Loading...
Cataldo Ambulance Materials MEMORANDUM TO: Members of the Planning Board FROM: Helen Sides, Vice Chair, Design Review Board SUBJECT: DRB Recommendation – 4 Franklin Street DATE: June 24, 2021 CC: Tom Daniel, AICP, Director, Dept. of Planning & Community Development Mason Wells, Planner The Design Review Board (DRB) reviewed the above-referenced project at its April 28th, May 26th, and June 23rd meetings. Board members reviewed the design of the project in accordance with the regulations of the North River Canal Corridor (NRCC) Mixed Use District and took public comment at each of the meetings. Throughout the design review process the applicant, represented by David Stockless, Icon Architecture at the meetings, was professional, respectful, open to design suggestions, and amenable to altering the design to meet Board and community concerns. The design, especially the materiality, is now more appropriate for the neighborhood, the building’s use, and its location. Proposal: On behalf of the property owner, CAS Salem, LLC, Attorney Joe Correnti of Correnti & Darling, LLC submitted a proposal to redevelop the property at 4 Franklin Street in a two-phased approach. Phase 1 is the current permitting focus and includes the construction of a business office and ambulance facility with associated employee parking area, utilities, landscaping, and harbor walking path along the North River. Referenced Plans and Documents 1. Site Plan Review for Business Office & Ambulance Facility, 4 Franklin Street, prepared by Griffin Engineering Group, 495 Cabot Street, 2nd Floor, Beverly, MA 01915, dated January 20, 2021 unless otherwise noted, containing the following plans: a. Plan Notes, sheet C-1. b. Existing Site Plan, sheet C-2. c. Demolition Plan, sheet C-3. d. Proposed Site Layout, sheet C-4, revised 3/25/21. e. Proposed Grading & Draining, sheet C-5, revised 3/25/21. f. Proposed Utilities Plan, sheet C-6, revised 3/25/21. g. Proposed Landscaping Plan, sheet C-7, revised 3/25/21 and 4/7/21. h. Detail I, sheet C-8. i. Detail II, sheet C-9. j. Detail III, sheet C-10, revised 3/25/21. k. Lighting Plan, sheet 1 of 1, prepared by WLS Lighting, 1919 Windsor Place, Fort Worth, TX 76110, dated 11/5/20. 2. Project Narrative dated 1/20/21. 3. Environmental Impact Statement dated 1/20/21. 4. Elevation Plans and Renderings, prepared by Icon Architecture, 101 Summer Street, Boston, MA 02110, submitted on 3/25/21, revised and resubmitted on 5/13/21 and 6/17/21. Page 2 of 3 5. A series of public comments submitted as letters and during the public meetings. 6. Staff comments dated 4/22/21, 5/20/21, and 6/18/21. DRB Review: Throughout the DRB’s review of this project, particular attention was paid to the overall massing and visual impact of the structure with a desire to reduce potential negative impacts through architectural elements, materials, and colors to reinforce building scale so that it is an appropriate addition to North Salem and the NRCC district. The architect has made several revisions since the first presentation of the building design: • The metal paneling has been removed and replaced it with cementitious panels and clapboards in a gray color palette. • To ground the building, the applicant has added a gray brick veneer base from grade to the bottom sills of the first-floor windows. • The North Street façade includes a series of windows to mimic the garage doors on the opposite side of the building, opening this façade to natural light. • Removal of the significant architectural feature at the corner of the building facing North Street in favor of a small awning over the access door, which reduces the significance of this entrance and emphasizes the main entrance on the opposite side of the building. • Addition of a cornice along the rooflines of both sections of the building. • Landscaping has been increased, softening the edges of the building. • Screening of mechanical systems on the roof and at grade will hide this infrastructure from view. Building Mass and Design Board members believe that the building design is appropriate for not only its location, but for its use. This is a unique building with a unique use as a private office building with the garage bay/ambulance component. It is not a civic building or open to the general public. The renderings provided by the architect accurately portray the building, however they do not provide neighborhood context. The building looks large, looming over the adjacent public ways. However, when members dug into the massing of the building, they determined that it is not a large building, comparatively. It may be larger than the Speedway across Franklin Street, but it is comparable to the three-family structures next to the Speedway. Board members found that the massing and design of the building is appropriate for the neighborhood, the NRCC, and the ECOD. Materiality The NRCC-prescribed preferred materials of brick, wood, and other natural materials are not an appropriate choice for this building. Many of the public comments referenced the applicant’s Danvers location, which is in a refurbished brick firehouse. To compare the proposal for the Salem location to the Danvers location is not a fair comparison and to ask the applicant to construct a red brick, civic- appearing building for an office and ambulance station is not a fair request. Many public comments referenced the brick structures across North Street and the North Street fire station as context for this building. While there are brick structures sprinkled along North Street, there are structures covered in clapboards, vinyl, and stucco. There are buildings with peaked roofs and flat roofs. There are single- and two-family homes, commercial buildings, multi-family buildings. There is no one building style or material representing the area; the context-providing neighborhood is a mix of all types of architecture, massing, and materials. Page 3 of 3 The applicant is seeking to use materials of the present time on a new building, which the Board voted to support. Landscaping and Screening The additional vegetation along the North Street façade softens the building and provides a more visually pleasant experience as pedestrians travel through the adjacent city-owned property as it connects with the path across the river. The mechanicals at grade as screened by a wall covered with the same clapboard as is used on the ambulance portion of the building, effectively incorporating and blending the mechanical area with the building. DRB Recommendation: While the vote to recommend approval of this design to the Planning Board was not unanimous (5 in favor, 1 in descent), the majority of the Board members believed that the design, massing, and siting are in compliance with the regulations and standards of the NRCC and the Entrance Corridor Overlay District. The Board would like to offer the following recommendations for your consideration: 1. While the materiality has improved from the originally proposed metal paneling, the applicant can continue to improve the building’s appearance. The mix of panels and clapboards in a cementitious material is appropriate. The applicant could further examine color options. The gray color palette can read as cold and unwelcoming. A warmer tone for the building would go far in integrating the new building with the surrounding neighborhood. 2. The Board is invested in the design of this building and would like the Planning Board to require the applicant to share the final design plans and color palette with the Board at a regularly scheduled public meeting. 3. If the applicant is to provide revised renderings, they should include abutting buildings to provide context for the new building and how it will fit into the existing neighborhood. CAS Salem LLC 4 Franklin Street Page 1 of 4 January 20, 2021 Project Narrative In Support of Site Plan Review Application From: CAS Salem LLC For Site Redevelopment at: 4 Franklin Street The proposed construction of the business office and ambulance facility at 4 Franklin Street requires demolishing the remaining portion of the former HMA car wash and service building and replacing it with a modern, attractive, energy- efficient business office and ambulance building. The site is ideally located for this purpose. The work includes a new parking lot, utilities, landscaping, and harborwalk path along the North River. The business office and ambulance facility construction is Phase I of site redevelopment, and encompasses approximately one-half of the property, the portion closest to Franklin Street. Phase II of site redevelopment will address the remaining portion of the site, which is the portion along the North River. Plans for Phase II have not yet been developed. The project is located in the North River Canal Corridor District (NRCC) and Flood Hazard Overlay District (FHOD). Portions of the site are also in the Entrance Corridor Overlay District (ECOD). The project narrative below follows the format specified in Section 9.5 of the Salem Zoning Ordinance. 1. Building The majority of the former HMA car wash and vehicle service facilities was demolished in the winter and spring of 2020. The remaining HMA building will be CAS Salem LLC 4 Franklin Street Page 2 of 4 January 20, 2021 demolished as part of site redevelopment. The proposed business office and ambulance facility is sited along Franklin Street with the garage doors for the ambulance bays facing North Street. The proposed building meets an essential community need. It will be constructed of a steel frame bearing on a cast-in-place concrete foundation. The building has been thoughtfully and efficiently designed by the project architect, Icon Architecture of Boston, a firm with considerable experience in emergency service facility design. The building exterior will be a mix of cementitious clap board and panel siding, vertical corrugated metal siding, and glass panels. The building will appear modern and commercial, and blend well with the surrounding industrial and commercial buildings. 2. Parking & Loading Twelve (12) parking spaces are provided on-site, one parking space per each anticipated shift employee. The building contains a large 50’x56’ ambulance bay with two garage access doors. The ambulance bay has sufficient space to park four to six ambulances. Routine shipping and receiving at the facility is not anticipated therefore a loading space is not necessary. 3. Traffic Flow and Circulation The proposed site entrance is along the untraveled portion of North Street near the intersection with Franklin Street. The proposed access driveway location will provide efficient access to North Street for emergencies. Parking lot traffic flow is primarily limited to employees which will occur during shift changes. 4. External Lighting The exterior parking area is small. Most of the parking area will be adequately illuminated by light fixtures mounted on the building exterior. Light packs will be installed above the two garage doors and near the entrance doors. Towards the North Street end of the parking lot, a light post and fixture is proposed. Lamps in the lighting fixtures will be energy-efficient LED. 5. Landscaping and Screening Landscape beds are proposed along Franklin Street and the North Street site entrance. Eight (8) deciduous and ornamental trees are proposed within the planting beds. The remainder of the area around the ambulance building will be lawn or parking. No screening is necessary along the rear of the building since the existing use is CAS Salem LLC 4 Franklin Street Page 3 of 4 January 20, 2021 a marine industrial site. An existing chain link security fence exists. Additional site landscaping will be proposed during Phase II. 6. Utilities New water, sewer, electric, and natural gas utility services will be installed from Franklin Street to the proposed ambulance building. Existing service connections will be reused to the extent practicable. A new stormwater outfall will be installed in the North River. Stormwater will be treated by deep-sump, hooded catch basins and a water quality separator prior to discharge. 7. Snow Removal Adequate snow storage is provided around the perimeter of the parking lot and access driveway. Should on-site snow storage capacity prove to be inadequate, snow will be removed from the site. No snow is to be dumped directly into the North River. 8. Natural Area Protection and Enhancement The site has been thoroughly disturbed by previous commercial and industrial uses. The proposed project will not disturb any natural areas. The 2003 North River Canal Corridor (NRCC) master plan directly addressed the project site. The proposed project is consistent with the plan’s mission in that it provides open space along the waterfront, includes low-density commercial development, improves pedestrian access along the river, and enhances the streetscape and sidewalk along Franklin Street. 9. Topography and Maintenance The topography of the site is fairly flat and will be easy to maintain. Maintenance of site landscaping, snow-plowing and the like will be the responsibility of a property manager employed by the property owner. 10. Compatibility of Architecture with Surrounding Area. The proposed building will have solid, strong commercial appearance, suitable for an emergency service building. The use of glass and metal panels in the building exterior also gives the building modern character. Nearby existing buildings generally consist of a mixture of brick, masonry-block, and conventional clapboard siding. The proposed building will generally match the architecture of the surrounding area while being a significant overall improvement to the neighborhood as compared to the former car care facility. The addition of green CAS Salem LLC 4 Franklin Street Page 4 of 4 January 20, 2021 space and planting beds at the site are a much needed benefit to an otherwise largely paved and impervious area. 4/5/2021 OpenGov https://salemma.viewpointcloud.io/#/explore/records/281410/printable?act=false&app=true&att=false&emp=false&int=false&loc=true&sec=1011753%2…1/7 04/05/2021 City of Salem, MA PB-21-2 Planning Board Application Applicant Information Project Address(s) and Owner Information Status: Active Date Created: Jan 28, 2021 Applicant Joseph Correnti jcorrenti@cdlawyers.com 63 Federal Street Salem, MA 01970 9787440212 Location 4 FRANKLIN STREET SALEM, MA 01970 Owner: CAS SALEM, LLC PO BOX 435 SOMERVILLE, MA 02143 Applicant Type Attorney Project Address Street Number 4 Project Address Street Name FRANKLIN STREET City SALEM Zip Code 01970 Full Address 4 FRANKLIN STREET, SALEM, MA 01970 Zoning District B5 Owner Name CAS SALEM, LLC Owner Street Name PO BOX 435 Owner City SOMERVILLE Owner State MA Owner Zip Code 02143 4/5/2021 OpenGov https://salemma.viewpointcloud.io/#/explore/records/281410/printable?act=false&app=true&att=false&emp=false&int=false&loc=true&sec=1011753%2…2/7 Brief Project Description Project Information Project Information Continued (Stormwater Management) Brief Project Description Construction of a business office and ambulance facility with associated employee parking area, utilities, landscaping and harbor walk path along the North River. The business office and ambulance facility is the first phase of site redevelopment and occurs on the Franklin Street side of the site. The second phase, the plan for which has not been developed, will occur on the North River side of the site. The project is located in the North River Canal Corridor District and Flood Hazard Overlay District. Portions of the site are also in the Entrance Corridor Overlay District. Proposed Use Commercial Existing Use Commercial North River Canal Corridor (NRCC)  Flood Hazard Overlay District (FHOD)  Entrance Corridor Overlay District (ECOD)  Total Parcel Square Footage 44,548 Number of Existing Dwelling Units 0 Number of Existing Affordable Dwelling Units 0 Proposed Building(s) Gross Square Footage 5,550 Proposed Building(s) Footprint Square Footage 4,260 Proposed Nonresidential Gross Square Footage (if any) 5,550 Proposed Total Number of Parking Spaces 12 Check box if there is a new curb cut proposed  4/5/2021 OpenGov https://salemma.viewpointcloud.io/#/explore/records/281410/printable?act=false&app=true&att=false&emp=false&int=false&loc=true&sec=1011753%2…3/7 Required Narrative Any modifications to existing drainage on the site, regardless of size.  Any activity that results in a land disturbance equal to or greater than one acre of land within the City of Salem.  Any activity that will disturb less than one acre of land but is part of a larger common plan of development or sale that will ultimately disturb equal to or greater than one acre of land.  Required Narrative - File Upload pdf Narrative for SPR Application.pdf Uploaded by Joseph Correnti on Jan 27, 2021 12:40 PM Building Narrative The proposed building will be constructed of a steel frame bearing on a case-in-place concrete foundation. the building exterior will be a mix of cementitious clap board and panel siding, vertical corrugated metal siding and glass panels. The building will appear modern and commercial, and blend well with the surrounding industrial and commercial buildings. Parking and Loading Narrative Twelve (12) parking spaces are provided on site, one parking space per each anticipated shift employee. The building contains a large 50'x56' ambulance bay with two garage access doors. The ambulance bay has sufficient space to park four to six ambulances. Routine shipping and receiving at the facility is not anticipated therefore a loading space is not necessary. Traffic Flow, Circulation, and Traffic Impact within the Site The proposed site entrance is along the untraveled portion of North Street near the intersection with Franklin Street. The proposed access driveway location will provide efficient access to North Street for emergencies. Parking lot traffic flow is primarily limited to employees which will occur during shift changes. External Lighting Narrative The exterior parking area is small. Most of the parking area will be adequately illuminated by light fixtures mounted on the building exterior. Light packs will be installed above the two garage doors and near the entrance doors. Towards the North Street end of the parking lot, a light post and fixture is proposed. Lamps in the lighting fixtures will be energy-efficient LED. Landscaping and Screening Landscape beds are proposed along Franklin Street and the North Street site entrance. Eight (8) deciduous and ornamental trees are proposed within the planting beds. The remainder of the area around the ambulance building will be lawn or parking. No screening is necessary along the rear of 4/5/2021 OpenGov https://salemma.viewpointcloud.io/#/explore/records/281410/printable?act=false&app=true&att=false&emp=false&int=false&loc=true&sec=1011753%2…4/7 Flood Hazard Overlay District Special Permit the building since the existing use is a marine industrial site. An existing chain link security fence exists. Additional site landscaping will be proposed during Phase II. Snow Removal Adequate snow storage is provided around the perimeter of the parking lot and access driveway. Should on-site snow storage capacity prove to be inadequate, snow will be removed from the site. No snow is to be dumped directly into the North River. Utilities New water, sewer, electric and natural gas utility services will be installed from Franklin Street to the proposed ambulance building. Existing service connections will be reused to the extent practicable. A new stormwater outfall will be installed in the North River. Stormwater will be treated by deep-sump, hooded catch basins and a water quality separator prior to discharge. Natural Features and their Protection and Enhancement The site has been thoroughly disturbed by previous commercial and industrial uses. The proposed project will not disturb any natural areas. The 2003 NRCC master plan directly addressed the project site. The proposed project is consistent with the plan's mission in that it provides open space along the waterfront, includes low-density commercial development, improves pedestrian access along the river, and enhances the streetscape and sidewalk along Franklin Street. Topography and its Maintenance The topography of the site is fairly flat and will be easy to maintain. Maintenance of site landscaping, snow-plowing and the like will be the responsibility of a property manager employed by the property owner. Compatibility of Architecture with Surrounding Area The proposed building will have solid, strong commercial appearance, suitable for an emergency service building. The use of glass and metal panels in the building exterior also gives the building modern character. Nearby existing buildings generally consist of a mixture of brick, masonry- block, and conventional clapboard siding. The proposed building will generally match the architecture of the surrounding area while being a significant overall improvement to the neighborhood as compared to the former car care facility. The addition of green space and planting beds at the site are a much needed benefit to an otherwise largely paved and impervious area. Plans and Drawings - Flood Hazard Overlay District Special Permit pdf Cataldo-PermitSet-012021.pdf Uploaded by Joseph Correnti on Jan 28, 2021 9:20 AM A list of Federal, State, and other local permits required by the applicant. Federal: None; State: Chapter 91 Licence (MassDEP); Local: Order of Conditions (ConCom), Drainage Alteration Permit, Curb Cut Permit and Site Plan Review 4/5/2021 OpenGov https://salemma.viewpointcloud.io/#/explore/records/281410/printable?act=false&app=true&att=false&emp=false&int=false&loc=true&sec=1011753%2…5/7 North River Canal Corridor Special Permit The proposed use will comply in all respects to the uses and provisions of the underlying district in which the land is located. Yes Brief explanation Business office is a permitted use within the NRCC There are adequate convenience and safety of vehicular and pedestrian movement within the site and in relation to adjacent streets and property, particularly in the event of flooding of the lot(s) or adjacent lot(s) caused by either overspill from water bodies or high runoff. Yes Brief explanation See attached Utilities, including gas, electricity, fuel, water and sewage disposal, shall be located and constructed so as to protect against breaking, leaking, short-circuiting, grounding or igniting or any other damage due to flooding. Yes Brief explanation See attached Such proposals minimize flood damage Yes All public utilities and facilities are located and constructed to minimize or eliminate flood damage Yes Adequate drainage is provided to reduce exposure to flood hazards Yes A brief narrative identifying how the proposed development is in compliance with the Neighborhood Master Plan for the North River Canal Corridor, October 2003. Master plan document located here https://www.salem.com/sites/salemma/files/uploads/nrcc-masterplan.pdf The 2003 North River Canal Corridor master plan directly addressed the project site. The proposed project is consistent with the plan's mission in that it provides open space along the waterfront, includes low-density commercial development, improves pedestrian access along the river, and enhances the streetscape and sidewalk along Franklin Street. All development shall be designed to complement and harmonize with adjacent land uses (existing and proposed) with respect to architecture, scale, landscaping and screening. Building materials of brick, stone, and wood are encouraged. Pre-cast concrete or prefab aluminum or metal panels are highly discouraged. The building has been thoughtfully and efficiently designed by the project architect, Icon Architecture of Boston. The building exterior will be a mix of cementitious clap board and panel siding, vertical corrugated metal siding and glass panels. The building will appear modern and commercial, and blend well with the surrounding industrial and commercial buildings. 4/5/2021 OpenGov https://salemma.viewpointcloud.io/#/explore/records/281410/printable?act=false&app=true&att=false&emp=false&int=false&loc=true&sec=1011753%2…6/7 Project Team Members Ground floor spaces should have active pedestrian friendly uses. N/A Buildings should be located in a way to create a presence on the main corridor's street edges. The proposed business office and ambulance facility is sited along Franklin Street with the garage doors for the ambulance bays facing North Street. Buildings shall face the main corridor and have an entrance on the main corridor. The proposed site entrance is along the untraveled portion of North Street near the intersection with Franklin Street. The proposed access driveway location will provide efficient access to North Street for emergencies. Streets and roadways must include sidewalks and landscaping to provide an attractive connection for pedestrian use, and to complement adjacent parkland. The plan proposes 5' wide sidewalks across the Franklin Street frontage with 6" vertical granite curbing. Additionally, landscaping along the Franklin Street frontage is proposed per the plans submitted. Uses are designed to generate pedestrian traffic. A proposed harbor walk pathway running along the North River is part of the plan. All retail uses should support the adjacent neighborhoods. N/A All development shall be designed to facilitate, accommodate, and encourage use by pedestrians and non-motorized forms of transportation as much as, if not more so than, use by motorized vehicles. See attached. Water dependent uses are encouraged to be developed on the parcels located within the district and adjacent to the North River, particularly parks, open space, pedestrian facilities, and both public and commercial recreational facilities; marinas, boat yards, boat basins, boat storage yards, yacht clubs, and other commercial and recreational boating; shore protection structures such as seawalls, bulkheads and revetments; flood, water level, or tidal control facilities; marine industry, including marine terminals for the transfer between ships and shore, facilities related to the construction, serving, maintenance, repair or storage of vessels or other marine structures, facilities for tug boats, barges, dredges or other vessels engaged in port operations or marina construction. See attached plans. Professional Staff Role Civil Engineer Company Phone 9789275111 Company Email bgriffin@griffineng.com Professional Staff Role Company Phone 4/5/2021 OpenGov https://salemma.viewpointcloud.io/#/explore/records/281410/printable?act=false&app=true&att=false&emp=false&int=false&loc=true&sec=1011753%2…7/7 Signatures Review responses Conditions - Distinct Architect 6174513333 Company Email dstockless@iconarch.com Applicant Signature CAS Salem, LLC, by Its Attorney: Joseph C. Correnti 01/28/2021 CATALDO AMBULANCE FACILITY: PERSPECTIVES CATALDO AMBULANCE FACILITY: PERSPECTIVES CATALDO AMBULANCE FACILITY : PERSPECTIVES CATALDO AMBULANCE FACILITY : PERSPECTIVES CATALDO AMBULANCE FACILITY: ELEVATIONS NORTHEAST ELEVATION SOUTHWEST ELEVATION Vertical Corrugated Metal Siding Steel Canopy 7” Cementitious Lap Siding Aluminum Frame and Glazing System Aluminum and Glass Overhead Doors CATALDO AMBULANCE FACILITY: ELEVATIONS NORTHWEST ELEVATION SOUTHEAST ELEVATION 7” Cementitious Panel Siding Vertical Corrugated Metal Siding Aluminum Frame and Glazing System Vertical Corrugated Metal Siding Wood-Look Panels Bollard with Light Screen Wall at Mechanical Equipment Screen Wall at Mechanical Equipment 6'-9 7/8" 7'-0" 46 ' - 3 3 / 4 " 49'-4 1/4" 12 ' - 2 5 / 8 " 12 ' - 0 " 3' - 0 " 12 ' - 0 " 2' - 0 " 3' - 0 " 2' - 0 " 52'-0 1/2" 70 ' - 8 " 24 ' - 5 3 / 8 " 46 ' - 2 5 / 8 " 70'-2 3/4" FRANKLIN STREET NO R T H S T R E E T GARAGE VEST.VEST. 2' - 1 1 1 / 8 " 7' - 6 1 / 8 " 2' - 1 1 " 2' - 1 1 " 2' - 1 1 " 0 2'4'8' 7' - 0 " 23 ' - 0 1 / 8 " 47 ' - 7 7 / 8 " 70 ' - 8 " 8' - 6 7 / 8 " MECHANICAL PAD WITH ENCLOSURE WALLS 20'-0 1/8" 3'-0" CATALDO AMBULANCE FACILITY FLOOR PLANS SALEM, MA. 1/4" = 1'-0"1 LEVEL 1 FLOOR PLAN CATALDO AMBULANCE FACILITY: PERSPECTIVES CATALDO AMBULANCE FACILITY: PERSPECTIVES CATALDO AMBULANCE FACILITY : PERSPECTIVES CATALDO AMBULANCE FACILITY: ELEVATIONS NORTHEAST ELEVATION SOUTHWEST ELEVATION Vertical Corrugated Metal Siding Steel Canopy 7” Cementitious Lap Siding Aluminum Frame and Glazing System Aluminum and Glass Overhead Doors CATALDO AMBULANCE FACILITY: ELEVATIONS NORTHWEST ELEVATION SOUTHEAST ELEVATION 7” Cementitious Panel Siding Vertical Corrugated Metal Siding Aluminum Frame and Glazing System Vertical Corrugated Metal Siding DN 7'-0"7'-0" 46 ' - 1 0 5 / 8 " 50'-3 3/4" 12 ' - 2 5 / 8 " 12 ' - 0 " 3' - 0 " 12 ' - 0 " 2' - 0 " 3' - 0 " 2' - 0 " 52'-0 1/2" 70 ' - 8 " 24 ' - 5 3 / 8 " 46 ' - 2 5 / 8 " 73'-2 3/4" 69 ' - 1 0 1 / 8 " FRANKLIN STREET NO R T H S T R E E T GARAGE VEST. VEST. 3' - 6 " 7' - 6 1 / 8 " 2' - 1 1 " 2' - 1 1 " 2' - 1 1 " 3' - 6 " 0 2'4'8' CATALDO AMBULANCE FACILITY FLOOR PLANS SALEM, MA. 1/4" = 1'-0"1 LEVEL 1 FLOOR PLAN CAS Salem, LLC Page 1 of 16 January 20, 2021 4 Franklin Street Redevelopment Environmental Impact Statement In Support of Site Plan Review Application For: CAS Salem LLC Proposed Business Office and Ambulance Facility 4 Franklin Street Introduction This Environmental Impact Statement discusses the proposed project in response to the topics presented in Appendix A of the Salem Subdivision Regulations. For convenience, the topics are discussed in the order presented in the regulations. In the text below, italics are the topic as provided in the regulations with responses following. 1.0 Natural Environment 1.1 Air. 1.1.a Describe possible sources and duration of significant amounts of odors, smoke and dust. Response: There are no known sources of significant odors or smoke anticipated with the proposed project. Dust may be generated during construction, but will be minimized as outlined in 1.1.b. 1.1.b Describe precaution to be taken to eliminate or minimize the adverse environmental effects of the smoke, dust or odors generated. Response: Dust will be minimized by applying water and calcium chloride to travelled portions of the site. Dust control measures will vary depending on weather conditions and ongoing construction activities. 1.1.c Describe the relationship of the location of the subdivision and prevailing wind patterns to nearby residences, businesses, recreation area, and other public areas. CAS Salem, LLC Page 2 of 16 January 20, 2021 4 Franklin Street Redevelopment Response: Long term meteorological records suggest that prevailing winds are generally from the northwest during winter months and from the west-southwest during the summer months. Downwind from the project site and across the North River is the Salem train station. The proposed ambulance facility is unlikely to create odorous or noxious conditions that could migrate downwind. 1.1.d If incineration of refuse is proposed for the subdivision, describe the effects resultant emissions will have on air quality in the area. Include proof that the incinerator complies with the latest local and state standards. Response: Standard refuse and recyclables collection will be employed at the site. A privately hired refuse and recyclables hauler will be required to bring waste materials to permitted solid waste handling or disposal facilities. 1.2 Land 1.2.a Describe the existing general physical conditions of the site, including existing use, general topography, unusual geologic formations and soils, and how the project will effect these features. Response: The 4 Franklin Street site is bordered to the southeast by the North River, to the southwest by North Street, to the northwest by Franklin Street, and to the northeast by a marine industrial parcel (Burnham Associates). The subject property is approximately 1.0-acre in size and consists of relatively level terrain. The highest point on the site is the existing building slab. The land generally slopes toward the North River. The FEMA Firm Flood Map shows that the site is located within a Zone “AE” Flood Hazard area (Elevation 10-ft; NAVD 1988 datum, reference: FEMA FIRM Map No. 25009C0419G dated July 16, 2014). Zone “AE” Flood Hazards are defined as areas subject to inundation by the 100-year flood event with known base flood elevations. The entire property is within the AE flood zone. The proposed building will be constructed so that the slab elevations is a minimum of 2-feet above the flood elevation as required by the state building code. All mechanical equipment for the buildings will also be located a minimum of 2-feet above the flood elevation. The United States Department of Agriculture Natural Resources Conservation Service Soil Survey characterizes the soil as Urban Land, which indicates that the soils have long been significantly altered or obscured by urban works and structures. The entire site has been disturbed. Approximately 80% of the property consists of filled tidelands per DEP maps. The property was formerly used as a car wash and vehicle service facility. One building remains on site. All of the vehicle service bays have been demolished. 1.2.b Describe any limitations on proposed project caused by subsurface soil and water conditions, and methods to be used to overcome them. CAS Salem, LLC Page 3 of 16 January 20, 2021 4 Franklin Street Redevelopment Response: Due to previous site development and the extent of filled tidelands at the site, all near surface soils at the site have been disturbed. Conventional construction techniques in general appear applicable, although deep foundations, such as piles or piers, may be necessary due to the presence of fill or soft marine deposits. 1.2.c Describe procedures and findings of percolation tests conducted on the site. Response: Percolation tests are not applicable to this project. Sewerage will be provided by connecting to the existing municipal sewer in Franklin Street. Stormwater runoff will be conveyed to the North River through a modern stormwater management system as described below in Section 1.3. 1.2.d Describe the types and amounts of land which will be permanently affected by construction of the subdivision. Response: All of the land on the approximately 1.0-acre parcel has been previously disturbed. The proposed ambulance building and associated harborwalk open space area will redevelop approximately 60% of site. The remaining 40% of the site will be redeveloped at a later date. 1.2.e Describe proposed rough grading plans. Response: As noted above, site topography is approximately level, with a slight slope towards Franklin Street and the North River. Site grades will be adjusted to elevate the proposed ambulance building 2-feet above the flood elevation. A small landscape retaining wall will be required along Franklin Street. See the project plans for the proposed grading and drainage. 1.2.f Describe location and extent of existing marshes, wetlands, or seasonal wet areas and any proposed alteration. Response: The project site is located adjacent to the North River. Wetland resource areas on and adjacent to the site include Land Subject to Coastal Storm Flowage, Coastal Bank, and Riverfront Area. The entire site is presently located within the 100-year flood plain. 1.3 Water and Wetlands 1.3.a Evaluate how and to what extent the project will affect the quality and quantity of any existing or potential public or private water supply, including watersheds, reservoirs and groundwater. Response: Due to the commercial/industrial history of the project area and the proximity to the intertidal North River, the site has no potential for public or private water supply uses. Site redevelopment will not affect existing or potential water supplies. CAS Salem, LLC Page 4 of 16 January 20, 2021 4 Franklin Street Redevelopment The proposed project includes a modern stormwater management system conforming to the Massachusetts Stormwater Management Guidelines. Parking lot runoff will be treated prior to discharge into the North River. The proposed project reduces impervious surfaces thereby increasing stormwater infiltration and groundwater recharge. 1.3.b Describe the methods to be used during construction to control erosion and sedimentation and siltation including use of sediment basins and type of mulching, matting, or temporary vegetation; approximate size and location of land to be cleared at any given time and length of time to exposure; covering of soil stockpiles; and other control methods used. Evaluate effectiveness of proposed methods on the site and on the surrounding areas. Response: A comprehensive erosion control program will be undertaken during construction. Haybales, silt fence, straw wattles and/or mulch filled sock will be installed along the downgradient edge of the proposed work area. A construction entrance will be installed at the North Street entrance and maintained until the pavement binder course is installed. Silt sacks will be installed and maintained in the vicinity of the proposed construction site. To help prevent off-site erosion, disturbed areas will be seeded and mulched as soon as practicable. Existing pavement will also be retained to the extent practicable. Temporary stockpiles of existing on-site soil materials will be created during construction. Stockpiles will be encircled with erosion control barriers and covered as necessary. Additional earth materials received during construction are expected to be installed upon delivery. 1.3.c Describe the permanent methods to be used to control erosion and sedimentation. Include description of: 1.3.c.1 - any areas subject to flooding or ponding; Response: FEMA FIRM Flood maps show the entire property lies within the 100- year flood zone. The 100-year flood elevation for this site is 10-feet (NAVD 1988 datum). The post-construction site will be stabilized by bituminous pavement or well-maintained landscaped area thereby minimizing potential erosion. 1.3.c.2 - proposed surface drainage system; Response: The paved access drive and parking area will be directed into catchbasins equipped with 4-foot deep sumps and hoods to prevent sediments, oils, and trash from discharging into the North River. Additional stormwater treatment will also occur in the proposed water quality structures prior to discharge. The proposed drainage system is designed to meet the Massachusetts Stormwater Management Guidelines. CAS Salem, LLC Page 5 of 16 January 20, 2021 4 Franklin Street Redevelopment 1.3.c.3 - proposed land grading and permanent vegetation cover; Response: Proposed topography is shown on the Grading and Drainage Plan. Re-graded areas will be stabilized as soon as practicable with lawn, pavement walkways, or landscaped planting beds. 1.3.c.4 - methods to be used to protect existing vegetation; Response: Due to the previous site use, the site is sparsely vegetated. The property mostly consists of pavement and building. Most of the existing vegetation will be removed. New vegetation will be planted as shown on the Landscape Plan. 1.3.c.5 - the relationship of the development to the topography; Response: The proposed development requires re-grading to position the proposed building 2-feet above the 100-year flood elevation. All areas disturbed during construction will be stabilized with vegetation or proposed finish surfaces (e.g. pavement) as soon as practicable. 1.3.c.6 - any existing or proposed alterations of shorelines, marshes or seasonal wet areas; Response: A stormwater outfall to the North River is proposed during Phase I. Bank repair and stabilization will be considered during Phase II. 1.3.c.7 - any existing or proposed flood control or wetland easements; Response: None. 1.3.c.8 - estimated increase of peak runoff caused by altered surface conditions, and methods to be used to return water to the soils. Response: The proposed project results in a reduction in impervious surface. Therefore a reduction in peak runoff rates and an increase in natural surface infiltration is anticipated. The proposed site re-grading also reduces the amount of tributary drainage area towards Franklin Street thereby not impacting the municipal system. Stormwater from the proposed drainage system is directed towards the intertidal North River per the methods described above. 1.3.d Discuss the probability that the project will increase pollution or turbidity levels within receiving waterway and the precautions to be taken to minimize the effects. Response: The project includes a modern stormwater management system that will improve the quality of stormwater discharge from the site and meets the CAS Salem, LLC Page 6 of 16 January 20, 2021 4 Franklin Street Redevelopment Massachusetts Stormwater Management Standards. Stormwater will be treated by a proposed water quality structure prior to discharging to the North River. The project is not anticipated to increase pollution or turbidity levels within the river. 1.3.e Discuss the project’s effect on the waterway’s aquatic biota and use as habitats. Response: For similar reasons to those described directly above, the project is expected to have a positive effect on the aquatic biota of the North River and aquatic habitats. 1.3.f Discuss the project’s effects on groundwater quality and supply and efforts to recharge groundwater supplies. Response: As discussed above, the proposed project is expected to decrease the amount of impervious surfaces on site thereby increasing natural infiltration. Clean roof runoff will be allowed to naturally infiltrate. All stormwater from the proposed parking lot is to be captured and treated by the proposed stormwater management system. 1.3.g Discuss what effect the project will have on increasing the incidence of flooding, including areas outside the subdivision. Response: The proposed project will have no effect on the incidence of flooding on or adjacent to the project area. The entire parcel is located within the 100- year flood zone. The proposed building and parking area will be raised above the flood elevation, decreasing the extent of flooding in those areas. 1.3.h Discuss the effect of the proposed sewerage disposal methods on surface and groundwater supplies and quality. Response: No impacts to surface water or groundwater supplies from the proposed sewerage system are expected. Sewage will be conveyed through sealed pipes and structures to the existing municipal sewer system in Franklin Street. 1.4 Energy 1.4.a Describe the types and increased quantity of energy required to serve the needs of the project residents. Response: The estimated annual power consumption of the proposed ambulance building is approximately 300-400 MMbtu. 1.4.b Indicate what the sources of this energy will be. Response: Natural gas will be used for heating and meal preparation. Electricity will be used for lights, appliances, computers, controls, and cooling. Adequate utilities are available in Franklin Street. CAS Salem, LLC Page 7 of 16 January 20, 2021 4 Franklin Street Redevelopment 1.5 Noise 1.5.a Describe the time, duration and types of noises generated by the project, both during and after construction. Response: During the construction phase, construction activities will conform to the Salem noise control ordinance (8:00 a.m. to 5:00 p.m. unless otherwise approved). Typical noise levels associated with the construction equipment are anticipated. During the foundation construction phase, pile driving may occur. During the operational phase, the site may generate noise associated with the ambulance use. Sirens will be used sparingly and only as needed in emergency situations. 1.5.b Discuss what effect these noises will have on both humans and wildlife. Response: During the construction phase, OSHA noise level requirements will be satisfied in the work zones. Construction activities will create noise levels noticeable to humans and wildlife. However, as noted above, the noise levels are expected to be typical of construction projects, and will be temporary. The noise associated with the project post-construction is not expected to be significant. As noted above, ambulance sirens will be used only as needed. 1.5.c Describe the controls which will be used to eliminate or minimize the effects of these noises. Response: Construction noise will be controlled by 1) the use of mufflers on all construction equipment, 2) providing temporary power to the worksite so gas powered generators are not required, and 3) limiting the work hours as noted above. 1.6 Local Flora and Fauna 1.6.a Discuss the project’s effects on land-based ecosystems, such as the indigenous wildlife, stream bank cover, and vegetal or wooded growth. Response: The project will redevelop land that has been substantially altered by previous activities at the site. The existing land surfaces are degraded and urban; Wildlife activity at the site is minimal. 1.6.b Describe proposed types and amounts of vegetative cover. Response: All cleared and disturbed areas, except buildings and hardscape surfaces, are to be covered with planting beds or loam and seed. Trees will be planted around the site per the Landscape Plan. CAS Salem, LLC Page 8 of 16 January 20, 2021 4 Franklin Street Redevelopment 1.6.c Discuss the existence of rare or endangered plant, wildlife or fish species in the project area. Response: There are no known rare or endangered plant, wildlife or fish species in the project area. 2.0 Man-Made Environment 2.1 Land use 2.1.a Describe how the proposed project conforms with the growth plans for the area and the city in general. Response: In 2003, the City prepared the North River Canal Corridor (NRCC) Master Plan which encourages new growth and development in the North River area while preserving and enhancing the quality of life in the adjacent residential neighborhoods. The proposed project is consistent with the plan’s mission in that it rehabilitates a dilapidated site and enhances the commercial character of the neighborhood. The NRCC plan specifically considered the Franklin Street neighborhood and the car wash parcel. The plan recommended construction of a pedestrian access pathway along the North River to provide linkage between the neighborhood, the MBTA station and downtown. The plan also recommended improving the streetscape and sidewalks along Franklin Street. This proposed site redevelopment project is consistent with the plan and will integrate well with other pending Franklin Street improvements. 2.1.b Describe land uses adjacent to the project. Response: To the northeast of the project site is a marine industrial parcel (Burnham Associates). The remaining perimeter consists of the North River and public roadways (North Street and Franklin Street). On the opposite side of Franklin Street there is a gas station and industrial office building. Within the North Street right-of-way there are several public parking spots. 2.1.c Describe any existing or proposed public or common recreational or open areas within the subdivision. Response: The proposed site plan provides a public-access pedestrian walkway (harborwalk) along the waterfront and extending from North Street. 2.1.d Discuss the site’s proximity to transportation, shopping, educational facilities, recreational facilities, etc. Response: Public Transportation – 0.2 Miles to Salem Train Station CAS Salem, LLC Page 9 of 16 January 20, 2021 4 Franklin Street Redevelopment Shopping – Downtown Salem – Various Shops – (0.3 mi); North Shore Mall (2.7 mi.). Educational Facilities – Salem High School (1.8 mi.); Collins Middle School (1.0 mi.); Bates Elementary School (0.8 mi.); and Salem Public Library (0.7 mi.). Recreational Facilities – Furlong Park (0.1 mi.); Mack Park (0.5 mi.); and Leslie’s Retreat Dog Park (0.7); 2.2 Density 2.2.a Provide a tabulation of proposed buildings by type, size (number of bedrooms, floor area), ground coverage, and a summary showing the percentage of the tract to be occupied by buildings, parking and other paved vehicular areas, and usable open space. Response: Table: Summary of Site Development Description / Location: 4 Franklin Street Land Use: Ambulance Service Building Total Lot Area: 1.0 acres Number of Buildings: 1 Number of Stories 1 Building Footprint: 4,292 SF Building Coverage: 10% Pavement Coverage: 14% Open Space: 26% Phase II: 33% 2.3 Zoning 2.3.a Indicate the zoning designations for the site and adjacent areas. Response: North River Canal Corridor (NRCC) Flood Hazard Overlay District (FHOD) Entrance Corridor Overlay District (ECOD) CAS Salem, LLC Page 10 of 16 January 20, 2021 4 Franklin Street Redevelopment 2.4 Architecture 2.4.a Describe the architectural and landscaping techniques which will be used to blend the structures with the surrounding area. Response: The proposed building façade will have a mix of cementitious clapboard and panel siding, vertical corrugated metal siding, and glass to blend with the surrounding architecture. The site plans include landscaping improvements to significantly improve site aesthetics (see Sheet C-7). 2.4.b Discuss the heights of the structures in relation to the surrounding area. Response: There are no buildings on the adjacent marine industrial property. On the opposite side of Franklin Street there is a one-story gas station and a two- story commercial office building. The proposed building will be approximately 27- feet tall and will blend-in with the other similar sized buildings along Franklin Street. 2.4.c Discuss the project’s visual impact and possible interference with natural views. Response: The project will improve the appearance of the site, which has been used as a one-story car wash and vehicle service facility for several years. The proposed building will not interfere with any existing scenic views. The proposed public walkway (harborwalk) will provide natural views for the public to enjoy. The proposed landscaping will provide year-round color. 2.4.d Describe type of construction building materials used, location of common areas, location and type of service facilities (laundry, trash, garbage disposal). Response: The proposed building will generally consist of steel-frame construction with a partial concrete block façade and concrete foundation. Trash and recycling barrels will be maintained inside the ambulance garage bays for weekly disposal. 2.5 Historic Buildings, Historical Sites and Archeological Sites 2.5.a Indicate location and significance of any historic buildings or sites on or adjacent to the project. Response: According to the Massachusetts Historical Commission MACRIS database there are no historically significant buildings or sites on or adjacent to the proposed project. Based on City Assessor’s records, the car care building was constructed in 1963. It does not appear to have any particular historical or architectural significance. CAS Salem, LLC Page 11 of 16 January 20, 2021 4 Franklin Street Redevelopment 3.0 Public Facilities 3.1 Water Supply, Flow, Pressure and Distribution. 3.1.a Describe the groundwater and/or surface water supply to be used. Response: Municipal water will be used. Salem obtains water from surface water supplies (Wenham Lake & Ipswich River). 3.1.b Discuss the demands of the project for consumption and fire protection. Response: The design demand flow for water consumption is estimated to be approximately 300 gallons per day. The peak demand for fire protection for the building is estimated to be approximately 1,500 gallons per minute. The buildings will be equipped with fire suppression sprinklers and hard-wired fire alarm systems. 3.2 Sanitary Sewerage Connection, Distribution and Facilities. 3.2.a Discuss the quantity and type of sewage which will be generated by the project. Response: The estimated maximum-day domestic sewage generation is approximately 300 gallons/day. 3.2.b Describe the method of sewage which will be generated by the project. Response: Domestic sanitary sewage from employee uses. 3.3 Storm Drainage Facilities 3.3.a Describe where connection to the City system is proposed. Response: The proposed stormwater management system will discharge directly to the North River after runoff is treated. There are no connections proposed to the City drainage system in Franklin Street. 3.4 Disposition of Stormwater 3.4.a Indicate the location of all proposed outfalls. Response: One stormwater outfall is proposed to the North River in the southerly corner of the project site. 3.4.b Describe the effect of the outfalls and their discharge on the receiving waters, i.e., increased flows, pollution etc. Response: The proposed project will treat stormwater prior to discharge, and thereby will improve receiving water quality and lessen pollutant discharges from CAS Salem, LLC Page 12 of 16 January 20, 2021 4 Franklin Street Redevelopment the site. The site currently drains by overland flow with no treatment devices. 3.4.c. Discuss the quantity of stormwater to be discharged. Response: The proposed project will result in a decrease in impervious surfaces thereby decreasing the quantity of stormwater runoff to be discharged from the site. 3.5 Refuse Disposal 3.5.a. Estimate the quantity and types of refuse that will be generated by the subdivision. Response: The estimated quantity of refuse and recyclables to be generated by the employees is approximately 100-150 pounds per week. 3.5.b Describe the proposed methods of refuse disposal. Response: Trash and recycling barrels will be located inside the ambulance garage bays. Refuse and recyclables pick-up and disposal will be managed by a private disposal company. 3.6 Traffic Facilities 3.6.a Discuss future vehicular circulation patterns including number and types of vehicles. Response: The proposed development incorporates a driveway with an entry/exit point off of the untraveled portion of North Street. The driveway will support two-way traffic, most of which will be employee personal vehicles and ambulances. The separately provided Traffic memorandum, prepared by Vanasse & Associates of Andover, MA, predicts approximately 5 vehicle trips (1 entering and 4 existing) during the weekday morning peak hour and 3 vehicle trips (1 entering and 2 existing) during the weekday evening peak hour. 3.6.b Describe the proposed pedestrian circulation pattern. Response: An improved sidewalk and crosswalk is provided along Franklin Street. On-site sidewalk are not necessary except for access to a rear emergency egress door. A pedestrian walkway (harborwalk) is proposed along the water for public use. 3.6.c Discuss the location and number of parking spaces proposed. Response: Twelve (12) parking spaces are proposed for the ambulance building as required per zoning. The parking spaces are located in the front of the building. CAS Salem, LLC Page 13 of 16 January 20, 2021 4 Franklin Street Redevelopment 3.7 Electric power 3.7.a Discuss the power demand of the subdivision. Response: Approximately 25 kW (peak), and 200 kwh per day. 3.7.b. Discuss the source of the electric power and the method of supplying the area. Response: National Grid will provide the power. 3.8 Gas 3.8.a Discuss the demands of the subdivision. Response: Approximately 250 therms per year. 3.8.b Describe what the gas will be used for in the area. Response: Natural gas will be used for heating and meal preparation. 3.8.c Describe the source of gas supply and the proposed method of supplying the area. Response: National Grid is the local natural gas supplier. 4.0 Community Services 4.1 Schools 4.1.a Discuss the effect of the subdivision on existing schools, including number and ages of children generated by the subdivision. Response: The proposed commercial development will not have an impact of the proposed schools. 4.1.b Describe the location of the nearest existing schools. Response: The locations of the nearest public schools are Bates Elementary School (0.8 mi.); Collins Middle School (1.0 mi.); and Salem High School (1.8 mi.). 4.2 Recreation 4.2.a Describe existing and proposed recreational facilities, including active and passive types; and age groups participating, and state whether recreational facilities and open space are available to all Salem residents. CAS Salem, LLC Page 14 of 16 January 20, 2021 4 Franklin Street Redevelopment Response: Recreational facilities in the general area are; Furlong Park (0.1 mi), Mack Park (0.5 mi.), and Leslie’s Retreat Dog Park (0.7 mi.). The listed facilities are available to all Salem residents. 4.2.b Indicate location and width of existing and proposed pedestrian ways, bikeways or bridle paths. Response: The existing sidewalks along Franklin Street are not consistently constructed and are used for parking in many locations. The proposed development will incorporate reconstructing a new sidewalk with curbing across the Franklin Street property frontage and providing a crosswalk to the North Street sidewalk. A walkway (harborwalk) is also proposed along the waterfront. 4.3 Police 4.3.a Estimate the total population projected for the subdivision. Response: The proposed commercial development will not increase the population of Salem. 4.3.b Estimate the total number of automobiles for the area. Response: There are approximately 12 automobiles associated with the proposed ambulance building. 4.4 Fire 4.4.a Discuss the total number of buildings to be constructed and their types and construction. Response: Phase I will consist of constructing one ambulance building. Construction type will meet applicable standards for life safety buildings. 4.4.b Describe the source and quantity of water available for fire protection for the area. Response: An existing 12-inch diameter water main exists within Franklin Street. A hydrant also exists at the corner of Franklin Street and North Street. The proposed building will be equipped with a fire-suppression sprinklers as required by code. 4.5 Public Works 4.5.a. Calculate the total linear feet of roadway to be publicly maintained and plowed. Response: No public roadways are proposed. The site will be privately maintained. CAS Salem, LLC Page 15 of 16 January 20, 2021 4 Franklin Street Redevelopment 4.5.b Calculate the linear feet of street drains, culverts, sanitary sewers, and waterlines to be publicly maintained. Response: All proposed water, sewer, and drains are to be privately maintained except for the water and sewer building service connections within the city right- of-way. 5.0 Human Considerations 5.1 Aesthetics and Visual Impact 5.1.a Discuss the change in the present character of the area due to the projects, i.e., land use, density of development, etc. Response: The proposed project will be a betterment to the neighborhood and community. The existing car wash is in deteriorating condition and is no longer in operation. The proposed land use is consistent with other uses along a main corridor (North Street). There is a fire station located approximately 0.25 miles to the north along North Street. The removal of the car wash facility and addition of public access along the river will significantly improve the character of the area. 5.1.b Discuss the measures to be taken to minimize the adverse effects of the project, i.e., architecture, buffers etc. Response: The project site will be landscaped to minimize potential adverse effects. The addition of landscaping to the site will improve the property and add scenic value to the area. 5.2 Parks, Forests and Recreational Areas 5.2.a Discuss how the siting and construction of the project will affect existing and potential park and recreation areas, open spaces, natural areas, and scenic values. Response: The siting and construction of the project will have minimal effect on existing and potential parks. There are currently several parks within close walking distance to the project site. On the property, a walkway (harborwalk) along the North River will be installed to promote the scenic value and public enjoyment of the river. 5.2.b. Discuss how the project will affect recreational opportunities in the area due to removal of parks, forests, or open areas from public use. Response: The proposed project will have no negative effect on recreational opportunities. It will not remove parks, forest, or open space from public use. To the contrary it will provide a public harborwalk. CAS Salem, LLC Page 16 of 16 January 20, 2021 4 Franklin Street Redevelopment 5.3 Public Health 5.3.a Discuss the project’s effect on residents’ public health due to changes in water quality, air quality, noise levels, etc. Response: The proposed construction project is not expected to significantly affect public health, in that it will not significantly, or only temporarily, alter air, water quality or noise