Loading...
90 Mason Street Action Form ZBA Action Form Address: (36 MQ,}'4vl ft ------- BOARD MEMBERS MOTION SECOND VOTE Petitioner: Nina Vyedin-Chair ,✓ Date: Paul Viccica Hearing Opened:8 e5p( , Hannah Osthoff Public Comment: Vote: Ellen Simpson Hearing Closed:8,LAq,en v New Documents: Stephen Larrick V V Total• - Standard Conditions: 1. Petitioner shall comply with all city and state statutes,ordinances, codes and regulations. 2.All construction shall be done as perthe plans and dimensions submittedto and approved by the Building Commissioner. �3.All requirements of the Salem Fire Department relative to smoke and fire safety shall be strictly adhered to. -'24.Petitioner shall obtain a building permit prior to beginning any construction. --5. Exterior finishes of the new construction shall be in harmony with the existing structure. -�V.A Certificate of Occupancy is to be obtained. )( 7.A Certificate of Inspection is to be obtained. 8.Petitioneris to obtain approval from any City Board or Commission having jurisdiction including,but not limited to,the Planning Board. 9.Petitioner shall obtain street numbering from the City of Salem Assessor's Office and shall display said number so as to be visible from the street. ✓1 O. Unless this Decision expressly provides otherwise,any zoning relief granted does not empower or authorize the Petitioner to demolish or reconstruct the structure(s)located on the subject property to an extent of more than fifty percent(50%)of its floor area or more than fifty percent(50%)of its replacement cost at the time of destruction.If the structure is demolished by any means to an extent of more than fifty percent(50%)of its replacement cost or more than fifty percent(50%)of its floor area at the time of destruction,it shall not be reconstructed except in conformity with the provisions of the Ordinance. 11. All construction shall be done per the plans and dimensions submitted to and approved by this Board.Any modification to the plans and dimensions must be approved by the Board of Appeals unless such changes are deemed a minor field change by the Building Commissioner in consultation with the Chair of the Board of Appeals. i 12. Petitioner shall schedule Assessing Department inspections of the property,at least annually, prior to project completion and a final inspection upon project completion. del '�'� ,Qog'�✓Gh�4 on'dal�1}��U�1 ❑ �l/I ^V Q � ---b 06ZZ[Jd2 GAP — - ❑ - — ZBA Action Form