Screen Shot 2025-05-21 at 9.42.04 AM PRECAST GONG. CAP TO MATCH
EXISTING. PITCH TO DRAIN. PROVIDE
CAST-IN GALV. STRAP ANCHORS TO
SECURE TO BOX STRUCTURE
20 OZ. COPPER CAP FLASHING
w
�m
m I`
1/2" "Z" BRICK VENEER TO
MATCH EXISTING. MATCH
COURSING, DETAILS AND PROFILES
I SET IN WIRE MESH, MORTAR BED.
PROVIDE MORTAR JOINTS TO
W MATCH EXIST.
= AVE MEMBRANE OVER Ya COX
N PLYWOOD BOX FRAME
wx
ds
FLASH BELOW I
SHINGLES U
F
EXIST. RIDGE Ll 2 X 4 WOOD STUDS AT i O.C. WITH
- 2 X 4 SI RONGBACKS AT 4' O.G VERT.
20 OZ. COPPER THRU-WALL STEP
FLASHING
FASTEN STUD TO BLOCKING
"SIMPSON" HOLD-DOWNS
SEE STRUCTURAL
n Chimney Detail
SCALE. 1/2" = V-0"