Loading...
Schematic Review-YMCA Rooftop AdditionDecision Development Project, Schematic Design Review - SRSD-24-2 Address of Project: 1 SEWALL STREET Meeting Date:December 11, 2024 Members Present:Grace Napolitano, Christine Madore, Dean Rubin Members Absent:Christopher Dunn Decision:To approve the schematic design as proposed and conditioned herein. Referenced Plans and Documents: - 1. Plan set tled ‘Building Axons’ prepared by Adapv Architecture & Planning, 44 Corning Street, Beverly, MA 01915, dated October 30, 2024. 2. Plan set prepared by Adapv Architecture & Planning, 44 Corning Street, Beverly, MA 01915, dated October 30, 2024. 3. Site Plan prepared by Adapv Architecture & Planning, 44 Corning Street, Beverly, MA 01915, dated October 30, 2024. 4. Exisng photographs tled ‘Photographs’ prepared by Adapv Architecture & Planning, 44 Corning Street, Beverly, MA 01915, dated October 30, 2024. 5. Project meline prepared by Adapv Architecture & Planning, 44 Corning Street, Beverly, MA 01915, dated October 30, 2024 Conditions of Approval: - Validity of Approval: This approval is valid for two years from the date of the meeting. The approval shall no longer be valid if a substantial use and/or construction has not commenced except for good cause within this two-year period. - Consistency with Approved Design/Plans: Should the applicant determine that the project may not be completed as presented and conditioned herein, he/she/they shall return to the SRA to review proposed modifications prior to making any changes in the field. - Fence Design: The applicant shall consider fence design alternatives that are consistent with guidance and regulations from the Massachusetts Historical Commission and that serve to create a more visually pleasing space for residential abutters. Findings: - The Authority found that the proposed roof top recreaon addions on the YMCA historic building were consistent with the design standards and guidelines in the Downtown Renewal Plan and the SHC Notebook. SRSD-24-2 The Authority determined that the proposed roof top recreaon project will not denigrate from the character of the Downtown Renewal Area with members in support of creavely adding addional recreaonal space in this densely developed urban area. Signature of the SRA: By the signature below, I certify that this recommendation accurately reflects the actions of the Salem Redevelopment Authority Board. Tom Daniel, AICP, Executive Director Date Signed: December 12, 2024 Page 1 of 1 Recommendation 1 Sewall Street Development Project – Schematic Design Review Meeting Date: November 20, 2024 Members Present: Marc Perras, Vice Chair, Leeann Leftwich, Kate Martin, Elizabeth Murray, Sarah Tarbet Members Absent: Paul Durand, Catherine Miller Recommendation: At a meeting of the Design Review Board (DRB), upon a motion duly made and seconded, it was unanimously voted to recommend approval of the schematic design plans for 1 Sewall Street as presented. Referenced Plans and Documents 1. Plan set titled ‘Building Axons’ prepared by Adaptiv Architecture & Planning, 44 Corning Street, Beverly, MA 01915, dated October 30, 2024. 2. Plan set prepared by Adaptiv Architecture & Planning, 44 Corning Street, Beverly, MA 01915, dated October 30, 2024. 3. Site Plan prepared by Adaptiv Architecture & Planning, 44 Corning Street, Beverly, MA 01915, dated October 30, 2024. 4. Existing photographs titled ‘Photographs’ prepared by Adaptiv Architecture & Planning, 44 Corning Street, Beverly, MA 01915, dated October 30, 2024. 5. Project timeline prepared by Adaptiv Architecture & Planning, 44 Corning Street, Beverly, MA 01915, dated October 30, 2024 Design Comments: The DRB requests the applicant consider the following: 1. The applicant may consider implementing color o r a mural of some kind on the vertical fencing around the recreation space. Findings: 1. The Board found that the proposed roof top recreation additions on the YMCA historic building were consistent with the design standards and guidelines in the Downtown Renewal Plan and the SHC Notebook. 2. The Board found that the proposed roof top recreation project will not denigrate from the character of the Downtown Renewal Area. The Board is supportive of adding additional recr eation space and appreciates recreation space if being added to an existing structure rather than space at grade. Signature of the DRB: By the signature below, I certify that this recommendation accurately reflects the discussion and actions of the Design Review Board. _______________________________________ _________ Marc Perras, Vice Chair Date 2024-12-01