Schematic Review-YMCA Rooftop AdditionDecision
Development Project, Schematic Design Review - SRSD-24-2
Address of Project: 1 SEWALL STREET
Meeting Date:December 11, 2024
Members Present:Grace Napolitano, Christine Madore, Dean Rubin
Members Absent:Christopher Dunn
Decision:To approve the schematic design as proposed and conditioned herein.
Referenced Plans and Documents:
-
1. Plan set tled ‘Building Axons’ prepared by Adap v Architecture & Planning, 44 Corning Street, Beverly, MA 01915, dated October
30, 2024.
2. Plan set prepared by Adap v Architecture & Planning, 44 Corning Street, Beverly, MA 01915, dated October 30, 2024.
3. Site Plan prepared by Adap v Architecture & Planning, 44 Corning Street, Beverly, MA 01915, dated October 30, 2024.
4. Exis ng photographs tled ‘Photographs’ prepared by Adap v Architecture & Planning, 44 Corning Street, Beverly, MA 01915, dated
October 30, 2024.
5. Project meline prepared by Adap v Architecture & Planning, 44 Corning Street, Beverly, MA 01915, dated October 30, 2024
Conditions of Approval:
- Validity of Approval: This approval is valid for two years from the date of the meeting. The approval shall no longer
be valid if a substantial use and/or construction has not commenced except for good cause within this two-year
period.
- Consistency with Approved Design/Plans: Should the applicant determine that the project may not be completed
as presented and conditioned herein, he/she/they shall return to the SRA to review proposed modifications prior to
making any changes in the field.
-
Fence Design: The applicant shall consider fence design alternatives that are consistent with guidance and
regulations from the Massachusetts Historical Commission and that serve to create a more visually pleasing
space for residential abutters.
Findings:
-
The Authority found that the proposed roof top recrea on addi ons on the YMCA historic building were consistent with the design
standards and guidelines in the Downtown Renewal Plan and the SHC Notebook.
SRSD-24-2
The Authority determined that the proposed roof top recrea on project will not denigrate from the character of the Downtown
Renewal Area with members in support of crea vely adding addi onal recrea onal space in this densely developed urban area.
Signature of the SRA: By the signature below, I certify that this recommendation accurately reflects the actions of
the Salem Redevelopment Authority Board.
Tom Daniel, AICP, Executive Director Date Signed: December 12, 2024
Page 1 of 1
Recommendation
1 Sewall Street
Development Project – Schematic Design Review
Meeting Date: November 20, 2024
Members Present: Marc Perras, Vice Chair, Leeann Leftwich, Kate Martin, Elizabeth Murray, Sarah Tarbet
Members Absent: Paul Durand, Catherine Miller
Recommendation: At a meeting of the Design Review Board (DRB), upon a motion duly made and seconded, it
was unanimously voted to recommend approval of the schematic design plans for 1 Sewall Street as presented.
Referenced Plans and Documents
1. Plan set titled ‘Building Axons’ prepared by Adaptiv Architecture & Planning, 44 Corning Street, Beverly,
MA 01915, dated October 30, 2024.
2. Plan set prepared by Adaptiv Architecture & Planning, 44 Corning Street, Beverly, MA 01915, dated
October 30, 2024.
3. Site Plan prepared by Adaptiv Architecture & Planning, 44 Corning Street, Beverly, MA 01915, dated
October 30, 2024.
4. Existing photographs titled ‘Photographs’ prepared by Adaptiv Architecture & Planning, 44 Corning Street,
Beverly, MA 01915, dated October 30, 2024.
5. Project timeline prepared by Adaptiv Architecture & Planning, 44 Corning Street, Beverly, MA 01915,
dated October 30, 2024
Design Comments: The DRB requests the applicant consider the following:
1. The applicant may consider implementing color o r a mural of some kind on the vertical fencing around
the recreation space.
Findings:
1. The Board found that the proposed roof top recreation additions on the YMCA historic building were
consistent with the design standards and guidelines in the Downtown Renewal Plan and the SHC
Notebook.
2. The Board found that the proposed roof top recreation project will not denigrate from the character of
the Downtown Renewal Area. The Board is supportive of adding additional recr eation space and
appreciates recreation space if being added to an existing structure rather than space at grade.
Signature of the DRB: By the signature below, I certify that this recommendation accurately reflects the
discussion and actions of the Design Review Board.
_______________________________________ _________
Marc Perras, Vice Chair Date