Meg Twohey November 13, 2024
122 Federal St
Salem, MA 01970
Dear Meg,
The below quote includes all labor, material, fabrication, equipment, disposal, and insurance costs.
As requested, we are quoting you on the following work:
New OG Copper gutter to the back porch area of the house:
• Working off a ladder stage to remove existing wood gutter and to install new 5” copper OG gutters to the
back porch section of the house
• Copper gutters will be custom fabricated in the shop prior to installation
• New gutter will follow all the way around the porch area/fascia board (3 sides)
• New gutters will have a 5” opening and will pitch to downspout locations
• 3” Copper downspouts will be installed to drain the gutter on the right side of the gutter, also using the
existing downspout on the left side of the gutter
• 1”X1/8” copper bar will run through the entire face of each gutter giving the gutter strength
• Gutter hangers will be fabricated out of 1”X1/8” copper bar and will have twist in the bar so water
does not run over the gutter at the hangers
• All seams, endcaps, miters and outlets will be thoroughly soldered
• Existing fascia board will be removed and new fascia board will be installed
• Gutter will be fastened directly to the fascia board with stainless steel screws
• All debris will be picked up at the end of each day and discarded in a dumpster at J.B. Kidney & Co. Inc
shop
NOTE owners’ change:
• existing downspouts to be replaced with 3” aluminum and repainted to be like kind: Monterrey White.
• New gutters to be painted Monterrey White (exterior only) after six months