Old Town Hall Exterior RestorationDecision Small Project Review - SRA-22-1 Address of Project: 0 DERBY SQUARE Meeting Date:June 8, 2022 Members Present:Grace Napolitano, Chair, David Guarino, Christine Madore, Cynthia Nina-Soto, Dean Rubin Members Absent:None Decision:To approve this project as designed and conditioned herein. Referenced Plans and Documents: - Existing Elevations, Existing Site Plan, Proposed Elevations, and Proposed Site Plan, prepared by Mills Whitaker Architects LLC, PO Box 750089, Arlington, MA 02475, dated May 6, 2022. DRB Presentation, prepared by Mills Whitaker Architects LLC, PO Box 750089, Arlington, MA 02475, presented to the Board on May 25, 2022. A series of existing conditions photographs submitted by Mills Whitaker Architects LLC, PO Box 750089, Arlington, MA 02475, submitted on March 10, 2022. Conditions of Approval: - Validity of Approval: This approval is valid for two years from the date of the meeting. The approval shall no longer be valid if a substantial use and/or construction has not commenced except for good cause within this two-year period. - Consistency with Approved Design/Plans: Should the applicant determine that the project may not be completed as presented and conditioned herein, he/she/they shall return to the SRA to review proposed modifications prior to making any changes in the field. - Vehicular Navigation at East Façade: The applicant shall consult with the City of Salem Traffic and Parking Department to explore what, if any, safety measures need to be implemented to protect the integrity of the proposed ramp at the east façade. Ramp Safety: The applicant may consider adding a gate to both sides of the proposed accessible ramp so that this access is closed when the building is not in use. This ramp may not deter all individuals from accessing the sub-grade area, but it will provide a visual cue that the area is not for recreation and it will provide a physical barrier from accidently stumbling down the ramp or the stairs. Design Details: The applicant shall return for additional design review when finishes, materials, and the like are identified for the exterior elements and the proposed access ramp. The applicant should ensure that the proposed railings match existing ones and that the transition of the to-be- exposed foundation with the above-grade façade treatments at the ramp area is addressed with care. Findings: - The SRA, a body duly established and responsible for overseeing all the duties as prescribed by M.G.L. 121B and in Salem's Downtown Renewal Plan, and having jurisdiction over proposed changes to the exterior facades of all buildings in the Downtown Renewal Area, finds that this project to restore and rehabilitate a significant historic structure is appropriate and consistent with the goals and standards in the Downtown Renewal Plan. Members support the proposed ramp and accompanying stairwell that creates a second means of accessible egress into the building via its basement and find that it is the optimal design to preserve the overall look and character of the building and its place in Derby Square. Signature of the SRA: By the signature below, I certify that this recommendation accurately reflects the actions of the Salem Redevelopment Authority Board. Tom Daniel, AICP, Executive Director Date Signed: June 9, 2022 SRA-22-1 Design Review Board Recommendation Small Project Review - SRA-22-1 Address of Project: 0 DERBY SQUARE Meeting Date:May 25, 2022 Members Present:Paul Durand, David Jaquith, Catherine Miller, Marc Perras, Helen Sides, J. Michael Sullivan Members Absent:Glenn Kennedy Decision:To recommend approval of the project as presented and conditioned herein. Referenced Plans and Documents: - Existing Elevations, Existing Site Plan, Proposed Elevations, and Proposed Site Plan, prepared by Mills Whitaker Architects LLC, PO Box 750089, Arlington, MA 02475, dated May 6, 2022. DRB Presentation, prepared by Mills Whitaker Architects LLC, PO Box 750089, Arlington, MA 02475, presented to the Board on May 25, 2022. A series of existing conditions photographs submitted by Mills Whitaker Architects LLC, PO Box 750089, Arlington, MA 02475, submitted on March 10, 2022. Conditions of Approval: - Consistency with Approved Design/Plans: Should the applicant determine that the project may not be completed as presented and conditioned herein, he/she/they shall return to the DRB to review proposed modifications prior to making any changes in the field. - Ramp Safety: The applicant may consider adding a gate to both sides of the proposed accessible ramp so that this access is closed when the building is not in use. This ramp may not deter all individuals from accessing the sub-grade area, but it will provide a visual cue that the area is not for recreation and it will provide a physical barrier from accidently stumbling down the ramp or the stairs. Design Details: The applicant shall return for additional design review when finishes, materials, and the like are identified for the exterior elements and the proposed access ramp. The applicant should ensure that the proposed railings match existing ones and that the transition of the to-be-exposed foundation with the above-grade façade treatments at the ramp area is addressed with care. Findings: - The members found the proposed in-kind repairs to the building's exterior elements are consistent with design standards and requirements for historic buildings. The proposed ramp and accompanying stairwell that creates a second means of egress into the building via its basement is the optimal design to preserve the overall look and character of the building and its place in Derby Square. SRA-22-1 Signature of the DRB: By the signature below, I certify that this recommendation accurately reflects the actions of the Design Review Board. Paul Durand, Chair Date Signed: March 10, 2022 3/10/22, 8:52 AM 1/1 Salem Redevelopment Authority 98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 (978) 619-5685 Small Project Review - SRA-22-1 Date of Submission: March 10, 2022 Owner at Submission (from Assessor) Old Town Hall / City of Salem Applicant name:Don Mills Owner (from Applicant)Don Mills Applicant phone:(617) 283-5377 Owner Phone (617) 283-5377 Applicant email:donmills@millswhitaker.com Owner Email donmills@millswhitaker.com Address of Property: 0 DERBY SQUARE Property Use (From Assessor) Year Built (From Assessor)1829 Occupancy (from Assessor) Zoning (From Assessor)B5 Building Type (from Assessor) Govt. Bldg. Old Town Hall Renovations Details: -There are proposed changes to the existing site plan Applicant's Description of Work: Improvements to functionality of the building to better serve as a local hub for arts and culture. Accessibility, energy efficiency, HVAC, fire suppression, acoustical improvements, restroom replacement and related interior work to maximize occupancy opportunities. Exterior work is limited to in-kind repairs to masonry and roofing, provision of exterior storm windows, improvements to accessible entrance, and provision of boreholes with flush manhole covers for a ground source heat pump system. EX. BOILER VENTS 9'-10" AVG.EXISTING EAST EXTERIOR ELEVATION Scale: 1/8" = 1'-0" A A-15 SECOND FIN. FLOOR FIRST FIN. FLOOR BASEMENT FIN. FLOOR 12'-5" MAX.ATTIC WALKWAY 19'-4"9'-10" AVG.12'-5" MAX.EXISTING SOUTH EXTERIOR ELEVATION Scale: 1/8" = 1'-0" B A-15 SECOND FIN. FLOOR FIRST FIN. FLOOR BASEMENT FIN. FLOOR ATTIC WALKWAY 19'-4"`EXISTING NORTH EXTERIOR ELEVATION Scale: 1/8" = 1'-0" D A-159'-10" AVG.SECOND FIN. FLOOR FIRST FIN. FLR. BASEMENT FIN. FLOOR12'-5" MAX.ATTIC WALKWAY 19'-4"9'-10" AVG.EXISTING WEST EXTERIOR ELEVATION Scale: 1/8" = 1'-0" C A-15 SECOND FIN. FLOOR FIRST FIN. FLOOR BASEMENT FIN. FLOOR12'-5" MAX.19'-4"ATTIC WALKWAY O L D T O W N H A L L R E N O V A T I O N S3 2 D E R B Y S Q U A R ES A L E M M A 0 1 9 7 0MILLS WHITAKER ARCHITECTS LLC P.O. BOX 750089 ARLINGTON MA 02475 tel: 617-876-7611 fax: 617-876-6420 DATE: SHEET #:DRAWING TITLE:PROJECT NAME:PROJECT ADDRESS: 06 MAY 2022 E X I S T I N G E X T E R I O R E L E V A T I O N SA-15 PROGRESS PRINT NOT FOR CONSTRUCTION PROPOSED SOUTH EXTERIOR ELEVATION Scale: 1/8" = 1'-0" B A-16 PROPOSED NORTH EXTERIOR ELEVATION Scale: 1/8" = 1'-0" D A-16 PROPOSED EAST EXTERIOR ELEVATION Scale: 1/8" = 1'-0" A A-16 9'-10" AVG.SECOND FIN. FLOOR FIRST FIN. FLR. BASEMENT FIN. FLOOR12'-5" MAX.ATTIC WALKWAY 19'-4"PROPOSED WEST EXTERIOR ELEVATION Scale: 1/8" = 1'-0" C A-169'-10" AVG.SECOND FIN. FLOOR FIRST FIN. FLOOR BASEMENT FIN. FLOOR12'-5" MAX.19'-4"ATTIC WALKWAY EXTEND ENTRY WALK PROVIDE ACCESSIBLE WALKWAY TO MATCH OPPOSITE SIDE EXTEND ENTRY LANDING EXTEND & UPGRADE ACCESSIBLE WALKWAY PROVIDE FIRE DEPT. VALVE CONNECTION9'-10" AVG.12'-5" MAX.SECOND FIN. FLOOR FIRST FIN. FLOOR BASEMENT FIN. FLOOR ATTIC WALKWAY 19'-4"`(RAMP DOWN)9'-10" AVG.SECOND FIN. FLOOR FIRST FIN. FLOOR BASEMENT FIN. FLOOR 12'-5" MAX.ATTIC WALKWAY 19'-4"EXTEND ENTRY WALK O L D T O W N H A L L R E N O V A T I O N S3 2 D E R B Y S Q U A R ES A L E M M A 0 1 9 7 0MILLS WHITAKER ARCHITECTS LLC P.O. BOX 750089 ARLINGTON MA 02475 tel: 617-876-7611 fax: 617-876-6420 DATE: SHEET #:DRAWING TITLE:PROJECT NAME:PROJECT ADDRESS: 06 MAY 2022 PROGRESS PRINT NOT FOR CONSTRUCTION P R O P O S E D E X T E R I O R E L E V A T I O N SA-16 O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S Designer Selection Interview Presentation 1 O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S 2 RENOVATION GOALS & INTENTIONS: !Preserve Significant Hub of Arts & Culture !Improve Accessibility, Functionality, Acoustics, Energy Efficiency, & Restrooms for All Uses Salem Redevelopment Authority 3 O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S PRELIMINARY PROJECT SCHEDULE: !Dec 2021: Designer Selection Completed !May 2022:Target for Regulatory Approvals !Jun 2022: Establish Project Scope & Budget !Aug 2022: Start Construction Documents if Funds Appropriated to Implement Project !Apr 2023: Competitive Bidding Process Begins !Jun 2023: Construction Begins !Sep 2024: Completion of Construction !May 2026: 400-Year Salem Celebration INITIAL REGULATORY APPROVALS: !MA Plumbing Board Variance !Salem Historic Commission Review !Salem Redevelopment Authority: Small Project !Salem Commission on Disabilities Review !MA Architectural Access Board Variance !MHC Project Notification Form (When Funded) Salem Redevelopment Authority 4 O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S EXISTING CROSS SECTION 75" AFF AT BEAM BRICK PIERS & TIMBER BEAMS AT BASEMENT EXIST. SECOND FIN. FLOOR EXIST. FIRST FIN. FLOOR EXIST. BASEMENT FIN. FLOOR 89" AFF AT JOISTS EXISTING BUILDING NOTES: !Second Floor Assembly: Originally Salem Town Hall; Stage at North End of Hall; Former Offices at South End; 150 Person Occupant Limit !First Floor Colonnade: Originally Market Stalls; Subsequently Town Offices; Used for Gallery & Gatherings; 150 Person Occupant Limit; !Basement Support Spaces: Mixed Uses Over Time; Central Support Beam/Piers; Salem Redevelopment Authority 5 O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S SECOND FLOOR / Wall-to -Wall Roof BASEMENT LEVEL Central Supports FIRST FLOOR Colonnade Columns Salem Redevelopment Authority 6 O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S RENOVATION THOUGHTS: !Second Floor Assembly: Mixed Use Meeting Hall; Make Stage Area Accessible; Lighting, Acoustics & AV; 350 Occupancy Limit !First Floor Colonnade: Mixed Use Gallery/Gatherings; Improve & Organize Access; Lighting, Acoustics & AV; 400 Occupancy Limit !Basement Support Spaces: Reconfigure Structural Support; Improve Restrooms & Access REMOVE BRICK PIERS & PROVIDE COLUMNS BELOW COLONNADE THOUGHTS ON CROSS SECTION SECOND FIN. FLOOR FIRST FIN. FLOOR BASEMENT FIN. FLOOR LOWER FLOOR BY ONE RISER 96" AFF AT JOISTS Salem Redevelopment Authority 7 O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S STORAGE & RECORDS RESTROOM FACILITIES UTILITIES & CUSTODIAL Salem Redevelopment Authority UP UP UP UP UP 5" UP UP UP VAULT MECH. WOMEN DOCUMENTS MEN ELEV. STO.UTILITIES COSTUMES STORAGE 5.4% SLOPE 2.9% SLOPE EXISTING BASEMENT PLAN Scale: 1/8" = 1'-0" 1.0 A-10 NORTH 8 O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S EXISTING BASEMENT LEVEL PLAN Salem Redevelopment Authority ACCESSIBLE RAMP & STAIRS TO GROUND FLOOR ENTRY WOMEN BASEMENT PLAN Scale: 1/8" = 1'-0" 0 HC-3 NORTH HDHD HDHD UP UP UP 6" @ 1:20 MAX. UP UP 21"UP 3" @1:20 MAXUP 3" @1:20 MAX CLO HD FAM. CLASSROOM STORAGE VAULT CLO MEN PANTRY STORAGE MECH. ELEV.ELECT.STORAGE JC FAM. UPRAMP UP UP 9 O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S Salem Redevelopment AuthorityPROPOSED BASEMENT LEVEL PLAN 10 O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S VIEWS OF DERBY SQUARE OPEN GALLERY SPACE ADJACENT EGRESS AREAS Salem Redevelopment Authority 11 O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S EXISTING FIRST FLOOR PLAN Salem Redevelopment Authority UP UP UP UP DNUP DN UP UP DN DN 2 3 4 5 UP SLOPE UP EXISTING FIRST FLOOR PLAN Scale: 1/8" = 1'-0" 1.0 A-11 NORTH ENTRY OFFICE VAULT SOUTH FOYER COLONNADE ELEV. 12 O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S Salem Redevelopment AuthorityPROPOSED FIRST FLOOR PLAN UP UP UP UP DNUP UP UP UP DN ELEV. COLONNADE STO. VAULT ENTRY OFFICE SOUTH FOYER FIRST FLOOR PLAN Scale: 1/8" = 1'-0" 1 HC-3 NORTH RAMP DOWN - 30' LONG @ 1:12 SLOPE 52" @ WALLS / 44" CLEAR @ RAILS LANDING BELOW DN 2 3 4 5 DN RAMP & STAIRS TO GROUND FLOOR ENTRY BELOW ACCESSIBLE WALKTO MAIN ENTRYACCESSIBLE WALKTO MAIN ENTRY 13 O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S MONUMENTAL STAIRS MAIN ASSEMBLY SPACE FORMER TOWN OFFICES Salem Redevelopment Authority 14 O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S EXISTING SECOND FLOOR PLAN Salem Redevelopment Authority UP DN DN UP E E EVENT SUPPORT (FORMER TOWN CLERK) GREEN ROOM (FORMER SELECTMEN) CLO. GREAT HALL STAGE ELEV. UP UP EXISTING SECOND FLOOR PLAN Scale: 1/8" = 1'-0" 1.0 A-12 NORTH CLO. W.C. 15 O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S Salem Redevelopment AuthorityPROPOSED SECOND FLOOR PLAN GREEN ROOM HD UP DN DN E UP UP UP UP TO ATTIC GREAT HALL STAGE ELEV.LIFT EVENT SUPPORT SECOND FLOOR PLAN Scale: 1/8" = 1'-0" 1.1 A-12 NORTH CLO. CLO. W.C. 16 O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S SALEM REDEVELOPMENT AUTHORITY REVIEW: Exterior Work subject to ”Small Project Review” by the Salem Redevelopment Authority includes: !In-Kind Repairs to Exterior Masonry Materials !In-Kind Repairs to Copperwork at Cornices !Preservation and Repairs to Ventilating Cupola !Remove Five Abandoned Louvers & Infill Brick !Provide Low Infiltration Exterior Storm Windows !Widen Walkway at Accessible North Entry by 18 ” for Accessible Entrance via NE & NW Corners !Provide Accessible Ramp & Stairs to Basement Entrance at East Elevation from SE Corner !Rehabilitate Exterior Lantern Lights at Facades !Flush Manhole Cover for Test GSHP Borehole (all other boreholes subsurface and not visible) !Selective Repairs to Brick & Concrete Paving Salem Redevelopment Authority 17 O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S MASONRY CONDITIONS BROWNSTONE SILLS WINDOW OPENINGS Salem Redevelopment Authority 18 O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S VENTILATION CUPOLA ROOFING CONDITIONS SNOW GUARDS Salem Redevelopment Authority 19 O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S COURSED GRANITE BASE MONUMENTAL STAIRS EXISTING NORTH ENTRY Salem Redevelopment Authority UP UP UP CATV1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 SOUTH ENDUP UP 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 S WW GASWATEREXIST. GRANITE @ 18" ABOVE SIDEWALK EX. CONC. FLUSH W/ SIDEWALK EX. BOILER VENTS EX. DS EX. DS EX. DS EX. BRICK SIDEWALK EX. GRANITE FLUSH WITH SIDEWALK EX. GRANITE CURB EX. GRANITE @ 13" ABOVE WALK EX. GRANITE @ 5" AFF EX. GRANITE FND. EXTENDS 3.5" @ EACH SIDE EX. GRANITE @ 4.5" ABOVE WALK EX. GRANITE FLUSH W/ SIDEWALK EX. GRANITE @ 2" ABOVE WALK EXIST. BRICK BELOW SIDEWALK LEVEL EX. GRANITE FLUSH W/ SIDEWALK EX. FLUSH BRICK EX. FLUSH GRANITE EX. STONE DUST 2" BELOW EX. CONC. WASH EX. GRANITE 4" ABOVE WALK EX. GRANITE FLUSH W/ WALK EX. GRANITE @ 2" ABOVE SIDEWALK EX. DS EX. CONC. WASH EX. GRANITE FLUSH WITH SIDEWALK EX. CONC. WASH OVER GRANITE EX. CONC. WASH OVER GRANITE S WW EX. GRANITE 18" ABOVE WALK EX. GRANITE FND. PROJECTS 3.5" FROM EACH SIDE DN DN EX. DS EX. DS EX. DS EX. DS EX. GRANITE UP 1"EX. BLUESTONE UP 4"EX. GRANITE DN 2"EX. BLUESTONE DN 1"SLOPE UP ~9.5" @ WALKWAYEX. FLUSH CURB CUT SLOPE UP 2" UP 4" @ CURB UP 4.5" @ STOOPEX. TERRACED COBBLESUP ~7" @ CURB CUTSLOPE UP 3.5" UP 5.25" DN 3" SLOPENORTH END1 2 3 4 5 6 7 8 9 10 11 WEST SIDE EAST SIDE WINDOW BAY NUMBERS AT EAST & WEST FACADES UP UP UP CATV1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 SOUTH ENDUP UP 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 S WW GASWATEREXIST. GRANITE @ 18" ABOVE SIDEWALK EX. CONC. FLUSH W/ SIDEWALK EX. BOILER VENTS EX. DS EX. DS EX. DS EX. BRICK SIDEWALK EX. GRANITE FLUSH WITH SIDEWALK EX. GRANITE CURB EX. GRANITE @ 13" ABOVE WALK EX. GRANITE @ 5" AFF EX. GRANITE FND. EXTENDS 3.5" @ EACH SIDE EX. GRANITE @ 4.5" ABOVE WALK EX. GRANITE FLUSH W/ SIDEWALK EX. GRANITE @ 2" ABOVE WALK EXIST. BRICK BELOW SIDEWALK LEVEL EX. GRANITE FLUSH W/ SIDEWALK EX. FLUSH BRICK EX. FLUSH GRANITE EX. STONE DUST 2" BELOW EX. CONC. WASH EX. GRANITE 4" ABOVE WALK EX. GRANITE FLUSH W/ WALK EX. GRANITE @ 2" ABOVE SIDEWALK EX. DS EX. CONC. WASH EX. GRANITE FLUSH WITH SIDEWALK EX. CONC. WASH OVER GRANITE EX. CONC. WASH OVER GRANITE S WW EX. GRANITE 18" ABOVE WALK EX. GRANITE FND. PROJECTS 3.5" FROM EACH SIDE DN DN EX. DS EX. DS EX. DS EX. DS EX. GRANITE UP 1"EX. BLUESTONE UP 4"EX. GRANITE DN 2"EX. BLUESTONE DN 1"SLOPE UP ~9.5" @ WALKWAYEX. FLUSH CURB CUT SLOPE UP 2" UP 4" @ CURB UP 4.5" @ STOOPEX. TERRACED COBBLESUP ~7" @ CURB CUTSLOPE UP 3.5" UP 5.25" DN 3" SLOPENORTH END1 2 3 4 5 6 7 8 9 10 11 WEST SIDE EAST SIDE WINDOW BAY NUMBERS AT EAST & WEST FACADES CB CB1.5" COPPERUP UP UP CATVHHHHHHHHHHHHHH HH HHHHHHHHHHHHHH CB CB E S D DS DS DS DS DS DS DS DN DN SWW LT LT LT HYD HH HH S S 8" A.C. SEWER 8" A.C. SEWER HHACCESSIBLE WALKWAYTO SOUTH ENTRANECEE D LTLT D LT LT CB D DS CB LT S WW GAS W E ?TO FRONT STREETTO ESSEX STREET6" C.I12" R.C.6" C.I.12" DICL WATER 12 R.C. DRAIN 6" C.I.6" C.I.6" C.I.6" C.I.CB 6" C.I6" C.I.6" C.I12 R.C.DRAIN (DMH) 8" A.C. SEWER 1" COPPER6" C.I12" R.C. DRAIN12" DICL WATER 8" A.C. SEWER 12" DICL WATER HYD 12" R.C. W C.O. CHIMNEY DROP AT TOP OF STAIRS EXIST. BELLY IN SANITARY PIPE 84" BELOW SIDEWALK EXIST. VITREOUS CLAY OUTSIDE BLDG. EXIST. CAST IRON INSIDE BLDG. 28" BELOW SLAB @ MID-HALL EXIST. CLEAN OUT IN FLOOR SLAB INFO FROM VIDEO REVIEW 1/28/2022 EX. H-CAP TOILET IN WOMEN'S ROOM FIBER OPTICS PASS THRU BUILDING TO SERVE OTHERS BLDGS 15" BELOW SLAB @ MECH. (36" BELOW MID-HALL) FORMER INTERIOR RAIN LEADER PIPING CHIMNEY DROP AT TOP OF STAIRS 84" BELOW SIDEWALK EXIST. VITREOUS CLAY OUTSIDE BLDG. EXIST. CAST IRON INSIDE BLDG. UP UP LT 6" C. I . EXISTING SITE PLAN Scale: 1/8" = 1'-0" 1 A-05 NORTH EXISTING SITE PERIMETER AT BUILDING FACADE Scale: 1/8" = 1'-0" 2 A-04 NORTH NOTE: Drawing has been drafted from 1972-1973 Site Plans provided by the City of Salem O L D T O W N H A L L R E N O V A T I O N S3 2 D E R B Y S Q U A R ES A L E M M A 0 1 9 7 0MILLS WHITAKER ARCHITECTS LLC P.O. BOX 750089 ARLINGTON MA 02475 tel: 617-876-7611 fax: 617-876-6420 DATE: SHEET #:DRAWING TITLE:PROJECT NAME:PROJECT ADDRESS: 06 MAY 2022 E X I S T I N G S I T E P L A NA-05 PROGRESS PRINT NOT FOR CONSTRUCTION Salem Redevelopment Authority 20EXISTING SITE PLAN OF OLD TOWN HALL PROPOSED SITE PERIMETER AT BUILDING FACADE Scale: 1/8" = 1'-0" 2 A-06 NORTH PROPOSED SITE PLAN Scale: 1/8" = 1'-0" 1 A-06 NORTH SCHEMATIC NOTES FOR SITE PLAN WORK •RECONSTRUCT ACCESSIBLE WALKWAY AT PUBLIC ENTRANCE ON NORTH SIDE OF BUILDING TO CORRECT SLOPES (RUNNING & CROSS) AND IMPROVE MANEUVERING CLEARANCE (AT OUTSWING DOORS). •PROVIDE FIRE SUPPRESSION SUPPLY PIPING INTO THE FACILITY FOR PROVISION OF AN AUTOMATIC SPRINKLER SYSTEM. •REPAIR AND RE-FINISH EXISTING METAL RAILINGS AT SOUTH FAÇADE STEPS AND BASEMENT DOOR WELLS AT EAST AND WEST FACADES. •REPAIR BELLY IN SEWER PIPING AT SOUTH PLAZA AREA IN FOREGROUND OF THE BUILDING TO ALLOW FOR CONSISTENTLY SLOPED SANITARY OUTFLOW. •PROVIDE EIGHTEEN (18) FULLY GROUTED 500’ DEEP BOREHOLES FOR CLOSED LOOP GROUND SOURCE HEAT PUMP HVAC SYSTEM. RESET ALL BRICK PAVERS OVER COMPACTED AND PATCHED SUBSTRATE IN AREAS OF DRILLING AND TRENCHING TO PRESERVE THE SITE. •SEQUENCE EXTERIOR WORK TO MAINTAIN SUFFICIENT PEDESTRIAN AND EMERGENCY VEHICLE ACCESS BETWEEN FRONT STREET AND ESSEX STREET.2.5" COPPERUP IMPROVE ACCESSIBLE WALKWAYTO NORTH ENTRANECEUP UP UP UP CATVHHHHHHHHHHHHHH HH HHHHHHHHHHHHHH CB CB E S D DS DS DS DS DS DS LT LT LT HYD HH HH S S 8" A.C. SEWER 8" A.C. SEWER HH E D LTLT D LT LT CB D DS CB LT S WW GAS W E X TO FRONT STREETTO ESSEX STREET12" R.C.6" C.I.12" DICL WATER 12 R.C. DRAIN 6" C.I.6" C.I.6" C.I.CB 6" C.I6" C.I.6" C.I6" C. I . 12 R.C.DRAIN (DMH) 8" A.C. SEWER 1" COPPER6" C.I12" R.C. DRAIN12" DICL WATER 8" A.C. SEWER 12" DICL WATER HYD 12" R.C. W EX. CHIMNEY DROP AT TOP OF STAIRS EXCAVATE & REPLACE BELLY IN SANITARY PIPE 28" BELOW SLAB @ MID-HALL REPLACE CLEAN OUT IN FLOOR SLAB FIBER OPTICS PASS THRU BUILDING TO SERVE OTHERS BLDGS 15" BELOW SLAB @ MECH. (36" BELOW MID-HALL) CB CB 84" BELOW SIDEWALK REPLACE SANITARY OUTSIDE BLDG. REPLACE SANITARY INSIDE BLDG. LT DS DN SWW GAS 6" C.I6" C.IFDVC 01BH 03BH FIRE SUPPRESSION SUPPLY07BH 09BH 13BH 04BH 08BH 15BH 06BH 10BH GSHP NW LOOP GSHP NE LOOP GSHP SW LOOP GSHP SE LOOP 18BH14BH 12BH 17BH 05BH 11BH 16BH 02BH PROVIDE TEST BOREHOLE W/ M.H. COVER DNPROVIDE ACCESSIBLE RAMP DOWN TO BASEMENT ENTRANCE 6" C.I.ENTRYDRAINTYPICAL CONCEALED BOREHOLE FOR GSHP CLOSED LOOP SYSTEM PEOVIDE ACCESSIBLE WALKWAYTO MATCH OPPOSITE SIDEUP NOTE: Drawing has been drafted from 1972-1973 Site Plans provided by the City of Salem O L D T O W N H A L L R E N O V A T I O N S3 2 D E R B Y S Q U A R ES A L E M M A 0 1 9 7 0MILLS WHITAKER ARCHITECTS LLC P.O. BOX 750089 ARLINGTON MA 02475 tel: 617-876-7611 fax: 617-876-6420 DATE: SHEET #:DRAWING TITLE:PROJECT NAME:PROJECT ADDRESS: 06 MAY 2022 PROGRESS PRINT NOT FOR CONSTRUCTION P R O P O S E D S I T E P L A NA-06 21PROPOSED SITE PLAN OF OLD TOWN HALL Salem Redevelopment Authority 22 O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S MASSACHUSETTS ARCHITECTURAL ACCESS BOARD: This project triggers the need for full compliance with current regulations (521 CMR). Variance requests require documentation to show that the cost of full compliance is excessive as compared to the benefit gained for the disabled. Special consideration is given to the potential loss of historic significance. VARIANCE REQUEST & ALTERNATIVE ENTRANCE: Current regulations require all public entrances to be accessible. The Essex Street entrance at the north facade will be improved and be made fully accessible. Making the Front Street entrance(s) accessible at the south facade would permanently disrupt historic resources and is not recommended. An alternative accessible entrance into the basement is proposed for minimal disruption and maximum benefit. Salem Redevelopment Authority 23 O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S Salem Redevelopment Authority FIRST FLOOR PLAN - ACCESSIBLE ENTRANCE AT SOUTH FACADE Scale: 1/8" = 1'-0" 1 HC-1 NORTH UP DNUP UP UP DN UP UP DN ELEV. COLONNADE STO. VAULT ENTRY OFFICE SOUTH FOYER UP UP 9'-2"5'-0"3'-0"16" TO START OF RAMP RAMP UP REQUEST VARIANCE FOR ACCESSIBLE SOUTH ENTRANCE REQUEST VARIANCE FOR ACCESSIBLE SOUTH ENTRANCE 24 O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S Salem Redevelopment Authority9'-10" AVG.SECOND FIN. FLOOR FIRST FIN. FLOOR BASEMENT FIN. FLOOR12'-5" MAX.19'-4"ATTIC WALKWAY9'-10" AVG.12'-5" MAX.SECOND FIN. FLOORFIRST FIN. FLOORBASEMENT FIN. FLOOR ATTICWALKWAY19'-4"`SOUTH ELEVATION - ACCESSIBLE ENTRANCE TO SOUTH FACADE Scale: 1/8" = 1'-0" B HC-1 WEST ELEVATION - RAMP TO ACCESSIBLE ENTRANCE AT SOUTH FACADE Scale: 1/8" = 1'-0" C HC-1 9'-10" AVG.SECOND FIN. FLOOR FIRST FIN. FLOOR BASEMENT FIN. FLOOR12'-5" MAX.19'-4"ATTIC WALKWAY9'-10" AVG.12'-5" MAX.SECOND FIN. FLOOR FIRST FIN. FLOOR BASEMENT FIN. FLOOR ATTIC WALKWAY 19'-4"`SOUTH ELEVATION - ACCESSIBLE ENTRANCE TO SOUTH FACADE Scale: 1/8" = 1'-0" B HC-1 WEST ELEVATION - RAMP TO ACCESSIBLE ENTRANCE AT SOUTH FACADE Scale: 1/8" = 1'-0" C HC-1 SOUTH FACADE WITH ACCESSIBLE ENTRANCESRAMP TO LANDING AND EXTENDED STAIRS AT SOUTH FACADE 25 O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S Salem Redevelopment Authority SOUTH ELEVATION - ACCESSIBLE ENTRANCE AT EAST FACADE Scale: 1/8" = 1'-0" B HC-3 WEST ELEVATION - RAMP TO ACCESSIBLE ENTRANCE INTO SOUTH FOYER AT WEST FACADE Scale: 1/8" = 1'-0" C HC-39'-10" AVG.9'-10" AVG.12'-5" MAX.SECOND FIN. FLOOR FIRST FIN. FLOOR BASEMENT FIN. FLOOR SECOND FIN. FLOOR BASEMENT FIN. FLOOR12'-5" MAX.ATTIC WALKWAY 19'-4"`19'-4"ATTIC WALKWAY FIRST FIN. FLOOR (RAMP DOWN) EAST ELEVATION - RAMP & STAIRS TO ACCESSIBLE ENTRANCE INTO GROUND FLOOR LEVEL Scale: 1/8" = 1'-0" A HC-3 9'-10" AVG.SECOND FIN. FLOOR FIRST FIN. FLOOR BASEMENT FIN. FLOOR 12'-5" MAX.ATTIC WALKWAY 19'-4"EXTEND ENTRY WALK PROPOSED SOUTH FACADEEXISTINGSOUTH FACADE EX. BOILER VENTS 9'-10" AVG.EXISTING EAST EXTERIOR ELEVATION Scale: 1/8" = 1'-0" A A-15 SECOND FIN. FLOOR FIRST FIN. FLOOR BASEMENT FIN. FLOOR 12'-5" MAX.ATTIC WALKWAY 19'-4"9'-10" AVG.12'-5" MAX.EXISTING SOUTH EXTERIOR ELEVATION Scale: 1/8" = 1'-0" B A-15 SECOND FIN. FLOOR FIRST FIN. FLOOR BASEMENT FIN. FLOOR ATTIC WALKWAY 19'-4"`EXISTING NORTH EXTERIOR ELEVATION Scale: 1/8" = 1'-0" D A-159'-10" AVG.SECOND FIN. FLOOR FIRST FIN. FLR. BASEMENT FIN. FLOOR12'-5" MAX.ATTIC WALKWAY 19'-4"9'-10" AVG.EXISTING WEST EXTERIOR ELEVATION Scale: 1/8" = 1'-0" C A-15 SECOND FIN. FLOOR FIRST FIN. FLOOR BASEMENT FIN. FLOOR12'-5" MAX.19'-4"ATTIC WALKWAY O L D T O W N H A L L R E N O V A T I O N S3 2 D E R B Y S Q U A R ES A L E M M A 0 1 9 7 0MILLS WHITAKER ARCHITECTS LLC P.O. BOX 750089 ARLINGTON MA 02475 tel: 617-876-7611 fax: 617-876-6420 DATE: SHEET #:DRAWING TITLE:PROJECT NAME:PROJECT ADDRESS: 06 MAY 2022 E X I S T I N G E X T E R I O R E L E V A T I O N SA-15 PROGRESS PRINT NOT FOR CONSTRUCTION PROPOSED ACCESSIBLE ENTRANCE TO BASEMENT 26 O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S Salem Redevelopment Authority SOUTH ELEVATION - ACCESSIBLE ENTRANCE AT EAST FACADE Scale: 1/8" = 1'-0" B HC-3 WEST ELEVATION - RAMP TO ACCESSIBLE ENTRANCE INTO SOUTH FOYER AT WEST FACADE Scale: 1/8" = 1'-0" C HC-39'-10" AVG.9'-10" AVG.12'-5" MAX.SECOND FIN. FLOOR FIRST FIN. FLOOR BASEMENT FIN. FLOOR SECOND FIN. FLOOR BASEMENT FIN. FLOOR12'-5" MAX.ATTIC WALKWAY 19'-4"`19'-4"ATTIC WALKWAY FIRST FIN. FLOOR (RAMP DOWN) EAST ELEVATION - RAMP & STAIRS TO ACCESSIBLE ENTRANCE INTO GROUND FLOOR LEVEL Scale: 1/8" = 1'-0" A HC-3 9'-10" AVG.SECOND FIN. FLOOR FIRST FIN. FLOOR BASEMENT FIN. FLOOR 12'-5" MAX.ATTIC WALKWAY 19'-4"EXTEND ENTRY WALK PROPOSED ACCESSIBLE ENTRANCE TO BASEMENT 27 O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S Salem Redevelopment AuthorityPROPOSED ACCESSIBLE ENTRANCE TO BASEMENT ACCESSIBLE RAMP & STAIRS TO GROUND FLOOR ENTRY WOMEN BASEMENT PLAN Scale: 1/8" = 1'-0" 0 HC-3 NORTH HDHD HDHD UP UP UP 6" @ 1:20 MAX. UP UP 21"UP 3" @1:20 MAXUP 3" @1:20 MAX CLO HD FAM. CLASSROOM STORAGE VAULT CLO MEN PANTRY STORAGE MECH. ELEV.ELECT.STORAGE JC FAM. UPRAMP UP UP UP UP UP UP DNUP UP UP UP DN ELEV. COLONNADE STO. VAULT ENTRY OFFICE SOUTH FOYER FIRST FLOOR PLAN Scale: 1/8" = 1'-0" 1 HC-3 NORTH RAMP DOWN - 30' LONG @ 1:12 SLOPE 52" @ WALLS / 44" CLEAR @ RAILS LANDING BELOW DN 2 3 4 5 DN RAMP & STAIRS TO GROUND FLOOR ENTRY BELOW ACCESSIBLE WALKTO MAIN ENTRYACCESSIBLE WALKTO MAIN ENTRY 28 O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S Salem Redevelopment AuthorityPROPOSED ACCESSIBLE ENTRANCE TO BASEMENT "Second Accessible Entrance & Exit "Access to Elevator from South End "Accessible Route Bypasses Colonnade "Off-Hours Public Restrooms Possible "Preserves South Entrances &Steps "No Addition to Original Building Facade "Utilizes an Existing Basement Doorway "Multiple Uses for Basement Access 29 ARCHITECTURAL ACCESS BOARD APPLICATION: !PROPOSED WORK FOR FULL COMPLIANCE •Improve North Accessible Entrance •Provide Wheelchair Access to Stage •Provide Compliant Wood Handrails •Provide Assistive Listening Systems •Provide Railings at Transition Ramps •Signage, Controls, & Fire Alarm System !PROPOSED LIMITED VARIANCE REQUESTS •Retain Historic South Facade Entrances & Propose Alternative Entrance to Basement •Taper Interior Thresholds at Great Hall •Retain Interior Stair Nosing Profiles •Retain Existing Fireplace Mantels O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S Salem Redevelopment Authority 30 KEY NEXT STEPS IN APPROVAL PROCESS: !Design Review Board Comments •Seeking Recommendation to SRA •Further Details in Subsequent Phase !Salem Redevelopment Authority •Small Project Conceptual Review •Seeking Preliminary Approval !Salem Commission on Disability •Final Review of Interior & Exterior •Seeking Endorsement of Accessibility !MAAB Variance Application •Variance Application for Decision •Mass. Historic Comm. ADA Review O L D T O W N H A L L / S A L E M M I L L S W H I T A K E R A R C H I T E C T S Salem Redevelopment Authority