja) meeting or to timely file schedules: and statement of affairs may result in dismissal, denial of the debtor s discharge, or other appropriate relief without further notice or hearing. 4. The meeting may be continued or adjourned by notice at the meeting without further written notice to creditors. 5. The debtor has filed or will file a list of creditors and equity security holders. Any creditor holding a listed claim which is not listed as disputed, contingent, or unliquidated as to amount, may but need not file a proof of claim in this case. Creditors whose claims are not listed as disputed, contingent or unliquidated as to amount and who desire to participate in the case or: share in any distribution must file their proofs of claim on or before the .last day fixed for: filing a proof of claim. Any creditor who desires to rely on the list has the responsibility for determining that he is accurately listed. Claims must be filed with the Clerk at the court address above. A Proof of Claim form is on the reverse side of this notice. 6. The court will not ordinarily allow a voluntary dismissal of a Chapter .1.1 case unless all fees due and owing the Court and U.S. Trustee have been paid. IN COMPLETING THE PROOF OF CLAIM FORM, PLEASE MAKE SURE TO ENTER DEBTOR S NAME AND CASE NUMBER, AND TO SIGN AND DATE THE FORM. AS A RESULT OF THE FILING OF THE PETITION, CERTAIN ACTS AND PROCEEDINGS AGAINST THE DEBTOR AND HIS ESTATE ARE STAYED AS PROVIDED IN 11 U. S.C. SECTION 362 ( a) . IFJC/BANCAI 3320 ma 341 Yotica 02/17/00:0021 BOF 19 (Rev 5165) 12trtnfttb lihtfts JW111 tmkrWcg Tmul For the District of In re Case No. Debtor' PROOF OF CLAIM 1. [[f claimant is an individual claiming for himself) The undersigned, who is the claimant herein, resides at** [I,(claimant is a partnership claiming through a member] The undersigned, who resides at** is a member of ,a partnership, composed of the undersigned and of** and doing business at** and is authorized to make this proof of claim on behalf of the partnership. [Ij claimant is a corporation claiming through an authorized officer] The undersigned, who resides at** is the of a corporation organized under the laws of and doing business at** , and is authorized to make this proof of claim on behalf of the corporation. [;J claim is made by agent] The undersigned, who resides at** is the agent of of• and is authorized to make this proof of claim on behalf of the claimant. 2. The debtor was,at the time of the filing of the petition initiating this case,and still is indebted[or liable]to this claimant,in the sum of S 3. The consideration for this debt [or ground of liability] is as follows: [If filed in a chapter 7 or 13 case]This claim consists of$ in principal amount and$ in addition charges [or no additional charges]. [Itemize all charges in addition to principal amount of debt, state basis for inclusion and com- putation, and set forth any other consideration relevant to the legality of the charge.] 4. [If the claim is founded on a writing]The writing on which this claim is founded(or a duplicate thereof)is attached hereto[or can- not be attached for the reason set forth in the statement attached hereto]. 5. [If appropriate] This claim is founded on an open account, which became [or will become] due on ,as shown by the itemized statement attached hereto. Unless it is attached hereto or its absence is explained in an attached statement, no note or other negotiable instrument has been receivedfor the account or any part of it. 6. No judgment has been rendered on the claim except 7. The amount of all payments of this claun has been credited and deducted for the purpose of making this proof of claim. 8. This claim is not subject to any setoff or counter-claim except 9. No security interest is held for this claim except [If security interest in the property of the debtor is claimed] The undersigned claims the security interest under the writing referred to in paragraph 4 hereof for under a separate writing(or a duplicate of which)is attached hereto,or under a separate writing which cannot be attached hereto for the reason set forth in the statement attached hereto]. Evidence of perfection of such security interest is also attached hereto. 10. This claim is a general unsecured claim,except to the extent that the security interest,if any,described in paragraph 9 is sufficient to satisfy the claim. [$priority is claimed, state the amount and basis thereof.] n. . t Claim No. Total Full Name of Creditor: (office use Amount Is only) Claimed Signature t Date ` Penaltyfor Presenting Fraudulent Claim. Fine of not more than$5,000 or imprisonment for not more than 5 years or both—Title 18, U.S.C., ]152. ,-Include all names used by debtor within last 6 years. --State mailing address. a MR'1' 16 185 13:56 P.2/5 THE FAFARD COMPANIN13 290 7Lar,Street/Aahia,,m MA 017e1 'SOB-asi-1600 Fa.r 1608.875.8810 H.A. Fsfsrd r Sons Construction. no. Leogemere Land Corporsmon Fafard sisal Estate Interiars Town Line Associates. irc, May 16, 1989 Building Inspector City of Salem One Sales Breen Salem, MA 01970 REQ HAN ET, UNIT_130D Dear Mr. Munroe This letter is to inform you that pursuant to the requirements of Section 127. 2.3 of- the Massachusetts Building Code, I hale inspected the above referenced unit. To the best of my knowledge, the unit has been satisfactorily completed in compliance with the Massachusetts Building Code and is ready for occupancy. Any exceptions are noted on an attached sheet. Very truly yours, H. A. WARD 8 SONS CONSTRUCTION, INC. oseph Trolla Vice President License No. 016373 'SSVW'h131VS 30 A110 03A1303L' JT/ps I 1430 ONIOIM THE FAFARD COMPANIES 290 Eliot Street/Ashland,MA 01721 SOB-681-1600 Fax 0 508-875-9810 H.A. Fafard 6 Sons Construction, Inc. FaPard Real Estate July 141 Building Inspector City of Salem One Salem Green Salem, MA 01970 Re: HAMI.E.T,_UNIT_121A Dear Mr. Monroe: This letter is to inform you that pursuant to the requirements of Section 127.2.3 of the Massachusett Building Code, I have inspected the above referenced unit. To the best of my knowledge, the unit has been satisfactorily completed in compliance with the Massachusetts Building Code and is ready for occupancy. Any exceptions are noted on an attached sheet. Very truly yours, A. FAFARD & SONS CONSTRUCTION, INC. Vull " e J ph Trolla ice President License No. 016373 Jil lk 'SSUki s�i3l�>S �0 Alli C aA1333e 1d30 JldiGlljl£3 THE FAFARD COMPANIES 290 Eliot Street/Ashland,MA 01721 617-681-1600 Fax 4617-881-6231 -... ... H.A.Fafard 6 Sons Construction,Inc. Ledgennere Land Corporation Fafard Real Estate Interiors Town Line Associates, Inc. September 14, 1988 L Building Inspector City of Salem One Salem Green Salem, MA 01970 RE: LEDGEMERE COUNTRY II DEVELOPM_E_NT UNIT 23D Dear Mr. Munroe: This letter is to inform you that pursuant to the requirements of Section 127.2.3 of the Massachusetts Building Code, I have inspected the above referenced unit. To the best of my knowledge, the unit has been satisfactorily completed in compliance with , the Massachusetts Building Code and is ready for occupancy. Any exceptions are noted on an attached sheet. Very truly yours, . FAFARD SONS CONSTRUCTION, INC. oseph Trolla Vice President License No. 016373 JT/ps �3�I3�3�1 fib; �� F� II fil Jnr 1(;30 Mom, THEFAFARO-COMPAPi 1ESEJ ~� 290 Ehot Street/Ashland.MA 01 721 617-881-1600 Fax 9617-881-6231 H.A. Fafard&Sons Construction,Inc. Ledgemere Land Corporation Fafard Real Estate Interiors Town Line Associates,Inc. Building Inspector 4s City of Salem ?� One Salem Green < c Salem, MA 01970 VD T.to p — T.m -� z RE: Lm"2 edgem re_Country I_I„Develo.pment— gIM a O Unit m y an em _ cm Dear Mr. Munroe: This letter is to inform you that pursuant to the requirements of Section 127.2.3 of the Massachusetts Building Code, I have inspected the above referenced unit. To the best of my knowledge, the unit( has/h e been satisfactorily completed in compliance with the Massaclletts B ilding Code and is/a e ready for occupancy. Any exceptions are noted on an attached she t. Yours truly, Robert Thomson, AIA Staff Architect Dated: 21 Attachments: THE FAFA_RD_COMPANIES 290 Eliot Street/Ashland,MA 01721 508-661-1600 Fex#5010 H.A. Fafard 6 Sons Construction, Inc. Ledgemere Land Corporation Fafard Real Estate Interiors Town Line Associates, Inc. October 26, 1988 Building Inspector n . City of Salem K m One Salem Green c Salem, MA 01970y N ro am m< N o_ m o O RE: LEDGEMERE COUNTRY II DEVELOPMENTo -e m 0 UNIT 126 �" - �.;` a � n 'i o� �' co Dear Mr. Munroe: This letter is to inform you that pursuant to the requirements of Section 127.2.3 of the Massachusetts Building Code, I have inspected the above referenced unit. To the best of my knowledge, the unit has been satisfactorily completed in compliance with the Massachusetts Building Code and is ready for occupancy. Any exceptions are noted on an attached sheet. Very truly yours, H. A. FAFARD & SONS CONSTRUCTION, INC. Jo eph Trolla Vice President License No. 016373 JT/ps K. Crockett Associates, Inc. = Strucr1lral Engineers j i•`` ' DEC I 1988 5 Wal Ila Street, Norwood, MA 02Oe2 (617) 700,2020 J November 25, 1968 Mr , Robert Thompson i a m hitect "� � T� 'z' r ITHe Faf_ar-d-Companies-� m o 2dq Elliot Street --2nd Floor n m N = Adhland , MA 01721 m e " n =rnC) -o m Re: The Sanctuary . n a Salem, MA y Ijddr Bob : A per your request , this office performed an inspection at tHso above mentioned site. The purpose of this visit was to rByiew the as-built conditions of certain stone and cast-in- pldce concrete retaining walls and cast-in-place concrete µ.: bApement walls. ,.. tHj► Building Units and items reviewed are as follows: a. 25X Regency; Cast-in-place concrete retaining wall . b . 25X Regency; Stone retaining wall between 25X and 26. C . 32C Long "L" ; Stone retaining wall .. d 32D Long "L" ; Stone retaining wall . 130 Regency; Cast-in-place concrete basement wall , f. 133 Regency; Cast-in-place concrete retaining wall . tHp large stone retaining wall between Building Units 25X and 26 appears to have been constructed properly. . THd stone retaining walls at Building Units 32C and 32D were dadpaged, according to the Project Superintendent, by the o0p;ration of a back-hoe. Similar stone retaining walls in tHd area appear to be sufficient . In our opinion these two wd115 should be re-constructed from the base in the same fAgbion as the remaining stone retaining walls. THw exterior cast-in-place concrete retaining walls have not UtAdorgone excessive rotation. The cold joint formed at the edde of the retaining wall and the building foundation is nd4 a structural concern, however this joint should be sealed td prevent water infiltration and damage. CROCKETT/THOMPSON November 259 1988 Pg. 2 of 2 The cold Joints formed in the cast--in-place concrete basement walls do not appear to provide any loss to their structural integrity if the walls have been doweled into their abutments. Again, these Joints should be cut-out and sealed to prevent water infiltration and damage. In general # the stone and cast-in-place concrete retaining walls should be monitored through the winter season for lateral movement and/or rotation. If you have any questions or require additional information on the data discussed , please do not hesitate to call . Sincerely, S.K. C ETT ASSOCIATES, INC Step K. Crockett , P.E. Pre i ent, SKC/hc1 File: 88869 P.S.: The stone retaining walls at Building 24 were inspected on November 25, 1988. These walls appeared to be properly constructed and sufficient to perform as gravity retaining walls. rl _ ° DEC I !988 K I i TH_E__FAFARD-CDMPANIE_S :' 290 Eliot Street/Ashland,MA 01721'_-- 617-BB1-1600 Fax#617-B81-6231 H.A.Fafard&Sons Construction,Inc. Ledgemere Land Corporation Fafard Real Estate Interiors Town Line Associates,Inc. Building Inspector City of Salem n rn One Salem Green C Salem, MA 01970 o z '�' o rn _ c�rs a Y'rr1 r'X n RE: Ledgemere Country II Development m Unit _ �o "n M n S 1 N Cb y GC Dear Mr. Munroe: This letter is to inform you that pursuant to the requirements of Section 127.2.3 of the Massachusetts Building Code, I have inspected the above referenced unit . To the best of my knowledge, the unit(s''J� has/h e been satisfactorily completed in compliance with the Massachusetts Building Code and is/qpr ready for occupancy. Any exceptions are noted on an attached sheet. Yours 77truly, KdIn,19� Robert Thomson, AIA Staff Architect Dated: 1(fl q, Attachments: A.jDti)E 6�`0N° Ma eitp of *alem, 0ag2;aCbUg¢ttg ' Public Propertp Mepartmeut Agw g 43uilbiug Mepartment One balem Oreen 745-9595 (Ext. 380 William H. Munroe Director of Public Property Inspector of Buildings Zoning Enforcement Officer September 16, 1988 Mr. Harry.Mack.,,President ,r--The`Fafard Co_l 290 Eliot Street Ashland, MA. 01721 Dear Mr. Mack, In response to your letter of September 15, 1988 regarding billing for Inspector's time, it would appear you have -not been made aware of the true facts in the matter. The reason behind the action was not the non-payment of the August 24, 1988 invoice but in fact the non-payment of a June 23, 1988 and subsequent invoices that had not been paid despite repeated calls to your bookeeping department and assurance that "the clerk is being cut today". This June invoice was for work performed by the inspectors for the month of May. The city ordinance that requires your payment for inspectional services clearly states that work will be stopped on project that are over thirty (30) days in arrears in payment. This is not the first time over the course of the project that Fafard ` Companies have been in arrears in their payment to the City of Salem and I feel this office has been most lienient regarding your late payments. In view of your concern in this matter I have instructed my staff to make you personnally aware of any future delinquence in payments. / Sincerely, William H. Munroe Inspector of Buildings WHM/eaf C.C. John Serafini, Esq. Roger Halle Scott McInnis THE FAFARD COMPANIES 290 Eliot Street/Ashland.MA 01721 509-951-1600 Fax#509-B75-B61O R H.A. Fafard 6 Sons Construction, Inc. Ledgemere Land Corporation Faferd Real Estate Interiors Town Line Associates, Inc. September 15, 1988 William Monroe, Inspector of Buildings One Salem Green Salem, MA 01970 Dear Mr. Monroe: I would like to make you aware of a situation that occurred regarding the billin& for Inspector's time in Salem which we think is unfair. The City of Salem's Invoice dated August 24, 1988 was received by The Fafard Companies on August 26, 1988. Unless there are special terms noted on the Invoices, our normal payment terms are 30 days, as is the case for most businesses. The week of September 5th our Salem Project Manager inquired as to occupancy permits and was told no permits would be received until this Invoice was paid. We think this situation is unfair given the timing involved and if you or the respon- sible person would deal with the Accounts Payable personnel by name (rather than someone said) , I think you will find there will be no problems with payment. If there is any problem, either Scott McInnis or myself will resolve it within 72 hours, but, please let's not use threats of withholding occupancies. If we communicate, any problem can be resolved. Sincerely yours, Harry Mack President HM:mt cc: John Serafini, Sr. , Esquire Roger Haley Scott McInnis Jew` Z,� Building Insp. , Roger Halley R. Bodziony J. David REPORT OF SITE VISIT lt.y 10) 1.5 ';n PHI 137 I V,0 CITY .0 Sh,L E N,1.14 5 S., SITE: SAS DATE OF VISIT: 3 NOV 87 VISIT B Y: R. THaISON WORK IN PROCESS: #23 - Slab extensions not poured in bay windows of master bedrooms. Windows to be boxed out atrJ30" A.F.F. Details to follow. A #23 - Window block-out detail from master bedroom to living room required. (Show framing) AA.l - Door between garage and basement to be 3'-0" (per schedule) not 3'-6". ACTIONS REQUIRED: #103 Units B&C, railing from lst to 2d floor to be secured back into stringer to stiffen railing. 2 layers type X required on ceiling of landing between base- ment and lst floor. 2x8 header required across joists of landing between lst and 41 2d floor (units B&C - tapered joists) . All stairs to be constructed so variance between risers on any run is less than 3/16". Stringers on short run between basement and lst floor (Units B&C) must rest on the kicker plate. OPEN ISSUES/COMMENTS: Scott M. to provide Architects with sizes of standard door block-out's. Architect to specify sizes on door schedule. Blue board (M.R. GYP. BD.) should be used behind showers and tubs where the fixtures are not on unit separation walls. Type X used behind fixtures on separation walls. Neither the Mass. Code, the NFPA Manual For House Framing, nor Architectural Graphics Standards fiiive requirements for using strapping to secure-GYP.BDto ceilings. Table 2104-6 (Mass. Code) shows fastening. (OVER) } � � ] � � j jOPEN eSUESZCU14ENTs cont5: ) ] - Requ2erents, which shows y. 6 screws, a" long, 2. O.C. for j stein y G.B. 2 ceilings. We should consider eliminating ] strapper altogether. ) � � ] � ) j . ) � � \ � j . j § - - \ ] � � ) j j 4 / J r , r '� ► tiI l.b _ A PARC E L I �/ iii L• . - , __\ - � /`\ 1 vNDISTvRBED � � - `• /� � AREA GRi \.-. T -�.... j '\ `I' r.,•. t ,�RYiEl7 `�. S.A. C� \ Zb�- ._ �' -^ Yl i' C/ �••'' / l (r,� / GO SIT. CONIC .PA'\IE. a z \ - All- / , R- 'j?s 8 - Kt ;� H �Q-' \ R: 882 / - ___-� ;,. r✓ �'�.-� .i// � 1 �I , �/ ~ �� � - \ Tt7EGTOFi �'\ /� ,` - I �- • �, STAT IoN I (X \ T8A5E F�. N Y p - - ► 31 r. caNc � 1 / WETLAND Seu? _- 8Q meq'. =: gI. -Ilk- -. f y _ r yio_ a, O 13 nQ RET'krNJIN 4 Illi 1 r �/� I \v, C• ; , T:- 3< - _ i _� �\ U _ � -O•-_-1 __ __ _. _ 2' - - - C If ' tit -: Pr\V� U 4�� �� !01 �4 - •.<4 WI0 \ .r A _ s � 11.Uh � � � ' FL C93 .O W -, � ` � ,/ / ,o�.�► 1 ?. > � � I ff14M J YH •'10 - - _.. - _ ._ ' _. -.. _._ - 1 T "i 94 v ` \ B . C"ONC. AVE n - Jf ► VA J � n AfZ 4r. ` V 1 _ q41 • �t - 7" V Q _ 0.1 X14 AL�- _ '--- -_ .. � / ' �..�. —�-_ •. r, �.. _. _ __ - _�'\� 1 6 sT - W • Q � O, /L E x t tNr 60' , 1 1 -7 H ti J J� ��s � � •,,---.�_ ` � G t_T `4 OF SALE M Lows MAP TOR13ED OU N IS f'�UTNOR ITy t,,aw, N: 5 .r-1 rI Nil Sw� iN :qS.4 \ ARE A v - k'ST1Nc,_ p� IN�2�S ` i ®•u- ! n -q -,� -� _ V OVi9S Ex,TI 9 v r ALL gV I LDI NC{s a RE Ta aE LEpCW1 C>P. l � SRA NED � uraER KI-P - RAP STOWE vL HAE NV - 9 � �\/ TI'isLopE GRAMITE � " Loll 85 OF l.Z /o LAS - AS PER A S.T.M MACS / / Revlstlo.. I-Z S 04 ----(,�-D - 1=XISTItJCy DRAIN M H . OC��/�OOG K\P W'.P RETAWIn�<-a wAt-L R' ,4 - - / ` ` . `� �- t� NES\ V0 SULFATE TEST DATE REVISED' Il • Ib BA —5 — EI<IsTINc, SEWER M.H. A UNIT nES1CINATIUN - I 1 SEASONAL RICH WATER AT 81 -1 II 14 84 ..._ __ RO'Ft75i`i� SEWER M. I"1 I E'iVla-DING NVMt ISER `� I, ` AT�F'ROVED `'`�., _ _- SITE 1-'L/-iN of LANi'�5 -' nx.'— - E ISTINCI S ♦— � _iTxcN c.u�Tta L SALEM PLAN SRT-_J \ +� O(_ CONTOURA -' Kx�--- �F2OixJ'E7 � O i RS 1`�-` �./'�'�� t NOTES 2rZVSri --- -L_ -03 t-.?(t ._. ._ S S A . SN(JW STt�1lAxC,E Aie,7A - - At - - y�CK,i�F-N C,VAR!'� RA1L `• N /F 1 '� BINDER SA l..-EMS M pFQUOIT 21MARY 3V1�DIr.IC, eNTeAIVCE ffA II iy HAY 13A.LE _ 3iT `,CALF. 1rr = ZO' DATE •. SEp STN % • 4m VNt� q ' �,J7,/ t' < y �q A1C. i RF-,4 NOV. 1-5 CC ✓4 n cX 1571 A7C. E SLOPD TIRE FAFAteC7u M_PIAAbES 4R,o.N ,T6 G vEr+1CUV+R 7ATTERN i • NOTES (,ARAC,E -•--�,_. --�J ! —__ NN. — e �' IJ2 .Uv 9"l�RgvEL RE0uIitED \ INV.' ,Cl.pl i-- Ie t�i0EL1oT gT � ASHLAND, MA � I I' .DE I.NCJCES ,../aT ERc..,PTE - 2 woop�!.I STAKES �aTE �1J.I,1s - [�E(�E vq -�tZ / v I ,,; _ 40 ?C� F PeR 'bAL-E 111 F112� t+ apltFtNT NOTE . :�AY�wI,-ES TO AE STAKED ZG)NIII\I�I �1STi�IGT --- -------. .._-_— _v FIC AL tnl�E.�..TL7it DRN EIn•'AY Crv . T S. ) Y / VVV I � 1 ; I . 5 0o FT / 15 SNV.c Iz°x T ,1 <' S - l 1 - O v� I I 1 7.� O �� yy' � v o l �4 I A, C7 z I P W 1 -a a- � 3 � 1 �. I I L� � p 4 I � ) UNDISTURF3ED 1 D J A j h II'LIPAREA \ t-t. Fes. Q .. I" / I )1 I � Aii F"`IL: I10��0-t� I ! ,� AZ2. F 100-' I O �I ... r � I � � I � � LO ,C . - 70 til R 8= to1.�`- \� �ITNa3- PL9 ' lol? / lay. q5•c ry' \ � u f ` �� � � _ S G./, ! l4� / if �1 0 vV R%P-RAP Get 57 loz,3 f J H � Zt ` --_-_—_ / l/ a� �f \ p a r ci 2.5 RlF - S TRo` _._.- �FE7 �! l� V '� 1ST �L �w' 11-1. 5•r121 ._ _ \ ri, • A\ G lov..5= C_: O L; — Z 1� a r,�- PAYE Jbi wDISrUIZPSF- 04,� C.B 2 _- P � I I \ Z °F �- - — ARC L 2 ; 1? S.S.A %1RtR►' `1 �� - = � � , � ��► ' j AREA - 2 . l to Pc, O LE64FNP� n ' \` lTAT10N GO\NT 1'do 1 t I ,T INC, flKAIN fl 11 BEV, . I . 1'1 - 85 -,` EKISTIN4 CONTOURS APPRC)\1E � E�IStb '" 12 5 M4 ---�xx}- - !'►zt,i�Y�_[� t_r�l'\ovR�� SALEM C'I.ANNtNC� F3L1gR� S S . j l= A NOw 7P 4 RAE AREA NOTES', _ I SgJ iL t_ r, K r1 _ _ — _ V hr R'f� n �1.11PET1 1 (PSLI ,E • / 1 ALL DUILDINC.IS ARE O F � FPIMARYIs1 �lll'n,.11 ENTICA1.hE_ -- - C,ItAA) ITF ELY.,IN(y _i.11 r I ' - --Q�h�'ti. . _ T DE UNDER- [�,� 1 � 7// .Y�I I FFtiP 1 w�-'r-. rw� hENOT tS 5<R_v�,ll f /w 1 IIITbP IyF'A1NF_t� -aiCCFL �- IYZj1-(i1N[>ER 1. FtIF RAP SONE WILL kAVE �OUN�N)ESS ♦ - ♦ -- w. ,crr.rr+ a�`nKC, RAIL_ - OF 1 2 "/o U-)5,% AS PER A.ST.M� MA L. I 14 ) H _ � - , ,� N. T t-_• . . ,nom"�, ,1- �- 1 fjIT 00 E� -A N1 ' ,11)M SULFATE TEST . I t w, 1^1 o t Phx__ � a1-,tlNt, HAY 1SAt_F 6RAN tTC. ED[,INC, 3 ;F-ASoNAL- rt\LIN wA-TEPt AT 91 ,1 Fc Fs11`�Fr )JUV. IS , )q�4 l f �1"- l It-b 1 11 Y 1 �Ahl I '�I f -11°.IHAVEI. WHERE REQUMED? - I [�FINk, L).NVI+NIES r,11 I 'P.11 l 1 i `•Ii.,N 111 Ifs/.) - � �.._� ..: l. .l- i �.--.I�L.._-_._ (' i 11n' I I _ _ ..._._ L lt�j.. - f l -1" F� I lIT Sl. � /' N I l�Mi . I � � 1 t ; 111 ,11.1. , rilrliaER 1) f •II 1 At Ir Ir`.1 1 VISI 1 Rr.>l nq.I F 1 AN PIAT f 1: Olt TAN Gil 1 / A IL I L_G l- lv "RIVE, .,'^Y 1 _-•-- 10Ax. C 'E Building Insp. , Prx'ser iu11a R. Bodziony S. o WE AT REPORT ® F SITE W rAr-'/�RD SITE: SA=, DATE OF VISIT: 6 ocr 87 VISIT B Y : R. T:ovsoN WORK IN PROCESS: Unit 103 : Interior partitions, eave trim. Unit 29-31: Assa7bly of panels onto foundations. ACTIONS REQUIRED: i Units 29-31: Contractor to apply sheet metal draftstopping up the outside face of the studs at the 2-hour wall between units. Sill height of 28" on upstairs bedroom window's on front of unit is okay. j Unit 103 Proposed changes on attic space next to loft area on end units should not begin unit approval is received frci? i1.A.F. Sloping floor joist to insure 6'-8" head space at stairs is approved. i ` OPEN ISSUES/ COMMENTS: 'I Major inconveniences to all sub's caused by Fafard site crew's opening tranches for utilities along Whalers Lane. It seems like anis work could have been done �oeek - even months - ago before work began on 22-33. Framers lost a day bccause they ;--re unable to wet to their buildings. other subs may be in { ion. a similar situat �oqer Flalley I ` R.. F,-)lzioay Fo15an REPORT OF SITE VISIT i. I'av id SITE: SALEM DATE OF VISIT: 19 ocMBER 87 VISIT BY: R. THOMSON WORK IN PROCESS: 31 - Roofing 22 - ECONDO Pouring _ 23 - Foundation Forming ACTIONS REQUIRED: 31 - Where floor joists are tapered to Provide-head room at stairs, the joist should run at an agnle the full width of the opening rather than having 3 blocks cut at angles. t against All Buildings - 2x3/4 Oak strips should be tse� n'Is (as ed to ao t top of stairs where carpet joins tile or where carpe leading to basement in deck buildings) . the stud 31 - North exterior wall near front door has'a place where spacing is greater than 16" - add a stud. 31 - The door between the garage & basement does not have its jambs resting on the plater Re-check shop drawings for location of door opening. 103 - Water line in garage wall must have plates at the studs to protect it from nailing. In the future locate the pipe in the center of the stud. Railing/wall from 1st fir t 2d fir needs further bracing (so. it can withstand a 200 lb. lateral force) . Check to see if temporary stairs are being converted to permanent ones. OPEN ISSUES/COMMENTS: 25X & 28 - Generally poor finish work on the ECONDO concrete (excessive honeycombing, chipped corners, Poor alignment of walls with foundation, bad seams - both ridges and cracks, and lots of 'cream' flaking away on the floors) . 103 - Note that the doors at the bottom of the stairs in the garage--are B-label doors. § t f �fy�Iy�y�l, 0055 U'.f` SCL} i i'M4 CERTIFICATE OF ACTION . DATE: TO: Josephine R.. Fusco, City Clerk FROM: Salem Planning Board- - RE: Special Permit for Planned Unit Development--The Fafard Companies, Inc. I hereby certify that, pursuant to Section VII-O of the Salem Zoning Ordinance, the Salem Planning Board has taken the following action with respect to the above-referenced application: On Thursday, March 15, 1984, at a regular meeting of the Salem Planning Board, the Board voted, by unanimous vote, to approve the application for a Special Permit under the provisions of the Zoning ordinance for a Planned Unit Development. Notice of the. Planning Board's action and the reasons supporting it are more fully described in the attached copy of a decision, the original of which y was sent today to the applicant by registered mail, postage prepaid, at the address stated on the application. 4�4- Walter B. Power, III Chairman J{ Y d 9 s_. CITY OF SALEM PLANNING BOARD IN RE: APPLICATION OF THE FAFARD COMPANIES FOR A SPECIAL PERMIT UNDER SECTION VII-O OF THE ZONING ORDINANCE C) M� OF THE CITY OF SALEM DECISION . This decision is rendered upon an application .for a special permit for a . planned unit development pursuant to Section VII-O of the Zoning Ordinance of the City of Salem (the "Ordinance"). The application was submitted on November 16, 19837 by The Fafard Companies, which include H. A. Fafard and Sons Construction, Inc., Ledgemere Land Corporation and Fafard Real Estate (collectively, "Fafard") together with a site plan entitled "Subdivision Plan - Planned Unit Development", by P. Boghosian, November 15, 1983 and an Environmental Impact Statement as . 1 required by Section VII-O 4 of the Ordinance. The Board, within seven days after receipt of the application transmitted a copy of the application and the plan to the Inspector of Buildings, the. City Engineer, the Board of Health and the Conservation Commission. Notice of the filing of the application was alsogiven to the City Clerk, Fire Department, Police Department, Superintendent of Streets and the School Department. Notice of Public Hearing by the Board on this application was duly published in the Salem News on December 3, 1983, and December 7, 1983, and duly mailed to all persons entitled thereto by law. A public hearing on the application was held in accordance with such notice at 7:30 p.m. on December 19, 1983, in the second floor hearing room at One Salem Green :n Salem. The following members of the Board were present at the ' 1 _ - hearing: Walter Power, III, Abby Burns, William Cass, Donald Hunt, David Goodof, Kenneth May and Normand Houle. Reports on the Application were received from the following Boards and Officers on the dates set forth below: 1. Inspector of Buildings -,Commented orally with no written report 2. City Engineer - January 9, 1984 3. Board.of Health - December 15, 1983 4. Conservation Commission January 12, 1984, Order of Conditions,-DEQE file 64-92 The .Board has made a thorough study of and has given full consideration to, all documents, plans and other materials submitted by Fafard; the reports, written or otherwise, of the Inspector of Buildings; the City Engineer; the Board of Health and the Conservation Commission and all statements made and other materials submitted of the Public Hearing and at other public meetings of the Board at which the Application was discussed. The data so considered includes, but is not limited to, the items listed in Addendum A attached hereto, which items are specifically incorporated in and made a part of this decision and which -need not be recorded as a part hereof. The Board is satisfied that such data is sufficient to meet the requirements of Section VII-0 of the Ordinance. Accordingly, the Board has unanimously voted to grant a Special Permit for a Planned Unit Development pursuant to Fafard's Application upon and in accordance with the provisions, conditions and procedures set forth below: I. Based upon the written material submitted to the Board as well as oral communications received at the Public Hearing and other public meetings of the Board, the Board makes the following findings: 2 A. The Planned Unit Development has been designed with various types of land uses which can be combined in a compatible relationship with each other as a totally - planned development. B. The design of the Planned Unit Development is compatible with the existing or potential development of the surrounding neighborhoods in that Fafard proposes commercial uses for property adjacent to an existing commercial zone. C. A plan for the total property has been submitted to the Board which clearly deans the manner in which the subject area is to- be developed and the means that will be employed to protect the abutting property and the health, safety, welfare and privacy enjoyed thereon in accordance with the requirements of Section VII-0 3.b of the Ordinance: D. Section VII-0 3.d of the Ordinance does not apply to the Planned Unit Development as it is not located adjacent to or across the street from existing residential developments. E. The Planned Unit Development is in harmony with the purpose and intent of the Ordinance and the Master Plan. of the city of Salem. and will promote the purposes of Section VII-0 of the Ordinance as set forth in Subsection 2 thereof. F. The mixture of uses in the Planned Development is sufficiently advantageous to render it appropriate to depart 3 from the normal requirements of the zoning district in which it is located. G. The Planned Unit Development will not result in a net negative environmental impact. H. The parcel containing the Planned Unit Development contains more than sixty thousand (60,000) square feet. II. The special permit and the exercise of the rights granted hereunder shall be subject to the following conditions: : A: Nobuilding permit shall be issued for any building.in the Planned Unit Development until a performance bond, satisfactory to the Planning Board and the Director of Public Works or City Engineer, shall be provided for the construction of a twenty-four foot wide paved vehicular way to be constructed in accordance with the requirements of the applicable Subdivision Rules and Regulations of the Board from the existing terminus of First Street to the existing paved area at the rear of Hawthorne Plaza, within the thirty foot easement area shown on a plan entitled. "Compiled Plan of Land in Salem, MA" by Joseph W. Moore Co., Inc.; owned by Highland Realty Trust; September 19, 1983, and the use of such way by the public at large shall be secured, in such a manner as shall be satisfactory to the Board. Construction of the road shall begin within ninety (90) days of the granting of the easement by the owner of .the Hawthorne Square shopping area. The City Engineer shall determine the amount of the bond by applying the estimated surveyed quantities 4 multiplied by the unit prices, listed in the latest Building Construction Cost Data Manual used by the City Engineering Department, adding ten percent (10.00%) thereto and adding ten percent (10.00%) each year for two (2) years. At the end of the two-year period from the date of the approval of the bond by the City Engineer, if the roadway has not been completed, the City shall have the right to determine the bond to be due and that the amount of said bond shall at that time be immediately paid to the City of Salem. B. No building in the Planned Unit Development shall exceed two stories in height or thirty (30) feet in height. C. Each building in the Planned Unit Development shall satisfy the parking and loading requirements of the Ordinance in effect at the time a building permit is sought for such building. D. The Gross Floor Area of the buildings located in that portion of the Planned Unit Development north of First Street shall at no time exceed three hundred ninety-five thousand square (395,000) feet with no more than one hundred eighty-five thousand square (185,000) feet thereof occupied by any of the following uses: 1. Retail department stores, supermarkets, food stores, restaurants and other eating places in which alcoholic beverages may be served on the premises, places of commercial recreation and entertainment, physical fitness facilities and health clubs, but excluding movie theatres and amusement arcades. 5 2.. The following uses now permitted in B-1 and B-2 zones: (a) Drugstores (b) Stores selling liquor, beer and wine for consumption off the premises (c) Newsstands and variety stores (d) Dry goods and notions stores (e) `- Book, stationery and gift stores (f) Florist shop, but excluding greenhouses (g) Hardware stores (h) Banks and savings and loan institutions '_ (i) Professional offices, medical and. dental clinics (j) , Restaurants and.other eating places which do not serve alcoholic beverages consumed on the premises, but excluding drive-thrn restaurants and drive-thru snack shops. (k) Warehousing and distribution (1)' General office buildings and other similar and related uses (m) Off-street parking and loading facilities and other accessory uses and buildings, provided that such uses are clearly incidental to the principal use ("Retail Uses") with the balance to be used for the following non-retail related uses: 1. Light industry uses: (a) Steam laundry or dry cleaning plant,- 6 lant;6 is n . �- (b) Food and beverage manufacturing, bottling or processing or commissary; (c) Assembly or packaging of articles not exceeding two hundred (200) pounds in weight, provided no manufacturing or processing is carried out;. . (d) Printing, binding, publishing and related arts and trades;. (e) ' Manufacturing, assembly, reconditioning and processing plant of the following type industries provided that such operations: (1) are not specifically prohibited from the - City of Salem, according to the schedule of prohibited uses in Section V-C. (2) are not dangerous by reason of hazard from fire or explosion. (3) are not offensive or.detrimental by reason of causing dust, smoke, odor, fumes, noise, vibration, traffic congestion or.other nuisance, and (4) are compatible with adjacent nonindustrial uses; Food and kindred products, apparel, electronics and electrical products, furniture and fixtures, primary and fabricated metal products, including the storage of new materials and containers used in or incidental 7 to any of the foregoing, physical fitness facilities and health clubs. 2. General storage, warehousing and distribution uses 3. Publishing and printing establishments 4. General office buildings and other similar and : .related uses ("Industrial. Uses"). The uses within the .buildings shown on the plan filed with the application between the PUD area and Highland Avenue presently under the control of the petitioner shall be limited to the retail uses allowed in the PUD. E. The ratio of the gross.floor area used for Retail Uses in the Planned Unit Development to the gross floor area used for Industrial Uses in the Planned Unit Development when completed shall not exceed .88. F. There shall be no more than twelve percent (12.00%) or twenty-two thousand two hundred (22,200) square feet of the gross commercial floor area devoted to stores, having less than three thousand (3,000) square feet in floor area, With a maximum of ten (10) such stores. It is the intent of this section that the Planning Board may waive this requirement on presentation of an appropriate plan and appropriate request- to the Planning Board. F-1. Between the northerly boundary of the Planned Unit Development and Highland Avenue, no more than twenty three thousand (23,000.00) square feet of building shall be constructed on land under the control of-the petitioner. 8 Of the twenty-three thousand (23,000) square feet, no more than fifty percent (50.00%) shall consist of stores under two thousand (2,000) square feet. G. No building or structure shall be constructed and no building.permit shall be issued therefore until: (1).a site plan and (2) landscaping theme shall have been approved by the Planning Board in accordance with the following procedures: Site plans submitted for approval shall include those items required to be shown under Sect. III B 2 a-p of the. Salem Subdivision Regulations and be accompanied by generalized floor plans and elevations of each building. The plan shall also show:- a. All building layouts in accordance with the use, dimensional, bulk, square footage, and other regulations established by this Special Permit. b. Landscaping in accordance with the approved - landscaping theme. c. Parking spaces and layout in accordance with the applicable Ordinance. d. Site plans submitted for approval shall designate an easement area of no less than ten (10) feet in width which would be suitable for potential trails and accesses to open space areas shown on Salem Conservation Commission Area Map dated October, 1983: Such easement when approved shall be granted to the Conservation Commission of the City of Salem. 9 The Board shall have thirty (30) days following the meeting at which the site plan is submitted to review the submitted plan and shall approve such plan or indicate to the applicant those specific instances where the submitted plan does not conform to the requirements as set forth bove. .The plan when amended to conform to the requirements, shall be then approved at the next scheduled meetings of the Planning Board. H. No residential use shall be.made of any portion of the : Planned Unit Development north of First Street and no residential.uses shall be made of that portion of the Planned Unit Development south of First Street unless a Planned Unit Development Pemit shall have been issued by the Board for the parcel of land immediately adjacent to the Planned Unit Development on the south and then in accordance with such requirements and restrictions as may be imposed in such permit. H-1. There shall be no interior mall within the PUD area_ I. Disturbing of land or storage of surplus material on the site is prohibited except in immediate building areas, and .- shall not begin until six (6) months prior to construction. This does not preclude the preliminary grading of future commercial and industrial sites within the PUD, providing that such sites shall be finished with a minimum of four inches of loam and seeded with a grass mixture, and no material storage piles will remain except in an area designated by the Planning Board. 10 T I-1. Except as specially modified by the permit, all zoning requirements shall apply to the PUD area. J. A certificate of compliance or approval signed by a majority of the members of the Board shall constitute conclusive evidence of the matters set forth therein if and when recorded with the Essex South District Registry of Deeds. K. Upon the request of Fafard, and after public hearing held in.accordance with the requirements of Section VII-0 of the Ordinance, any provision. of this Special Permit may be waived or amended by a majority vote of the Board... L. The Special Permit granted hereunder shall lapse within two years if a substantial use thereof has not sooner commenced except for good cause, or if construction has not begun by such date except for good cause. :- M. If Fafard or its successors or assigns shall make any use of the Planned Unit Development other than as set forth herein, the Board, after notice to Fafard and hearing, may revoke this permit for all buildings for which a Certificate of Occupancy has not been issued and all land within the Planned Unit Development which has not yet been built upon. Decision dated March K 1984 Members of the Planning Board of the City of Salem y- Filed with the City Clerk of the City of Salem on 3 , 1984. Josephine R. Fusco, City Clerk 11 - qY 4 ND CtV of �.IMIIItIYC$ '�`IIar�k ee�ixns o�-m (one psa6m (sreen April 3, 1984 Appeal from this decision, if any shall be made pursuant to Section 17 of the Mass. General Laws, Chapter 808, and shall be filed within 20 days after the date of filing of this decision in the Office of the City Clerk. Pursuant to Massachusetts General Laws, Chapter 808, Section 11, the Special Permit shall not take Affect until a copy of the decision, bearing the certification of the City Clerk that 20 days have elapsed and no appeal has been filed, or that, if such an appeal has been filed, that it has been dismissed or denied is recorded in the South Essex Registry of Deeds and indexed under " the name of the owner of record or is recorded and noted on the owner's Certificate of Title. Walter B. Power, III Chairman Im ADDENDUM A Reports on file with the Salem Planning Board, One Salem Green, Salem, 14A 01970 relevant to The Fafard Company's application for a Special Permit under Section VII-0 of the Salem Zoning Ordinance. A-1 Reports or comments from City of Salem Departments and Agencies 1/3/83 Salem Planning Board, Plan Believed Not to Require Approval for Boston Trader's site off First Street. 11/25/83 Salem Board of Assessors, Abutters List. - 11/30/83 Salem Department of Public Works, Grant Time Table for "Traders Way." 12/12/83 Salem Fire Department, letter stating there are no objections to the plan. 12/15/83 Salem Board of Health, letter sta£ing :concarrance with.plan_ 12/19/83 Salem Police Department, letter stating concurrance :with o2an_ 12/30/83 Salem Planning Board, Application for Approval of Definitive Plan for "Traders Way." 1/3/84 Salem Fire Department, letter stating concurrance for "Traders .,..Way. 1/9/84 Salem Department. of Public Works, letters of concurrance for special permit and "Traders Way. 1/12/84 Salem Conservation Commission, Massachusetts Wetlands Protection Act, Order of Conditions, File No. 64-92. . 1/18/84 Salem Planning Board, letter of request to Johnstown Properties, Inc. , 89 State Street, Boston, MA 02109 for comments on Fafard plan. 1/27/84 Salem Board of Health, letter stating concurrance on "Traders Way-' 1/30/84 Salem Conservation Commission, comments on the subdivision of - "Traders Way." 2/2/84 Massachusetts Department of Environmental Quality Engineering_ Notification of Field Investigation on Appeal of DEOE File 64-92- 2/8/84 Salem Planning Board, Certificate of Action on the Subdivision of "Traders Way. " 3/15/84 Salem City Clerk, confirmation of no appeal within 20 days on Certificate of Action for "Traders Way." q ` ADDENDUM A, 3/20/84 Page 2. A-2 Reports submitted to the Salem Planning Board from The Fafard Companies 8/81 Final Environmental Impact Report, Highland Acres, prepared by HMM Associates, Concord, MA. - 4/15/83 Highland Acres Draft Environmental Impact Report EOEA #k4573, prepared by HMM Associates, Concord, MA. 11/16/83 Covenant for First Street subdivisions. 1/30/84 Analysis of Traffic Impacts Associated with Fafard Project Changes: Supplement to Final Environmental Impact Report-EDEA $4573, prepared by HMM Associates, Concord, MA. - --' 2/1/84 Market Delineation Study of Highland Acres Access Route 1O7, Salem, MA, prepared by The Fafard Companies. - 2/10/84 Covenant for subdivisions on "Traders Way." 3/1/84 Certificate of Encumbrances, from Atty. John Serafini. 3/1/84 Statement of Ownership for Fafard's land, from Atty_ John SexafiT+i_ -A-3 -Letters--of Opposition to the Fafard Planned Unit Development - - - - _ 1111tg of "itt1em' � Useachusetts 9 Aire Department ?"rt j T,D dames�j. �remw" 48 Pfaue#ie ptitieE 'Satent, ffla. 10MI MSALL`E,FAASS. December 12, 1983 City of Salem Re: -Traders-Way—(Tentative Name) Planning Department z COf£ Highland Ave. One Salem Green Opposite-Marlborough Road Salem, Mass. Fafard Companies project Sirs: Notification of the proposed hearing for the planned development tentatively named "Traders Way", has been received by this office, after the proposed date of the hearing. No plan has been received for our review as of this date. However, on November 23 , 1983 a meeting was held in the office of Public Services Director Fletcher, with the Fafard Companies representative Gerard F. McNeil, L.A. (Manager of Engineering and Planning) and , Attorney John Serafini, Sr. , to discuss the project., At this meeting I was shown a basic plan of the proposed first project, which detailed three commercial structures located on a proposed roadway leading off Highland Ave. in a Southeasterly direction. The requirements of the Salem Fire Department for approval of said proposal were verbally outlined at this meeting. It was stated that adequate sized water mains for firefighting purposes will be needed. Also it was stated that the Salem Fire Department will require a plan showing the proposed layout and sizes of the water mains, hydrant locations, master fire alarm street boxes, and eventually structural plans when the time arises for issuance of a building permit. Mr. Gerard McNeil was to arrange for an appointment at my office, for a furthur detailed review of the proposal. No furthur meeting has been held as of this date. The Salem Fire Department has no objections to the contemplated sub-division, but approval of this office can not be provided until adequate plans are submitted. Respectfully submitted, cc: Building Inspector L� Director of Public Services eui�,� 2�t- Electrical Dept. Ca t- David Ji' Goggin✓ file Salem Fire Marshal Approved by James F. ennan, Fire Chief i CMtu urf Sal T , fit �z s cl;u �tfs 4 Tauarb � j SPR2, a� µ (ane G�5a1em G mu ` „Mew'°'-""• CERTIFICATE OF ACTION - DATE: TO: Josephine R. Fusco, City Clerk FROM: Salem Planning Board ` RE: Special Permit for Planned Unit Development--The Fafard Companies, Inc. I hereby certify that, pursuant to Section VII-O of the Salem Zoning Ordinance, the Salem Planning Board has taken the following action with respect to the above-referenced application: On Thursday, March 15, 1984, at a regular meeting of the Salem Planning Board, the Board voted, by unanimous vote, to approve .the application, for a Special Permit under the provisions of the Zoning Ordinance for a Planned Unit Development. Notice of the Planning Board's action and the reasons supporting it are more fully described in ,the attached copy of a decision, the original of which y was sent today to the applicant by registered mail, postage prepaid, at the address stated on the application. Walter B. Power, III Chairman ^ {. a 84 V CITY OF SALEM PLANNING BOARD IN RE: APPLICATION OF THE FAFARD COMPANIES FOR A SPECIAL PERMIT UNDER SECTION VII-0 OF THE ZONING ORDINANCE OF THE CITY OF SALEM �l DECISION This decision is rendered upon an application for a special permit for a , planned unit development pursuant to Section VII-O of the Zoning Ordinance of the City of Salem (the "Ordinance"). The application was submitted on November 16, 1983, by The Fafard Companies, which include H. A. Fafard and Sons Construction, Inc., Ledgemere Land Corporation and Fafard Real Estate (collectively, 'Tafard") together with a site plan entitled 'Subdivision Plan - Planned Unit Development", by P. Boghosian, °November 15, 1983 and an Environmental Impact Statement as required by Section VII-O 4 of the Ordinance. The. Board, within seven days after receipt of the application transmitted a copy of the application and the plan to the Inspector of Buildings, the City Engineer, the Board of Health and. the Conservation Commission. Notice of the filing of the application was alsogiven to the City Clerk, Fire Department, Police Department, Superintendent of Streets and the School Department. Notice of Public Hearing by the Board on this application was duly published in the Salem News on December 3; 1983, and December 7, 1983, and duly mailed to all persons entitled thereto by law. A public hearing on the application was held in accordance with such notice at 7:30 p.m. on December 19, 1983, in the second floor hearing room at One Salem Green in Salem. The following members of the Board were present at the 1 ; hearing: Walter Power, III, Abby Burns, William Cass, Donald Hunt, David Goodof, Kenneth May and Normand Houle. Reports on the Application were received from the following Boards and Officers on the dates set forth below: 1. Inspector of Buildings Commented orally with no written report , 2. City Engineer - January 9, 1984 3. Board of Health December 15, 1983 4. Conservation Commission - January 12, 1984, Order of Conditions, DEQE file 64-92 The Board has made a thorough study of and has given full consideration to, all documents, plans and other materials submitted by Fafard; the reports, written or otherwise, of the Inspector of Buildings; the City Engineer; the Board of Health and the Conservation Commission and all statements made and other materials submitted at the. Public Hearing and at other public meetings of the Board at which the Application was discussed. The data so considered,,includes, but 3 is not limited to, the items listed in Addendum A attached hereto, which items are specifically incorporated in and made a part of this decision and which 'need not be recorded as a .part hereof. The Board is satisfied that such data is sufficient to c meet the requirements of Section VII-O of the Ordinance. Accordingly, the Board has unanimously voted to grant a Special Permit for a Planned Unit Development pursuant to Fafard's Application upon and in accordance with the provisions, conditions and procedures set forth below: I. Based upon the written material submitted to the Board as well as oral communications received at the Public Hearing and other public meetings of the Board, the Board makes the following findings: 2 A. The Planned Unit Development has been designed with various types of land uses which can be combined in a compatible relationship with each other as a totally planned development. B. The design of the Planned Unit Development is compatible. with the existing or potential development of the surrounding neighborhoods in that Fafard proposes commercial uses for property adjacent to an existing commercial zone. C. A plan for the total property has been submitted to the Board which_ clearly deails the manner in which the: subject area. is to be developed and the means that will be employed to protect the abutting property and the health, safety, welfare and privacy enjoyed thereon in accordance with the requirements of Section VII-0 3.b of the Ordinance. D. Section VII-0 3.d of the Ordinance does not apply to the Planned Unit Development as it is not located adjacent to or across the street from existing residential developments. E. The Planned Unit Development is in harmony with the purpose and intent of the Ordinance and the MasterPlan of the city of.Salem and will promote the purposes of Section VII-0 of the Ordinance as set forth in Subsection 2 thereof. F. The mixture of uses in the Planned Development is sufficiently advantageous to render it appropriate to depart 3 from the, normal requirements of the zoning district in which it is located. G. The Planned Unit Development will not result in a net negative environmental impact. H. The parcel containing the Planned Unit Development contains more than sixty thousand (60,000) square feet., The special permit and the exercise -of the rights granted hereunder shall be subject to the following conditions: A. No building permit shall be issued for any building.in the Planned Unit Development until a performance bond, satisfactory to the Planning Board and the Director of Public Works or City Engineer, shall be provided for the construction of a twenty-four foot wide paved vehicular way to be constructed in accordance with the requirements of the applicable Subdivision Rules and Regulations of the Board from the existing terminus of First Street to the existing paved area at the rear of Hawthorne Plaza, within , the thirty foot easement area shown on a plan entitled "Compiled Plan of Land in Salem, MA'I by Joseph W. Moore Co., Inc.; owned by Highland Realty Trust; September 19, 1983, and the use of such way by the public at large shall be secured, in such a manner as shall be satisfactory to the Board. Construction of the road shall begin within ninety (90) days of the granting of the easement by the owner of the Hawthorne Square shopping area. The City Engineer shall determine the amount of the bond• by applying the estimated surveyed quantities 4 i multiplied by the•unit prices, listed in the latest Building 4 Construction Cost Data Manual used by the City Engineering Department, adding ten percent (10.00%) thereto and adding ten percent (10.00%) each year for two (2) years. At the end of the two-year period from the date of the approval of the bond by the City Engineer, if the roadway has not been completed, the City shall have the right to determine the bond to be due and that the amount of said bond shall at that time be immediately paid to the City of Salem. B. No building in the Planned Unit Development shall exceed two stories in height or thirty (30) feet in height. C. Each building in the Planned Unit Development shall satisfy the parking and loading requirements of the Ordinance in effect at the time a building permit is sought for such building. D. The Gross Floor Area of the buildings located in that portion of the Planned Unit Development north of First Street shall at no time exceed three hundred ninety-five thousand square (395,000) feet with no more than one hundred eighty-five thousand square (185,000) feet thereof occupied by any of the following uses: I. Retail department stores, supermarkets, food stores, restaurants and other eating places in which alcoholic beverages may be served on the premises, places of commercial recreation and entertainment, physical fitness facilities and health clubs, but excluding movie theatres and amusement arcades. : 2.. The following uses now permitted in B-1 and B-2 zones: (a) Drugstores (b) 7j Stores selling liquor, beer and wine for consumption 'off: the premises (c) Newsstands and variety stores (d) Dry goods and notions stores (e) .Book, stationery and gift stores (f) 'Florist shop, but excluding greenhouses (g) Hardware stores (h) Banks and savings and loan institutions (i) Professional offices, medical and dental clinics (j) Restaurants and.other eating places which do not serve alcoholic beverages consumed on the premises, -thru restaurants and drive-thru but excluding drive snack shops. (k) Warehousing and distribution (1)" General office buildings and other similar and related uses (m) Off-street parking and loading facilities and other accessory uses and buildings, provided that such uses are clearly incidental to the principal use ("Retail Uses") with the balance to be used for the following non-retail related uses: L Light industry uses: (a) Steam laundry or dry cleaning plant; 6 (b) Food and beverage manufacturing, bottling or processing or commissary; (c) Assembly or packaging of articles not exceeding two hundred (200) pounds in weight, provided no manufacturing or processing is carried out; (d) Printing, binding, publishing and related arts and trades; (e) Manufacturing, assembly, reconditioning and processing plant of the following type industries provided that such operations: (1) are not specifically prohibited from the - City of Salem, according to the schedule of prohibited "uses in Section V-C. (2) are not dangerous by reason of hazard . from fire or explosion. (3) are not offensive or detrimental by reason of causing dust, smoke, odor, fumes, noise, vibration, traffic congestion or.other nuisance, and (4) are compatible with adjacent nonindustrial uses; Food and kindred products, apparel, electronics and electrical products, furniture and fixtures, primary and fabricated metal products, including the storage of new materials and containers used in or incidental 7 to any of the foregoing, physical fitness facilities and health clubs. 2. General storage, warehousing and distribution uses 3. Publishing and printing establishments 4. General office buildings and other similar. and related uses ("Industrial. Uses"). The'uses within the buildings shown on the plan filed with the application between the PUD area and Highland Avenue presently under the control of the petitioner_shall be limited to the retail uses allowed in the PUD. E. The ratio of the gross.floor area used for Retail Uses in the Planned Unit Development to the gross floor area used for Industrial Uses in the Planned Unit Development when completed shall not exceed .88. F. There shall be no more than twelve percent (12.00%) or twenty-two thousand two hundred (22,200) square feet of the gross commercial floor area devoted to stores, having less than three thousand (3,000) square feet in floor area, with a maximum of ten (10) such stores. It is the intent of this section that the Planning Board may waive this requirement on presentation of an appropriate plan and appropriate request to the Planning Board. F-1. Between the northerly boundary of the Planned Unit Development. and Highland Avenue, no more than twenty- three thousand (23,000.00) square feet of building shall be constructed on land under the control of -the petitioner- 8 etitioner8 Of the twenty-three thousand (23,000) square feet, no more than fifty percent (50.00%) shall consist of stores undertwo thousand (21000) square feet. G. No building or structure shall be constructed and no building permit shall be issued therefore until: (1).a site plan and (2) landscaping theme shall have been approved by the Planning Board in accordance with the following procedures: Site plans submitted for approval shall include those items required to be shown under Sect. III B 2 a-p of the Salem Subdivision Regulations and be accompanied by generalized floor plans and elevations of each budding_ The plan shall also show: a. All building layouts in accordance with the use, dimensional, bulk, square footage, and other regulations established by this Special Permit. b. Landscaping in accordance with the approved landscaping theme. c. Parking spaces and layout in accordance with the applicable Ordinance. d. Site plans submitted for approval shall designate an easement area of no less than ten (10) feet in width which would be suitable for potential trails and accesses to open space areas shown on Salem Conservation Commission Area Map dated October, 1983: Such easement when approved shall be granted to the Conservation Commission of the City of Salem. - 9 J The Board shall have thirty (30) days following the meeting at which the site plan is submitted to review the submitted plan and shall approve such plan or indicate to the applicant those specific instances where the submitted plan does not conform to the requirements as set forth bove. The plan when emended to conform to the requirements, shall be then approved at the next scheduled meetings of the Planning Board. H. No residential use shall be made of any portion of the Planned Unit Development north of First Street and no residential.uses shall be made of that portion of the Planned Unit Development south of First Street unless a Planned Unit Development Pemit shall have been issued by the Board for the parcel of land immediately adjacent to the Planned Unit Development on the south and then in accordance with such requirements and restrictions as may be imposed in such permit. H-1. There shall be no interior mall within the PUD area. e ' I I. Disturbing of land or storage of surplus material on the site is prohibited except in immediate building areas, and shall not begin until six (6) months prior to construction. This does not preclude the preliminary grading of future commercial and industrial sites within the PUD, providing that such sites shall be finished with a minimum of four inches of loam and seeded with a grass mixture, and no material storage piles will remain except in an area designated by the Planning Board. 10 Except as specially modified by the permit, all zoning requirements shall apply to the PUD area. J. A certificate .of compliance or approval signed by a majority of the 'members of the Board shall constitute conciusive-evidence of the matters set forth therein if and when recorded with the'Essex South District Registry of Deeds K. Upon the request of Fafard, and after public hearing held in.accordance with the requirements of Section VII-0 of the Ordinance, any provision. of this Special Permit may be waived or amended by a majority vote of the Board.. L. The Special Permit granted hereunder shall lapse within two years if a substantial use thereof has not sooner commenced except for good cause, or if construction has not begun by such date except for good-cause. M. If Fafard or its successors or assieam shall make any use of the Planned Unit Development other than as set forth herein, the Board, after notice to Fafard and hearing, may revoke this permit for all buildings for which a Certificate of Occupancy has not been issued and all land within the Planned Unit Development which has not yet been built upon. Decision dated March 1984 Members of the Planning Board of the City of Salem Filed with the City Clerk of the City of Salem on 3 , 1984. Josephine R. Fusco, City Clerk . 11 CU of �aCEm, � azu4u-sdb 9� �e z S Vl mtiq 31var3 (One �Skm (Sran April 3, 1984 Appeal from this decision, if any shall be made pursuant to Section 17 of the Mass. General Laws, Chapter 808, and shall be filed within 20 days after the date of filing of this decision in the Office of the. City Clerk. Pursuant to Massachusetts General Laws, Chapter 808, Section 11, the Special Permit shall not take gffect until a copy of the decision, bearing the certification of the City Clerk that 20 days have elapsed and no appeal has been filed, or that, if such an appeal has been filed, that it has been dismissed or denied is recorded in the South Essex Registry of Deeds and indexed under the name of the owner of record or is recorded and noted on the owner's Certificate of Title. Walter B. Power, III Chairman v ADDENDUM A Reports on file with the Salem Planning Board, One Salem Green, Salem, MA 01970 relevant to The Fafard Company's application for a Special Permit under Section VII-0 of the Salem Zoning Ordinance. A-1 Reports or comments from City of Salem Departments and Agencies - 1/3/83 ' Salem Planning Board, Plan Believed Not to Require,Approval for, -- Boston Trader's site off First Street_ 11/25/83 Salem Board of Assessors, Abutters List. 11/30/83 Salem Department of Public Works, Grant Time Table for 'Traders . . Way. 12/12/83 Salem Fire Department, letter stating there. are no objections to the plana 12/15/83 Salem Board of Health, letter stating.:concurrance *ith.glan_ 12/19/83 Salem Police Department, letter stating concurrance-with-plan_ . 12/30/83 Salem Planning Board, Application for Approval of Definitive Plan for "Traders Way." 1/3/84 Salem Fire Department, letter stating concurrance for 'Traders Way. 1/9/84 Salem Department of Public.Works, letters of concurrance for special permit and "Traders Way." 1/12/84 Salem Conservation Commission, Massachusetts Wetlands Protection Act, Order of Conditions, File No. 64-92- 1/18/84 Salem Planning Board, letter of request to Johnstown Properties, Inc. , 89 State Street, Boston, MA 02109 for comments on Fafard plan. 1/27/84 Salem Board of Health, letter stating concurrance on "Traders Way-" 1/30/84 Salem Conservation Commission, comments on the subdivision of "Traders Way." 2/2/84 Massachusetts Department of Environmental Quality Engineering_ Notification of Field Investigation on Appeal of DEOE File 64-92- 2/8/84 Salem Planning Board, Certificate of Action on the Subdivision of "Traders Way." 3/15/84 Salem City Clerk, confirmation of no appeal within 20 days on Certificate of Action for "Traders Way." 1. - ADDENDUM A, 3/20/84 Page 2 - A-2 Renorts submitted to the Salem Planning Board from The Fafard Companies 8/81 Final Environmental Impact Report, Highland Acres, prepared by HMM Associates, Concord, MA. - 4/15/83 Highland Acres Draft Environmental Impact Report EOEA #4573, prepared by HMM Associates, Concord, MA. 11/16/83 Covenant for First Street subdivisions. 77 1/30/84 Analysis of Traffic Impacts Associated with Fafard Project Changes:' Supplement to Final Environmental Impact Report-EDEA x4573, prepared by RMM Associates, Concord, MA. 2/1/84 . -Market Delineation Study of Highland Acres Access Route 107, Salem, MA, prepared by The Fafard Companies. - •- 2/10/84 Covenant for subdivisions on "Traders Way." 3/1/84 Certificate of Encumbrances, from Atty. John Serafiai_ 3/1/84 Statement of Ownership for Fafard's land, from Atty_ Joha SerafimLi A-3 Letters--of opposition to the Fafard Planned Unit Development 11/29/83 Purity Supreme Supermarkets, 312 Boston Road, North Billerica, MA. Opposed to grocery market on site. 12/19/83 Mrs. Patricia Finares, 17 Cloverdale, Salem, MA 01970 1/10/84 Jim Crosby, Crosby's Marketplace, 426 Essex Street, Salem, MA ° 01970. Opposed to grocery store onsite. 1/23/84 Johnston American Companies, 355 First Street, Batavia, II. 60510_ Opposed to grocery store use on site. A-4 Correspondance between The Fafard Companies and the Salem Planning Board are also on file at One 'Salem Green, Salem, MA 01970. CITY OF SALEM, MIASSACHUSETTS- .N PLANNING DEPARTMENT \ ONE SALEM GREEN Cc n.= �.1 KA VANAUGH �.` 1 7 01970 C Y PLANNER (_ ` CI i Y I t , 1-ia$S. (517) 744-4580 \iCms�•T T0: Gerry i FROM: Jonath RE: Fafard `L DATE: March 4, 1987 ---------------------------------------------------------------------- Please be advised that Fafard Development has not installed utilities as shown on approved plans of Whaler' s Lane approx. station 32+50 to 34+00. There was no approval for the changes they implemented and Bruce Hollis of Fafard has been told it must be changed several times. Specifically, the water main has been placed 9-10 feet below the surface and the sewer main crosses over the water main. Paul Niman is ' aware of the situation and strongly believes that it must be changed. To date, Fafard has given me no indication that they will comply with my requests. I only wish to make you aware of this situation. cc: Paul Niman . . ' Engineering Department clll8 cc: Bill Monroe Building Inspector 3/23/87 r f } CI1Y OF SALEM, MASSACHUSETTS''`? PLANNING DEPARTMENT '�1d >?\ - - ONE SALEM GREEN GE"r�,6J i:AVANAOGH � /. 1 f�-. l ' IJ - �+ i;�y 01970 GI : PLANNER - I. $ �I i 7 Ci .- J. (617) 744-4580 T0: Gerry " i ' FROM: Jonath „i # RE: Fafard (5 DATE: March 4, 1987 ------------------------------------------------------------------- Please be advised that Fafard Development has not installed utilities as shown on approved plans of Whaler' s Lane approx. station 32+50 to 34+00. There was no approval for the changes they implemented and Bruce Hollis of Fafard has been told it must be changed several times. . ._... - - .. Specifically, the water main has been placed 9-10 feet below the surface and the sewer main crosses over the water main. Paul Niman is t aware of the situation and strongly believes that it must be changed. To date, Fafard has given me no indication that they will comply with my requests. I only wish to make you aware of this situation. m cc: Paul Niman 'Engineering Department c1118 cc: Bill Monroe Building Inspector 3/23/87 r ' I t P 445 292 237 RECEIPT FOR CERTIFIED MAIL NO INSURANCE COVERAGE PROVIDED NOT FOR INTERNATIONAL MAIL r (See Reverse) e A Sent to ' I Street and No. m m to d ZIP Postage S 6 *' Certified Fee / Special Delivery Fee Restricted Delivery Fee Return Receipt showing to whom and Date Delivered N a Return Receipt showing to whom. Date.and Address of Delivery d C TOTAL Postage and Fees S Postmark or Date 171 N a STICK POSTAGE STAMPS TO ARTICLE TO COVER FIRST CLASS POSTAGE, CERTIFIED MAIL FEE, AND CHARGES FOR ANY SELECTED OPTIONAL SERVICES. (see front) 1. If you want this receipt postmarked,stick the gummed stub to the right of the return address leaving the receipt attached and present the article at a post office service window or hand it to your rural carrier. (no extra charge) 2. If you do not want this receipt postmarked,stick the gummed stub to the right of the return address of the article,date,detach and retain the receipt, and mail the article. 3. If you want a return receipt,write the certified mail number and your name and address on a return receipt card,Form 3811,and attach it to the front of the article by means of the gummed ends if space per- mits. Otherwise,affix to back of article. Endorse front of article RETURN RECEIPT REQUESTED adjacent to the number. 4. If you want delivery restricted to the addressee,or to an authorized agent of the addressee,endorse RESTRICTED DELIVERY on the front of the article. 5. Enter fees for the services requested in the appropriate spaces an the front of this receipt. If return receipt is requested, check the applicable blocks in item 1 of Form 3811. 6. Save this receipt and present it if you make inquiry. UNITEDSWESPOSMSERVICE 111111 OFRCIALBUSINESS SENDER INSTRUCTIONS u-® Print your name,address,and ZIP Code in the space below. • Complete items 7,Y,S,and 4 on the referee. • otherwise frontof back Rapace hermits, - PENALTY FOR PRIVATE otharwfee alfia to back of article. USE,Saco • Endorse article"Retum Receipt Requested" - adjacent to number. RETURN TO Building Dept . CityHall Annex (Name of Sender) One Salem Green (No.and Street'APL,Suite,P.O.Box or R.D.No.) Salem,MA 012" (City,Stet.,and ZIP Code) SENDER: Complete items 1,2,3 and 4. Q Put your address in the"RETURN TO"space on the 3 reverse side.Failure to do this will prevent this card from m�1 being returned to you.The return receipt fee will provide you the name of the Demon delivered to and the date of delivery.For additional fees the following services are available.Consult postmaster for few and check box(es) .� for service(s)requested. 1. ❑ Show to whom,date and address of delivery.F 2. ❑ Restricted Delivery. 3. Article Atldrassetl to: Howard' Fafard Yafard Co. 290 Elliot St. Ashland,MA 01721 4. Type of Service: Article Number ❑ Registered ❑ Insured BMailCertified ❑COD P 445 292 237 Express Always obtain signature of addresseegagent and DATE DELIVERED. G B. Signature—AddressooL 3 x y 6. Signature—tl#nt N x n M 7. Date of Delivery C 2 8. AtldreEsaB's Address�0 M in n in ti F'r, - 14 of *alvnt, fflnssa r4us is Public Priipert� Pepartmeut , �lluilbing )Department �earHme ap°� (One .4alem (6reen 713-0213 �,• -William H. Munroe Director of Public Property Maurice M. Martineau, Ass't Inspector Inspector of Buildings Edgar J. Paquin, Ass't Inspector Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp. April 2, 1987 Howard Fafard The Fafard Companies 12-90-Ell iot-Street----- - Ashland,MA 01721 Dear Mr Fafard, - In accordance with provisions of the State Building Code, Article I , section 121 .0, you are hereby notified that a stop-work order is being posted today, April 2, 1987, on Building 1186, Units A, B, C, and D, as shown on plan entitled "Ledgemere Country 11 in Salem,MA . , scale 1" = 100' , Date: December 1985." This action is necessitated by non-compliance with the requirements and intent of the Commonwealth of Massachusetts State Building Code, as expressed in Article I , sections 108. 1 , 121 and 122, other applicable sections of the Code including but not limited to Section 909. Plans re-submitted on March 24, 1987 for building 1186, and intended as revisions of previous plans are hereby rejected as not being in compliance with Article 9, Section 909. Under appropriate sections of law, you have the right to appeal this decision to the State Building Code Appeals Board. Before work may be allowed to resume, the contractor or his agent will be re- quired to comply with plans duly approved by the Building Department or the City of Salem, or pending an- appeal decision appropriately taken before the Appeals Board in accordance with specified provisions of the Code. Very truly Roger L Halle Asst. Building Inspector C.C. William Munroe, Inspector of Buildings City Solicitor City Clerk George Sabrsula, Project Manager, Fafard Companies, Salem,MA. Joseph Trolla V.P. e .�.Cox MVi# of "�tt34..n`, NV`tt.VNtt✓ �M1.V ##.V 3 Public Prope7�rgqt`V Pepart>neut "�aryMeo° tg �� uillittq AIeparfnzeut Air -*ttlrm (6rren 7.13-11213 William H. Munroe Director of Public Property Maurice M. Martineau, Asst Inspector Inspector of Buildings Edgar J. Paquin, Asst Inspector Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp. April 2, 1987 Howard Fafard The Fafard Companies 290 Elliot Street Ashland,MA 01721 Dear Mr Fafard, In accordance with provisions of the State Building Code, Article I , section 121 .0, you are hereby notified that a stop—work 'order is being posted today, April 2, 1987, on Building 1186, Units A, B, C, and D, as shown on plan entitled "Ledgemere Country 11 in Salem,MA . , scale 1" = 100' , Date: December 1985." This action is necessitated by non—compliance with the requirements and intent of the Commonwealth of Massachusetts State Building Code, as expressed in Article 1 , sections 108. 1 , 121 and 122, other applicable sections of the Code including but not limited to Section 909. Plans re—submitted on March 24, 1987 for building 1186, and intended as revisions of previous plans are hereby rejected as not being in compliance with Article 9, Section 909. Under appropriate sections of law, you have the right to appeal this decision to the State Building Code Appeals Board. Before work may be allowed to resume, the contractor or his agent will be re— quired to comply with plans duly approved by the Building Department or the City of Salem, or pending an appeal decision appropriately taken before the Appeals Board in accordance with specified provisions of the Code. Very truly our Roger L Halle Asst. Building Inspector C.C. William Munroe, Inspector of Buildings City Solicitor City Clerk George Sabrsula, Project Manager, Fafard Companies, Salem,MA. Joseph Trolla V.P. 'CON 01}.(� t v o4 *aIr , C.V•N.V IJ�����V##.V Public Property Department JpC��MML�N'4V jll uilliuq 3Iepartntent (One �ulrm (6rrrn 7.13-0213 William H. Munroe Director of Public Property Maurice M.'Martineau, Ass't Inspector Inspector of Buildings Edgar J. Paquin, Ass't Inspector Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp. April 2, 1987 Howard Fafard The Fafard Companies 290 Elliot Street Ashland,MA 01721 Dear Mr Fafard, In accordance with provisions of the State Building Code, Article 1 , section 121 .0, you are hereby notified that a stop-work order is being posted today, April 2, 1987, on Building 1186, Units A, B, C, and D, as shown on plan entitled "Ledgemere Country 11 in Salem,MA . , scale I" = 100' , Date: December 1985." This action is necessitated by non-compliance with the requirements and intent of the Commonwealth of Massachusetts State Building Code, as expressed in Article I , sections 108. 1 , 121 and 122, other applicable sections of the Code including but not limited to Section 909. Plans re-submitted on March 24, 1987 for building 1186, and intended as revisions of previous plans are hereby rejected as not being in compliance with Article 9, Section 909. Under appropriate sections of law, you have the right to appeal this decision to the State Building Code Appeals Board. Before work may be allowed to resume, the contractor or his agent will be re- quired to comply with plans duly approved by the Building Department or the City of Salem, or pending an appeal decision appropriately taken before the. Appeals Board in accordance with specified provisions of the Code. Very truly our , Roger L Halle Asst. Building Inspector C.C. William Munroe, Inspector of Buildings V City Solicitor City Clerk ✓ George Sabrsula, Project Manager, Fafard Companies, Salem,MA. Joseph Trolla V.P. `Sy.cae��l�b QEitU of ,'-$ttle.ni, assar4us.etts �• F� �9ublic �rttperfg �epttrttneut A�O�Nne W' uiliting Department (nnr �ttlreic (�irrrn 745-0213 William H. Munroe Director of Public Property Maurice M. Martineau, Ass't Inspector Inspector of Buildings Edgar J. Paquin, Ass't Inspector Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp. February 2, 1987 Howard Fafard The Fafard Companies 290 Elliot St. Ashland, Ma. 01721 Dear Mr. Fafard, This is to notify you that a stop-work order issued on January 15, 1987 on Building #20, units A,B,C, and D, and other wise known as #26, 428 , 430 and #32 Celestial Way, Has been removed as of 12:00 o'clock noon today Friday, January 30, 1987. As of that date, work on this building may proceed according to approved plans. Sheetrocking, however, may not be done in the basements of any of the units, until correctional work has been completed as per verbal orders. Very truly yours,/ R" er L. Halle Asst. Bldg. Inspector CC: William Munroe, Bldg. Insp. George Sabrsula, Project Manager City Solicitor City Clerk File ev( ou J2ituz ,ry tt4 � -1 oh. •_Y-aPd/" 9 Zoe ��,- ' s l3 C and -� a � �/ � erwr _ /cowv� a e _ _.. J - r- � bee. c uvt -d _d a-?-_ ® - _/2 a0 0r-/e C'A no o +, L*'7. `Z ' )av-a /-e 4 s . S Gi e ?tr-c� c,k w-e-v e ✓� Y - a CA Y ° 4 e - U -/-&:;r , v �, 47- c o -ve c -f i v ti aa' vb � l 26 p ewa tf 14fir4-& C' ¢ , w, /l/'r LAI Ad 11 Y'a e , I3/d g ..Z'44-pl.10, �o u /a , �°v�e s -ecf /Gla a � ��¢� c /C. Ctv o alem Public PrttpertV Peparttnent XML Cone Salem Green 7,15-11213 William H. Munroe Director of Public Property Maurice M. Martineau. Asst Inspector Inspector of Buildings Edgar J. Paquin, Asst Inspector Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp. February 2, 1987 Howard Fafard The Fafard Companies 290 Elliot St. Ashland, Ma. 01721 Dear Mr. Fafard, This is to notify you that a stop-work order issued on January 15, 1987 on Building #20, units A,B,C, and D, and other wise known as #26, #28 , #30 and #32 Celestial Way, Has been removed as of 12:00 o'clock noon today Friday, January 30, 1987. As of that date, work on this building may proceed according to approved plans. Sheetrocking, however, may not be done in the basements of any of the units, until correctional work has been completed as per verbal orders. Very truly yours, Roger L. Halle Asst. Bldg. Inspector CC: William Munroe, Bldg. Insp. George Sabrsula, Project Manager City Solicitor City Clerk File i e µ.ra �,� �it� ofttient, .4 �ssttcl�usEt � a �ublic �ri�per#g �epttr#then# ,ay \ �' �"� �uilliltg t�e{�artnten# r One �&zttrni (15)rren j 745-0213 William H. Munroe { Director of Public Property Maurice M. Martineau, .Ass't Inspector Inspector of Buildings Edgar J. Paquin, Ass't Inspector Zonine Enforcement Officer John L. LeClerc, Plumbing/Gas Insp. February 2, 1987 Howard Fafard The Fafard Companies 290 Elliot St. Ashland, Mia. 01721 Dear Mr. Fafard, This is to notify you that a stop-work order issued on January 15, 1987 on Building #20, units A,B,C, and D, and other wise known as #26, #28 , 430 and #32 Celestial Way, Has been removed as of 12:00 o'clock noon today Friday, January 30, 1987. As of that date, work on this building may proceed according to approved plans. Sheetrocking, however, may not be done in the basements of any of the units, until correctional work has been completed as per verbal orders. Very truly yours, Roger L. Halle Asst. Bldg. Inspector CC: William Munroe, Bldg. Insp. George Sabrsula, Project Manager City Solicitor City Clerk File r i (TAN If '00rin, (011.0 7 !mn (_seri ; - isnuar7 ° 1987 3tnald Killian s.iIand _-. 01 :21 0A . P .U.D. -- Parcels 1 & 2. First Street Dear .`.r . ni . i .an: to A accordance c:it-. .,action VII-C A the City of Salem' s Zoning Ordnance , tMPlanning scard , on January 8, 1987 . approved the Cert__iCa_e of CoMo'- _a..te ___ Parcels 1 and II on First Street , .with ..o coed tics as stated in _-.e decision dated January 22 , 1935 . Sincerely, Patter B. Powe- --Chairman APPLICANT COPY �b� /✓ _ ` �o THIS PERMIT NOT VALID UNLESS v CITY Of SALEM BUILDING F' PROPERLY RECEIPTED BY CASHIER s SALEM, MASSACHUSETTS 01970 PERMIT VALIDATION 'a u DATE April 14. 19 P6 PERMIT NO, h 196 APPLICANT Fafard 6 Son", Conct. ADDRESS Ashland HA 7936 _ L, I1N 0.) (STREET) (CONTR'S LICENSE) PERMIT TO erect dwelling ( zg I STORY dwellinfi NUMBER OF DWELLING UNITS A- T1 0 (TYPE OF IMPROVEMENT( NO. (PROPOSED OSE( AT (LOCATION) 15 CRnt,;Jn's Cove Ward #3 ZrR ONINGGT A3 (NO.I A, -/ h {'A/#STREET) BETWEEN I (' AND ICROStl STREET) (CROSS STREET) LOT SUBDIVISION LOT BLOCK SIZE BUILDING 15 TO BE FT. WIDE 61 FT. LONG BV FT. IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS: erect condo--duelling one of Pour unit® ******CALL FOR PaRHIT TO OCCUPY****** e.REA ORSB,OQO.t�0 PERMITS _179.00 VOLUME ESTIMATED COST C'ISIC,SOUI.NE FEETI OWNER Led"wore Condo Coro. �'�� T�o�� �ti ADDRESS 290 41iot St. Ashland, MA Building Inspector b � YOUR SPECIAL ATTENTION is q+dled to tha tullowinc: This permit is granted on the express condition that the said construction shall, in all respects,conform to the Ordinances of this jurisdiction including the Zoning Ordinance,regulating the construction and useof buildings, and may be revoked at any time upon violation of any provisions of said ordinances. llcathcrprouf pbux d given at dic time pernut is issued must be displayed on premises. The department must N. notified and iospention male of prior conxtru,tion ,cork no' requested on weather card. All new buildings and - midition. :utd iterations to existing buildings require a minimum of three call inspections, namely, (1) Footings, drain tele SYFtemS, fOUnd:dlon and basement walls, when walls are at least two feet high, but before back filling the wall and before proceeding with the superstructures. (2) Fanning prior to lathing and plastering, duct work, fire stopping and other equipment before it is oonoealnl. (3) Final inspection when building or structure is com- pleted. On jobs involving reinforced concrete work, inspection must be made after steel is in place and before concrete is poured. The fkpartment reserves the right to reject any work which has been concealed or completed without first having been insp,,en-d wid :yq,rovcd by the Department in ar-corci.mee with the requirements of the various codes. .Any deviation from the :y,proved plans must ho authorized hN the approval of revised plans subject to the same procedure established for the examination of the originsd plans. An additional permit fee is also charged predicated on the extent of the v;Tintion from the original plans- Permits lansPermits are not v.JM if construction work is not started within six months from date permit is issued. Request for Final Inspection should be made by postcard or phone call to this department when the construction work is completed and heating apparatus has been instiled. Painting or decorating is not required before the Final Building Inspection. Final Inspection and certificate of occupancy must be ohtained before cocupying building. ` ''° CHU of jSttlem, 45a9sarhusett9 Fee Paid 510.00 FIRE DEPARTMENT-FIRE PREVENTION BUREAU October 27 , 1986 48 Lafayette Street W Salem,Massachusetts 01970 (Ditij CERTIFICATE OF COMPLIANCE In accordance with the provisions of Chapter 148, G.L. as provided in Sec. 26E and/or 26F smoke detectors have been approved within residential occupancies as applicable. Owner: H. A. Fafard Construction Company (Fun name of person, firm or corporation granted permit) Smoke Detectors have been installed and are approved for type and location as per current codes as of this date. SMOKE DETECTORS REQUIRE ANNUAL MAINTAINANCE AND CLEANING Type of ❑ One Family Dwelling Occupancy ❑ Two Family Dwelling ® Condominium Unit at 5 Bengal Lane (talve tocation by street and number,or describe In such a manner as to provide adequate Idantl tlo locatlon1) f 1 (sigoat� ottm41 nn permit) NOTICE: Certificate is NOT VALID,for sale or transfer of teal estate, '� 60 days after date of issue. ( q Form RaIA (Rev.9/87) Ctg of gttlem, C assurhusetts Fee Paid S]0.00 3 + a. f x FIRE DEPARTMENT-FIRE PREVENTION BUREAU October 27, 1986 48 Lafayette Street "FCum.cSalem,Massachusetts 01970 (Date) CERTIFICATE OF COMPLIANCE In accordance with the provisions of Chapter 148, G.L. as provided in Sec. 26E and/or 26F smoke detectors have been approved within residential occupancies as applicable. Owner: H. A. Fafard Cons ruction Company (Full me" of person, firm or corporation grantee permit) Smoke Detectors have been installed and are approved for type and location as per current codes as of this date. SMOKE DETECTORS REQUIRE ANNUAL MAINTAINANCE AND CLEANING Type of ❑ One Family Dwelling Occupancy ❑ n Two Family Dwelling tY l Condominium Unit Ham_ at (01-010 tion by atl"t end number,a deurlbe In wch a r nmr at to pre-]de saeduate lee (fiat of location) (Signature OHlcial grant] MR) NOTICE: Certificate is NOT VALID,for ule or transfer of real estate, 60 days after date of issue. (T Form 0 81A (R0-.9p a) ^`OVO 4o Fee Paid $10.00 CHU of Aulem, CMassurhusetfs 3 m FIRE DEPARTMENT-FIRE PREVENTION BUREAU October 27, 1986 jF 48 Lafayette Street unn�''r Salem,Massachusetts 01970 (Data) CERTIFICATE OF COMPLIANCE In accordance with the provisions of Chapter 148, G.L. as provided in Sec. 26E and/or 26F smoke detectors have been approved within residential occupancies as applicable. Owner: H.A. Fafard Construction Company (Full name or person, firm of corporation granted permit) Smoke Detectors have been installed and are approved for type and location as per current codes as of this date. SMOKE DETECTORS REQUIRE ANNUAL MAINTAINANCE AND CLEANING Type of ❑ One Family Dwelling Occupancy ❑ Two Family Dwelling ® Condominium Unit 9 3 _ at 3 Bengal Lane (Give IOCallgn hY atrNt and M111bef.Or dQ<rlhe In W Ch a 111ait"t ae to provide adequate Went)Ne df loaatlon) (SlgMtu g official p tinryn For NOTICE: Certificate is NOT VALID,for sale or transfer of real estate. 60 days after date of issue. (Tito Form RaIA (nev.g/aa) (9itV of $alem, 44ffiu59ttrhUSett8 Fee Paid S10.00 A FIRE DEPARTMENT•FIRE PREVENTION BUREAU October 27, 1986 < F 48 Lafayette Street Salem,Massachusetts 01970 (Oat*) CERTIFICATE OF COMPLIANCE In accordance with the provisions of Chapter 148, G.L. as provided in Sec. 26E and/or 26F smoke detectors have been approved within residential occupancies as applicable. Owner: H. A. Fafard Construction Company (Fun name of person, firm w corporation granted permit) Smoke Detectors have been installed and are approved for type and location as per current codes as of this date. SMOKE DETECTORS REQUIRE ANNUAL MAINTAINANCE AND CLEANING Type of ❑ One Family Dwelling Occupancy ❑ Two Family Dwelling ® Condominium Unit/¢ 11_ at 13 Bengal Lane (Give location by atrast and number,w describe In suCh a nlan"r ea to provide adequate Identlt I f location) it P (signature f official granting par it) NOTICE: Certificate is NOT VALID,for We or transfer of real estate, 60 days after date of issue. Tit Form galA (Rev.9/82) Fee Paid S 10.00 CCU of ialem, .Massttchusei4s 3 e FIRE DEPARTMENT-FIRE PREVENTION BUREAU October 27, 1986 48 Lafayette Street o n Salem,Massachusetts 01970 (Date) CERTIFICATE OF COMPLIANCE In accordance with the provisions of Chapter 148, G.L. as provided in Sec. 26E and/or 26F smoke detectors have been approved within residential occupancies as applicable. Owner: H. A. Fafard Construction Company (Full name of person, firm or corporation granted permit) Smoke Detectors have been installed and are approved for type and location as per current codes as of this date. SMOKE DETECTORS REQUIRE ANNUAL MAINTAINANCE AND CLEANING Type of ❑ One Family Dwelling Occupancy ❑ Two Family Dwelling ® Condominium Unit 9 .}�_ at 15 Bengal Lane (Ohre location by Rre rt and num".or describe in such a manner as to provide adequate Ment of location) (Signature oMlclal varilknitgermto NOTICE: Certificate is NOT VALID,for sale or transfer of real estate, 60 days after date of issue. (T ) Form IFaIA (Rw.9/82) 0 SENDER: Complete items 1,2,3 and 4. Put your address in the 'RETURN TO"space on the 3 reverse side.Failure to do this will prevent this card from being returned to you.The return receipt fee will provide + you the name of the person delivered to and the date of + tlaliverv.For additional fees the following services are e available.Consult postmaster for fees and check boxes) e for service(s)rerluested. ,� 1. 0 Show to whom,date and address of very. 2. ❑ Restricted Delivery. ' 3 ��Voo pj 3. Article Addressed to: i+ Howard. Fafard The Fafard Companies 290 Elliot St. Ashland, Ma. 01721 4. Type of Service: Article Number ❑ Registered 11Insured EfCertified ❑ COD P 445 292 145 U❑ Express Mail Always obtaimsignatum of addressee or agent and 8D--A-STr"EOn ELIVERED. p� 5. ignatur —Addr )4, 'tun—Agent X A7. Date of Delivery l� Z S. AddrerAWs Address( NL a In n m ti i UMEDSWESPOSMLSERVICE VIII I OFFICIAL BUSINESS SENDER INSTRUCTIONS LL- hIM your nems,address,and S'Cods in the �® spae•below. • Compl•t•Rams 7,2,3,and 4 on the reveres. • Attach to 1r0M Of artids R roe permits, PENALTY FOR PRIVATE otharwiss stC to bad[of arBde. USE,$3W • Endorse aRids"Karam Raaipt Rpuasted" ad aceto to number. RETURN TO Public Property Tl Salem Green (Name of Sander) (No.and Street,Apt,Suite,P.O.Box or R.D.No.) Salem, Ma. 01970 (City,State,and ZIP Code) P . 445 292 145 RECEIPT FOR CERTIFIED MAIL NO INSURANCE COVERAGE PROVIDED NOT FOR INTERNATIONAL MAIL (See Reverse) a Sent to a Howard Fafard -Fafard sve2qUdtj.liot St. 6P O State and ZIP Code d Ashland, Ma. 01721 Posl�a S tl1 * Codified Fee Special Delivery Fee Restricted Delivery Fee Return Receipt showing to whom and Date Delivered N Return Receipt showingwhom. Date.and Address of Delivery d C TOTAL Postage and Fees S c 00 Postmark or Date e7 E o LL N a STICK POSTAGE STAMPS TO ARTICLE TO COVER FIRST CLASS POSTAGE, CERTIFIED MAIL FEE,AND CHARGES FOR ANY SELECTED OPTIONAL SERVICES. (see front) 1. If you want this receipt postmarked,stick the gummed stub to the right of the return address leaving the receipt attached and present the article at a post office service window or hand it to your rural carrier. (no extra charge) 2. If you do not want this receipt postmarked,stick the gummed stub to the right of the return address of _ the article,date, detach and retain the receipt,and mail the article. 3. If you want a return receipt, write the certified mail number and your name and address on a return receipt card,Form 3811,and attach it to the front of the article by means of the gummed ends if space per- mits. Otherwise,affix to back of article. Endorse front of article RETURN RECEIPT REQUESTED adjacent to the number. 4. If you want delivery restricted to the addressee,or to an authorized agent of the addressee,endorse RESTRICTED DELIVERY on the front of the article. 5. Enter fees for the services requested in the appropriate spays on the front of this receipt. If return receipt is requested,check the applicable blocks in rVid 1 of Form 3811. 6. Save this receipt and present it if you make inquiry. of �$Ulent, C4Rc'I5�_.c`I_CI1u5EIJu sem_ `f Public Vrnperfve{surttnettt 'Ito Abby Apartment Unr,c 100 (6rcen 74&0213 William H. Munroe Director of Public Property Nlaurice M. Martineau, Asst Inspector Inspector of Buildings Edgar J. Paquin, Asst Inspector Zoning Enforcement Officer John L. LeClere, Plumbing/Gas Insp. January 15, 1987 Howard Fafard The Fafard Companies 290 Elliot St. A.;' Aand, Ma. 01721 Dear Mr. Fafard, In accordance with provisions of the State Building Cole, Article I, ` section 121.0, I am hereby notifying you of a stogy-work order posted on Building 420, Units A, B, C and D, otherwise known as 426, 28, 30 and 32 Celestial way, and as shown on plan entitled "Ledgemere Country II in Salem, Ma. , scale 1" = 100' , Date: December 1985. " This action was necessitated by non-compliance withe the requirements and intent of the Commonwealth of Massachusetts State Building Code, as expressed in Article I, and more specifically sections 121 and 122: other applicable sections of the code, as well as sections 826.3, 919.0 and 1007.11. Before work may be allowed to resume, the contractor or his agent will be required to complete all work normally required to be done 1' prior to a close-in inspection, in accordance with code require- ments. . After proper notification, the local inspector may permit 'the resumption of work. Very truly yours, Roger L. Halle Asst. Building Inspector CC: William Munroe, Bldg. Insp. George Sabrsula, Project Manager City Solicitor City Clerk File F YIJ ADDRESSES FUR nU1LDIMS 10 '1.1?RUUGl1 20 kl.a,_; . 10A - ✓ 3 Bengal LF 0 X10 Bldg . 1711 6 Celestial Way, , 1013 - v .1 Benyal Lane If 179 - ✓S Celestial Way" s J.UC - ✓ 5 I3enyal Lan _ a 19 17C - ✓ 4 Celestial" Way.. 3'y„ 1.01) - 7 Bengal La)i ✓ 511 RIO, 17D - / 2 Celestial Way, airs Bldg . 11A -411 Benyal Lane ✓ Ra Bldg . leA -114 Celestial 1.1 11 - ! 9 Bengal Line'It'D ad S 18B -V`16 Celestial Wav , Qz'w ;}!. / C/ 1.1.C , -✓13 WAn nengal I,zn _ ' � leC -UN2 Celestial Way 111) - ✓15 Bengal WOW a�'( 18D / 10 Celestial Way x r. 13Jdy . 1.2A - VJ.7 Deny al Lane Bldg . 19A -✓24 Celestial Wa.yzy �� p ].2.?3 -✓ 1.9 Bengal Lane C� �Ja� 19B /22 Celestial Way .rsS Fin ro<f, 0 3 J.0 -V/23 Bengal l.an� C �a 19C /20 Celestial Wriy ' r3 `3 a0� J.2D -'✓21 Bengal Lan 19D ,/19 CelPstia1 /J k: (1.1, . 13A - '✓25 Bengal Lane �'., Aldg: 2071 -�32 Celestial Way 0- R Sp /� 13B -01 Bengal Lane ✓ 209 - 30 Celestial Way ' 13C - 3J. Bengal Lane a� / 20C -/28 .Celestial Way . r--s, i / 3.3D - 29 13enyal Lane v �30 20D ✓ 26 Celestial Way VI Iall 1114c? . 13;;A - ,256 I3enyal Lane 3 13XB - �i1 9enyal Lane ;,1 ✓/ , i. 3XC Ig Bengal Lane Ga ` 13XULie nyal - ba lie 3y` hOC� rtc;. 1.4A -ale B^.1,,.1x1 Lane ✓ Je$ 1. 48 -:/20 :3eay21 La„^ 1 ✓p 14C - 2. 4 Bengal Lanef ? f ` "14D - 22 Bengal Lane ✓ r: 0J 1314y ., 15A - 10 Beng'll Jane ✓ x - ^j1 159 ].2 9enyal .I.ane ✓ aDS 15iC -✓l.G Bengal Lane ap/r HD 114 Bengal Lane L� � 14141.1 . 1GA -VI7 Bengal bane / ��/ 1G(S - ✓ 4 Bengal t IGC - 0 I3enyal y�Y / C/ 101) - G Bengal 1lalie 4 � rA F THE FAFARD COMPANIES LETTER OF TRANSMITTAL 290 Eliot Street Ashland, MA 01721 DATE NOVEMBER 17, 191808- NO.104706 (617) 679-7300 ATTENTION BILL MUNROE TO CITY OF SALEM / BUILDING INSPECTOR RE: PHASE 1 – BUILDING 11 log ONE SALEM GREEN SALEM. MA 01970 GENTLEMEN: WE ARE SENDING YOU 18 Attached ❑ Under separate cover via the following items: ❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order in Cr1NCRFTF TFRT RFPl1RTR COPIES DATE NO: DESCRIPTION 1 FOUNDATION – BUILDING # �0 g 1 FIRST FLOOR – BUILDING # �� g 1 SECOND FLOOR – BUILDING # /0 g 1 THIRD FLOOR - BUILDING # /0V THESE ARE TRANSMITTED as checked below: O For approval ❑ Approved as submitted ❑ Resubmit copies for approval Cl For your use ❑ Approved as noted ❑ Submit — copies for distribution EA As requested D Returned for corrections D Return _ corrected prints O For review and comment ❑ ❑ FOR BIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO •I' SIGNED: 0 P�2.. CONCRETE TEST REPORT FOR ECONDO MANUFACTURING, INC. JOBSITE: —__5_I&wl DATE: . 1/-1 -7-9-6 JOB Q: JiA706 BUILDING lk: /b$ POUR #: - run A. DATE POURED: DESIGN MIX: _ f" ACA 6w DULY) VENDOR kzenri sf5 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - TEST CYLINDER DATA i SET i A.. B, c 5C-3'it,AQ 5.5, A-7 8Z° CT-7$0 -rf-k SET 11 A, B, c QL 7 'l It/ 1�C 5. 7, i�7 �5` CT 7S��rK r✓y �,cic 9 zz 3 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - BREAK STRENGTH DATA CYLINDER, # DATE CAST BREAK DATE ACE TOTAL POUNDS PSI IA IB /d-Z 2� 1C 10 4 rl IIB ► , -? 2g COMMENTS Rasnactfully Submitted, CK MA Concrete Licence 5��;y CONCRETE TEST REPORT FOR ECONDO MMNFACTURING, INC. JOBSITE: , AjRA DATE: * JOB #: 1647n C, BUILDING #: - /C*i POUR #: DATE POURED: 1c)-q �R DESIGN MIX: VENDOR �irt S - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - TEST CYLINDER DATA SET 1 A. B, C g(Tgi ji s(� 7Y0 CT ZPo -VCk tick 93o15, t�w.e 11' 15 SET 11 A, B, C SLg�2: X53. 1�t7$,° C!? 75° �SiC 4p -t,( k 43oLa "T w e tt . Lc� - - - - - - - - - - - - - - - - - - - - - - - - - - -'- - - - - - - - - - - - - - - - - BREAK STRENGTH DATA CYLINDER, # DATE CAST BREAK DATE ACE TOTAL POUNDS PSI IA IB 4 2. 1p2 _ I - 2 5 I IA IB - 17 O O ::I IC 2 3 COMMENTS Respec fully Submitted MA Concrete Licence I-!56?) CONCRETE TEST REPORT FOR ECONDO MANUFACTURING, INC. JOBSITE: _ %ew--� DATE: * JOB #: _ IC1166 BUILDING #:__ lo,I POUR #: _ 7 nJ DATE POURED: to-q -,( C DESIGN MIX: _ - 4, 4%y (� )F zk�I fX) VENDOR Zynn TEST CYLINDER. DATA SET 1 A. B, C �'�y, ITC° 5.5,, Thi; Car 72O vvli65,q, dl3167 Time C/: 3d SET 11 A, B, c - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - BREAK STRENGTH DATA CYLINDER # DATE CAST BREAK DATE ArE TOTAL POUNDS PSI C7,IA l 5,17D- IB f 0 ' 50 II // 7 0 IIB '7 69 70 COMMENTS . Resp tfully Submi dt,E�e S MA Concrete Licence tv2� CONCRETE TEST REPORT FOR ECONDO MANUFACTURING, INC. JOBSITE: DATE: , JOB 0: _ lnUTOG BUILDING POUR a: _ 3Ca DATE POURED: DESIGN MIX: _ ,,a yLD barb VENDOR n✓1 - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - TEST CYLINDER DATA SET 1 A. s, cs6, *1 530 Ct 7 3° SET 11 A, B, C gG~(�. S�� 4-T SZ,° CT 75° p - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - BREAK STRENGTH DATA CYLINDER # DATE CAST BREAK DATE AGE TOTAL POUNDS PSI IA ( IB - 7 Z 5d IC 11- 7 2 '1 5970 G( -7IIC -7 d 6976 Q 6 COMMENTS Res2fgtfully Submitted, # MA Concrete Licence 1�a7 THE FAFARD COMPANIES LETTER OF TRANSMITTAL 290 Eliot Street ' Ashland, MA 01721 DATE NOVEMBER 17, 1918013. NO.104706 (817) 979-7300 ATTENTION BILL MUNROE TO CITY OF SALEM / BUILDING INSPECTOR RE: PRASE 1 — BUILDING #&7 ONE SALEM GREEN SALEM. MA 01970 GENTLEMEN: WE ARE SENDING YOU di Attached O Under separate cover via the following items: O Shop drawings O Prints O Plans O Samples O S ifications 1 O Copy of letter O Change order ]b CANCRFTB TEST RPTORTR COPIES DATE NO. DESCRIPTION I 1 FOUNDATION — BUILDING 9 /0 1 FIRST FLOOR — BUILDING #140 7 1 SECOND FLOOR — BUILDING #/07 1 THIRD FLOOR — BUILDING #I 0 7 THESE ARE TRANSMITTED as checked below: O For approval O Approved a submitted O Resubmit copies for approval a For your use O Approved as noted O Submit copies for distribution IR As requested O Returned for corrections O Return corrected prints O For ryview and comment O O FOR BIDS DUE 19 O PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO , SIGNED: . LQ r) CONCRETE TEST RE-PORT FOR ECONDO MANUFACTURING, INC. JOBSITE: - Sq)eWI DATE: , JOB 0: - loq 7oG BUILDING #:_L0-7 POUR U: DATE POURED: DESIGN MIX: - Aa( oa VENDOR - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - TEST CYLINDER. DATA SET 1 A, B, C 54, ���2, A1' 5.6, IQ't 690CT 75; -Tvk 65, �tlr�ke3P 485 11 '~e Vt.ec�o SET 11 A, B, C $G' 7�2� ► s•gi1A'f 70' CT 72° "V4 !YS tvc-k,e* gZZS 2 5 , - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - BREAK STRENGTH DATA CYLINDER # DATE CAST BREAK DATE ArEPOUNDS PSI IA IB Ir /0-3n 2$ 5,6"04010 d IC IO-30 IIAr lv- Zp Ia 1 r /o-Y) Zg2 IIC 1 6-30 Z8 3 Zjp 42 0 COMMENTS Re a fully Subi ed, MA Concrete Licence L CONCRETE TEST REPORT 1 FOR ECONDO MANUFACTURING, INC. JOBSITE: B(✓1 DATE: , 1 7 -g(� JOB 1l: _ 1014.20 6 BUILDING 0:_ LD7 POUR 11: _ l Sf DATE POURED: JD-IO-gC, DESIGN MIX: - -A k d 3w!� -100 VENDOR �gCI 57f--S TEST C`.'LINDER DATA SET 1 A. B, C 5� ���L� I�ds•8, 6-T 65; C.r 7271 rK E3, T.cK c#727o, r„.v 1: yo SET 11 A, B, c $C-% 14e 5•5, wr 65, L'� -15° err►cE3, t,ck. 93ZgG, - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - BREAK STRENGTH DATA CYLINDEP # DATE CAST BREAK DATE AGE TOTAL POUNDS PSI IB 16 111 29 1 Gg ., 500 5q 5 -7 2 0 0 qm�l IA 10 -1 ,7 760, Soo 4KI 0 IB 1 11 - 7 2 5-7D IIC 1' 1 1--7 Z COMMENTS Respe tfully Sm .ted, MA Concrete Licence fd Z•� I CONCRETE TEST RE-PORT FOR ECONDO KkNUFACTURING, INC. JOBSITE: SME0 0 DATE: , 1 h 7 -9'6 JOB U: _ l0gZ0b BUILDING 0:_ 10J'_7 POUR O: �w� DATE POURED: DESIGN MIX: �Fi(c� `Torr �IAO VENDOR 'L/t r/ S/ S - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - TEST CYLINDER DATA SET 1 A. B, C SZ 1% 06 5-3, 1!VT 58° CT 7'!; }rK 61/, t►t k., 5 3y 5 3, t,.;.t tF;o S SET 11 A, B, C �-$, 14'CS.S, �'}7 sg� C17j,tcK b;. �►ck, 4�515�.�/r..� - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - BREAK STRENGTH DATA CYLINDER # DATE CAST BREAK DATE —7AGE TOTAL POUNDS PSI IA b IB /' I I-� 5270 "OTTA 5v IB � d l� COMMENTS Res tfu11 Sbm ted, MA Concrete Licence CONCRETE TEST RE-PORT FOR ECONDO MANUFACTURING, INC. JOBSITE: __ 5I1BwI DATE: * JOB 0: _ 10006 BUILDING #:_ �1�0-7 sPOUR #: _ 3rd DATE POURED: DESIGN MIX: _ a��a►(A -lam�t)job VENDOR - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - TEST CYLINDER. DATA SET 1 A. B, C9, 6?' ss0 GT ID' -rr$4 5, �C�G. 93$4Sf SET 11 A, B, C 54-9, G� -7q: V�f K 6S, TCA-. ;I-5s .710 - - - - - - - - - - - - - - - - - = - - - - - - - - - - - - - - - - - - - - - - - - - - BREAK STRENGTH DATA LIND DATE CAST BREAK DATE ArEPOUNDS PSI IA -( 3 / Lsowo 5q10 IB 1 ( - 1 �705570 0 ftpIIAl ' C -vDO -5a ' ' - `71 0M 5654 COMMENTS Resp tfully Submitted, n MA Concrete Licence THE FAFARD COMPANIES LETTER OF TRANSMITTAL 280 Eliot Street Ashland, MA 01721 DATE NOVEMBER 17, 19 806. NO.104706 (817) 6757300 ATTENTION BILL MUNROE TO CITY OF SALEM / BUILDING INSPECTOR RE: PHASE 1 — BUILDING #10y ONE SALEM GREEN SALEM, MA 01970 GENTLEMEN: WE ARE SENDING YOU III Attached 0 Under separate cover via the following items: 0 Shop drawings O Prints O Plans O Samples O Specifications O Copy of letter O Change order 10 rnMrRRTF TRRT RRPnRTR COPIES DATE NO. DESCRIPTION 1 FOUNDATION — BUILDING 11 1 FIRST FLOOR — BUILDING # 1 SECOND FLOOR — BUILDING ii/Oq 1 THIRD FLOOR — BUILDING 1110 THESE ARE TRANSMITTED as checked below: O For approval O Approved as submitted O Resubmit copies for approval Cl For your use O Approved as octad O Submit copies for distribution IRAs requested O Returned for corrections O Return corrected prints O For review and comment O O FORBIDS DUE 10 O PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO SIGNED: I CONCRETE TEST REPORT I FOR ECONDO MANUFACTURING, INC. JOBSITE: 5wewl_ DATE: * JOB #: _- 1011 70(o p BUILDING (I:_ 10tI POUR O: . y✓I(J. DATE POURED: DESIGN MIX: D-tno VENDOR - - - -- - - - - - - - - - - - - - --- - - - - - - - - - - - - - - - - - - - - - - - - - - TEST CYLINDER. DATA SET 1 A. B, C S(. 7j 5.2, 14T�zi� Cr7 S�rJCIc 6q, d'�ckei' SET 11 A. B, C $(. g; 40 5.5, d-T7y ° CT 13;��i< Eu, rt,�kQt 9o8S3, - - — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — BREAK STRENGTH DATA CYLINDER # DATE CAST BREAK DATE ArE TOTAL POUNDS PSI IA q-Z� 39, Jlc)c) IB D- Z Z-$ 0 320 /Q-? o00 ' — OO 7,8 (00 B la- O 9 O IIC (j- Z 7-g 56500 COMMENTS Resp tfu11 S bmitted, MA Concrete Licence Lsa2-� CONCRETE TEST RE-PORT FOR ECONDO MANUFACTURING, INC. JOBSITE: _ S )VO-1 DATE: . &1 .7 46 JOB #: _ IDy7ob BUILDING U: 11!04 POUR #: _ ]5� DATE POURED: 7 Q "30-9 C DESIGN MIX: _ Aj(arA f4t\ * 1) inn VENDOR �ifw S I-S - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - TEST CYLINDER. DATA SET 1 A, B, c SG�7 `l i, IOC 5.6, ►fir 86; SET 11 A, B, C $G 714 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - BREAK STRENGTH DATA CYLINDEP, # DATE CAST BREAK DATE AGEUNDS PSI IA /o - 7 259 IB 1 ` o-2A2B 55.'00op IC itl o—Z$ 28Z.0 fod ftwIIA - -7 . Soo 380 ' Z9 00 70 IIcZ8' ov COMMENTS Respec ully Submitted, MA Concrete Licence Sc Z19 CONCRETE TEST RE-PORT - FOR ECONDO Md►NUFACTURING, INC. JOBSITE: _ r+i+1 DATE- , JOB fl: !OL/106 BUILDING U:_ LDC/ POUR 0: . Zwd DATE POURED: Ib-L-g(o DESIGN MIX: AArc. cmzls�b-/0d VENDOR 4!j kin S*-S - - - - - - - - - - - - - - - - - --- - - - - - - - - - - - - - - - - - - - - - - - - - - TEST CYLINDER DATA SET 1 A, B, C Si, T4, Or 76-rrk-Eq, Micktt °FZSy7, SET 11 A, B, C 5&&, Itt5,3, W 66° ( 7g;' trV.6s, 4vjje.,t gz,551, Qryp,lp :5a - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - BREAK STRENGTH DATA CYLINDER # DATE CAST BREAK DATE ArEPOUNDS PSI IA ' Ci (7 �7 Sa o Vow IB ►� .10-30 Z (Co' 00 /0 lb- 50 10- 1 D 400 IIB 10- 31) 2 00 LL4 20 !v- 3e Z l 0BSa COMMENTS Res ctfully Submitted, ^ 0 1� MA Concrete Licence I S,o Z/9 CONCRETE TEST REPORT FOR ECONDO KkNUFACTURING, INC. JOBSITE: `SK lem DATE- , 1'1 7-k� JOB 0: __ 140470 6 BUILDING 0:. /n(4 POUR 0: 3 d DATE POURED: /D- - k Ln DESIGN MIX: - A/4(A Cnot"' n,4w VENDOR 5f-5 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - TEST CYLINDER. DATA � SET 1 A. B, C S'G-7, 14053, ►�TSS° �T-� L° �tcuES, t�ck�i 4z8o3, �-�:..p y : Sv SET 11 A, B, C 41:7 le I�(� S6, f� 5�° CT-75, t'fKC-$, k<j 92$ 12, �„m a f:c/O - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - BREAK STRENGTH DATA CYLINDER 0 DATE//CAST BREAK DAIL AGEPOUNDS PSI IA (0-b I b' I 7 �. IB 11 - 3 f -136 IC ) 1.-'3 63,00c) 5010 I IAi , _I 36go B t D06 q S6 IIC 1 - 2 ow --T9 3Q COMMENTS Res ctfully Submitted,, MA Concrete Licence f�dZ THE FAFARD COMPANIES LETTER OF TRANSMITTAL 290 Eliot Street Ashland, MA 01721 DATE NOVEMBER 17, 14 8Oa. NO.104706 1617) 979.7300 ATTENTION BILL MUNROE ^E` TO CITY OF SALEM / BUILDING INSPECTOR PHASE I — BUILDING # z ONE SALEM GREEN SALEM, MA 01970 GENTLEMEN: WE ARE SENDING YOU di Attached O Under separate cover via the following items: O Shop drawings O Prints O Plans O Samples O Specifications O Copy of letter O Change order In rnur nFTF TFCT RFPnRTC COPIES DATE NO. DESCRIPTION 1 FOUNDATION — BUILDING # IQZ 1 FIRST FLOOR — BUILDING # IQZ 1 SECOND FLOOR — BUILDING # INZ 1 THIRD FLOOR — BUILDING # IOL THESE ARE TRANSMITTED as checked below: O For approval O Approved a submitted O Resubmit copies for approval Q For your use O Approved as noted O Submit copies for distribution IR As requested O Returned for corrections O Return corrected prints O For review and comment O O FOR BIDS DUE 19 O PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO SIGNED: RAZZ, . CQNCRETE TEST RE-PORT FOR ECONDO MANUFACTURING, INC. JOBSITE: SGtlew% DATE: wellf. ( "�, 1 Cl t-L JOB 0: IAS IQ 6 BUILDING Il:- ID Z POUR DATE POURED: DESIGN MIX: -A&Eck 6=n!2�D-.nn VENDOR Jod,T - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - TEST CYLINDER DATA SET 1 A, B, C 5Cr 31L, 5,6, ,dA '7S; -lyK SET 11 A, B, C SG,I�l�7i��d g�� d� 1(,'*TCK yg�4'tM+ p - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - BREAK STRENGTH DATA CYLINDEP DATE CAST BREAK DATE ACE PSI IA - 11 - Z 7 1000 B ► ► - do O Rd0 � - 9 10 t ► `7 - Z `7 • v 5a 2 B 2. 2 04400 C� IIC 1 - Z ✓Q 3 d COMMENTS i Resp tfully Submitted, �Q. MA Concrete Licence /lra Z y CONCRETE TEST REPORT I FOR ECONDO M.INUFACTURING, INC. JOBSITE: _ SjqIek*l DATE: JOB 0: _ 104 7D 6 BUILDING 0: /OZ POUR 0: - IS I' DATE POURED: _Q'L DESIGN MIX: _ - aeW(DO VENDOR �•T�111 SSS - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - TEST CYLINDER DATA SET 1 A. B, C 5"o ►'kd�,Z, Wr 70; F7, T ••. ^c z . s SET 11 A, B, C SL��2, ��. S S.+ 14T 7Do �z 7 3; -rr v- E3, -,,ked 9 1'�93� v;,, -3 S - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - BREAK STRENGTH DATA CYLINDER, # DATE CAST BREAK DATE - AGE TOTALPOUNDS PSI IA - Z -30 : o ZD IB IC - z- I IA 2 0 -36 S ado 360 IB /0- 222Sad !L60 I IC ( - _ v L COMMENTS Respfully Submitted, MA Concrete Licence /v.Z CONCRETE TEST REPORT r FOR ECONDO MANUFACTURING, INC. JOBSITE: I&M DATE: * 17 -J� (2 JOB #: _ 1t)q 706 BUILDING U:_ I0Z POUR B: _ DATE POURED: DESIGN MIX:,-kA(A 12. 00 VENDOR .Zein $� S - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - TEST CYLINDER DATA SET 1 A. B, C fL l'�t� ItS.i, 1A'f 7Sdo CT 7SJ 'TrltES, 'f-a 9!9/AV, rl" ✓I�35 SET 11 A, B, C 5C 7 ��+f/ C �i� Wr 7PI C? `7 7; -T(K d5, 'r%cA�ek lI o"SS 2'.Z.S - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - BREAK STRENGTH DATA CYLINDEP I DATE CAST BREAK DATE AGES PSI IA vC.� - Z do 03790 — IB LI - Z *70,006 o Ic o - 2 60 10 IIA 53, 000 m IIB - Z3 Z o00 5 IICv - o0 533a COMMENTS Respectfully Submitted, MA Concrete Licence `l�Z� CONCRETE TEST REPORT FOR ECONDO M.'1NUFACTURING, INC. JOBSITE: DATE: 0 JOB #: _ 104706 BUILDING #:. 101 POUR 0: DATE POURED: DESIGN MIX: --&faCb Fml*-vi 06 VENDOR lEll 9,f-S TEST CYLINDER. DATA SET 1 A. B, C SL"(�! YAC �•b� D? 65� Cr 76; �(cK3Zo QIGAL& 9'11 SET 11A, B, CSC 7 /Vi *0 5.7� 1�'1 (s� CT �S, -trKs�"T1L �Z15 v'Iw.v COO BREAK STRENGTH DATA CY,LINDEP # DATE CAST BREAK DATE AGE TOTAL POUNDS PSI IA -Z �V`~b IB 11 O- 9 I(:)-? �7 ? ��006 A4 I 41MIIA (7- 1 p- 0 0 IIB 0 - 2 7 2 50Z'0 o- z 7 28 �6 o Z5a COMMENTS Res ctfu11 nSubmItted, MA Concrete Licence Hrez A THE FAFARD COMPANIES LETTER'OF TRANSMITTAL 290 Eliot Street Ashland, MA 01721 DATE NOVEMBER 17, 1918013. NO.104706 (617) 8797300 ATTENTION BILL MUNROE p— TO CITY OF SALEM / BUILDING INSPECTOR RE: PHASE 1 BUILDING 9(0 ONE SALEM GREEN - -SALEM, MA 01970 GENTLEMEN: WE ARE SENDING YOU df Attached O Under separate cover via the following items: O Shop drawings O Prints O Plans O Samples O Specifications O Copy of letter O Change Order . rONCRFTF TFCT RF.PQRTS COPIES DATE NO. DESCRIPTION 1 FOUNDATION — BUILDING # 910 1 FIRST FLOOR — BUILDING # 910 1 SECOND FLOOR — BUILDING # 9� 1 THIRD FLOOR — BUILDING 11 Q6 THESE ARE TRANSMITTED as checked below: O For approval O Approved as submitted O Resubmit copies for approval Q For your use O Approved as na N - O Submit copies for distribution Q As requested O Returned for carraetlons O Return corrected prints O For review and comment O O FOR BIDS DUE 19 O PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO SIGNED: ' I t A Pe, �f CONCRETE TEST RE-PORT FOR ECONDO KkNUFACTURING, INC. JOBSITE: SWlew DATE: , 10-Lo -B'(� JOB #: _ Lhj41oC BUILDING RGc POUR O: . 4uytA, DATE POURED: �7-10 -CSC. DESIGN MIX: —42i,kcx VENDOR „r S+S - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - TEST CYLINDER. DATA SET 1 A. B, C St Th, �4\ '1 SV dT (ol° �►cbte G3, iC►cl¢et 86761,-7�^•C to•.3a lose% SET 11 A. B} C SCG, 14t� (o• 0oJ Y}1 gL� CtGS; •1'�1� �5, T�CkC'} S67R9, ��N• e, 1:i5 p .... - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - BREAK STRENGTH DATA CYLINDEP 11 DATE CAST BREAK DATE ArEPOUNDS PSI IA - O -7 �7 a 7-re IB --72-9 '�� I I g- !�NDOCS 3500 I TA1 ► - ► `7 aq., Sad IIB 42,o06 13-3(110 IIG i - -7 AZ 2 ov 33�fd COMMENTS Resp ctfully Submitted, MA Concrete Licence CONCRETE TEST REPORT FOR ECONDO M.MiUFACTURING, INC. JOBSITE: S11184n DATE: , 10-Zn -AR-C, JOB U: _ loop& BUILDING //:_ 94 POUR #: 15+ DATE POURED: DESIGN MIX: Ca ban ril-,nIrl VENDOR k.HhH St C - - - - - - - - - - - - - - - - - -• - - - - - - - - - - - - - - - - - - - - - - - - - - TEST CYLINDER DATA SET i A. s, C SL ?AJ 60, CT 7g; -rck63, j-►ckef 910%, Wq5 pr+ SET 11 A, B, C 5(,-7; li- Z, pl.T l5Cr 76; tfk63bt't glla/. 1-�� � 5@ 3a ja - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - BREAK -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -BREAK STRENGTH DATA CYLINDERP # DATE CAST BREAK DATE AGEPOUNDS PSI IB IC 1126 l IIB to ' Zg Q COMMENTS Respe fully Submitted, MA Concrete Licence CONCRETE TEST RE-PORT FOR ECONDO MANUFACTURING, INC. JOBSITE: mem_ DATE: 10`Lo -R JOB #: —t0gZOfo BUILDING #:— 46 POUR #: . 7-►u1 DATE POURED: Q l J -�� DESIGN MIX: �, i t4 rA CbD b-inn VENDOR A V h m S+!5 - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - TEST CYLINDER. DATA SET 1 A. s, c $l TIL, iced- 9r 365, -rio%E I;15 SET 11 A, B, c 7s/y p c 5,3�d� /ryT�� eT T$° t(K E3, 'riCAet' 913j S, Ti n% to Z%jo - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - BREAK STRENGTH DATA CYLINDER DATE CAST BREAK DATE ACEPOUNDS PSI IA - -Z a 7 RO IB l l b- 0 0 Z -til Sha 1 3760 IIB 10-1.5 Z 2 oeo AJ3U IIC 1 10 -1-e, 28 iv COMMENTS Respec ully ted, MA Concrete Licence Sa Z'q i r CONCRETE TEST RE-PORT FOR ECONDO MANUFACTURING, INC. JOBSITE: 4ql4lew+ DATE: . w' 2.D ~K6 JOB #: 10q 713 C BUILDING POUR 0: 3 DATE POURED: DESIGN MIX: _ 4ACck (am 'b-ino VENDOR ky N „ Si-S - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - TEST CYLINDER DATA SET 1 A. B, C SET 11 A, B, C $L7 ��y� wCS•`%/YF�67° CK 7S° `irl< ES t zkv-1- - - — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — BREAK STRENGTH DATA CYLINDER # DATE CAST BREAK DATE ACE �( POUNDS PSI IA '" �� - I �0 IB 10 -1 -7 5�0�() n AJA-7 0 IC 6 — i (p-( I2 qw.IIAi `-�L -7 1-r2jc) -1 fiaIIC 0'I '7 70 M' COMMENTS Resile fully Submitted, , MA Concrete Licence " THE FAFARD COMPANIES LETTER'OF TRANSMITTAL 290 Eliot Street Ashland, MA 01721 DATE NOVEMBER 17o 191809- NO-104706 (617) 679.7500 ATTENTION BILL MUNROE TO CITY OF SALEM / BUILDING INSPECTOR RE: PHASE 1 - BUILDING # /0/ ONE SALEM GREEN SALEM, MA 01970 GENTLEMEN: WE ARE SENDING YOU III Attached O Under separate cover vie the following items: O Shop drawings O Prints O Plans O Samples 0 Specifications O Copy of letter O Change Order 15 rnWCRETE TEST REPQRTR COPIES DATE NO. DESCRIPTION 1 FOUNDATION - BUILDING # /d/ 1 FIRST FLOOR - BUILDING #/d/ 1 SECOND FLOOR - BUILDING #/d/ 1 THIRD FLOOR - BUILDING i7/0/ THESE ARE TRANSMITTED as checked below: O For approval O Approved as submitted 0 Resubmit copies for approval * For your use O Approved as noted O Submit copies for distribution IR As requested O Returned for corrections O Return corrected prim O For review and comment O O FOR 81DS DUE 19 O PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO SIGNED: nA-1 C L"co CONCRETE TEST REPORT FOR ECONDO MANUFACTURING, INC. JOBSITE: ISAIeM- DATE- * �O-To-fit; JOB #: lb4f7eC� BUILDING #: In 1 POUR #: - Au^cl- DATE POURED: LS-9'f6 DESIGN MIX: -AACC 19;x, -loo VENDOR St-S, - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - TEST CYLINDER. DATA SET 1 A. B, C $L-y� {9C $,5/� 14t .jd, Ct 7930 TCf2'ES,, v�cket g78YL,T SET 11 A, B, C SL-70 �1c S6 fe PA 9Z; Ct goy -�<►c E5, 'ricQ Z: - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - BREAK STRENGTH DATA CINDER # DATE CAST BREAK DATE AGEPOUNDS PSI IA 1 c3D 500 �bo IB 55,000 "Z2 Z o0 IIA1 - -7 ---67 o v o 29 y IIB C8-2 Z Z S 50 So 0 '40 IIC 1 1 g- Z Z ZO 5d 39 go COMMENTS Resile fully Submitted,' MA Concrete Licence 1 50?-A CONCRETE TEST REPORT FOR ECONDO MI►NUFACTURING, INC. JOBSITE: SPAPM DATE: . to -2.0 -k JOB 0: _ IoU 7n(o BUILDING U:_ In 1 POUR 0: . I S+ DATE POURED: q -10 -%10 DESIGN MIX: _Arg kc L Gyn A- lao VENDOR d" k3 S+S - - - - - - - - - - - - - - - - - --- - - - - - - - - - - - - - - - - - - - - - - - - - - TEST CYLINDER DATA SET 1 A. B, c 50'�L� 1A�5,t%� E3, twke t 9o8L9 -Tj* v 2:Sa (�►s1 SET 11 A, B, C SLI94, ft 004, y}T 7S; Ort =6� `�rIc ES, 968y/., --f vv. . 1 3a - - — — — — — — — — — — — — — — — -- - — — — — — — — — — — — — — — — — — — — — — — — — — BREAK STRENGTH DATA CYLINDER. # DATE CAST BREAK DATE AGE TOTAL POUNDS PSI IA -10 CH I 7 Q IB - 0 4:S q0 - 7 7 d0 IIB '4570 IIc 1 10 -$ PY9 70 COMMENTS Respe tfu11 Submitted, MA Concrete Licence CONCRETE TEST RE-PORT FOR ECONDO ?LkNUFACTURING, INC. JOBSITE• _ SF1IeM DATE: * JOB 0: _ 164106 BUILDING 0:_ 101 POUR 0: _ Zr.A DATE POURED: 4-IL-K(. DESIGN MIX: . -4L kf dr GC6 'tll-166 VENDOR t- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - TEST TEST CYLINDER DATA SET 1 A, B, C 54 J%, jAd S.O°/a -7%0 0t 74° -ttKES ubet SET 11 A, B, C $G-dS, Ke IA, iA't -1Y CT -7B° ick. E3, -��ck� (- 9/-0 iso. t�.. e Z •bs P y„� - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - BREAK STRENGTH DATA CYLINDER # DATE CAST BREAK DATE ACE TOTAL POUNDS PSI IA A -1 cl3zl;o IB 1 o- a - 79 6 20 540o 4 > 30 IC 29 o (4950 1 9 14 o d 0 IB ' - L6,00 '4 g 56 IIC 0 q, J2 COMMENTS Resp ctfu11 Submitted, n MA Concrete Licence SaY p CONCRETE TEST RLMORT FOR ECONDO MANUFACTURING, INC. JOBSITE: _ Salew+ DATE: Jo - zz -K JOB o: _ loU 706 BUILDING #:_ bbl POUR -3(A DATE POURED: 9-)L-ILL DESIGN MIX: Lty) h-1Dn VENDOR =k rte"' St S TEST CYLINDER DATA SET 1 A. B. C SC- `7 '/La53° Ct ?6 $� -Y�tkaf 41221,`h»-t 1 :Sf w. P SET 11 A, B, c S� �'/y , RcS.o�� y}-I 750 -CrK 5,-tic4et 912.L9 ,r��e A :ja P"^ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - BREAK STRENGTH DATA CY INDEP # DATE CAST BREAK DATE ACE TOTALPOUNDS PSI IA IB 2 o C)-/q v oq0.I IA 34 . 1 -Z `7 2 ®- 1 ZIR 640 5i IIC q COMMENTS Reap tfully Submitted, MA Concrete Licence -- THE FAFARD COMPANIES LETTER'OF TRANSMITTAL 280 Eliot Street Ashland. MA 01721 DATE NOVEMBER 17, 191606- N0.104706 (617) 679-7300 ATTENTION BILL MUNROE TO CITY OF SALEM / BUILDING INSPECTOR RE: PRASE 1 — BUILDING 11I1JZ ONE SALEM GREEN -SALEM. MA 01970 GENTLEMEN: WE ARE SENDING YOU di Attached O Under separate cover via the following items: O Shop drawings O Prints O Plans O Samples O Specifications O Copy of letter O Change order 10 rnMrRRTR TFCT RRPQRTQ COPIES DATE NO. DESCRIPTION - 1 FOUNDATION — BUILDING # /02 1 FIRST FLOOR — BUILDING 11 /DZ 1 SECOND FLOOR — BUILDING #102 1 THIRD FLOOR — BUILDING # /OZ. THESE ARE TRANSMITTED as checked below: O For approval O Approved as submitted O Resubmit copies for approval M For your use O Approved as , O Submit copies for distribution IR As requested O ReWmad for corrections O Return corrected prints O For review and comment O O FOR BIDS DUE 18 O PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO SIGNED: Co elf e. CONCRETE TEST REPORT ! FOR ECONDO M.INUFACTURING, INC. JOBSITE: SIgiP,m DATE: . /O--A —SSS JOB 0: -70�0 ' BUILDING 0: Q-?- POUR 0: _ Fevre . DATE POURED: DESIGN MIX: --A fA `nno 'r>- I 0o VENDOR ky n ✓► S t S - - - -- - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - TEST CYLINDER DATA SET 1 A, s, c 5C 3'!L, v4 c 5.1, Yo 4T' gZ° e r 7 5° z �K c�, t�cl2�.t r• gl4 7 �6a�-,TMe i:Zv SET 11A, B, C SL1, A0- 5 19c r64; CT -7,40 trkG �/, tic/.cit $7491 t�^"c 3' 1U ph - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - BREAK STRENGTH DATA CYLINDER. # DATE CAST BREAK DATE AGE TOTAL POUNDS PSI IA -? -Z - Q IB 2IR 3(4,z 0 - t 3500 IIA _ Z 7 10 2 0 IIB Z d IIC - -Z o 3160 COMMENTS Rea a tfully Submitted, MA Concrete Licence CONCRETE TEST REPORT FOR ECONDO KkNUFACTURING, INC. JOBSITE: sill m DATE. a /D-'S JOB #: .l_y 76 BUILDING #:. /I)-?- POUR #: DATE POURED: DESIGN MIX: ` k kCa 600 V-i-1Oo VENDOR L 4w N 54-5 - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - TEST CYLINDER DATA SET 1 A, B, C S(,•7.j 1QIC��L/o f 4K 70; CIT 7 S. 't�K, 63, Y•�C ke,t �I l 2(. ,-1'��++'Q, Z'.3i p». SET 11 A, B, C - - — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — BREAK STRENGTH DATA CYLINDER # DATE CAST BREAK DATE ArEPOUNDS PSI IA 0 Z IB J406 o IC D—Z U 1 . Q - `7 0 - IIB Z 6 o COMMENTS Rey 11 Y Submitted, MA Concrete Licence CONCRETE TEST REPORT r FOR ECONDO M.INUFACTURING, INC. JOBSITE: 4 DATE: . JOB 0: _ 10410( BUILDING 0: 101 POUR 0: _ Znd DATE POURED: 4-Z5$� DESIGN MIX: - AkA-CA b-ion VENDOR L7k&% StS - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - TEST CYLINDER. DATA SET 1 A. B, C SL-7'/Z,j �Cri.3%� 1�'1' -150 CT 7540 •tck c.ckej 919 Iq SET 11 A, B, C SL'73fy� pts 5.6, 14t 7SOrt 91935, lZ .ZS pw. - - — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — BREAK STRENGTH DATA CYLINDEP # DATE CAST BREAK DATE AGE TOTAL POUNDS PSI IA -Z5 0 -7, 0 IB t - 2 -10 Doo i Z v ZO IB 11irly 0007-12513,31-0 IIC 1 0-Z3 Z COMMENTS Respec fully Submitted; MA Concrete Licence r CONCRETE TEST REPORT FOR FOR ECONDO MANUFACTURING, INC. JOBSITE: —S Wiem- DATE: v 10--11-19�. JOB #: W4 ZO�o BUILDING 4: 107— POUR 4: 5 f _ DATE POURED: — 4'ze/ -fs� DESIGN MIX: . -Azk[I 60n -0-10D VENDOR Lyra, S�5 - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - TEST CYLINDER DATA SET 1 A, B, C 5L'g, 1�C` �+,6 k, 1�?�05; CT 719' 'trk 3z, *vc,ket 9-t It 1 ,'t►w v S:ol p ►., SET 11 A, B, C rj� 7 ��cJ,.1�}C �l �bo, ke-i q 219 3 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - BREAK STRENGTH DATA CYLINDEP. # DATE CAST BREAK DATE ArEPOUNDS PSI IA e-CY 10 do b O IB d-L7000 l0- Z5154,000 "WIIA Z44 1)6 4. IIB ' ' 6 n I40 dZ0 IU ` 1710 Z 7 COMMENTS Respe tfully Submitted,. u� MA Concrete Licence Z I j i)L�r' l�Eti'T 13 J L: E CSD 0 p MANUFACTURING INC. w! X31 290 ELIOT STREET/ASHLAND � 15 g z6 N MA 01721 (617)BBI.1600 RE CF:k`IE0 CITY MANL FACTU'RERS OF ENGINEERED CONCRETE CONDOMINIUMS April 10, 1987 Mr. William Monroe -- ---- — ;_, Building Commissioner City of Salem One Salem Green Salem, MA 01970 Dear Commissioner Monroe: I appreciate the recent time afforded our Company at your office to go over some of the job problems. In addition to the discussion on the plans and details on buildings 86 and 103, which are to be rectified by Mr. Jack Perry and resubmitted, the following isolated problems and hopeful solutions are still to be agreed upon: 1. Bathroom Vents to the Ridge Vent. The Code separates a vent for fuel appliances from a ventilation system for fresh air. The bathroom vent system is used to get fresh air into the bath by creating a negative pressure in the bath. The vented air is not potentially combustible as is the case in a fuel appliance vent. The ridge vent opening far exceeds the area requirements and by its nature, has a cross vent action similar to that of a crawl space. We feel there is no code requirement that prevents this configuration and it minimizes roof penetration; we ask that it be approved. Bear in mind that this is a forced venting of the bath, whereas a bath with a window doesn't require that the window be open and therefore, during winter, the bath air goes out Into the hall when the door is opened. 2. Un-Windowed Storage Areas - ECONDO L Buildings. Per our discussion of long ago, in some of these buildings, the windows were omitted due to the high ledge on one side to afford the owners a better yard area with more light and a lower ledge. Subsequently, due to field discussions revolving around the gas pipe locations, these grades were dropped. In our recent discussions, I believe we agreed on the following: Letter to Mr. William Monroe, , : 'Building-Commissioner . s. City of Salem Apri 10, Pa ge 2 1 Where provision in the ,concrete•had" een,made for a window, we,_will . .remove, part of. the bricked=in area s;and;.put a, of at ,least 7 square feet':' (1/50 area)'.- Where there was.:no window.,opening left, in:�the concrete, ' we will , provide ,a glasa paneled' (safety.or-;plexi-glass), in the basement . doors', 'which "'Vii . pick-...up " the- light ,-from the . .stair ,skylight. VFor ventilation; -we , plan to -tie .into; the.,return,air of-'the.system to:assure the proper;c hange 'of air. "•We ask-that these'methods be -approved 3 S.: , Decks - SuOObrts. We will make sure-that all decks,are _suppor,�ted on . sonotubes.put 4•" Into the. ground. Very truly your9, ECONDO.MANUFACTURING, INC:. -Robert B.' Barton, PE President RBB/bad : i \,.i _I ; J (9i#V of �$ttlem, fflttssar*etts "ire of the (iIi#g cerk �,�owmT1 y c 'A7 ?,Jasepl2uici- nscn <e� , LIAR 16 3 ?i1 PM m 3 Ciln Olerh R 01711/1 fl Olin pull 9 CITY Of S)�LEH-MASS, +ams dn' March 13, 1987 Mr. Walter Power, III, Chairman Planning Board City of Salem Salem, MA 01970 Dear Mr. Power: At a regular meeting of the City Council held in the Council Chamber on March 12, 1987, the Council voted to approve the street name "Whalers Lane" for the Fafard project located off First Street. Very truly yours, J 9JZEPHINE R. FUSCrJ CITY CLERK JRF/deb Copy: Assessors Police Fire Public Property CHH of. ssar4usetts QiJILt)ING u�Pr Office of the Citu Clerk 'Cox r ,aft aJ°srPhinc�'�- �i,ar° 6 i m,,,m,Ra RECEIVED CITY OF SALEM,MASS" X&11 1r �Q�unus va''* March 13, 1987 Mr. Walter B. Power, III, Chairman Planning Board City of Salem Salem, MA 01970 Dear Mr. Power: At a regular meeting of the City Council held in the Council Chmt)er on March 12, 1987, the Council voted to approve the street name "Nightingale Lane" for the Fafard Project off First Street. Very truly yours, 9 JOSEPHINE R. FUSCO CITY CLERK JRF/deb Copy: Assessors Police Fire Public Property Speed Letter, -. p ; To Yc cC MON �-Q1�3 ,i _ , From 'l. Subject'`JC 11 � 1�Q?yV�1 T, } �Pl✓ %I/ tr�tC�.n ^'MESSAGE, - - _.1 ..� �- ,� ,;•,,} �. - - rTJG(�U•S��"� 1?C�1°�S� - ���'_l•ry'O -2 'fZ�`Y,VIIZ�`(.� '-`�C�CrKaST�= - �,- ���" } .Sc�tF�S�l�cv�m t°r-c � ,•r-�`:,�� ,�1,,i�u� ''Rc�' ti°r0�2�S�C.� --- car-C_Lk- Date �V,3'1 � j Signed' L -W.10 FOLD-. :f --R rl• u - Dated Signed Wilson Jones Company, s auY� ForM"« spmv ;RECIPIENT—RETAIN WHITE COPY, RETURN PINK'COPY . - .. olara•wuxrzDwusw - - - v. - _ < ...:,.. r -ray J�Y"3-7-S cc") �" -S Lsx�so rev -. Sw-P&,O� — jf:f�c�-! �,wrt..C�S PRAI•.+v� �C�IvV�.Li�- . - G• -3> G L L wrrJ_ -u P_ E --C OrJ-d� F — W U2-C, oc� ST'v vaI Li t�v-,2- '�✓ tC.S . G.C--T- rte- (L.=cm= --ts9 waiv_' MAS_,--�ea��. be+wee--,% t_nct13T. _ _G��_ r_-al.l. drwu� S4r..}cttxrcS _ O_F t"�bb1C. --eA�_ 1St _ST_- -- --------•__-- .—?5._8••�lire _- a*' �J a�`cets ILI,Z _5 ee,ots -------- ,_ Lt+ltr -Qrb..� O£.Q� o_E'—�'±A�ando�t.S-_�'►1� ferno..reA _-4're�-rte -Y�ynr�nb S1ZG.. 1Q a mo..e r'%.b6t a -Fraw. w e}l mad s of rt R adi' --- -- 5 Pro —m"-��'�'----9�"�"+G _G.�.rb bth�r�--GR-��� -�gity, o-• ts!� 3T. - e,!.-ce -- 0^ - _ tg__ Clear'once.-----._----- -- ----------------•-------------- z l,+►wd,o.-dr-is,.�s�.__.c•^�_Ca`pL-,P<►^•S.----�.v.i4._±__b��,�w qod__ _`-'J--- - -- ------ --- ---------- — le $PIPo1 441!�r _.._ -Far..._. �.--ReQa•�. -- 5� L+a+�o•. -barrte.r_ko -W all vIndls_ Z.- ct•ec� -- -.alt---.Sev..er -�_-��a�.. S;}•n+Nuc�es ------ --- -----•-� - - - ----------- ---mor+cral--io.— a er elevn^t,vrt--are.�..b --lvete wall - . __o, -- - - Pte• P— —•- ---- -- q ' r r, t i - ' , % � ' � ' '1.11j �... 'i i I '�., .� tl t�J{• 13 Li pt' ''' •f :.4,4ct ' '.1 ,�,� f- �., I .1'•11 If Nfz If .19 .f , t � �k: ` � • r1L 1,1[+ � 1.' .� '� Q. ...i 1�_ ( ,�• )Li : I rpt ,�, i } rd .a' pt '•,1.� Orr g .f'`• j 1 + �t,'' 1 t � :', It 1'f1 •{„ .' t� .� L t. It! I 1IlJ I 1 '�� la�� '+ ,,��yy '' �� "j� •�i� �t�'e 1. •'r.,Q 1 � i Lil + T1C`_ T ' VI � '...�' 'i({ :�' `7 - � '. p,:.. '{•, t. ' OI r r.? ~':7 17 .�'t/1� ..�w� •..p 1•.h � i Li' .iF�. .1 -, 1 ✓ t-• S, I! [ , . .i J pL, 1VYi: �y ),.'Y J '!{'� ) :�l!'Q �� Ley A.� 1 ,! yl, yl:' t •� t ���. ,J � 'li ��.11. p, ,•i(.'� %•S 1 _ t ': j/;: � p• _�}- r.,� -v _ 4 < .;1', Q rt't�:� ,,�, � �i�' :Iy ''�pl' i`;I) ;1N�. ..'.. , i f i,.'. .1 •! r •r� ^, ,i�. I'� ' ' ' ':4{. 'O ^yL:•-� .,`'j }l ��)� v ,tJJ .� " d .t i. } ,tW .i n "v. !+�' Cw I 111 'i .J i.J•,n. ,�y*It �• t •`.., ;', p: i .^ 1 t r` }'L; -y-�p „_,!, J „` aid C �� f 1. a .tl� Y 1 •!f': ) t V1 .1 � .�: 0! .r .V � . ..1 , ,' . , � J.i,.,`. r' �. I � til! •':� +' ' •`� '1 •V S 1�0- 41 � C ' C �i� i,'�C �'' ' 'tl0r • ''�� J. .- �i..;C , ;J-a'.t , 9( ''1 r\;:• vimIr .Q1 „rj.`.Y 11�_tV ,.!! . 5 "�. + 'I .l'rl'.r ', F1 .}. r1'nv'�tf j { tf i'� F.(�V i� - ; t 1�'%t';`/; ' t Gl t ' t v t InV V� ' �,�, Az LT 07 LL i1:1 .•�l �1,i•. f 1,�/t.t i'- ,'. N,r`J `Ir^��• � ,: t'l p� Q � r':`�V �.rQ IJ�))�I Iv�.� �`f� T` t :X,. '�• t , \+,C•Q i� Y •�� p, ,.�: C,J,. 6 Il,i/: i1',r1♦ Ylf ty'. ..is i �) ] 'tt (w... 1 d ` I n.j. L 1.. f -• �_! 4�'p t1 y, _ a•.11 7. j( .:) � !',��f 1 ,`ft � t� "�J-.I •(�• V 1 ' � :�l � i'l. � 1`, �, .I t V f �vf:r ',rJ� .•�4 ''� it- �. If,. - t.L � �I �`,J � 1 �_ pf y •,:� ti't� .} i i5�'` ( � .t r (1 '1 i{4 1 r ` ...� ''{',( ,l f' p„�p.. ��!tia .�' .ftt,� w, t 'M'�� Y � ��� � .L`0 �.� '''� !' � )it il,w � .I�,i i;L1:'• Frr�. •,,.1•o i�.11 I .:� ,� 'e / g'��� ` r '� � Y�., .:� ' Y �''S r. ri .1 � r U:. •tl•, � e((v`�` 'J�. � Y ,t� .� �•� ' !1' .r.. ;�f`�•�`ll i,, �fit�J 1 {. 1' }'� ,t�Y,l Y J'•; .1,• 1 , L.rSt i 1 t ,t.r 1':i�� i1.J ",717:. ia. A�A'� T.rr 1�._ ,� is .1.:'1� ��, � r I,� -"p' '(t l� �rT 1 .{j�6+� r.J ,-•' , •{ t !..- li, ��•0 � .T•e � A_ 't,.' TN IP' !(: V '.ir` , 1 .I �!� • ^ 1,l .. •1. 7.., .p. .t.i:^ 'tom •./. ,,. ' 't t * . • ". i" �.{.'i,,1 y�.!G S .t-,! .,'.l,l:S rr.7.rrtl ai �!': ti -t .. ;;; 'i f -ldt:' .'I�`•�r '•�• v. I:'t �l iiy• f. '1L, ^"L. F Sip{J, ?``�.: ;�•i�.•. ..�j.'. .t i{.:I'I� [I�� .�c�i •', ... ' , i.5 � 'rl���' r,�!• .1`I�,, .J: '(• .t .�1 .j- 1.+� ••1 e t 9 :3 11' r� ,• 'I r I t u�gCSr ' 71A1_/ 1. r �: { r f. ,l �'- •ill 1t' , ',' :til •_:/,. '.1 ���;. . :., ads%ili •( 11 ,+`•,' .. --i>. •�{ ..- d`r`: !•'• 1 ./. ;t ; - '.^a, .Y. , '!'• .'� f ,itil iI '�'. GA o/srC • ylayn 4�fls11cs Q�rChl�s+ a� �h(�+�j S c rams V C .ts "7, C ever br,c�- -.tr�dM mom - Id 5,�p,e $wa(P. A.. ouf(e--}-. - _ . . ._. ��-`-1 ' _ �'`^aZ-icer^ .- . 1'a'�s`^'-� --•-. R.c - �'P�`---------- -- - - -- -- -� V_5r.1 F4 y_ _ .Ch.v%,yqe- -=4-le:. Y S c wt--��_ca�eR -_ 1 e. dr► h, CULAr OA n°`,j�- -- --- -- - -rydcom-t ---- Smt} G_{e_A-. _-_"^040*- ..-G� trvice,� -_ I^sim11.-- Ar Sewer7. kAJ a-t.4- Pr aer P f - -Tr%vom I SAHq''-S C LAA -re b A(_ -jr G a.ar w�-f�L+ r,n cA- r M6—Gtr— A+ t l r1�i� { � �T— -�-Q _- r%ttjtl�k.- fr&n ercknrl Sm K-AL.- Tv%5AA,%t A'1.e� _ I ., co nc"-4e- ._k!�sE�rtt S '►�rS , ..Foss 6Gy cc S< c.n� c G sk(o- rA oN-cher- - P J A<e c9 oP e tee - -- - -. .. - - - 9;r,t� C g 4t .-►i _ C e GM cY ' r�at✓5 _ s P.4 _.F`E►^+a grjeotji�Y.� r%.r-_a 4•o_ tow".) itow 1r'%- TA r1.TA cr'-Mr fifrm.Y/Sr 1,w5cle, of — Ar".% f6ee., ._... �L�F P'�� i --k.�-.. o-�• o....+le�- 1n.k� n`pcze. I'wr , vA a 1'6U_-ec In te-- PaQ4u- - el-OR"66%. P` ,% - rem A%" a^ •� S t-'��¢-._..._..._.. - --- �'= -9,ev y1 aAA_ —Y"ft cks _a-k - k%3rAd-rJl Gd `� • �'.," -`� �a P -Swale: �y _ .q,..��s_kee_+nr►• h• AAAA 61 c._,As Per 5pec,, 3 los- f3u•� Iks CITY OF SALEM, MASSACHUSETHII-JII4I' DrPT PLANNING DEPARTMENT Nov 12 2 07 PH '66 GERARD KAVANAUGH `� RECEIVED ONE SALEM GREEN CITY PLANNER CITY OF SALEM,PASS. 01970 (817)744.4580 ? �J �'tLpH�.Od November 11 , 1986 Mr. William Munroe Building Inspector One Salem Green Salem, MA 01970 Dear Mr. Munroe: As per a site visit to the Fafard Companies development entitled "Ledgemere Country II", Salem, MA, please be advised that all Planning Department and Planning Board requirements have been met or will be met shortly. As a result, the Planning Department and Planning Board concur with the issuance of Certificates of Occupancy for Bengal Lane, Units #10-16. Sincerly Gerar Kavanaugh City lanner C705 EC °D 0 BUILDIN-1 DEPT MANUFACTURING INC. NOW I $ 290 ELIOT STR1_STREET/ASHLAND 3 AH '66 MA 1311-21 (617)'0=1600 0 (/l/\ TYy o(�RECEIVED �!p^11�.��.. M ANUFA TIUREPf CPMA CONCRETE CONDOMINIUMS November 6, 1986 Mr. Roger Halle Assistant Building Inspector Town of Salem One Salem Green Salem, MA 01970 Dear Mr. Halle: This letter is in answer to your letter requesting an exploration of the ver- tical wall cracks inherent in the concrete frames. Concrete is a material that shrinks between 3/8" to 3/4" per 100 feet. In the 30 foot wing of the long ell building, we would expect a shrinkage of between 1/8" to 1/4". However, because there is a free moving end at the garage and because we use a superplasticized concrete mix, the shrinkage in our buildings is less. Many experiments with slabs poured in long strips show that concrete tends to crack in 10 to 14 foot intervals. This pattern has shown up in our buildings also. Shrinkage cracks do not weaken the structure and will not interfere with the quality of the finish product. If you have any further questions, please call. Very truly yours, ` ECONDO Manufacturing, Inc. ��'.•r'r• _,. u Fti i.•-r..^.�.0 9^�t Robert B. Barton, P.E. President RBB/bad THE FAFARD COMPANIES LETTER OF TRANSMITTAL 290 Eliot Street Ashland, MA 01721 DATE October 30, 1986 Joe. NO. 104706 1617) 879.7300 ATTENTION Bill Munroe RE: TO City of Salem / Building Inspector Building 11100 One Salem Green Salem, MA 01970 GENTLEMEN: WE ARE SENDING YOU Attached ❑ Under separate cover via the following items: ❑ Shop drawings ❑ Prints 0 Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order Concrete Test Report COPIES DATE NO. DESCRIPTION 1 Foundation 11100 1 First Floor #100 1 Second Floor 11100 1 Third Floor #100 THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted 0 Resubmit copies for approval For your use ❑ Approved as noted ❑ Submit copies for distribution Q As requested ❑ Returned for corrections ❑ _Return corrected prints ❑ For review and comment 0 0 FOR BIDS DUE 19 O PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO OAA ``,,�� (\�/� SIGNED: OAA 0.[A J X)0,1) n !J� CONCRETE TEST REPORT POR ECONDO M-ANUrAC"MRING, INC. JOBSITE: --5-ftjek�l DATE: JOB #: —10 BUILDING I/: POUR fl: DATE POURED: DESIGN MIX: VENDOR TEST CYLINDEF. DATA SET I A. B, C -/q, SET 11 A, B, C 5L BREAK STRENCTH DATA CYLIND .R l DATE CAST BR• FAH DATE AGE P, l. �TA 700 Alto MNL EVTS Res CtfUll Submitted, t (I MA Concrete Licence �D Zhu CONCRETE TEST RE-PORT 1 •� FOR ECONDO K'MFACTURINC, INC. JOBSITE: 1 hive DATE: JOB Il: �lNtj—1i BUILDING 0: POUR !/: ' ( ,+ DATE PO F-�-t� URED: < (� DESIGN MIX: c ( � ����-1 1105 VENDOR TEST CYLINDEF. DATA SET 1 A.. B, C 501, l4c4 ( e, �. � ...i,LI SET 1.1 A. B. C !j )z f1 n `.i,Gj Iii %{(;' (�t G; 1cV•-E�. ��c NeS" 90l z . J S C. BREAK STRENGTI{ DATA YLI EP f DATE CAST BREAK DATE PO NDS PSI - C�a IA r 1 oqc .2 �> J/UCG IB t r IN 1 COMMENTS Res tfull � S bmitted, MA Concrete Licence ) CONCRETE TEST REPORT FOR ECONDO ?L�NL'FACTURING, INC. JOBSIT'F,: _ S�iN.lr1 DATE; JOB 0: BUILDING �1()() POUR ll: _ DATE POURED: ' ,e DESIGN MIX: `r�,�ciCc� �'����"�.�M —' VENDOR 4y MI (.:1 (, TEST CYLINDEE DATA SFT 1 A. B, C ' 7 SET 11 A, B. C 5L -,%, rj� � . )v BREAK STRENGTH DATA CYLINIEP(1 DAT�CAST• BR1 AK DATE ArE TOTAL POUNDS PSI IA lJ IB ; 1 •„IIA � � ��' `� r? - o a � IIC 7 qi COMMENTS Regpectfully Submitted, MA Concrete Licence $q •. CONCRETE TEST REPORT • FOR ECO14DO TLkNUFACTURING, INC. JOBSITE: �iEi(P.c•' DATE: �L`T"Y JOB A: �IIJrt� tl'(. BUILDING #:_I N1 POUR 0: . <;•. t DATE POURED: _ ��'`t �>(• DESIGN MIX: VENDOR J yltr'r TEST CYLINDER. DATA SET 1 A, B, C L C, • � j, t:i••- 1. 'i �;CS{i' ci'L•; .y, . 'Yn�•e tl� (c SET 11 A. B, C -.7u� t 75, BREAK STRENGTH DATA 'YLIN Eft # DATE CAST BR> 4K DATE A PO S PSI y- r_ c IR 11 o`b TIC76 COMMENTS Respectfully Submitted, MA Concrete Licence k5oz;4 ® THE FAFARD COMPANIES LETTER OF TRANSMITTAL 290 Eliot Street Ashland, MA 01721 DATE JOB. NO, October 30 1986 1 104706 (617) 879.7300 ' ATTENTION BillMunroe RE: TO City of Salem/ Building Inspector Building 41101 - Phase 1 One Salem Green Salem, MA 01970 GENTLEMEN: WE ARE SENDING YOU Attached ❑ Under separate cover via the following items: ❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter OC Change order EX Conrretp Test Report COPIES DATE NO. DESCRIPTION 1 Foundation 41101 1 First Floor 41101 1 Second Floor 41101 1 Third Floor 41101 THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval M For your use ❑ Approved as noted ❑ Submit copies for distribution !� As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FOR BIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO SIGNED: C.() +` CONCRETE TEST REPORT FOR ECONDO MINUFACTURING, INC. JOBSITE: v✓t JOB 6': DATE: _ ILS j Y6 - BUILDINGU:_lf,/ POUR #: i _L-� �._� DATE POURED: DESIGN MIX: ;Fi:cA_ �; ��'�� '�;.� VENDOR �-7�,•i -1..�. TEST CYLINDEF DATA . SET t A. B. c SL 3;ft55, 141' 0I ;,. c ,si> SET 11 A, B, C 5'4-7 tNCS,8. �+N cl•L - - - - - -.- - - - - - - - - - - •- - - - BREAK STRENGTH DATA CY I EP, I DATE CAST BREAK DA TAL POU S pSI IA o G r a 'l 0'j L x �Y)?C) i COMMENTS Res /Iectfullly;-Submitted, MA. Concrete. Licence ''` `,. CONCRETE TEST REPORT FOR ECONDO MNUFACTURING, INC. JOBSITE: CZ}��Eti•t .JOB li: ,�4i1.� .�UIJ DATE: BUILDING #: `j J YOUR #: 1 �' DATE POURED: U u DESIGN PtIX: - �:G Icy( �l A VENDOR a `.'r TEST CYLINDER DATA SET 1 A, B, C 5(- SET (- SET 11 A, B, C SC 3+ BREAK STRENGTR DATA CYLI ;R ATE :CAST BREAK DA E / y TOTAL PMPMS PSI IA ( 0 CI yl i '• U � {j IB ITC C0.MENTS Respectfully•,Submitted, MA Concrete licence CONCRETE TEST REPORT 1 FOR ECONDO MANUFACTURING, INC. JOBSITE: `�i�l�f�t�i JOB 0:• 1 t-"c - DATE: _---- mob�� BUILDING L/:��Q I POUR � DATE POURED: 7 DESIGN MIX: c� U` --�I �,. VENDOR PEST CYLINDER DATA SET 1 A, B, CSG 1.k rkC t C C ) [ f f.OJ Y,! 1 � n.� 'i •. 2D Fre: SET 11 A. B, C �G 4;��C�:L 1:1..� .7�•I; �� -.1�,J' �_Rk C 5; •�u•k r''s1tv..,�, �� i..•. •� 'r-, n ,: 1 . I BREAK STRENGTH DATA CYLI TLDl , fi DATE CAST BREAK DA T L P- OUN S PS:E IA c IB I IC �- j •-�D COMMENTS ;lt Respectful,ly,.Submitted, G; r �� y ' MA Concrete:Licence_-��;,Z CONCRETE TEST REPORT FOR ECONDO MANUFACTURING, INC. JOBSITE: _ DATE: .JOB !/: - lO�7f'� s BUILDING 1�:�(Q 1 POUR #: r rr --��_ DATE .D OURED: DESIGN MTX: _ _ ►�1_�4(c� (•x�t` �Ll—Irr• • 'I VENDOR 1_�aerf TEST CYLINDER DATA SET 1 A, B, C Ji 1 j�2� ►'�,�'. �� 1i'"f 5 Z` t,+ SET 1I A, B. C L� BREAK STRENGTH DATA CYI•IND R A DATE CAST BF.EAK DATE G T 0 5 PSI IA zB �. l �• _ I j6.-1 ,� C. IIB nc COMMENTS Res ctful-ly-Submitted, OA V MA Concrete Licence -- I THE FAFARD COMPANIES LETTER OF TRANSMITTAL 290 Eliot Street Ashland, MA 01721 DATE 10-30-86 JOB. NO. 104706 (617) 879-7900 ATTENTION Bill Munroe RE: TO City of Salem/ Building Department Building 1194 - Phase 1 One Salem Green Salem, MA 01970 GENTLEMEN: WE ARE SENDING YOU CY Attached ❑ Under separate cover via the following items: ❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order FD Concrete Test Report COPIES DATE NO. DESCRIPTION 1 Fo-ndation 1194 1 First Floor - 1194 1 Second Floor - 1194 1 Third Floor - 1194 THESE ARE TRANSMITTED as checked below: i ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval CK For your use ❑ Approved as noted ❑ Submit copies for distribution CR As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ i ❑ FOR BIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO SIGNED:' 11y1'J CONCRETE TEST REPORT FOR ECONDO ILMNUFACTURING, INC. JOBSITE: _- SNIetw% DATE: /, ` _%� �l . JOB U: �11>� lr)k, BUILDING !f: _- POUR !l: 6 411ci DATE POURED: DESIGN MIX: __�4��� ������1>•-iGJ VENDOR /,,.�%tir=� r TEST CYLINDER DATA SET 1 A. B, C wo iac r-`r, 1j �a w r j. I SET 11 A, B. C ;L 'l'lz, 11 c 5.jj -), T-,c/ x r °; '1 '� r �. i ! .'fL: BREAK STRENGTH DATA C";1ID I DATE CAST RREAK pATE AGEPOU PS1 IA e ►` ;r Flo I B ` Q4 IIB LD COMMENTS Res ectfully Submitted, MA Concrete Licence �.5�:>Lr) CONCRETE TEST RF—PORT FOR ECONDO ItVUFACTURINC, INC. JOBS ITE: Ft . DATE: JOB #: BUILDING POUR DATE POURED: DESIGN MIX: VENTDOR TEST CYLINTDRR DATA SET I A. B, C 0 v kT ti SET 11 A, B, C BREAK STRENGTH DATA CvLINDER # --RAjl:f CAST BREAK 2ATE ACE PSI IA IIB SA —TIC— COKMENTS Respectfully Submitted, MA Concrete Licence CONCRETE TEST REPORT FOR ECONDO K�1NTFACTURINC, INC. JOBSITE: JOB DATE! BUILDING POUR #; _LL,�i— DATE POURED: DESIGN MIX: VENDOR TEST CYLINDER DATA SET I A. B, CI/zi io, dt I.,lj� SET 11 A, B, C. tiC – – – – --- – – – – – – – – – – BREAK STRENGTH DATA —PAFF�CAST BREAK DATE --SELI-POvm-,s-. PSI xx IB C- r�) QL IIB -ft—UC--j COMMENTS R sPectfullY Suhldtted, MA Concrete Licence 1�0-6+j CONCRETE TEST REPORT FOR FCON"DO MANUFACTURING, INC. JOBSITE: PATE.; JOB #: BUILDINGDATE POURED: POUR DESIGN MIX: VENDOR TEST CYLINDEP. DATA SET I A. B, C 76 ici -lvl, r SET 11 A, B, C 1,4 t BREAK STRENGTH DATA YLIN'DrP, # —DATE CAST— BMLK—DA�TF - .-...ACE -------T—Q]LAL POUNDS IB 6S C7 -L2 I' L— COMMENTS Re Dectful-17 Suburitted, C-1- MA Concrete Licence THE FAFARD COMPANIES LETTER OF TRANSMITTAL 290 Eliot Street Ashland, MA 01721 DATE October 30, 19 ®Oe. NO. 104706 (617) 679-7300 ATTENTION Bill Munroe TO City of Salem/ Building Inspector RE: Building 1198 — Phase 1 One Salem Green Salem, MA 0197 GENTLEMEN: WE ARE SENDING YOU C Attached ❑ Under separate cover via the following items: ❑ Shop drawings ❑ Prints ❑ Plans Cl Samples ❑ Specifications ❑ Copy of letter ❑ Change order tb Concrete Test Report COPIES DATE NO. DESCRIPTION 1 Foundation 1198 1 First Floor 1198 1 Second Floor 1198 1 Third Floor 1198 THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval IN For your use ❑ Approved as noted ❑ Submit copies for distribution I$ As requested ❑ Returned for corrections ❑ Return — corrected prints ❑ For review and comment ❑ ❑ FOR BIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO ��-,�� , /n^� SIGNED:�ddId1CCZ_ pL_ CONCRETE TEST REPORT FOR ECONDO MANUFACTURING, INC. DATE JOB #: BUTLDING #: POUR #! DATE POURED: _1121.c�"6 DESIGN MIX: VENDOR TEST CYLINDER DATA SET 1 A, B, C St.t Zi I.L t. ., 01 SET 11 A, B, C }t /0 L's" i-xtkri -tip, BREAK STRENGTll DATA =L]LNDEP # _ —JALE_ ASjBREAK DATE AG E TOTAL POUNDS PSI IA IB 1C 00 JtrIN COMMENTS Rec ctfully Submitted, MA Concrete Licence lLl CONCRETE "EST REPORT FOR ECONDO "LAITUFACTLTRINC, IN%-. JOBSITE: DATE JOB #: BUILDING POUR DATE P07URED: J. DESIGN MIX: as VENDOR TEST CYLINDER DATA SET ET I A. B, C SET 11 A. B, C BREAK STRENGTH DATA ll'!'_l!NDE�, Il -LATE CA57' BREAK �IA SL COMMENTS Res ectfully Subnd�ted, MA Concrete Licence CONCRETE TEST REPORT FOR ECONDO ItkNUFACTURING, INC. JOBSITE! DATE JOB #: BUILDING #; POUR DATE POURED: DESIGN MIX: VENDOR — — — — — — — — — — — TEST CYLINDER DATA SET 1 A., B, C51,-. A SET 11 A, B, C I 4je BREAK STRENGTIA DATA CAST _jREAK qATL__ TOTAL 2OUNDS Sl 13 oo COMMENTS lResvectful1v Submitted, s.� MA Concrete Licence CONCRETE TEST REPORT FOR ECO14DO M,A-NUFACTURINC, INC. JOBSITE: DATF: BUILDING 0(l FOUR #: DATE POURED: DESIGN MIX: VENDOR TEST CYLINDER DATA SET I A. B, C w- J Y SET 11, A, B, c BREAK STRENGTH DATA DATE CAST BREAK L1ATE AC PSI IB Lp-- 5Q -TIC COt LMENTS R pectfu'lly Submitted, MA Concrete Licence/-,�,j-Kl- ® THE FAFARD COMPANIES LETTER OF TRANSMITTAL 290 Eliot Street Ashland, MA 01721 DATE JOB. NO. October 30 1986 104706 (817) 879-7300 ATTENTION Bill Munroe RE: TO City of Salem/ Building Inspector Building 1199 – Phase 1 One Salem Green Salem, MA 01970 GENTLEMEN: WE ARE SENDING YOU C Attached ❑ Under separate cover via the following items: ❑ Shop drawings ❑ Prints ❑ Plans _ ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order ff CrmorPta TPRf Rpp nrr COPIES DATE NO. DESCRIPTION 1 Foundation – 1199 1 First Floor – 1199 1 Second Floor – 1199 1 Third Floor – 1199 THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval [X For your use ❑ Approved as noted ❑ Submit copies for distribution O; As requested ❑ Returned for corrections ❑ .Return — corrected prints ❑ For review and comment ❑ ❑ FOR BIDS DUE 19 O PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO SIGNED: C O a CONCRETE TEST REPORT FOR ECONDO M-WrACTURING, INC. JOBSITE: DAM JOB #: BUILDING ',MR il lk�a� d— DATE POURED: DESIGN MIX: VENDOR TEST C2LINDEY DATA SET I A, B, C IC-6 SET 11 A, B, Cne BREAK STRENGTH DATA ClyLlMR -�MELi_E— LA K DATE _ TOTAL lOUNDS, PSI C 17 IB IIB —jD-- i fl be COKMENTS Re9pectfully Subraltted, Ckl'k MA Concrete Licence CQNCRETE TEST REPORT FOR FCONDO M,1NUFACTURING, INC. JOBS I TE: JOB #: DATE: BUILDING YOUR DATE POURED: DESIGN MIX: VENDOR TEST CYLINDER DATA SET I A. B, C -1, SET I1 A, B, G L -a, BREAK STRENGTH DATA 'vLTPII3ER # DATE CAqL BRYAN DATE AG I=AL LUtiTL[),S PSI IA )0 c-5 I D TIB "14 t 2—C _LzL C0M?qmlTS ctfully Submfltted, MA Concrete Licence CONCRETE TEST REPORT FOR ECONDO KkNUFACTURING, INC, JOBSITE: Iti DATE: JOB #: BUILDING F: _ DESIGN MIX: POUR DATE POURED: VENDOR TEST CYLINDER DATA SET I A, B, C %,I SET II A, B, C BREAI, STRENGTH DATA CYLINDER R DATF. CAST BREAK DATEnOUNDS PSI IA 1A I B L 1 4 IIB 1 ,7- 4 Z 11 C COMMENTS Re ectfullY Spbmitted, MA Concrete Licence CONCRETE TEST REPORT FOR ECO.'ID0 K&NUFACTURING, INC. JOBSITE: DATE: JOB #: BUILD'INC YOUR DATE POURED: DESIGN MIX: VENDOR TEST CYLINDER DATA SET I A, B, C � 1!�Pr 7 , SET ll. A, B, C 1C 5. sI'l r BREAK STRENGTH DATA DATE CAST BRPAV DATE ACE ------ZrOTAL ROUNDS Psi ,IA IB C IIB COMMENT S -Re,�pevtfully Submitted, MA Concrete Licence 4 A,, THE FAFARD COMPANIES LETTER OF TRANSMITTAL 290 Eliot Street Ashland, MA 01721 DATE October 30, 1986DB. NO. 104706 (617) 879-7300 ATTENT WiNll Munroe TO City of Salem/ Building Inspector RE' Building 1195 - Phase 1 One Salem Green Salem, MA 01970 GENTLEMEN: WE ARE SENDING YOU IN Attached O Under separate cover via the following items: ❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order Yd Concrete Test Reports COPIES DATE NO. DESCRIPTION 1 Foundation Building 1195 1 First Floor Building 1195 1 SecbnddFloor Building 1195 1 Third Floor Building 1195 THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval 1A For your use ❑ Approved as noted ❑ Submit copies for distribution ER As requested O Returned for corrections ❑ Return _ corrected prints ❑ For review and comment p ❑ FOR BIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO �j SIGNED: &'/ A4 JI16) CONCRETE TEST REPORT FOR ECONDO M!,NUFACT'UR1'NG, INC. TOBSIT'Et DATE- SOB f1: BUILDING POUR f/: DESIGN MDATE POURED: TX: ��(Y) VENDOR � �Rar �•t TEST CYLINDER DATA SET 1 A, B, ` j'�Z c c SET 11 A, B, Cjo tk^,H BREAK STRENGTH DATA CYLItd)_EP # DATE CAST BR tC DA17E AG IA — IB IIB t 'l COMMENT'S Re ecifuiIy\ Sy�mitted, MA Concrete Licence ,r, } CONCRETE TEST REPORT FOR ECONDO X"UNUFACIURING, INC. JOBSITE- Jos it: 12Z DATE: - BUILDING POUR #: DESIGN MIX: DATE POURED: VENDOR TEST CYLINDER DATA SET 1 A. B, C "T -T SET 11 A, B, C BREAK STRENGTH DATA DATE CAST BREAK DATE --jTL0aTAL POUNDS PSI IA IIB MNEN-rs Re • .ecc.f 11 q bmitte�d, u y U -c-4L— MA Concrete Llcence CONCRETE TEST REPORT FOR ECONDO MANUFACTURING, INC. JOBSITE: JOB fi: iL PATE BUILDING #: POUR DATE POLTED: DESIC,b MIX: .�A VENDOR TEST CYLINDER DATA SEI i A. B, C SET I I A, 33, C 5&7 BREAK STRENGTH DATA DATE' CAST.. BRX-*' ATE J !A IB ,IC t COMMENTS Respe tfully Submitted, YLA Concrete I'leence CQ;'�'PTTE TEST REPORT F 101R. INC. j 0 Ll DAI F. 00ft:'RED! ')ESICN MIX: '�RNDOR TESI' CYJ,pz)CP DATA SE'S 3 A, Y�, C SFT 12 A, B. C PREAK SIRENVil DArA A C COM&;ENTS tLJx", 14A COM�rete Licence f � e 'CONotT '�YilyJ o ` tz1�m, tt��ttcl�usE�#s Pepar#men# of Public Portes \ � One 6ttlPm Orem �D Afb1MINL IA. PAUL S.NIMAN DIRECTOR OF PUBLIC SERVICES March 31, 1986 Mr. William Munroe n Building Inspector One Salem Green Salem, MA. 01970 S RE: Development - Whalers Lane rn , Dear Bill: 1 This letter shall serve as confirmation of_ .our_discussion this morning regarding Phase I of the Ledgemere County project by the Pafard Company. As discussed, my office has reviewed and approved the plans for the project including the proposed water meter locations. Very truly yours; Paul S. Niman Director of Public Services PSN/cmc Ty F y{MSFT CIO NOO s� Q 2782 2NpA1)9 F F� pVERHN ,63, I' .A o� o� 0 PARCEL A AREA = 614t S.F. OkyAtv 0 / O \ 21Vp Fz p�RNANV #139 aCD � 9 /61 J6 6�1 2Np FC p�RHANp O #140 \ 'bAD Oo i 5� I CERTIFY THAT THE BUILDING SHOWN HEREON AREOF / LOCATED ON THE GROUND AS SHOWN. '" AIL lyG L $ SMITH GO. O Nc.35043 DATE RE STERED PROFESSIONAL LAND SURVEYOR 41OL.AN96U O � 4141 P�,o PLOT PLAN OF LAND IN SALEM PROPERTY OF GRAPHIC SCALE MARINER DEVELOPMENT CORP. 20 0 10 20 40 eo SCALE 1" = 20' JULY 22, 1996 - NORTH SHORE SURVEY CORPORATION ( IN FEET ) 47 LINDEN STREET — SALEM, MA 1 inch = 20 fin #47 _ ___ w �---.: - _ _ ___ � __ _ _ _ ___ _____ _ _ _ _ _ _ _ __ _� __ _ _ r I i 'I� �� �I �I� I �� II I Cit II tt�E.11l� c� £SSC LY E f z Public VroperfU Bepartment Jp�uwnc�,Sr �;willing 1�lepttrtmenf (One �;aletn Green 7.15-tt%t3 William H. Munroe Director of Public Property Maurice M. Martineau, Ass't Inspector Inspector of Buildings Edgar J. Paquin, Ass't Inspector Zoning Enforcement Officer John L. LeClerc, Plumbing/Gas Insp. August 29, 1986 John Chabot, Supt. The Fafard Companies Highland Ave. Salem; Ma. 01970 Dear John: Being now in possession of a letter from Robert B. Barton, P.E., certifying to the structural integrity of bldg. #83, located at the rear of 1st. Street on Whaler's Lane. _ Said letter being duly dated, stamped with the engineers stamp, and signed. I hereby acknowledge receipt of said letter, and state that that construction may proceed as planned. Very truly yours, Roger Halle Asst. Building Inspector City of Salem RH/lyd y (situ of iltttlem, massac4usPtts Public Propertg Department Nuilaing Department (Out *elcm Q;run 588-715-9595 Ext. 388 Leo E. Tremblay Director of Public Property Inspector of Building Zoning Enforcement Officer March 10 , 1997 Fafard Construction 290 Elliot Street Ashland, Mass . 02119 RE : Retaining Wall To Whom it May Concern: On March 3 , 1997 through March 7 , 1997 blasting was done on your property adjacent to Swampscott Road. This blasting is approximately 200 to 300 yards down hill from Building 142 and Building 143 . On March 4 , 1997 the retaining wall in back of building 143 collapsed. As a result of this , the back half of this foundation was removed. An inspection was conducted and was photographed. It is my opinion that it is a shear crack approximately 4 feet in vertical distance . At this time the Salem Building Department places a Stop Work order on Building 142 and 143 pursuant to Article 1 , Section 122 . 1 and Article 1 Section 113 . 6 and Section 113 . 7 of the Massachusetts State Building Codes . No further work shall be performed until the proper engineering work has been submitted to this office pursuant to Article 1 , Section 113 . 6 and 113 . 7 . Thank you for your anticipated and immediate attention in this matter . Sin e� 1y, ohn J . J nn ngs Local B�r1 in Inspctor JJJ : scm THE MASSACHUSETTS STATE BUILDING CODE the building official may institute the appropriate proceedings at law or in equity in a court of competent jurisdiction to restrain, correct or abate such violation or to require the removal or termination of the unlawful use of the building or structure in violation of the provisions of this code or of the order or direction made pursuant thereto. 121.4 Violation penalties: Anyone who shall violate a provision of this code shall be punishable by a fine of not more than one thousand dollars ($1,000) or by imprisonment for not more than one year, or both, for each violation. Each day during which any portion of a violation continues shall constitute a separate offense. 121.5 Abatement of violation: The imposition of the penalties herein prescribed shall not preclude the building official from instituting appropriate action to prevent unlawful construction or to restrain, correct or abate a violation, or to prevent illegal occupancy of a building, structure or premises or to stop an illegal act, conduct, business or use of a building or structure in or about any premises. SECTION 122.0 STOP-WORK ORDER 122.1 Notice to Owner: Upon notice from the building official that any work is being prosecuted contrary to the provisions of this code or in an unsafe or dangerous manner, such work shall be immediately stopped. The stop-work order shall be in writing and shall be served on the owner or on the person doing the work, and shall state the conditions under which work maybe resumed; provided, however, that in instances where immediate action is deemed necessary for public safety or in the public interest, the building official may require that work be stopped upon verbal order, provided that said verbal order be confirmed in writing within forty-eight (48) hours. 122.1.1 Posting: A stop-work notice shall be posted in a conspicuous place on the job site and can only be removed by the building official. 122.2 Unlawful continuance: Anyone who shall continue any work in or about the job site after having been served with a stop-work order, except such work as he is directed by the building official to perform to remove a violation of unsafe conditions, shall be liable to prosecution as provided in Section 121.0. 1-24 780 CMR - Fifth Edition THE MASSACHUSETTS STATE BUILDING CODE 2. the method and amount of ventilation and sanitation; 3. the methods of firestopping as required in this code; and 4. schedules and details indicating compliance of interior trim and finish with provisions of Article 9. 113.5.1 Structures subject to control: In those structures subject to control as required in Section 127.0, affidavits must be submitted with the permit application that the individuals and testing laboratories responsible for carrying out the duties specified in Section 127.0 have been licensed by the BBRS. 113.5.2 Architects' and engineers' seals: Unless otherwise provided in this code, all plans and specifications for buildings and structures containing more than thirty-five thousand (35,000) cubic feet of enclosed space shall bear the Massachusetts seal of registration of a qualified registered professional engineer or architect. Plans and specifications, plats and records whenever required to be stamped with the seal of a registered professional engineer or architect shall be signed by the registrant named thereon. The use of a facsimile signature stamp shall not be deemed to comply with this section. 113.6 Site plan: There shall also be filed prior to a permit being granted for the excavation or for the erection of any building or structure a site plan showing to scale the size and location of all new construction and all existing structures on the site, distances from lot lines, the established street grades if they exist (verified by the town or city) and proposed finished grades. In the case of demolition, the site plan shall show all construction to be demolished and the location and size of all existing structures and construction that are to remain on the site or plot. The site plan shall not be changed except as specified in Sections 113.8 and 115.3. 113.7 Engineering details: The building official may require adequate details of structural, mechanical and electrical work, including computations, stress diagrams and other essential technical data, prepared by a registered professional engineer qualified by experience in the specific field of construction, to be filed. All such plans and computations shall bear the Massachusetts seal of registration and signature of the qualified registered professional engineer or architect. 113.8 Independent structural engineering review: As a condition for the issuance of a building permit the structural design of the following described structures shall be reviewed by an independent structural engineer to verify that the design of the primary structure is conceptually correct and that there are no major errors in the design. 1-16 780 CMR - Fifth Edition 65M(Effective en9/92)