Loading...
156 Derby St 156 Derby St *This work will be done to the 2" and 3rd floor of the front facade. The grade level entrance of the restaurant will remain as is, wood and painted. A separate application will be submitted for paint of restaurant entrance. Currently, the front siding is leaking into first floor of the building as we aim for a March 1 opening date. *Copper roof trim was installed over the white aluminum edge metal that previously existed over the single story restaurant area and across the first floor roof edge above bar entrance. Siding and Window Replacement 1. Wooden Shingle Replacement— 18"xRandomWx3/8" to match existing on 3 other sides of building. 2. Trim Replacement—composite white window trim with band molding around outside trim. 3. Window Replacement— Double hung replacement windows with 4 over 1.