Loading...
227 ESSEX STREET - BUILDING JACKET, ROCKAFELLAS 22�l ��X � , Building Permit No.: 691 11 iCertificateNa -- -- --- Commonwealth of Massachusetts City of Salem j Building Electrical Mechanical Permits i This is to Certify that the located at Banquet Hall i Dwelling Type 227 ESSEX STREET in the CITY OF SALEM - -- --- - Address Town/City Name IS HEREBY GRANTED A TEMPORARY CERTIFICATE OF OCCUPANCY Sprinkler Work related to occupancy of 2nd floor banquet facility This permit is granted in conformity with the Statutes and ordinances relating thereto, and expires .Monday Jun-13,2011 unless sooner susp ded or evoked. Expiration Date li Issued On: Fri May 13,2011 GeoTMS®2011 Des Lauriers Municipal Solutions,Inc. ]FP'SOLUTIONS, INC. ' Ui)hliddlosex Direct%:'_' Wa!'C5ed MA 0188' - T:781.389.1999 - Sat�w.j°psnln.fiors.eon: To: Kevin Marchino Date: May 10,2011 Rockafel las 231 Essex Street Salem, Massachusetts Tel. 978-745-2411 RE: Attic Sprinkler System—Temperature Verification Kevin, The purpose of this letter is to verify our observations of the ambient temperatures witnessed within the attic space of your building located at 231 Essex Street in Salem,Massachusetts.Out firm was hired to develop a sprinkler system design for the expansion of the existing wet-pipe sprinkler system currently protecting the basement and first floor levels of your facility.During the design phase,the option of designing a dry-pipe system to protect the attic and second floor of the building due to the attic space being unheated.The intent of the design was to conceal the sprinkler piping within the unheated attic space and feed both upright sprinklers protecting the attic space and pendent sprinklers protecting the second floor.Although there is no direct heat source within the attic space,there are existing ducts throughout the second floor and ceiling that allow the flow of heated air from the 2vd floor into the attic space.Due to the large increase in cost for a dry-pipe sprinkler system,the temperature of the attic space was monitored throughout the winter months to determine if the temperature ever dropped below 40°Fahrenheit.Using thermometers,strategically placed in the areas with the highest potential for drafts and cold pockets,the ambient temperature within the attic space was closely monitored and recorded by yourself and witnessed by us during site visits.Even with outside temperatures dropping well below Zero degrees,the thermometers never dropped below 40°.As an additional precaution,plastic bottles of water were also positioned in high freeze potential areas and none of the bottles ever showed signs of freezing. While we cannot guarantee that the sprinkler system will not freeze,as it is the responsibility of the building owner to provide sufficient heat within all areas of the building containing water-filled sprinkler piping,we are confident that the amount of heat passing through from the second floor will keep the sprinkler system from freezing.It is our suggestion that you continue to monitor the ambient temperature within the attic space throughout the year and should the temperature begin to approach 40°,heating units be placed within the attic space.Additionally,we recommend that a low-temperature alarm be installed in the attic space which will notify the building owner should the ambient temperature ever drop below 500.Please feel free to contact us should you require more information. Regards, Taylor D. enkins,EIT Presiden PkTH OF MAss9 c DOMENICA. yc Z CIOLINO mr _ FIRE ROTEOTiON 0141630 A lSTE S lONAL NGS I or'- SEGER ARCHITECTS , INC . D E S I G N/ PLA NNINGIMA NA GEM ENT ARCHITECTURAL FINAL AFFIDAVIT To the Commissioner, Building Department: I certify that I, or my authorized representative, has periodically inspected the Construction Phase work associated with Rockafellas-Function Hall Renovations-Phase 1.1 231 Essex Street,Salem,MA Reference: Dwg. Set dated: 04/11/2011 To the best of my knowledge, information and belief the work has been completed in conformance with the permit and plans approved by the Building Department and with the provisions of the Massachusetts State Building Code and all other pertinent laws and ordinances. Life safety items have been fully addressed for the Function Hall with the condition of installation of the panic hardware for the entrance door located on Washington Street, which will be completed on 5/13/11. Seger Architects, Inc. will provide an Affidavit for the kitchen area under a separate cover. gEDaa 30105 SES/Tri ARCHITECT—MASS.REG. NO.c� o Seger Architects,Inc. No.30105t� COMPANY CAE. , S� M1AA �J 10 Derby Square,Salem,MA N/}IOFMPS? ADDRESS 5 l' 978-744-0208 PHONE Date:May 12, 2011 /�p Then personally appeared the above-named 6I h-n �ti1 c r And made oath that the above statement by him is true. Before me, My Commission pir 10 DERBY SQUARE, SALEM, MA 01970 PHONE: 978-744-0208 > ]OHNASEGER@SEGERARCHITECTS.COM 8-29-2008 JEP�96LUTIONS INQ n W%cliddlescx Strcct 42 bvaicticl NIA(11880 - Ti '389.N4)9 - ,i,.•,=.j 1p �l.,tiea.,.ccar. To: Kevin Marchino Date: May 10,2011 Rockafellas 231 Essex Street Salem, Massachusetts Tel. 978-745-2411 RE: Attic Sprinkler System—Temperature Verification Kevin, The purpose of this letter is to verify our observations of the ambient temperatures witnessed within the attic space of your building located at 231 Essex Street in Salem,Massachusetts.Out firm was hired to develop a sprinkler system design for the expansion of the existing wet-pipe sprinkler system currently protecting the basement and first floor levels of your facility.During the design phase,the option of designing a dry-pipe system to protect the attic and second floor of the building due to the attic space being unheated.The intent of the design was to conceal the sprinkler piping within the unheated attic space and feed both upright sprinklers protecting the attic space and pendent sprinklers protecting the second floor.Although there is no direct heat source within the attic space,there are existing ducts throughout the second floor and ceiling that allow the flow of heated air from the 2 floor into the attic space.Due to the large increase in cost for a dry-pipe sprinkler system,the temperature of the attic space was monitored throughout the winter months to determine if the temperature ever dropped below 40°Fahrenheit.Using thermometers,strategically placed in the areas with the highest potential for drafts and cold pockets,the ambient temperature within the attic space was closely monitored and recorded by yourself and witnessed by us during site visits.Even with outside temperatures dropping well below Zero degrees,the thermometers never dropped below 400.As an additional precaution,plastic bottles of water were also positioned in high freeze potential areas and none of the bottles ever showed signs of freezing. While we cannot guarantee that the sprinkler system will not freeze,as it is the responsibility of the building owner to provide sufficient heat within all areas of the building containing water-filled sprinkler piping,we are confident that the amount of heat passing through from the second floor will keep the sprinkler system from freezing.It is our suggestion that you continue to monitor the ambient temperature within the attic space throughout the year and should the temperature begin to approach 40°,heating units be placed within the attic space.Additionally,we recommend that a low-temperature alarm be installed in the attic space which will notify the building owner should the ambient temperature ever drop below 50°.Please feel free to contact us should you require more information. Regards, Taylor D. skins,ETT Presiden 1 ot:' l LSAB .� .�.� Wff Fire Suppression Inc. For excellence in fire protection CERTIFICATE OF COMPLETION AFFIDAVIT AND WARRANTY KEVIN MARCHINO 978-745-2411 RE: ROCKAFELLAS 2N FLOOR AND ATTIC 5111111 231 ESSEX ST SALEM, MA The fire protection sprinkler system alterations have been completed. All materials used in the installation—pipe, fittings, hangers, sprinkler heads—meet the published standards of the NFPA and State building codes. The remedial work done by our firm has been installed per all applicable codes (NFPA#13), rules, laws, regulations,plans and manufacture's specifications. Our work is guaranteed to be free from defects for a period of one year from date of acceptance. In the unlikely event that material replacement is needed, it will be made by Ellis Fire Suppression, Inc. at no cost to the owner provided that others have not worked on or altered the sprinkler installation. The installation complies with the published standards of the NFPA 13 and State Building codes. David Corbett Project Mana er 1 Tel: 781.995.0235 ext 104 10 Draper Street Unit 16, Woburn, MA 01801 Fax: 781.933.0988 estimating@ellisfire.com ow*t 2008 by,National Fire Protection Association(NFPA). licensed,by agreemeni,for individual osa and single dovmload on October 27,2008 a JUSTIN FISNLN of El-US FIRE SUPPRESSION.No other reproduction or transmission in any form permitted without•.written permission of NFPA.For inquires or ea report unauthorized use,contact licensing@mpa.org. 858 Chapter 24 • Systems Acceptance Contractor's Material and Test Certificate for Aboveground Piping PROCEDURE Upon completion of work,inspection and tests shall be made by the contractor's representative and witnessed by the proper(owner or their authorized agent..Ail defects shall be corrected and system left in service before contractor's personnel finally leave the job. A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities,owners,and contractor. It is understood the owner's representative's signature in no way prejudices any claim against contractor for faulty material,poor workmanship,or failure to comply with approving authority's requirements or local ordinances. Property name � Date , --._—.�o SLI ------ -------- — — 1 S �--.. Property address _ 231 e5si-ex Pli I Accepted by approving authorities(names) _ Address Plans r,Equlpment ation conforms to accepted plans — Y ❑No used is approved Yes ❑No xplain deviations Has person in charge of fire equipment been instructed as 2rYEs ❑No to kacaton of control valves and care and maintenance of this new equipment? If no,Explain Instructions Have copies of the following been left on the premises? �JYes ❑Plc I. System components instructions 'J Yes &10 2, Cara and maintenance instructions D Yes (-'No 3. NFPA 25 Yes 41Ko Locasystem of syssteSupplies buildings Yearof Orifice Temperature Make Model manufacture sizeOuantib rating ML ��nnSprinklerss_ --_ � �✓) 12— f� �bC—I--- Pipe —- Pipe and Type of pipe -:&,T-l'-p_—_.__________._—,..—___ fittings Type of fittings arty l Alarm Maximum time to operate vAlarm device ! through test connection valve or flow _ Type 41ake Model — Minutes Seconds indicator -- ---- -- j — - — -- i Dry'valve O.DID Make Madel Sardine Blake Madel Serial no. Time to trip Time waldr Alarm through test V`lat Air Trip point reached operated Dry pipe connecF ma•b su desire air pressure test outlets property operating - -- --- — .— test Mmutas'i Seconds si psi psi Minutes i Seconds Yes No without O.O.D. O.O.D. ---------- -------`----------_-------'-------- - '— - If no,explain 0 2006 National Fire Protection Association NFPA 13(p.I of 3) a Measured from lime inspector's test connection is opened b NFPA 17 drily requires;he 60-second limitation in specific sections FIGURE NJ Contractor's Material and Test Certifica!e fir Abovelgomitd Piping. 2007 Autocratic Sprinkler Systems Handbook opyright 2009 oy,Hationaf Fire Pro faction Asoociere'fNFPA). Ucansed,dy agrvamenq for individual use end singls Cownioad on Dander 27,20CS to JUSTIN R9HLIN of ELLIS FIRE SUPPRESSION.No olhor eproducte,or transmission's any form permitted wiihoet wriiten permission or:NFPa.For inquires or to repos unauthorized use,contactiieansingciemirr rg. Section 24.2 - Acceptance Requirements 353 I Operation IJFnauma__tic ❑Electric Hydradics Piping superAsed —'�J Yes QNo Detecting media supervised ❑Yes NO Does valve operate from the manual hep,remote,or both yes 1,No control stations? Deluge and przac;ion Is there an accessible facility in.each - If no,explain valves for testing? vn ❑Yes ❑NO Does each circuit Operate i Does aeon Circuli operate Maximum time to Make Made! '_ supervision loss alarm? valve release? operate release___ Vas Na Yes I No Minues, Seponds I Location 1 Make and I Residual pressure Pressure : and floormodel Setting Static pressul'eFl (flowing) ew rate reducing vaNe test Inlet(psi) Outlet(psi) Inlet(psi) j Outlet(pal) Flom(gpm) hlyclostrillrg; Hydrostatic tests shall be made at not less than 200 psi(13.6 bar)for 2 hours or 50 psi(3.4 bar) above static pressure in excess of 150 psi(10.2 bar)for 2 hours. Differential dry-pipe valve clappers shall be left open during the lest to prevent damage. All aboveground piping leakage shall be stopped. Test description Pneumatic Establish 40 psi(2.7 bar)air pressure and measure drop,which shall Odl exceed 112 psi(i bar) In 24 hours, -last pressure ranks at normal water love 1 and air pressure and measure air pressure drop,which shall I not exceed 1112 psi(0.1 bar)in 24 hours. All piping hydrostatically tested at 1U/psi bar)for —_ hours It no,state reason Dry piping pneumatically tested ;J Y ,yo Equipment operates properly Ves j No Do you cedlhi as the sprinkler contractor that additives and corrosive chemicals,sodium silicate or derivatives of eeddiu/r�silicate,brine,or other corrosive chemicals were not used for testing systems or stopping leaks? hr"Yes 1]No i Drain I Reading of gauge located ne r water ;Residual pressure with ahr test Teststest supply:est connection: psi(_ bar) 1 connectioopen wide. psi(_bar) j Underground mains and lead-in connections t0 system risers flushed before connection made to sprinkler piping ,��,�� Verified by copy of the Contractor's Material and Test UYes l..)NO Other Explain Certificate far Underground Piping. Flushed by installer of underground sprinkler piping Iff ; ❑pip If powder-driven fastener are used in concrete, d` r✓ r,SNa If no,explain ' has 2presertative sample Testing been satislso only completed? Elank tasting Number used I Locations Number removed gaskets i i Yielding Pfp-__ gNo Q Yes in Lyes... Ce you certify as the sprinkler contractor that welding procedures used complied wit;: '„J Yes 'tet No the minimum requirements of A'✓•B 82.1,ASME Section IX Wadi and Brazing Qualifications,or other applicable qualification standard as required by the AHJ? Do you c=ertify that all Yielding was performed by welders or welding operators Yes ID No qualified in accordance win the minimum requirements of AWS B2,1,ASNIE Section IX Welding and&-.zing Qualifications,or other applicable qualification standard as Welding required by the.AHJ? Do you cehihr that the welding was conducted in compliance with a documented Iyj yes ❑Nu quality control procedure to ensure that(1)all discs are retrieved,(2)that openings in piping are smooth,that slag and other welding residue are removed,(3)the internal diameters of piping are not penetrated;(4)completed welds are free from cracks, incomplete fusion,surface porosity greater than'Aa in.diameter,undercut Ill than the lesser of 25','.of the wall thickness or els,in.;and(51 completed eimumferantial butt weld reinforcement does not exceed�a in.? 60 2006 Plat!onal Fire Protection Association 111-"PA 1.3(p.2 of 3) FIGURE 24.1 Continked Automatic Srjrrrkler Systems Handbook 2007 "Tint?008 by National Pile Protection,Association p4FPA7. Licensed,ty agreement,for individual use and single download on October?',2002 to JUSTIN FISFL!N of FLUS FIRE SUPPRESSION.No otter reproducdon or transmission in any farm permitted without written permission ofNF?A. pr irquir.=s or ad report unauthorized uae,contact licensing,rynlpa.org. - 880 Chapter 24 Systems Acceptance cutouts Do you certify[hat you:nave a contml-eaters io ensure that — es �Plo (discs) all cutouts(discs)are retrievetla. Hydraulic Nameplate provided It no,explain data nameplate I YaS Q No Date left in service with ail control valves open Remarks Hams nt spdnk! rcentl'actor Tests witnessed by signalures The property owner or their authorized agent(signed) rile Dale For sprinkler cc _ -ignsd) Title Date yLIr Additional explanations and nates C 2006 Alatlonal Fire Protectlon Association NF-A 13(p 3 of 3) FIGURE 24.1 C071t4RUed 2007 Automata. Sprinkler Systems Handbook Az Fire Suppression Inc. For excellence In fire protection Rockafel la's 231 Essar St. Salem,MA 01970 Attn:Kevin Mmrchino Phone: 978.745-2411 Fax: April 20,2011 RF: Rocicefella's Rcstaura.ru . .. . Salem,MA (Levin, Ellis Fire Suppression would like to inform you that we recently installed a wet type sprinkler system throughout the attic area at 231 Essex St. per the specified design. The wet type sprinkler system requires adequate heid tis ensure the water in the piping will not freeze and cause possible water damage. We will provide a copy of NEPA 25 with your close out package which will further explain your inaintenance responsibilities as owner. Ellis Fire is not responsible for the installation mud operation of heating systems or providing the necessary heat required for maintaining the sprinkler system we are currently installing. Ellis Fire is not and can not be held responsible for any costs associated with damages and repairs should the sprinkler system 1huze due to neglig coca Ellis Fire asks that you acknowledge the responsibility to provide adequate heat prior to any final testing and issuing,a warranty by signing and returning this letter as acceptaucc and understanding of that responsibility. Please feel free to contact us directly with any questions or if we can be of any further assistance. When deemed acceptable please sign and return at your earliest cnnveniencc. Signature 7zl{ bate Thmtit you for the opportunity to quote on this prelicct. Sincerely, %ir(ae.(MerrFenrode.r Tel: 781.995.0235 ext 104 10 Draper Street Unit 16, Woburn, MA 01801 Fax: 781.933,0988 estimating@ellisflre.com Certificate No: Commonwealth of Massachusetts City of Salem Building Electrical Mechanical Permits This is to Certify that the Banque[Hall located at Dwelling Type 227 ESSEX STREETin the CITY OF SALEM -------------------------------- - - - -- - - - - - -- --------- Address Town/City Name IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY New Kitchen and Fire Suppression system for new Banquet hall at existing Second Floor This permit is granted in conformity with the Statutes and ordinances relating thereto, and expires unless sooner suspended or revoked. Expiration Date Issued On: Thu May 26,2011 - - GeoTMS®2011 Des Lauriers Municipal Solutions,Inc. t O'1.1' O1. S.V..1:m —� �✓r� ]�t 'l�l .l(: PROPI .It.l.�. APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT 11.1. BUILDINGS EXCEPT ONE AND 2 FAMILY DWELLINGS IMPOR'l ANT: Al p-fictints must complete all items on this page e Localon NamIN1A Ialf ggrf-CIA-) 1 t45 f,a�ao f r ( Low Location Name ,/J(( 1` Building 4� (-Q Property Address �555'CJt ,5('• Z / Located in: Conservation Area Y/N Historic district r1PPLICAT[ON DATE Use Groups (check one) Group Homes R3 Ra_ Residential (3 or more Units) R2_ Type of improvement Residential (hotel/motel) RI _ (check one) Assembly(Theaters) At _ New Building_ Assembly (restaurants & clubs) A2rXA2ne_ Addition�/ Assembly (churches) Al _ Alteration V Business B Repaid Replacement / Educational E_ Demolition Factory (moderate hazard) FI _ Move/RelOCate Factory(low hazard) F2_ Foundmion Only High Hazard H_ Accessory Building Institutional (residential care) 11 Institutional (incapacitated) 12 Institutional (restrained) 13 Mercantile M _ Stora�te SI _Moderate Flared Storaee S2 Low Ilarnd ON'N4 RSIIII' INFORMATION tl'lease lope or Print Clt•ark) C@ 1 O\VN'ER Name 'T Ka�/ih N✓hrCh;no ��/ -727=► 5q2 Address '23 1 V 53-ex Si , Telephone T1 & -1q S a I / Si;?nature K o p DI•:SCRIPTION OF %%ORK '1'0 BE PERFOICNIEU L.i#noaow Bbi4e) 40 at Co✓NV'� � fA'If'� �JOCSI-I'ls 1 . ES HAIA„•:D CONS FRUC'r ION COST '2GD0. ov ( 1t 1 Wi CON I RAC I OR INFORM:\I ION r� '9 �fe Name Ed C� I 7 V�r Address Mj;Q �n S-t L)< kA </d &1A Telephone 79( 483 53)3 Construction Supervisor's Lic # CS'S Yzf) I Home Improvement Contractor # /S813! .UtClll'I'Isl'"1'/GNGINFailt INF'(1R1�IA'1'IU ' - i Name Address 22 W4sH/N�r St. Telephone 971 88Y 755" Mass. Reuistration PERINUF FEE CAI.CUI.A'rION Estimated Cost x $11/$1,000 + $5.00= 21 uv COIMINIENTS The undersigned applicant does hereby attest that all information stated above is trite to the best of lny kno4vle(lge under the penalties of perjury f� .411 Signed D.tAIl / (owner) (agent) AI PROVED BY : DATE APPROVED: 4 i W. !I BLW Engineers, Inc. 311 Great Road,Littleton, MA 01460 tel:978.466.4301 fax 978.486.9384 e-mall Info@l3LWEngineem corn Memorandum a DATE: October 13, 2010 TO: MICHAF.LLEARY 1 Ttta PRE-CON CONSTRUCTION WIL to t ~ • 6 FER No. � FROM: MIKE DENOMMEE—BLW ENGINEERS SUBJECT: Domestic Cold Water Service Evaluation t Second Floor Renovations COPIES TO: Salem Plumbing Inspector, Kevin Marchino-Rockefellas,File Michael, It has been brought to our attention that there are(2) water services supplying 231 Essex St.,each with a separate meter. To the best of our knowledge (1) service feeds a bulk tank that supplies the kitchen and existing second and third floor bathrooms. The latter service supplies water to a private employee bathroom's that are seldom used. BLW would recommend that the new third floor men's bathroom be tied into the water service that supplies water to the employee bathrooms. This service should be upsized at the meter to 1" and run full sized up to the men's 1 room fixtures. This sequence would be in an effort to maximize pressure and flow while leaving the burden of the new men's room off the bulk tank. Should you have any questions or comments please don't hesitate to contact our office, Mike Denommee BLW Engineers Page 1 of I October 23, 2010 Thomas McGrath Inspectional Services City of Salem 120 Washington Street Salem, MA 01970 Re: Rockafellas—Renovations to Function Hall 231 Essex Street, Salem, MA ]ASA Ref. No. 10-016.01 Dear Mr. McGrath; I'm writing in response to your question related to HC accessibility to the Mezzanine level from the second floor function Hall at Rockafellas. Since the cost for renovation falls.below 30%of the fair cash value of the building, vertical accessibility is not require for the mezzanine floor. The first and second floor of the building is of one use,therefore the property assessment is based on the whole building. Based on the current property assessment of$1.020.400. Construction cost equals $140.000 Construction Cost eauals 13% of the assessed value. I spoke with Mark Dempsey at the MA Architectural Access Board and he referred me to the section listed below: 3.3 EXISTING BUILDINGS All additions to, reconstruction, remodeling, and alterations or repairs of existing public buildings or facilities, which require a building permit or which are so defined by a state or local inspector, shall be governed by all applicable subsections in 521 CMR 3.00: JURISDICTION. 3.3.1 If the work being performed amounts to less than 30%of the full and fair cash value of the building and a. if the work costs less than $100,000, then only the work being performed is required to comply with 521 CMR or b. if the work costs $100,000 or more, then the work being performed is required to comply with 521 CMR. In addition,an accessible public entrance and an accessible toilet room, telephone, drinking fountain. Thank you for your comments and feel free to contact me with any questions. Very truly yours, Seger Architects, Inc. t�Gtt�L $uD6 ifirt�`r John A. Seger, Principal Architect cc Kevin Marchino; ]ASA File .'lX n CtM1, Ciro,( pTIL FWmt hR,;(44141 l �t tJ11J � �;, , . ;. ,.—,, , . : r•. ,.. i :roc , � , ARCHITECTURAL FINAL AFFIDAVIT To the Commissioner, Building Department: I certify that 1, or my authorized representative, has periodically inspected the Construction Phase work associated with Rockafellas-Function Hall Renovations 231 Essex Street, Salem, MA Reference: Dwg. Set dated: 9/16/2010 To the best of my knowledge, information and belief the work has been completed in conformance with the permit and plans approved by the Building Department and with the provisions of the Massachusetts State Building Code and all other pertinent laws and ordinances. 30105 ARCHITECT—MASS. REG. NO. Seger Architects, Inc. J0.30105 COMPANY y'rn PSA J`t 111 Derbv Square,Salem,MA rrDper! ADDRESS Cpm/CA�°?� � 978-744-0208 PHONE Date: October 26, 2010 Then personally appeared the above-named C- r- And made oath that the above statement by him is true. Before mc, My Commission expir 8-29-2008 a 227 ESSEX STREET L 278-11 GIs#: 552 COMMONWEALTH OF MASSACHUSETTS Map: 35 Block: ;� CITY OF SALEM Lot: 0254 Category: RENOVATIONS Permit# 278-11 BUILDING PERMIT Project# JS-2011 000273.;, Est.Cost: $150,000.00 Fee Charged: $1,435.00 Balance Due: $.00PERMISSION IS HEREBY GRANTED TO: Const.Class: I Contractor. License: Expires Use Group: PRE-CON CONSTRUCTION Lot Size(sq. ft.): 5658:0084 Zoning: B5 Owner: HOUSTON HOLDINGS TRUST,C/O DIGITAL BUNGALOW Units Gained: Applicant. PRE-CON CONSTRUCTION Units Lost AT. 227 ESSEX STREET Dig Safe#i - ISSUED ON: 28-Sep-2010 AMENDED ON. EXPIRES'ON. 28-Feb-2011 TO PERFORM THE FOLLOWING WORK. RENOVATE EXISTING BANQUET HALL PER PLANS,EXTEND SPRINKLER SYSTEM AS REQUIRED R w141pgL W TLr4,.'D )466P n•27-tvt o POST THIS CARD SO IT IS VISIBLE FROM THE STREET Electric Gas Plumbing Building Underground: A Al�10 Underground: Underground: Excavation: ✓/L ly a Meter: Footings: //�/ oM f Rough: A�gP�e J6u, Rough�l��� J Foundation: i s 3 /7f n•✓ (Jill �— �o ✓ roM 1O l 1D i� incl: 02/ 6 = Final:tl�J�e.le�/'8 Rough Frame Jv 1'-1 Fireplace/Chinmey P. Fire .t Health. yv+ Insulation: Meter: Oil. , <" `�+,.\D Final: 0K l 0� /l!/ 1 4 G� 4 - ' ` {{{ � House k Smoke:CJ��� ` a /a S¢SSOrTreasury: Water: Alarm: / T Sewer: Sprinklers: Final: {� THIS PERMIT MAY BE REVOKED BY THE CITY OF SALEM UPON VIOLATIO F ANY OF iTS RULES AND REGULATIONS. „ 11 Signature: All 33 Fee Type: Receipt No: Dale Paid: . Check o: - Amount r�€� An 1 3 , 28-Sep-10 3767 S1 4b 00 upw completion Of WOfk, dp Gi for Permit ti) Occ ,; GeoTMS®2010 Des Lauriers Municipal Solutions,Inc. 1 t V%avF An CITY OF SALEM BUILDING PERMIT CITY OF SALEM BOARD OF HEALTH Establishment Name: QAC y p r t� A Date: 10- 2-7 -1 o Page: y of No. Reference R-Rad R Item cone c-Red Item re Critical-Item DESCRIPTION OF VIOLATION/PLAN OF CORRECTION De PLEASE PRINT CLEARLY verified 'A I� � � o,J off• � � hv��'T�os� ;t ws�s Cv�7 c:�,O 71,� — Vl. �"O 1.3��.-�, ` i1-�G'�e. 'v`+� \ ��1�, Y",qua \L.,TcJtil3•-� Tla�t\ wit,\. )F_ tiv 1�� S 1 ior� Z Sa F T=on G lam\ ZFS - 1 Discussion With Person in Charge: Corrective Action Required: ❑ No ❑ Yes I have read this report, have had the opportunity to ask questions and agree to correct all ❑ Voluntary Compliance ❑ Employee Restriction/ violations before the next inspection, to observe all conditions as described, and to Exclusion comply with all mandates of the Mass/Federal Food Code. I understand that ❑ Re-inspection Scheduled ❑ Emergency suspension noncompliance may result in daily fines of twenty- ive dollars or suspension/revocation of ❑ Embargo ❑ Emergency Closure your food permit. /�f /� ❑ Voluntary Disposal ❑ Other: Certificate No: 278-11 Building Permit No.: 278-11 Commonwealth of Massachusetts City of Salem Building Electrical Mechanical Permits This is to Certify that the Banquet Hall located at ----------------- - - ------------------------ Dwelling Type 227 ESSEX STREET in the CITY OF SALEM -- -- --------------- Address Town/City Name IS HEREBY GRANTED A TEMPORARY CERTIFICATE OF OCCUPANCY .Max Occupancy 240 on 2nd Floor &100 on mezzanine for a total of 340. No occupancy without Fire Watch This permit is granted in conforuty with the Statutes and ordinan S relating thereto, and expires Monday Nov 29,2010 unless sooneqsus n dor evoked. Expiration Date ,•, Issued On: Wed Oct 27, 2010 —----- " w�1J--- --------------------- ---------- -------- nrrt'(-- u0b-► tc(L GeoTMS®2010 Des Lauriers Municipal Solutions,Inc. ------ ----------------------------------------------------------------------