7 Cloutman Street SKM_C360i241126130400 (1) Asa!
b"5 _
Have a project#?
Step 1 of 9 • Save Draft and Exit
Confirm your contact information
Ensure your contact information is up-to-date so that we can get in touch with you if needed.
First Name
JOHN
Last Name
BAVUSO
Email address
jbavusol@gmail.com
Phone Number
7812815466
Address 1
5 HIAWATHA RD
Address 2 (Optional)
City
WOBURN
State
MA
ZIP/Postal Code
01801
Next
City of Salem, MA
Your Profile
Your Records (/dashboard/records)
Resources
Search for Records (/search)
Claim a Record (/claimRecord)
Employee Login (https://salemma.workflow.opengov.com)
Portal powered by OpenGov
Have a project#?
Step 2 of 9 Save Draft and Exit
Location for Zoning Board of Appeals Application
PRIMARY LOCATION
The main location associated with the record.
7 CLOUTMAN STREET
SALEM, MA 01970
Change Location A
Unit
No Unit
Property Owner Information
Name
PUERTA EDER JUNIOR BOMBC
Phone Number
781888 3533
Email
ederpuertal@gmail.com
Street#
14
Street Name
EARLES ROW
Unit
City
WILMINGTON
State
MA
Zip Code
01887
Property Data
Year built
1915
Lot Area
2108
Occupancy
Water
MBL
24-0213-0
Zoning
131
Book Page
40302/498
Building Type
Muiti-Gard2F
Sewage
Next
Back
City of Salem, MA
Your Profile
Your Records (/dashboard/records)
Resources
Search for Records (/search)
Claim a Record (/claimRecord)
Employee Login (https://salemma.workflow.opengov.com)
Portal powered by OpenGov
Have a project#?
Step 3 of 9 - Save Draft and Exit
Applicant Information
Who is completing this online application?
Applicant Type* A
Representative
Next
Back — — - --
City of Salem, MA
Your Profile
Your Records (/dash boa rd/records)
Resources
Search for Records (/search)
Claim a Record (/claimRecord)
Employee Login (https://salemma.workflow.opengov.com)
Portal powered by OpenGov
Have a project#?
Step 4 of 9 Save Draft and Exit
Applicant Information
Petitioner Name *
Puerta Eder Junior Bombonato
Petitioner Street Address
14 Earles Row
Petitioner City, State,Zip
Wilmington
Petitioner Telephone
781888 3533
Petitioner Email *
ederpuertal@gmail.com
Is the Property Owner the same as the Petitioner?
Yes
Is the Petitioner being represented by another party(like an attorney, architect,or contractor)?
Yes
Representative Name
john bavuso
Representative Street Address
5 Hiawatha Rd
Representative City, State,Zip
woburn ma 01801
Representative Telephone
7812815466
Representative Email
jbavusol@gmail.com
Next
Back
City of Salem, MA
Your Profile
Your Records (/dashboard/records)
Resources
Search for Records (/search)
Claim a Record (/claimRecord)
Employee Login (https://salemma.workflow.opengov.com)
Portal powered by OpenGov
Have a project#?
Step 5 of 9 - Save Draft and Exit
Project Address and Application Information
4 Search...
Use the above search bar to find the subject property by Address or by Parcel ID. With the
exception of Year Built, the property information should automatically populate below.
The Undersigned represent(s) that they are the owner(s) of a certain parcel of land at the below
location.
Street Number
7
Street Name
CLOUTMAN STREET
Zoning District(s) A
B1
Parcel ID
24-0213-0
Year Built* A
1915
® Age of Building
109
Does this project include multiple addresses?
No
Why is this application being submitted to the Board of Appeals?The below statement must
describe what you propose to build, the dimensions, the zone property is in, and the zoning
requirements. (Example: I am proposing to construct a 10' x 10' one story addition to my home
located at 3 Salem Lane, in the R-2 Zoning District. The Zoning Ordinance requires the minimum
depth of the rear yard to be 30 feet. The current depth of my rear yard is 32 feet; the proposed
addition would reduce the depth of the rear yard to 22 feet.)
An application is being submitted to the Board of Appeals for the following reason(s): A
1 am requesting a variance from Section 4.0 of the City of Salem dimensional rear setback
regulations due to the shape of the lot and the placement of the existing structure. The existing
two family home is in a B-1 zone and is an allowed use, however the second floor unit of the
existing non conforming two family dwelling, does not have a second means of egress. Mr.
Bombonato bought the house 4 years ago in this condition. The lack of the second egress is a
major safety concern, a Building Code mandated regulation and a requirement to allow the
house to be safely re-occupied. This second means of egress deficiency was discovered when
there was a water line break at the property and the basement was flooded.
A certified plot plan has been attached to show the existing setback lines to the house and the
proposed setback lines to the second egress stairs. The minimum required rear setback is
30', the minimum required side yard setback is 10'.The existing house does not meet either of
these setbacks. The current rear setback to the house is 20', and the current side setback is
4'. The proposed rear setback to the 5' diameter spiral stair will be 15', the proposed side
setback will be between 5' to 8' depending on the subsurface soil conditions. Notes to the
City of Salem zoning code, section 4.1.2 defines the Setback Line as being measured from the
property line to the building line. Section 10 defines Building Line as the face of the building
and excludes the measurement to a set of stairs. The landing of the required second egress
spiral stairs will only project from the building 3'. The proposed location of the egress spiral
stair is at the rear left corner of the house. It will not be visible from the street or the side yards
and does not affect the neighborhood or the dwelling, except to make it a safer place for the
occupants.
For the above reason(s), I am requesting:
Variance(s)
J
Special permit(s)
Comprehensive Permit for construction of low or moderate income housing
Appeal of a Decision of the Building Inspector
U
Variance(s).
Variance(s)from provisions of which section of the Zoning Ordinance?
Section 4,Table of Dimensional Regulations
Which dimensional requirement(s)will not be met? Describe what is allowed and what you are proposing
(sq.ft.,stories, etc.).*
Rear setback requirement of 30', current setback is only 20'. Side setback requirement is 10',
current setback is only 4'. The addition of a second egress stairway from the second floor unit
will be 15' from the rear setback and 8.9' from the side setback. The proposed spiral stairs are
a pre-fabricated metal assembly, 5' in diameter with a 3'X5' landing. The stairs will not
increase the floor area of the dwelling and will offer a safe second egress from the unit, as
remote as possible from the main front stairs.
Appeal of a Decision of the Building Inspector- Describe:
Building Department has refused to grant a permit to install the second egress spiral stairs
since we cannot meet the setback requirements.
Current Property Use:* A
Residential two family
Proposed Use: * A
Residential One- or Two-Family
Are lot dimensions included?
Yes
The Undersigned hereby petitions the Board of Appeals to vary the terms of the Salem Zoning
Ordinance and allow the project to be constructed as per the plans submitted, as the enforcement
of said Zoning By-Laws would involve practical difficulty or unnecessary hardship to the
Undersigned and relief may be granted without substantially derogating from the intent and
purpose of the Zoning Ordinance.
Next
Back -
City of Salem, MA
Your Profile
Your Records (/dashboard/records)
Resources
Search for Records (/search)
Claim a Record (/claimRecord)
Employee Login (https://salemma.workflow.opengov.com)
Portal powered by OpenGov
Have a project#?
Step 6 of 9 Save Draft and Exit
Plans and Elevations
Is construction or exterior alteration planned?
Yes
Is this new construction?* A
Yes
Is there any construction to an existing structure where the proposed work would affect the structure's
footprint?
No
Are you seeking relief for building height(in feet and/or stories)?
No
Next
Back -- - - - - -- - - - - ----
City of Salem, MA
Your Profile
Your Records (/dashboard/records)
Resources
Search for Records (/search)
Claim a Record (/claimRecord)
Employee Login (https://salemma.workflow.opengov.com)
Portal powered by OpenGov
Have a project#?
Step 7 of 9 Save Draft and Exit
Written Statement (Variance)
For all Variance requests a written Statement of Hardship demonstrating the following must be
included:
a) Special conditions and circumstances that especially affect the land, building, or structure
involved,generally not affecting other lands, buildings, and structures in the same district;
b) Literal enforcement of the Ordinance would involve substantial hardship to the applicant; and
c) Desirable relief may be granted without substantial detriment to the public good, and without
nullifying or substantially derogating from the intent of the district or the purpose of the
ordinance.
You may type the Statement of Hardship in the below text box and/or attach it as a separate
document in the Attachments section. If you will only attach the Statement separately, please
note "Attached separately" in the text box below.
Statement of Hardship*
We respectfully request a Variance from the City of Salem Dimensional Regulations, Section
4, as the irregular shape of the lot and the placement of the existing structure on this lot, as
well as the lot width and frontage deficiencies make this dwelling a pre-existing nonconforming
structure.
Literal enforcement of the setback regulations would cause the owner considerable hardship
and cost as the only other options to make this dwelling safe are to completely change the
layout of the floor plan by moving this second egress to the front right corner of the
dwelling which is the location of the kitchen,and immedialtely adjacent to the front main entry
and driveway or add a sprinkler system to the building.
The Massachusetts State Building Code, Amendments, Section R311.2 requires egress doors
to be as remote from each other as possible.
If approved, this variance request would create a safer structure without any effect to the
neighborhood or any adverse inference to the City of Salem Zoning Code.
L
Next
Back - -----
City of Salem, MA
Your Profile
Your Records (/dashboard/records)
Resources
Search for Records (/search)
Claim a Record (/claimRecord)
Employee Login (https://salemma.workflow.opengov.com)
Portal powered by OpenGov
Salem News Fee*
Puerta Eder Junior Bombonato Clear
Nov 20, 2024
Salem News Payment Method A
Check (sent to Salem Planning Dept)
Next
Back
City of Salem, MA
Your Profile
Your Records (/dashboard/records)
Resources
Search for Records (/search)
Claim a Record (/claimRecord)
Employee Login (https://salemma.workflow.opengov.com)
Portal powered by OpenGov
11125/24, 1:01 PM Submit Zoning Board of Appeals Application-VewPoint Cloud
We respectfully request a Variance from the City of Salem Dimensional Regulations, Section 4, as the
irregular shape of the lot and the placement of the existing structure on this lot, as well as the lot width
and frontage deficiencies make this dwelling a pre-existing nonconforming structure.
Literal enforcement of the setback regulations would cause the owner considerable hardship and cost
as the only other options to make this dwelling safe are to completely change the layout of the floor
plan by moving this second egress to the front right corner of the dwelling which is the location of the
kitchen,and immedialtely adjacent to the front main entry and driveway or add a sprinkler system to
the building.
The Massachusetts State Building Code, Amendments, Section R311.2 requires egress doors to be as
remote from each other as possible.
If approved, this variance request would create a safer structure without any effect to the
neighborhood or any adverse inference to the City of Salem Zoning Code.
r
_f h Al-jEM �i
REQUEST FOR LEGAL NOTICE
Payment is required at the time of the legal notice being received by the city and before it is published in
the newspaper.An email will be sent to you with the cost. Payment by cr edit card is preferred.
Prepaid cost required to run the ad:$540. $270 per day x two(2)days=$540
***Important:Average legal notice costs are estimated;customers paying by check will be refunded if the
legal ad is less than the deposit amount.
If paying by check, please make checks payable to THE SALEM NEWS and mail to:
City of Salem
Dept.Of Planning and Community Development
Co:ZBA
98 Washington St
2"d Floor
Salem, MA 01970
Please choose and check one of the boxes for payment option:
QCheck-# _(attach check)
El Credit Card-Must call Salem News legal notice clerk at 978-675-2710
If payment is not received,the legal notice may be cancelled.
I understand that by signing this form,I am agreeing to the cost of the legal notice to be published in the
newspaper.
Signed Applicant/Au t orized Agent
Print Name:
Address: / Ems.y )-,,5
d-u-n 1 Y1 CL 0 i 3!'1
l
Email: E'_-c�e.v- C:cv,J,7
Phone: `��'� / " %, _ `. �3 3
Date: 1) C'V 5- J-0-4-`l
lax
HE ALEM E, WS
REQUEST FOR LEGAL NOTICE
Payment is required at the time of the legal notice being received by the city and before it is published in
the newspaper.An email will be sent to you with the cost. Payment by credit card is preferred.
Prepaid cost required to run the ad:$540. $270 per day x two(2)days=$540
***Important:Average legal notice costs are estimated;customers paying by check will be refunded if the
legal ad is less than the deposit amount.
If paying by check,please make checks payable to THE SALEM NEWS and mail to:
City of Salem
Dept.Of Planning and Community Development
Co:ZBA
98 Washington St
211 Floor
Salem,MA 01970
Please choose and check one of the boxes for payment option:
0Check# � � �..� (attach check)
❑Credit Card—Must call Salem News legal notice clerk at 978-675-2710
If payment is not received,the legal notice may be cancelled.
I understand that by signing this form,I am agreeing to the-cost of the legal notice to be published in the
newspaper.
A
Signed Applica`nt/Authonzed Agent
Print Name:
Address: j
Email: 41 i' :f 1•i i fi ti 'l {� ^r _ L.v
Phone: -
Date: r b V
Owner of 7 Cloutman St.
Salem MA
Puerta Eder Junior Bombonato
14 Earles Row
Wilmington MA
Contractor —H IC 198080
Ernani Paganini -CS 110551
EMP Construction
21 Thatcher St.'Medford MA
Scope of work
Install a prefabricated metal spiral staircase to serve as the second means of
egress from the second floor unit at 7 Cloutman St. Salem.
Total cost of the project is $8,000
Payment schedule is $4000 in advance, the remaining $4000 after the
completion of the job.
Owner signature date 10/26/2024
Contractor signature LIV- date 10/26/2024
N
Map 24
Lot 158
Map 24 Lot 161 4 Wheatland St.
237 Jefferson Ave.
Chain Llnkl
15.00' Fence '
N84•1,6'21 ' Map 24 Lot 157
In= 6 Whealand St. a
10.6'
Why 15.0' �
Fence r, Prol+9 mu. 4RIf
5' Spiral sg3F
Egress Stair Bo Y h
Map 24 Lot 162 . 000 i
239 Jefferson Ave. /i �eoc
Gate: Dwelling Map 24 Lot 213
5,160 sq.ff.
4"1 — � Porch Up °
D'Map 24 Lot 212 Ri 'I' 30.0'
241-243 Jefferson Ave. O 16"
v1 0 \Tree
,1 Bit. Conc. fp++y
g _i Driveway J/pry
m
c� A 1 64.8' N
3 ofDi I Map 24 Lot 163
9 Cloutman St.
a I �ac0
Map 24 Lot 164 T\\c i 00
247 Jefferson Ave. m C' �� I
�J
4
83.5 '30"W
25.50'
V_
�sg•\
CLOUTMAN s?p��?'
Iron Rod
W/Cap
(Held)
ZONING DISTRICT — B
REFERENCES:
1) Deed Book 40302 Page 498
2) Plan in Bk. 1001 Pg. 300 PROPOSED PLOT PLAN
3) Plan #85 of 1980 7 CLOUTMAN STREET
4) Plan Bk. 332 Plan 88 SALEM, MASSACHUSETTS
Prepared By
LeBlanc Survey Associates, Inc.
161 Holten Street
Danvers, MA 01923
OF (978) 774-6012
J..°N��\, October 11, 2024 Scale: 1"--20'
LeBL,wc I
NO. 33800
Qs HOR. SCALE IN FEET
Lo 20 100
11/19/24,5:36 PM SECTION 4.0-DIMENSIONAL REQUIREMENTS I Zoning Ordinance I Salem,MA I Municode Library
Zoning Ordinance Nonresidential Nonresidential Residential l Residential
Uses—Existing Uses—New Uses or Uses or
Building Construction Mixed Use Mixed Use-
-Existing New
Buildings; Construction;
see note 1 see note 1
1. Where residential use compromises twenty-five (25) percent or less of the total building area, the
regulations for nonresidential uses shall apply.
2. Distance shall be equal to the height of the taller building.This distance may be reduced to a
distance which is sufficient to provide adequate light, air and access, subject to the approval of the
planning board.There shall be no requirement for individual row houses sharing a party wall.
i3. May be increased up 6 to 1 for the buildings predominantly characterized as fifty(50%) percent open
automobile parking structures.
4.1.2 Notes to Table of Dimensional Requirements. In interpreting the Table of Dimensional
Requirements, the following provisions shall apply:
1. The minimum front yard depth required shall be measured from the right-of-way line
where a plan of the right-of-way is on file with the registry of deeds, or in the absence of
such a plan, from a line thirty-five (35)feet from and parallel with the centerline of the
traveled way to the front building line.
2. The minimum side yard width required shall be measured from the side lot line to the side
building line, and the minimum rear yard depth required shall be measured from the rear
lot line to the rear building line.
3. On a corner lot, the minimum front yard depth. rather than the minimum side yard width,
shall be applied to determine the setback of any building from lot lines abutting any public
way.
4. The minimum lot width required shall be measured at the rear of the required front yard
depth and on a line parallel to the right-of-way line where a plan of the right-of-way is on
file with the registry of deeds or, in the absence of such a plan, from a line twenty-five (25)
feet from and parallel with the centerline of the traveled way.
5. Frontage shall mean a lot line coinciding with the sideline of a street which provides both
legal rights of vehicular access and physical vehicular access to the lot, said line to be
measured continuously along a single street or along two (2) intersecting streets if their
11/19/24,5:32 PM B SECTION 10.0-DEFINITIONS I Zoning Ordinance i Salem, MA I Municode Library
Zoning OI CYIn l�ldbreakfastestablishment.•Accommodations with not more than six (6) bedrooms
occupied by bed and breakfast guests in which the owner of the establishment resides. Bed
and breakfasts are intended for guest on intermittent visits, and shall not be used as long-term
rental units or apartments.All parking for residents and guests shall be off-street.
Brewery, distillery, or winery with a tasting room: A business located in a building where the
primary use is for the production and distribution of malt, spirituous, or vinous beverages with
a tasting room as defined in Section 10.0. Any such facility that only provides samples at no
charge and limited in size as set forth in M.G.L. c. 138 shall have a Commonwealth of
Massachusetts issued Farmer Series License and any such facility that sells alcoholic beverages
to be consumed on the premises shall have a Commonwealth of Massachusetts issued Farmer
Series Pouring License.The facility may host marketing events, special events, and/or factory
tours.The facility may only sell beverages produced by, and commercial goods branded by,the
brewery, distillery or winery.The facility may sell permitted beverages by the bottle to
consumers for consumption off the brewery premises.
Building:Any structure used or intended for supporting or sheltering any use or occupancy.
Building, attached:A building, having one (1) portion completely separated from another
portion by a division wall without openings.
Building, detached.•A building, usually an accessory building, having no direct attachment to the
principal building on the lot.
Building line:The line of a building face, which face shall include cornices projecting more than
twelve (12) inches, balconies, sun parlors, covered porches and entrances, whether enclosed or
unenclosed, but shall not include steps.
Building, principal.•A building in which is conducted the main or principal use of the lot on
which said building is situated.
Building coverage:That percentage of the lot or plot area covered by the roof area of a building
or buildings.
Building height:Building height shall be measured from the average elevation of the proposed
finished grade at the front line of the building to the highest point of the roof for flat roofs,to
the deck line for mansard roofs, and to the mean height between eaves and ridge for gable, hip
and gambrel roofs. Fences and walls shall be measured from the Finished grade vertically to
the highest point.
Business or professional office:A building or part thereof, for the transaction of business or the
provision of services exclusive of the receipt, sale, storage, or processing of merchandise.