Loading...
253 Essex Street SKM_C360i241219162001 ZBA Action Form cz- Address: BOARD MEMBERS M ION SEC OND I V TE Petitioner: ,Y,in l�, i Nina Vyedin-Chair �� Y Date: ce a Hearing Opened: ;/�n V� c.•lv�/ Paul Viccica N Public Comment: ✓L l` ,J�i Hannah Osthoff Vote: N Hearing Closed: New Documents: Ellen Simpson(Alternate) (� Stephen Larrick(Alternate) V Total:Standard Conditions: 1 7titioner shall comply with all city and state statutes,ordinances,cods and regulations t t �d All construction shall be done as per the plans and dimensions submitted to and approved by the Building ommissioner. All requirements of the Salem Fire Department relative to smoke and fire safety shall be strictly adhered ZPA'titioner shall obtain a building permit prior to beginning any construction. ExLEI Exterior finishes of the new construction shall be in harmony with the existing structure. VCertificate of Occupancy is to be obtained. pCertificate of Inspection is to be obtained. etitioner is to obtain approval from any City Board or Commission having jurisdiction including,but not limited to,the Planning Board. ❑ Petitioner shall obtain street numbering from the City of Salem Assessor's Office and shall display said I/umber so as to be visible from the street. Unless this Decision expressly provides otherwise,any zoning relief granted does not empower or authorize the Petitioner to demolish or reconstruct the structure(s)located on the subject property to an extent of more than fifty percent(50%)of its floor area or more than fifty percent(50%)of its replacement cost at the time of destruction.If the structure is demolished by any means to an extent of more than fifty percent(50%)of its replacement cost or more than fifty percent(50%)of its floor area at the time of destruction,it shall not be reconstructed except in conformity with the provisions of the �rdinance. L� All construction shall be done per the plans and dimensions submitted to and approved by this Board. Any modification to the plans and dimensions must be approved by the Board of Appeals unless such c anges are deemed a minor field change by the Building Commissioner in consultation with the Chair of Board of Appeals. /he etitioner shall schedule Assessing Department inspections of the property,at least annually,prior to project completion and a final inspection upon project completion. ❑ 1�� AI Vr, eli--e c,�c 5-" c �- S r ZBA Action Form