Loading...
342 Highland Ave Materials Design Review Board Recommendation 342 Highland Avenue Design Review of Entrance Corridor Project Meeting Date: July 28, 2021 Members Present: Paul Durand, Chair, David Jaquith, Glenn Kennedy, Catherine Miller, Marc Perras, J. Michael Sullivan Members Absent: Helen Sides At a regular meeting of the Design Review Board (DRB), upon a motion duly made and seconded, it was unanimously voted to recommend design approval to the Planning Board of the proposed construction of the Al Prime gas/service station and associated site improvements as designed with the recommendations herein. Referenced Plans and Documents 1. Set of plans titled ‘New Gas Station and C-Store’, prepared by A.L. Prime Energy Consultant, Inc., 18 Lark Avenue, Saugus, MA 01906, revised to July 22, 2021. 2. Photographs and renderings provided by Anthony Guba, A.L. Prime, submitted July 19 and July 23, 2021. 3. Staff Comments dated 7/22/21. Design Recommendations Overall, the DRB found that the planning of the project was well thought out, given all of the local and state regulations and jurisdictions involved with gas/service stations and this particular location (off of Highland Avenue, which is the jurisdiction of MA DOT. Upon discussion and deliberation, the Board offers the following recommendations for the Planning Board’s consideration: • Compliance with the ECOD Regulations: The Board would like to reinforce the importance of complying with the ECOD design-focused regulations as follows: o Fencing: The cedar plank fence along the property’s northern border should be no taller than 4’ to comply with the ECOD regulations. o Landscaping: All of the trees planted should have a minimum caliper of 3.5” to meet the ECOD minimum standards. o Granite Curbing: All of the curbing around the site should be vertical granite at least 6” in height. This includes all curbing around landscaped areas. • Canopy Signage: The applicant should reduce the size of the numerals on the canopy signage so that they match the size of the numerals on the freestanding sign. • Additional Landscaping as Buffer: To promote a more significant visual buffer between this commercial property and the adjacent residential neighborhood on Barcelona Avenue, the applicant should reach out to the immediate abutter on Barcelona and offer to plant an additional four trees on the abutter’s property to supplement the plantings along this shared property line. Signature of the DRB By the signature below, I certify that this recommendation accurately reflects the actions of the Design Review Board. __________________________________ ____________ Paul Durand Date Chair 7/29/21 ENVIRONMENTAL IMPACT STATEMENT For Proposed Improvements at 342 Highland Avenue, Salem, Massachusetts (In accordance with City of Salem Subdivision Regulations Appendix A) 03 June 2021 Prepared by Anthony Guba, P.E. A.L. Prime Energy Consultant, Inc. 18 Lark Avenue, Saugus, MA 01906 Mobile 512-745-6400 Environmental Impact Statement – 03 June 2021 Page | 2 342 Highland Avenue, Salem Massachusetts Executive Summary A.L. Prime is proposing to raze any remaining improvements and pavement on this currently vacant property located at 342 Highland Avenue and construct a new gas station and convenience store. The total area of the parcel is 46,263 square feet, situated at the intersection of Highland Avenue and Barcelona Street. It is zoned “B2 - Business Highway” and also located in the Entrance Corridor Overlay District. It is presently vacant as previous residential structures have been removed. It is abutted by commercial and residential uses. There are no wetlands on the site nor located within 100 feet of any wetlands. A portion of the site is located within the 200’ Riverfront Area associated with Forest River, and that area will be minimally impacted and no building or pavement footprint is proposed to be located within that area. The proposed work includes razing any existing improvements and constructing a new store, fueling islands and canopy, underground tanks, utilities, and pavement. The proposed use will require minimal City resources nor impact the schools, while adding significantly to the tax base. The new station will be constructed to meet or exceed all state and federal environmental and safety requirements and standards including state of the art vapor emission controls, storage monitoring, and fuel area dry chemical fire suppression. There will be reduced stormwater flow to the municipal storm drain system and to the downgradient residential abutter. All exterior lighting will be sharp cutoff LED energy efficient and designed to project minimal light beyond property bounds. Significant landscaping is proposed to provide screening to abutting residential and interesting aesthetic to abutting roadways. Environmental Impact Statement – 03 June 2021 Page | 3 342 Highland Avenue, Salem Massachusetts Natural Environment 1. Air a. The convenience store will not produce any odors, smoke, or dust. The major potential source of odors is from the motor fuel areas. During construction, the major potential is for creation of dust during excavation and grading activity. b. During construction, measures will be taken to reduce dust during the short timeframe that will be devoted to grading or excavation, such as wetting soils prior to disturbing and covering stockpiles. For the period after construction, the motor fuel facility will be constructed in accordance with all MA DEP requirements for vapor emissions control including pressure/vacuum vent caps, vapor tight piping and fittings, Stage I vapor controls during deliveries to capture displaced vapors and return them to the fuel terminal. c. The total project is less than one acre and will require minimal disturbance for only a short timeframe so that impact to surrounding area will be limited to only the immediately abutting residences. d. There is no proposed incineration of refuse. 2. Land a. The subject site consists of two parcels totaling just over one acre total size and is currently vacant. The site was previously used as residential but those structures have been removed and only some pavement remains from previous driveways. The majority of the site is grass or brush with larger vegetation in the north corner of the property. Grading slopes a total of approximately 13 feet towards the north away from the intersection of abutting Highland and Barcelona Avenues and towards abutting residential properties. The North corner of the property is within the 200’ Riverfront Area (RA) of Forest River and the proposed development will only impact this area minimally. b. Depth to ledge varies with some very shallow ledge but it will not significantly impact the proposed development or require any blasting. Seasonal High Groundwater (SGHW) at the site is typically around 15 feet below grade and does not significantly impact the proposed development. The soil at the site consists primarily of Urban Fill. c. Several test pits were installed on the site using an excavator. These were witnessed by MA Certified Soil Evaluator to determine depth to SGHW and ledge and to determine the practicality of stormwater infiltration. Percolation testing was not completed as a septic system is not proposed and perc testing is not acceptable for MA DEP Stormwater design. d. Approximately 86% of the 1.06 acre (46,263 sf) site will be disturbed during construction. The proposed development will not disturb about 13.8% (6,385 sf) of land that is located within the RA which totals 9,508 sf or about 20.5% of the site. e. The site will be graded to meet ADA access and reasonable vehicle grades throughout. This will be accomplished by adding fill and raising the grade from zero to seven feet Environmental Impact Statement – 03 June 2021 Page | 4 342 Highland Avenue, Salem Massachusetts with the deepest fill being located in front of the new store. The site will continue to slope in the same general direction as it is presently. There are two small retaining walls proposed that will range from zero to 30 inches in height and there is no grading proposed that will exceed 1 vertical to 3 horizontal slope. f. There are no marshes, wetlands, or seasonal wet areas on the site. 3. Water and Wetlands a. It is not expected that the proposed development will have any significant impact on the quality of quantity of any public or private water supply, watershed, reservoir, or the groundwater. b. An Erosion Control Plan is included in the application plan set. The small site will disturb less than one acre during construction and it is likely that most of this area will be cleared and exposed at some point during the initial construction for about 60 days and then steadily reduced as graded areas to remain permeable are permanently stabilized, the floor slab and site paving is installed. There will be very little exposed area for the last 60 days of the construction when most work will be above pavement and slab. Erosion and sedimentation will be controlled by encircling all work with sedimentation barrier and protecting all infiltration systems and stormwater structures. Entrances to the site during construction will be restricted to points where aggregate surfaces will be used to limit the tracking of soil out of the site by construction vehicles. It is not proposed that there will be any temporary sedimentation basins or temporary vegetation. c. Permanent erosion control is primarily accomplished by land grading and permanent vegetation cover. This site is not subject to flooding or ponding. The proposed surface drainage system will be routed to an on-site underground infiltration system and will reduce runoff to off site. There are no shorelines, marshes, or seasonal wet areas, nor any proposed flood control or wetland easements. There is a stormwater report attached to the application showing that peak runoff will be decreased and groundwater recharge will be enhanced by the proposed stormwater infiltration system. d. The project will not increase pollution or turbidity in any receiving waterway. The closest waterway is Forest River and there is no direct connection between site runoff and the river. e. There is no expected impact to any waterway’s aquatic biota or use as habitat. f. The proposed infiltration system will enhance groundwater recharge at the site. g. The project will reduce runoff and is therefore expected to produce no increase on the incidence of flooding on or off the property. h. The proposed development will utilize municipal sewer system and there is no sewage disposal effect on surface or groundwater supplies or quality. 4. Energy a. The site will use only a small commercial electric service account. 5. Noise Environmental Impact Statement – 03 June 2021 Page | 5 342 Highland Avenue, Salem Massachusetts a. Construction is expected to last less than six months. The use of heavy equipment on the site is expected during the first 60 days for excavation, fill, and grading work and for a few days at the end of the project for paving. Most of the other work at the site will be masonry or steel construction that will not produce much noise. b. The noise of the site will be limited to typical working daylight hours and is not expected to be much more intense than that already existing on abutting Highland Avenue creating limited impact to humans or wildlife. c. The hours of equipment operation will conform to any City requirements and will typically be limited to weekdays, approximately no earlier than 7am and no later than 5pm. Normal site activity does not include operation of any heavy or noisy equipment. 6. Local Flora and Fauna a. The site area to be disturbed is presently vacant but previously residential and is primarily grass and shrub providing minimal habitat for indigenous wildlife. There is no expected project effect on any stream bank. b. About 14% of the site is proposed to be not disturbed at all and existing vegetal cover will remain as is. The remaining lot area will be significantly utilized for pavement and building, with maintained landscape areas along most of the property lines except as interrupted by access driveways. c. There is no known rare or endangered plant, wildlife, or fish species in the project area. Man-made Environment 1. Land Use a. The proposed project is located in a Business Highway zone along an entrance corridor to the City. This use is relative to the commuter traffic on Highland Avenue and complements other business along this travel route. b. Highland Ave consists of a variety of commercial uses. The immediately abutting property to the site is residential. c. There are no proposed public or common recreation areas proposed at this project. d. This is not a residential development so that proximity to shopping, educational, and recreational facilities are not relevant. 2. Density A tabulation of the site dimensional characteristics is included on the C-1.0 Layout plan. The development will meet all zoning bylaw requirements. The proposed store gross floor area is 3,353 square feet and there are no proposed bedrooms. Building lot coverage will be 15.7% of the site. 3. Zoning a. The site is zoned B2 Business Highway and is also located within the Entrance Corridor Overlay District. Abutting area NW of the site is zoned and used residential. Environmental Impact Statement – 03 June 2021 Page | 6 342 Highland Avenue, Salem Massachusetts 4. Architecture a. The proposed improvements will be of similar architecture to that of commercial properties directly across Highland Avenue. b. The store will be one story, the total height of any improvement on the site will be less than 25’ and expected not to exceed the typical commercial or residential structures surrounding the site nor mature trees in the area. c. The development will not interfere with any natural views. d. The store will be single story masonry with steel joist flat roof, that canopies will be steel construction. A screened trash enclosure is proposed at the NW corner of the store. 5. Historic Buildings, Historical Sites and Archeological Sites The site is currently vacant. There are no known historic buildings or sites on or adjacent to the project. Public Facilities 1. Water supply, flow, pressure and distribution a. There is no proposed groundwater or surface water supply, the project will use municipal water. b. There is no proposed fire protection in the store. The fuel island system will be dry chemical. The store use will be less than MA Title V minimum of 500 gallons per day based on experience at other owned and operated similar locations. 2. Sanitary sewerage connection, distribution and facilities. a. The expected generated flow will be less than the MA Title V minimum of 500 gallons per day. Sewage will primarily be from restroom use. b. The site will be serviced by municipal sewer. 3. Storm drainage facilities There is no proposed connection to City or State drainage system 4. Disposition of stormwater a. There are no proposed outfalls. All stormwater up to and exceeding 100 year storm event will be retained within the site underground infiltration system. 5. Refuse Disposal a. There is a screened trash enclosure proposed and trash pickup will be scheduled as needed, typically once or twice per week. Environmental Impact Statement – 03 June 2021 Page | 7 342 Highland Avenue, Salem Massachusetts 6. Traffic facilities a. There is a traffic study attached with the application. The majority of traffic is expected to enter the site from Highland Avenue and exit partially to Highland and partially to Barcelona to travel back to Highland. There is ample circulation area within the site for movement between all areas for any size vehicle. b. The majority of pedestrians using the facility are expected to be between the fueling area and the store. The grading between all areas meets ADA slope requirements for pedestrians. c. There are 18 proposed parking spaces with 11 being located immediately in front of the convenience store. There is more than sufficient parking within the site to eliminate the need for any parking off site. 7. Electric power a. The project will require minimal electrical power similar to small commercial uses. b. A new overhead service is proposed from an existing pole located along the property line and already serving the abutting property. The service will probably be 600 or 800 amp total. 8. Gas a. It is not believed that gas is available for this site so all appliances will be electric, including heating. b. If gas is available, then a small service line will be installed for store heating. Community Services 1. Schools a. This project is entirely commercial and will not have any effect on schools. 2. Recreation a. There are no proposed recreational facilities. 3. Police a. The site will be occupied only during business hours and expected that approximately two or three employees to be the most on site at any time, and the most expected customers on site at any time is 20 or 30. b. The maximum total number of vehicles on site at any time is not expected to exceed 20. 4. Fire a. One single story masonry noncombustible unprotected 3,353 retail convenience store and two steel fueling area canopies are proposed. b. There is a hydrant immediately in front of the property at the intersection of Highland and Barcelona Avenues. Environmental Impact Statement – 03 June 2021 Page | 8 342 Highland Avenue, Salem Massachusetts 5. Public Works a. There is no new roadway associated with this project. b. There are no street drains, culverts, sanitary sewers, or waterlines to be publicly maintained associated with this project. Human Considerations 1. Aesthetics and visual impact a. The property is currently vacant. It is located along a commercially zoned entrance route to the City. There is a similar use located on the other side of Highland Avenue. There is residential use on the northwest side of the property along Barcelona and a residential property abutting to the northeast. b. The perimeter of the property will be landscaped and a solid fence will be installed along the northeast property line common with a residential abutter on Barcelona Avenue. The existing vegetation to remain in the RA will provide deep screening and buffer with the residential abutter to the northeast along Highland Avenue. 2. Parks, forests and recreational areas a. This project will not affect existing or potential park and recreation areas. b. There is no proposed removal of any parks, forests, or open public use areas. 3. Public Health a. There should be no appreciable effect on resident public health due to changes in water quality, air quality, noise levels, etc. 300' RAD I U S SITE 8-15 8-14 7-73 7-41 7-40 8-12 8-13 7-46 8-09 8-11 8-01 8-147 8-02 8-10 8-08 8-16 8-102 7-42 8-145 F O R E S T RIVER SCALE PROJECT ADDRESS SHEET VICINITY MAP APPROX SCALE DWG FILE COVER SHEET DE S C R I P T I O N RE V BY DA T E A.L. PRIME ENERGY SAUGUS MA 01906 (781)246-0201 18 LARK AVENUE CONSULTANT, INC. REFERENCE - CITY OF SALEM GIS PROJECT A.L. PRIME ENERGY SAUGUS MA 01906 (781) 246-0201 18 LARK AVENUE CONSULTANT, INC. A.L. PRIME #TBD SALEM, MASS 342 HIGHLAND AVENUE LAST REV COVER ORIG DATE DRAWING INDEX REV DATE C-0 NEW GAS STATION and C-STORE PROPOSED SITE IMPROVEMENTSC-1.0 GRADING C-2 FLOOR PLANA1.0 BUILDING ELEVATIONSA2.1 NONE N/A CANOPY ELEVATIONSA2.3 NONE N/A TANK AND PIPING DETAILS NONE N/A EXSTG CONDITIONS (EASTERN LAND SURVEY)F19120 SELF SERVICE FIRE SUPPRESSION NONE N/A APPLICANT CONTACT: ANTHONY GUBA, P.E. -- MOBILE 512-745-6400 LANDSCAPE (KDTurner Design) EROSION CONTROL LIGHTING (RED LEONARD ASSOC) 05 APR 2021 L-1 ER-1 TK-2 FSP-1 NONE N/A NONE N/A NONE N/A NONE N/A SITE DETAILSSD-1 SITE DETAILSSD-2 NONE N/A NONE N/A SIGN AND GRAPHICSSG-1 NONE N/A THIS SET FOR DESIGN REVIEW BD HRG 28 JUL 2021 PROJECT INFORMATION SITE ADDRESS - 342 HIGHLAND AVE AND 2 BARCELONA AVE, SALEM, MA ASSESSOR MAP 8, PARCELS 14 & 15 OWNER - WILLIAM H. GOLDBERG FAMILY LLC, 7 RANTOUL ST, SUITE 100B, BEVERLY MA 01915 APPLICANT - A.L. PRIME ENERGY CONSULTANT, INC., 18 LARK AVE, SAUGUS MA - ANTHONY GUBA, ENGR - 512-745-6400 - NASSER ABU-EID, VP - 617-212-3551 EMERGENCY - 911 || DIGSAFE - 811 SALEM INSPECTIONAL SVCS AND BLDG DEPT - 978-619-5641 SALEM FIRE DEPT (NON EMERGENCY) - 978-744-1235 SALEM POLICE (BUSINESS) - 978-744-0171 SALEM PUBLIC SERVICES - 978-744-3302 SALEM WATER AND SEWER - 978-619-5674 SALEM HEALTH - 978-741-1800 ELECTRIC UTILITY - NATIONAL GRID GAS UTILITY - NATIONAL GRID CODES SUMMARY CODES: - MA STATE BUILDING CODE 780, 9TH EDITION BASED ON MODIFIED VERSION OF 2015 INTERNATIONAL CODES AS PUBLISHED BY INTL CODE COUNCIL (ICC): --- IBC - INTL BUILDING CODE --- IECC - INTL ENERGY CONSERVATION CODE --- IMC - INTL MECHANICAL CODE --- IFC - PORTIONS OF INTL FIRE CODE - MA STATE FIRE CODE 527 CMR 1.00, 2015 EDITION - MA ELECTRICAL CODE 527 CMR 12.00 (NFPA 70, 2020 EDITION) - MA UNIFORM STATE PLUMBING CODE 248 CMR 10, 2017 EDITION - ARCHITECTURAL ACCESS BOARD REGULATIONS CMR 521 CMR - EPA GEN CONST PERMIT - DISTURBED AREA LESS THAN ONE ACRE. GC TO VERIFY NPDES PERMIT NOT REQ'D PRIOR TO CONST OCCUPANCY - USE GROUP M MERCANTILE - CONVENIENCE STORE AND GAS STATION TOTAL GROSS AREA - ~3,350 GFA CONVENIENCE STORE CONSTRUCTION TYPE - IIIB - NON COMBUSTIBLE EXT WALLS, STEEL ROOF FRAMING/DECK HEIGHT - ~20'-2" (SINGLE STORY) EGRESS: - MAX EGRESS TRAVEL DISTANCE - 82 FEET - SINGLE STORY - PROVIDED EGRESS WIDTH - 72" - ONE EACH EGRESS AT FRONT CENTER - OCCUPANCY CALC - 40 = 35 MERCANTILE + 0 KITCHEN + 5 STORAGE - NON SPRINKLER OCCUPANCY LESS THAN 50 WITH EGRESS PATH >75' REQUIRES SECONDARY EGRESS FIRE PROTECTION: UNPROTECTED CONSTRUCTION. PROVISIONS MADE FOR SMOKE DETECTORS, EMERGENCY LIGHTING AND SIGNAGE, HORN AND STROBE ANNUNCIATORS PLUMBING: - COMPLY WITH STATE PLUMBING AND FUEL GAS CODES - MIN OF ONE ADA RESTROOM FOR MEN AND ONE RESTROOM FOR WOMEN - COMPLY WITH BOARD OF HEALTH REQUIREMENTS PROJECT GENERAL SCOPE OF WORK THIS PROJECT PURPOSE IS TO CONSTRUCT A NEW CONVENIENCE STORE AND GAS STATION. THE WORK WILL INCLUDE: - DEMOLISH ALL EXISTING IMPROVEMENTS AT THE PROPERTY - INSTALL NEW STORMWATER STRUCTURES INCLUDING SUBSURFACE INFILTRATION - CONSTRUCT NEW ~3,353 SF CONVENIENCE STORE. - INSTALL ALL NEW UTILITIES - CONSTRUCT TWO NEW STEEL CANOPIES OVER FUELING AREAS - INSTALL UG MOTOR FUEL STORAGE TANKS AND ASSOCIATED UG PIPING TO INCLUDE DIESEL, FUEL DISPENSERS, ISLANDS, AND DRY CHEMICAL FIRE SUPPRESSION SYSTEM AT FUELING AREA - INSTALL ALL NEW CURBING, PAVING, ACCESS DRIVEWAYS AND SITE LANDSCAPE - THE BUSINESS IS PROPOSED TO OPERATE 24 HRS NONE N/A C-0AS NOTED SALEM, MA 342 HIGHLAND AVENUE TBD-021-01 SAL2 A.L. PRIME SITE # TBD 24 M A Y 2 0 2 1 0 A G O R I G I N D A T E O F D R A W I N G BUILDING ELEVATIONSA2.2 UTILITIESC-3 EMGCY & TANKER VEHICLE PATH TR-1 TANK AND PIPING LAYOUT TK-1 19 JUL 2021 N/A 2 24 MAR 2021 SELF SERVICE FIRE SUPPRESSIONFSP-2 STORMWATER AREASSW-1 7266-S1 NONE N/A 17 MAR 2021 24 MAY 2021 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 NONE N/A 01 NONE 11 MAY 20211 07/22/21 24 MAY 2021 24 MAY 2021 24 MAY 2021 24 MAY 2021 24 MAY 2021 24 MAY 2021 24 MAY 2021 24 MAY 2021 24 MAY 2021 24 MAY 2021 24 MAY 2021 24 MAY 2021 24 MAY 2021 24 MAY 2021 24 MAY 2021 24 MAY 2021 24 MAY 2021 20 J U L 2 0 2 1 1 A G R E V P E R P L N G B D C M T S - R E D U C E P V M N T , A D D T R E E S , E T C . 20 JUL 20211 20 JUL 20211 22 JUL 20212 20 JUL 20211 HIGHLAND AVENUE B A R C E L O N A A V E N U E UP UP UP UP UP UP UP 36+0 37+0 39+038+0 UP 300' RAD I U S SITE 8-15 8-14 7-73 7-41 7-40 8-12 8-13 7-46 8-09 8-11 8-01 8-147 8-02 8-10 8-08 8-16 8-102 7-42 8-145 F O R E S T RI V E R LAYOUT OF PROPOSED SITE IMPROVEMENTS SEE GRAPHIC SCALE VICINITY MAP ZONE: B2 - BUSINESS HIGHWAY // ENTRANCE CORRIDOR OVERLAY DISTRICT PROPOSED MAX. BLDG. HEIGHT (FT) MIN. LOT AREA (FT) MIN. LOT FRONTAGE (FT) MIN REAR YARD DEPTH (FT) MIN FRONT YARD DEPTH (FT) 10 FT (min) REQUIRED EXISTING PARKING SPACES (MIN 9.0'x19' / 170SF) ZONING INFO - MAP 8, PARCELS 14 & 15 - 342 HIGHLAND AVE & 2 BARCELONA AVE *40 FT (min) 46,263 SF± MIN SIDE YARD DEPTH (FT) 25 % --- *20,000 SF 100 FT *200 FT NO CHANGE NO CHANGE RELIEF RQSTD NONE NONE NONE NONE NONE NONE NONE PROPOSED USES: MOTOR VEHICLE LIGHT SERVICE - PERMITTED RETAIL STORE - PERMITTED REFERENCE: ZONING ORDINANCE - CITY OF SALEM ADOPTED SEPT 10, 2009 W/ AMENDMENTS THRU JULY 9, 2020 (SUPP NO. 23, UPDATE 3) -Retail - 1ea / 150 GFA (less storage) =2,074sf / 150 = 13.82 15.7% GENERAL NOTES 1. THE GENERAL PURPOSE OF THIS WORK IS TO REMOVE EXSTG IMPROVEMENTS AND CONSTRUCT A NEW GAS STATION WITH 12 FUELING POSITIONS AND A 3353 SF CONV STORE 2. THE PROSPECTIVE PROPERTY OWNER WILL OBTAIN ANY APPLICABLE BOARD AND STATE APPROVALS AND GENERAL BLDG PERMIT. THE CONTRACTOR WILL BE RESPONSIBLE FOR PERMITS FROM THE LOCAL FIRE MARSHAL'S OFFICE AND TRADE OR BLDG PERMITS FROM THE LOCAL BLDG DEPT AND ALL ASSOCIATED TESTING AND INSPECTION REQUIREMENTS. 3. THE CONTRACTOR SHALL CONTACT DIG-SAFE PRIOR TO ANY CONST EXCAVATION (811) 4. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL FIELD VERIFY: 4.1. PROPERTY BOUNDARIES, EASEMENTS, AND RIGHT OF WAYS. 4.2. EXSTG STRUCTURES, BUILDINGS, AND DRIVEWAYS 4.3. LOCATIONS, SIZES, DEPTHS OF EXSTG UG UTILITIES, PIPING, STRUCTURES, TANKS, ETC. 4.4. ALL EXSTG AND PROPOSED CRITICAL ELEVATIONS 5. WHERE CONFLICTS ARISE BETWEEN FIELD CONDITIONS & PROPOSED CONST, OR IF THERE IS A CONFLICT BETWEEN ANY REGS OR MUNICIPAL REQMNTS AND PROPOSED PLANS, CONTRACTOR SHALL NOTIFY OWNER'S REP PRIOR TO CONTINUANCE OF WORK. 6. PROPOSED WORK INCLUDES: 6.1. PREP SITE PER ANY CONDITIONS OF SITE APPROVALS FROM ZONING, PLANNING, CONSERVATION COMMISSION, MA STATE HIGHWAY, OR ANY OTHER APPLICABLE BODY 6.2. RAZE AND REMOVE ALL EXISTING IMPROVEMENTS 6.3. REPLACE UG UTILITIES AND INSTALL ANY STORMWATER MANAGEMENT STRUCTURES 6.4. INSTALL NEW UNDERGROUND STORAGE TANKS 6.5. CONSTRUCT NEW STORE, GAS STATION ISLANDS & CANOPIES 6.6. INSTALL PAVEMENT & CURBING INCLUDING DRIVEWAYS. MATCH GRADE ALONG ALL PROP LINES 6.7. INSTALL SIGNAGE IAW SIGNAGE APPROVALS 6.8. INSTALL LANDSCAPING, FENCING AND SCREENING PER APPROVED SITE PLAN. 14 NONE REFERENCE - SALEM GIS MAX LOT COVERAGE, BLDGS (%) 30 FT (min)NONE 14 >30 FT 245 FT± 42.4% SCALE PROJECT ADDRESS SHEETDWG FILE LAYOUT A.L. PRIME ENERGY SAUGUS MA 01906 (781)246-0201 18 LARK AVENUE CONSULTANT, INC. PROPOSED SITE C-1.0AS NOTED SALEM, MA 342 HIGHLAND AVENUE TBD-021-01 SAL2 A.L. PRIME SITE # TBD DE S C R I P T I O N RE V BY DA T E 24 M A Y 2 0 2 1 0 A G O R I G I N D A T E O F D R A W I N G REFERENCE: PROPERTY LINES AND OTHER EXISTING SITE IMPROVEMENT INFORMATION ON THIS DRAWING TAKEN FROM EXISTING CONDITIONS PLAN BY EASTERN LAND SURVEY, ASSOC, INC., SHEET F 19120, 05 APRIL 2021, SCALE 1"=20'. ALL SITE IMPROVEMENTS ARE SHOWN PER THE BEST AVAIL INFO AND MUST BE VERIFIED IN THE FIELD, PARTICULARLY PRIOR TO ANY EXCAVATION OR WORK THAT MAY AFFECT BURIED UTILITIES. 03 MIN. LOT WIDTH (FT) MIN OPEN SPACE (%) MAX. BLDG. HEIGHT (STORIES) BUFFER AREA RQD FROM RESIDENTIAL FLOOR AREA RATIO 30 FT NONE ---NONE1 NONE ---NONE7.2% NO CHANGE 243.5 FT± 22 FT± --- n/a --- 0 % 40 FT 30 FT * MODIFIED PER SECTION 6.3.2 MOTOR VEHICLE LIGHT SERVICE STATION --- n/a n/a n/a n/a n/a n/a n/a 07/22/21 20 J U L 2 0 2 1 1 A G R E V P E R P L N G B D C M T S - R E D U C E D P V M N T , A D D E D T R E E S , E T C 22 J U L 2 0 2 1 2 A G A D D E D F U T U R E E V C H A R G I N G L O C A T I O N HIGHLAND AVENUE B A R C E L O N A A V E N U E UP UP UP UP UP UP UP 36+0 37+0 39+038+0 UP EX S T G TR E E S RE M A I N 300' RAD I U S SITE 8-15 8-14 7-73 7-41 7-40 8-12 8-13 7-46 8-09 8-11 8-01 8-147 8-02 8-10 8-08 8-16 8-102 7-42 8-145 F O R E S T RI V E R 15.7% GENERAL NOTES 1. THE GENERAL PURPOSE OF THIS WORK IS TO REMOVE EXSTG IMPROVEMENTS AND CONSTRUCT A NEW GAS STATION WITH 12 FUELING POSITIONS AND A 3353 SF CONV STORE 2. THE PROSPECTIVE PROPERTY OWNER WILL OBTAIN ANY APPLICABLE BOARD AND STATE APPROVALS AND GENERAL BLDG PERMIT. THE CONTRACTOR WILL BE RESPONSIBLE FOR PERMITS FROM THE LOCAL FIRE MARSHAL'S OFFICE AND TRADE OR BLDG PERMITS FROM THE LOCAL BLDG DEPT AND ALL ASSOCIATED TESTING AND INSPECTION REQUIREMENTS. 3. THE CONTRACTOR SHALL CONTACT DIG-SAFE PRIOR TO ANY CONST EXCAVATION (811) 4. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL FIELD VERIFY: 4.1. PROPERTY BOUNDARIES, EASEMENTS, AND RIGHT OF WAYS. 4.2. EXSTG STRUCTURES, BUILDINGS, AND DRIVEWAYS 4.3. LOCATIONS, SIZES, DEPTHS OF EXSTG UG UTILITIES, PIPING, STRUCTURES, TANKS, ETC. 4.4. ALL EXSTG AND PROPOSED CRITICAL ELEVATIONS 5. WHERE CONFLICTS ARISE BETWEEN FIELD CONDITIONS & PROPOSED CONST, OR IF THERE IS A CONFLICT BETWEEN ANY REGS OR MUNICIPAL REQMNTS AND PROPOSED PLANS, CONTRACTOR SHALL NOTIFY OWNER'S REP PRIOR TO CONTINUANCE OF WORK. 6. PROPOSED WORK INCLUDES: 6.1. PREP SITE PER ANY CONDITIONS OF SITE APPROVALS FROM ZONING, PLANNING, CONSERVATION COMMISSION, MA STATE HIGHWAY, OR ANY OTHER APPLICABLE BODY 6.2. RAZE AND REMOVE ALL EXISTING IMPROVEMENTS 6.3. REPLACE UG UTILITIES AND INSTALL ANY STORMWATER MANAGEMENT STRUCTURES 6.4. INSTALL NEW UNDERGROUND STORAGE TANKS 6.5. CONSTRUCT NEW STORE, GAS STATION ISLANDS & CANOPIES 6.6. INSTALL PAVEMENT & CURBING INCLUDING DRIVEWAYS. MATCH GRADE ALONG ALL PROP LINES 6.7. INSTALL SIGNAGE IAW SIGNAGE APPROVALS 6.8. INSTALL LANDSCAPING, FENCING AND SCREENING PER APPROVED SITE PLAN. 18 NONE REFERENCE - SALEM GIS MAX LOT COVERAGE, BLDGS (%) 30 FT (min)NONE 14 >30 FT 245 FT± 42.4% SCALE PROJECT ADDRESS SHEETDWG FILE LAYOUT A.L. PRIME ENERGY SAUGUS MA 01906 (781)246-0201 18 LARK AVENUE CONSULTANT, INC. PROPOSED SITE C-1.0AS NOTED SALEM, MA 342 HIGHLAND AVENUE TBD-021-01 SAL2 A.L. PRIME SITE # TBD DE S C R I P T I O N RE V BY DA T E 24 M A Y 2 0 2 1 0 A G O R I G I N D A T E O F D R A W I N G REFERENCE: PROPERTY LINES AND OTHER EXISTING SITE IMPROVEMENT INFORMATION ON THIS DRAWING TAKEN FROM EXISTING CONDITIONS PLAN BY EASTERN LAND SURVEY, ASSOC, INC., SHEET F 19120, 05 APRIL 2021, SCALE 1"=20'. ALL SITE IMPROVEMENTS ARE SHOWN PER THE BEST AVAIL INFO AND MUST BE VERIFIED IN THE FIELD, PARTICULARLY PRIOR TO ANY EXCAVATION OR WORK THAT MAY AFFECT BURIED UTILITIES. 03 MIN. LOT WIDTH (FT) MIN OPEN SPACE (%) MAX. BLDG. HEIGHT (STORIES) BUFFER AREA RQD FROM RESIDENTIAL FLOOR AREA RATIO 30 FT NONE ---NONE1 NONE ---NONE7.2% NO CHANGE 243.5 FT± 22 FT± --- n/a --- 0 % 40 FT 30 FT * MODIFIED PER SECTION 6.3.2 MOTOR VEHICLE LIGHT SERVICE STATION --- n/a n/a n/a n/a n/a n/a n/a LAYOUT OF PROPOSED SITE IMPROVEMENTS SEE GRAPHIC SCALE VICINITY MAP ZONE: B2 - BUSINESS HIGHWAY // ENTRANCE CORRIDOR OVERLAY DISTRICT PROPOSED MAX. BLDG. HEIGHT (FT) MIN. LOT AREA (FT) MIN. LOT FRONTAGE (FT) MIN REAR YARD DEPTH (FT) MIN FRONT YARD DEPTH (FT) 10 FT (min) REQUIRED EXISTING PARKING SPACES (MIN 9.0'x19' / 170SF) ZONING INFO - MAP 8, PARCELS 14 & 15 - 342 HIGHLAND AVE & 2 BARCELONA AVE *40 FT (min) 46,263 SF± MIN SIDE YARD DEPTH (FT) 25 % --- *20,000 SF 100 FT *200 FT NO CHANGE NO CHANGE RELIEF RQSTD NONE NONE NONE NONE NONE NONE NONE PROPOSED USES: MOTOR VEHICLE LIGHT SERVICE - PERMITTED RETAIL STORE - PERMITTED REFERENCE: ZONING ORDINANCE - CITY OF SALEM ADOPTED SEPT 10, 2009 W/ AMENDMENTS THRU JULY 9, 2020 (SUPP NO. 23, UPDATE 3) -Retail - 1ea / 150 GFA (less storage) =2,074sf / 150 = 13.82 20 J U L 2 0 2 1 1 A G R E V P E R P L N G B D C M T S - R E D U C E D P V M N T , A D D E D T R E E S , E T C 07/22/21 22 J U L 2 0 2 1 2 A G A D D E D F U T U R E E V C H A R G I N G L O C A T I O N HIGHLAND AVENUE B A R C E L O N A A V E N U E UP UP UP G7 NO TP LEDGE 24" 122.0 G1 LEDGE 57" 123.3 1 2 4 1 2 6 1 2 8 130 122 1 2 2 1 2 0 124 1 2 6 1 2 0 11 8 126 127 1 2 8 12 9 13 0 13 1 126 1 2 5 12 4 FF - 126.97 126.72 126.95x x 126.95x 123 126.84 x 126.98x 126.76 x 126.58 x 126.64 x 126.87x 1 1 9 1 2 0 1 2 2 1 2 7 1 1 7 1 2 1 117 1 1 8 1 1 9 1 2 0 12 1 1 2 2 1 2 3 1 1 8 1 2 4 1 2 5 130 128 126 124 127.26x 126.65 x 126.95x 36+0 37+0 39+038+0 130.82 118.76 119.01 LE D G E @ 2 ' A L O N G T R E N C H G8 NO TP LEDGE 24" 119.0 G2 SHGW 116" 113.4 NO LEDGE 14 6 " <110.9 G3 SHGW 104" 114.4 NO LEDGE 12 0 " <113.1 G4 SHGW 144" 116.0 NO LEDGE 15 4 " <115.2 G5 SHGW 100" 115.7 NO LEDGE 14 0 " <112.4 G6 SHGW @ LED G E LEDGE 80" 115.4 G9 SHGW @ LED G E LEDGE 81" 114.3 1 2 5 128 12 9 125 1 2 4 124 1 2 4 125 127 128 126.0 126.90 x 122.95 x 122.20 x 122.80 x 12 2 124.93 x124.43 x 1 2 0 1 1 8 1 2 2 1 1 8 1 2 2 122.40 x122.60 x 125 124 12 1 SMH R-132.81 I-121.1 SMH R-130.10 I-118.7 (Reco r d ) SMH R-122.19 I-116.9 (Reco r d ) 1 2 0 13 0 1 2 9 129 127 1 2 8 1 2 7 126 12713 2 129 13 1 12 5 125 125 124 1 2 3 12 3 123 123 1 2 5 1 2 4 1 2 8 1 2 7 1 2 6 127 126.37 x 1 2 6 1 2 3 126.65 x 126.95x x 124.65x 126.87x 126.37x ~143.5 (bottom fascia ) (min 15' clear a n c e ) CB2 R-125.05 I-122.55 ~124.5 (top all f t g s ) ~119.5 (bottom f t g s ) CB3 R-123.92 I(in)-121.58 I(out)-121.35 CB1 R-126.32 I-123.55 SC1 (450i) R-124.65 I(in)-120.30 I(out)-120.05 DMH2 R-124.60 I(in1)-120.67 I(in2)-120.69 I(out)-120.51 DMH1 R-126.60 I(in1)-123.23 I(in2)-123.39 I(out)-123.03 INFILTRATIO N S Y S RS-8 @ 118.5 Bottom Sys -1 1 8 . 0 I(in)-119.9 1 2 3 1 1 9 UP 1 3 0 1 3 2 10" ADS 54' - 2.O% ( C 3 ) 1 2 " A D S 2 6 ' - 2 . 5 % ( C 2 ) 1 0 " A D S - 1 1 8 ' - 1 . 7 5 % 1 0 " A D S 1 6 ' - 2 . 0 % 8" PV C 72' > 1 . 5 % (C 1 ) 6 " P V C 85 ' - 2 . 0 % 6" P V C 58 ' - 2 . 0 % (C4) 15" ADS 4' - 1.5% 15" ADS 4' - 1.5% LAYOUT OF PROPOSED SITE GRADING SEE GRAPHIC SCALE SCALE PROJECT ADDRESS SHEETDWG FILE GRADING DE S C R I P T I O N RE V BY DA T E A.L. PRIME ENERGY SAUGUS MA 01906 (781)246-0201 18 LARK AVENUE CONSULTANT, INC. C-2AS NOTED SALEM, MA 342 HIGHLAND AVENUE TBD-021-01 SAL2 A.L. PRIME SITE # TBD 24 M A Y 2 0 2 1 0 A G O R I G I N A L D R A W I N G D A T E GENERAL NOTES 1. THE CONTRACTOR SHALL CONTACT DIG-SAFE PRIOR TO ANY CONSTRUCTION EXCAVATION (811 IN MA) 2. SITE GRADES VARY APPROX 14 FEET ACROSS THE PROPERTY, CONTOURS SHOWN AT ONE FOOT INTERVAL. 3. OWNER WILL HAVE SURVEYOR CONFIRM LOCAL TEMP BM AT HYDRANT ALONG FRONTAGE PRIOR TO START OF CONSTRUCTION AND CONTRACTOR WILL MAINTAIN AND PROTECT THE BM THROUGHOUT THE PROJECT 4. WHERE CONFLICTS ARISE BETWEEN THE FIELD CONDITIONS VERIFIED AND PROPOSED CONSTRUCTION, OR IF THERE IS A CONFLICT BETWEEN ANY REGULATIONS OR MUNICIPAL REQUIREMENTS AND THE PROPOSED PLANS, THE CONTRACTOR SHALL NOTIFY THE OWNER'S REPRESENTATIVE PRIOR TO CONTINUANCE OF THE WORK. 04 07/20/21 20 J U L 2 0 2 1 1 A G R E V P E R P L N G B D C M T S - R E D U C E D P V M N T , A D D E D T R E E S , E T C LUMINAIRE SCHEDULE SYMBOL QTY LABEL ARRANGEMENT LUMENS LLF BUG RATING WATTS/LUMINAIRE TOTAL WATTS MANUFACTURER CATALOG LOGIC 2 A3B SINGLE 10899 1.030 B2-U0-G2 104 208 Cree Inc OSQ-ML-B-DA + OSQM-B-16L-50K9-3M-UL-NM-X 2 A4B SINGLE 12349 1.030 B2-U0-G2 104 208 Cree Inc OSQ-ML-B-DA + OSQM-B-16L-57K7-4M-UL-NM-X 20 C SINGLE 13251 1.030 B3-U0-G1 134 2680 CREE, INC.CAN-304-SL-RD-06-E-UL-XX-700-57K 23 L4 4FT LIGHTBAR 148 1.000 B0-U1-G0 2.9 533.6 MAXLITE INC.LB4850 2 W SINGLE 2490 1.030 B1-U0-G1 19 38 Cree Inc XSPW-B-WM-2ME-2L-57K-UL-XX LUMINAIRE LOCATION SUMMARY LUM NO.LABEL MTG. HT. 1 A3B 17 2 A3B 17 3 A4B 17 4 A4B 17 5 C 18 6 C 18 7 C 18 8 C 18 9 C 16 10 C 16 11 C 16 12 C 16 13 C 16 14 C 16 15 C 16 16 C 16 17 C 16 18 C 16 19 C 16 20 C 16 21 C 16 22 C 16 23 C 16 24 C 16 25 L4 10 26 L4 10 27 L4 10 28 L4 10 29 L4 10 30 L4 10 31 L4 10 32 L4 10 33 L4 10 34 L4 10 35 L4 10 36 L4 10 37 L4 10 38 L4 10 39 L4 10 40 L4 10 41 L4 10 42 L4 10 43 L4 10 44 L4 10 45 L4 10 46 L4 10 47 L4 10 48 W 10 49 W 10 FOOTCANDLE LEVELS CALCULATED AT GRADE USING INITIAL LUMEN VALUES LABEL AVG MAX MIN AVG/MIN MAX/MIN DIESEL CANOPY 31.77 36 24 1.32 1.50 GAS CANOPY 50.03 69 28 1.79 2.46 PAVED AREA 7.90 30.6 0.4 19.75 76.50 UNDEFINED 0.31 6.2 0.0 N.A.N.A. 1 A3B 2 A3B 3 A4B 4 A4B 5 C 6 C 7 C 8 C 9 C10 C 11 C 12 C 13 C 14 C 15 C 16 C 17 C 18 C 19 C 20 C 21 C 22 C 23 C 24 C 25 L4 26 L427 L428 L429 L430 L431 L432 L433 L434 L435 L436 L437 L438 L439 L440 L441 L442 L4 43 L4 44 L4 45 L4 46 L4 47 L4 48 W 49 W 27 32 36 34 29 32 33 34 34 32 34 34 32 24 34 33 33 27 31 34 32 28 28 39 44 47 47 49 48 50 47 46 42 31 39 33 57 47 59 51 50 59 57 57 35 43 33 45 65 66 36 55 69 63 49 32 46 42 65 56 67 59 57 63 55 58 36 42 41 54 61 64 64 64 57 59 52 49 43 34 45 55 64 65 68 63 58 40 54 60 64 62 60 48 46 41 65 55 66 52 43 34 44 64 67 37 34 40 34 57 47 56 42 33 32 42 46 47 45 42 30 5.5 5.1 4.9 2.7 4.9 6.6 8.5 0.9 1.4 1.9 2.3 2.4 2.5 3.5 6.2 8.2 6.1 4.9 3.3 1.7 1.5 2.8 6.0 8.8 3.9 1.3 1.0 2.0 4.4 6.9 8.7 9.1 9.5 11.4 11.6 10.2 5.6 3.3 2.2 1.2 0.9 1.5 3.5 4.8 4.3 1.4 0.7 1.5 5.2 12.9 22.1 28.0 29.6 30.0 28.9 23.9 16.7 6.8 3.4 1.8 1.0 0.7 0.8 1.6 3.3 2.9 1.6 1.0 2.0 8.3 25.0 24.3 8.4 2.7 1.5 0.9 0.6 0.6 1.3 2.5 9.8 29.0 25.3 8.0 2.2 1.4 1.1 0.9 1.5 2.8 10.8 30.3 17.1 6.0 2.1 1.8 2.6 2.8 2.0 3.1 10.7 30.6 24.1 12.7 7.1 3.6 2.3 3.5 8.2 9.1 3.5 3.1 3.5 10.0 26.9 14.9 5.4 3.2 2.6 3.5 8.8 15.0 11.1 5.0 5.6 5.4 11.0 24.2 10.3 3.8 2.6 3.2 7.1 15.9 8.3 6.7 8.7 16.8 26.8 30.6 26.5 17.0 9.9 5.8 2.9 2.9 5.6 14.7 8.2 9.4 13.3 11.5 5.7 3.7 3.0 4.5 11.9 4.2 8.0 12.2 11.3 5.3 4.1 4.5 7.5 1.7 3.5 8.5 18.5 26.0 26.6 21.0 11.9 6.2 6.8 2.0 5.2 0.6 1.8 4.5 7.4 9.9 10.7 11.0 9.2 7.7 7.6 1.7 0.4 0.8 1.4 5.1 3.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.4 0.4 0.5 0.6 0.6 0.4 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.3 0.3 0.3 0.4 0.4 1.0 1.1 0.8 0.9 1.4 1.9 1.4 0.7 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.3 0.4 0.4 0.5 0.6 0.6 0.7 0.8 1.9 5.1 2.5 1.3 1.0 2.2 3.4 4.1 2.7 0.7 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.3 0.5 0.7 0.9 1.1 1.1 1.2 1.3 3.8 1.5 2.0 3.5 0.4 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.3 0.5 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.3 0.5 0.4 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.3 0.4 0.5 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.4 0.6 0.7 1.2 1.7 0.9 0.4 0.1 0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.3 0.5 0.8 0.6 0.5 0.6 0.8 0.5 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.4 0.8 1.1 1.5 0.7 0.5 0.4 0.3 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.3 0.6 1.2 1.8 5.2 1.6 0.5 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.3 0.9 2.0 2.8 0.6 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 1.0 2.5 1.0 0.4 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.7 2.5 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.4 3.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.4 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.3 0.5 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.3 1.1 1.6 0.0 0.4 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 2.2 2.8 3.7 6.2 5.3 6.1 5.0 4.4 1.7 1.3 2.4 1.7 1.3 0.4 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.4 0.6 0.8 1.0 1.1 1.1 1.1 1.1 0.8 0.4 0.4 0.3 0.4 3.3 2.9 3.2 0.8 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.3 0.4 0.4 0.5 0.5 0.5 0.5 0.3 0.2 0.1 0.1 0.1 0.2 1.3 1.1 4.4 1.6 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.2 1.9 1.6 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.1 0.3 0.7 0.4 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.1 0.2 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 NOTE: AREA LIGHTS ON NEW 15 FT. POLES MOUNTED ON 2 FT. CONCRETE BASES THIS SITE IS LOCATED IN A REGION WHERE LIGHTING IS REGULATED BY LOCAL ORDINANCES A.L. PRIME SALEM, MA SCALE: 1" = 20' D 3/24/21 JSG LAYOUT BY: DWG SIZE: DATE: PROJECT NAME: DRAWING NUMBER:RL-7266-S1-R1 REV. BY DATE DESCRIPTION R1 . . . JSG . . . 5/11/21 . . . REVISE PER UPDATED SITE PLAN . . . 1340 Kemper Meadow Dr, Forest Park, OH 45240 513-574-9500 redleonard.com ANY SITE PLAN(S), FLOOR PLAN(S), RENDERING(S), LIGHTING LAYOUT(S) AND PHOTOMETRIC PLAN(S) INCLUDING BUT NOT LIMITED TO ANY PROJECT(S) CREATED/PRODUCED BY RED LEONARD ASSOCIATES INC., ARE ONLY INTENDED FOR ILLUSTRATION AND QUOTING PURPOSES ONLY. RED LEONARD ASSOCIATES HAS THE RIGHT TO USE THIRD PARTY LASERS, SCANNERS, AND CAMERAS BUT ACTUAL PROJECT CONDITIONS, DIMENSIONS, AND ACCURACY OF MEASUREMENTS MAY DIFFER FROM THESE OR ANY PARAMETERS. RED LEONARD ASSOCIATES INC. ASSUMES NO LIABILITY FOR WHAT IS CREATED/PRODUCED IN THESE RECREATIONS. THIS INCLUDES BUT IS NOT LIMITED TO THE USE OF, INSTALLATION OF AND/OR INTEGRITY OF EXISTING BUILDING(S), SURROUNDING AREA FOR PRODUCT(S) SUCH AS EXISTING POLE(S), ANCHOR BOLT(S), BASE(S), ARCHITECTURAL AND SIGNAGE STRUCTURE(S), LANDSCAPING PLAN(S), LIGHTING PLAN(S), FIXTURE SELECTION(S) AND PLACEMENT, MATERIAL(S), COLOR ACCURACY, TEXTURE(S), AND ANYTHING ATTRIBUTED TO PHOTO REALISM THAT IS CREATED. FURTHERMORE, RED LEONARD ASSOCIATES INC., DOES NOT ASSUME LIABILITY WHATSOEVER FOR ANY PURCHASES MADE BY CLIENT BEFORE, DURING, OR AT THE CONCLUSION OF THE PUBLISHED WORK. THE CUSTOMER, ITS RELATIVE AFFILIATES, AS WELL AS ANY OTHER PERSON(S) IN VIEWING OF THIS PRODUCT IS RESPONSIBLE FOR VERIFYING COMPLIANCE WITH ANY BUT NOT LIMITED TO ALL CODES, PERMITS, RESTRICTIONS, INSTRUCTIONS, PURCHASES, AND INSTALLATIONS OF OBJECTS VIEWED WITHIN THIS DOCUMENT(S) OR PROJECT(S). SYMBOLS ARE NOT DRAWN TO SCALE. SIZE IS FOR CLARITY PURPOSES ONLY. SIZES AND DIMENSIONS ARE APPROXIMATE, ACTUAL MEASUREMENTS MAY VARY. DRAWINGS ARE NOT INTENDED FOR ENGINEERING OR CONSTRUCTION USE. THIS DOCUMENT, ANY RED LEONARD DRAWING(S), OR PROJECT(S) IS NOT TO BE USED AND/OR INTENDED FOR ENGINEERING OR CONSTRUCTION PURPOSES, BUT FOR ILLUSTRATIVE PURPOSES ONLY. ANY LOCATIONS OF EMERGENCY LIGHTING SHOWN WERE PROVIDED BY OTHERS. RED LEONARD ASSOCIATES IS NOT RESPONSIBLE FOR INSUFFICIENT LIGHTING DURING AN EMERGENCY EVENT. ANY USE OF THIS DOCUMENTATION AND/OR OTHER ARTICLES PRODUCED BY RED LEONARD WITHOUT WRITTEN AUTHORIZATION FROM JAYME J. LEONARD IS STRICTLY PROHIBITED. DISCLAIMER 1340 Kemper Meadow Dr, Forest Park, OH 45240 513-574-9500 | redleonard.com 1'-0" 1:50 SLOP E SLOPE1:50 SLOPE1:50SLOPE 1:12 to 1:2 0 1:50SLOPE 1:50 SLO P E ACCESSIBLEVANACCESSIBLE WALLSTORE S I D E W A L K E D G E SANITARY MANHOLE (IF NECESSARY) NOT TO SCALE SECTION THRU FUEL ISLAND NOT TO SCALE CLEAN-OUT NOT TO SCALE ASPHALT PAVEMENT NOT TO SCALE U-SHAPE BOLLARD NOT TO SCALE CONCRETE PAVEMENT JOINTS NOT TO SCALE UTILITY PIPE TRENCH NOT TO SCALE BUILDING SIDEWALK NOT TO SCALE SIDEWALK ADA PARALLEL CURB RAMP NOT TO SCALE ADA PARKING SIGNAGE NOT TO SCALE ADA PARKING PAVEMENT MARKING NOT TO SCALE CURBING NOT TO SCALE SCALE PROJECT ADDRESS SHEETDWG FILE DE S C R I P T I O N RE V BY DA T E A.L. PRIME ENERGY SAUGUS MA 01906 (781)246-0201 18 LARK AVENUE CONSULTANT, INC. SITE DETAILS 1 SD-1.0AS NOTED SALEM, MA 342 HIGHLAND AVE TBD-021-01 SAL2 A.L. PRIME SITE # TBD 24 M A Y 2 0 2 1 0 A G O R I G I N D A T E O F D R A W I N G 15 07/20/21 SCREENED TRASH ENCLOSURE AND TYP PRIVACY FENCE (CEDAR) NOT TO SCALE RETAINING WALL UNDER 48" (TYP) NOT TO SCALE BIKE RACK NOT TO SCALE 20 J U L Y 2 0 2 1 1 A G A D D E D B I K E R A C K , C H A N G E D F E N C I N G T O C E D A R D01 126.7 2 x 126.6 8 x126.8 7x 126.9 5 x 126.9 5 x 126.8 7x126.8 7x 126.7 0 x 126.3 7 x 126.6 0 x 126.0 8 x 125.5 8 x 126.1 6 x 126.9 5 x FLOOR PLAN SEE GRAPHIC SCALE GENERAL NOTES 1. ALL EXTERIOR DIMENSIONS TO EXTERIOR FACE OF FOUNDATION OR CMU 2. ALL INTERIOR DIMENSIONS TO FACE OF FINISH EXCEPT WHERE NOTED AS OTHERWISE. 3. ALL WOOD IN CONTACT WITH MASONRY OR CONCRETE SHALL BE PRESSURE TREATED. 4. PROVIDE SOLID WOOD BLOCKING BEHIND ALL WALL MOUNT FIXTURES. 5. REFER TO DOOR AND FINISH SCHEDULE 6. PROVIDE TILE BACKER BOARD BEHIND ALL TILED WALL SURFACES. 7. TRADE CONTRACTORS SHALL SUBMIT SHOP DRAWINGS AND/OR EQUIPMENT CUT SHEETS AND SPECS PRIOR TO PROCEEDING WITH PURCHASE OF MATERIALS OR FABRICATION. SCALE PROJECT ADDRESS SHEETDWG FILE DE S C R I P T I O N RE V BY DA T E A.L. PRIME ENERGY SAUGUS MA 01906 (781)246-0201 18 LARK AVENUE CONSULTANT, INC. FLOOR PLAN A-1.0AS NOTED SALEM, MA 342 HIGHLAND AVENUE TBD-021-01 SALEM A.L. PRIME SITE # tbd 24 M A Y 2 0 2 1 0 A G O R I G I N D A T E O F D R A W I N G 17 05/24/21 342 ATM FASCIA 14'-9" TOP OF 20'-2" TOP OF PARAPET SLAB (FF) 0'-0" TOP OF (126.91) FTG -5'-8" BOTTOM OF (121.24) SOUTH ELEVATION (FRONT) SEE GRAPHIC SCALE GENERAL NOTES 1. THIS PLAN FOR HEARINGS ONLY, DO NOT USE FOR BUILDING PERMIT OR CONSTRUCTION REFERENCE. REFER TO ARCHITECT STAMPED BUILDING PERMIT PLANS FOR CONSTRUCTION. 2. ALL DIMENSIONS TO FACE OF FINISH EXCEPT WHERE NOTED AS OTHERWISE. 3. PROPOSED BUILDING INTENDED TO MEET ALL ADA REQUIREMENTS INCLUDING HEIGHT OF TRANSACTION DRAWER AND ATM. 4. TOP OF FASCIA TO PITCH BACK TOWARDS ROOF AT 18" PER FOOT, ALL ROOF AND FASCIA AREA TO DRAIN TOWARDS REAR GUTTER AND ROUTED TO SUB-SURFACE INFILTRATION SYSTEM 5. LOCATION OF FIRE SAFETY EQUIPMENT SUBJECT TO FINAL APPROVAL FROM LOCAL FIRE DEPARTMENT. 6. IT IS INTENDED THAT ALL SIGNAGE WILL BE AS ALLOWED BY RIGHT AND APPLIED FOR SEPARATELY THROUGH TYPICAL SIGN PERMIT APPLICATION(S). ALL SIGNAGE ON THIS PLAN INCLUDED ONLY FOR ILLUSTRATION OF DESIRED SIGNAGE. THE APPLICANT IS NOT SEEKING ANY WAIVERS OR RELIEF FOR SIGNAGE. EAST ELEVATION SEE GRAPHIC SCALE SCALE PROJECT ADDRESS SHEETDWG FILE ELEVATIONS DE S C R I P T I O N RE V BY DA T E A.L. PRIME ENERGY SAUGUS MA 01906 (781)246-0201 18 LARK AVENUE CONSULTANT, INC. STORE A-2.1AS NOTED SALEM, MA 342 HIGHLAND AVENUE TBD-021-01 SALEM A.L. PRIME SITE # tbd 24 M A Y 2 0 2 1 0 A G O R I G I N D A T E O F D R A W I N G 18 05/24/21 342 ATM FASCIA 14'-9" TOP OF 20'-2" TOP OF PARAPET SLAB (FF) 0'-0" TOP OF (126.91) FTG -5'-8" BOTTOM OF (121.24) SOUTH ELEVATION (FRONT) SEE GRAPHIC SCALE GENERAL NOTES 1. THIS PLAN FOR HEARINGS ONLY, DO NOT USE FOR BUILDING PERMIT OR CONSTRUCTION REFERENCE. REFER TO ARCHITECT STAMPED BUILDING PERMIT PLANS FOR CONSTRUCTION. 2. ALL DIMENSIONS TO FACE OF FINISH EXCEPT WHERE NOTED AS OTHERWISE. 3. PROPOSED BUILDING INTENDED TO MEET ALL ADA REQUIREMENTS INCLUDING HEIGHT OF TRANSACTION DRAWER AND ATM. 4. TOP OF FASCIA TO PITCH BACK TOWARDS ROOF AT 18" PER FOOT, ALL ROOF AND FASCIA AREA TO DRAIN TOWARDS REAR GUTTER AND ROUTED TO SUB-SURFACE INFILTRATION SYSTEM 5. LOCATION OF FIRE SAFETY EQUIPMENT SUBJECT TO FINAL APPROVAL FROM LOCAL FIRE DEPARTMENT. 6. IT IS INTENDED THAT ALL SIGNAGE WILL BE AS ALLOWED BY RIGHT AND APPLIED FOR SEPARATELY THROUGH TYPICAL SIGN PERMIT APPLICATION(S). ALL SIGNAGE ON THIS PLAN INCLUDED ONLY FOR ILLUSTRATION OF DESIRED SIGNAGE. THE APPLICANT IS NOT SEEKING ANY WAIVERS OR RELIEF FOR SIGNAGE. EAST ELEVATION SEE GRAPHIC SCALE SCALE PROJECT ADDRESS SHEETDWG FILE ELEVATIONS DE S C R I P T I O N RE V BY DA T E A.L. PRIME ENERGY SAUGUS MA 01906 (781)246-0201 18 LARK AVENUE CONSULTANT, INC. STORE A-2.1AS NOTED SALEM, MA 342 HIGHLAND AVENUE TBD-021-01 SALEM A.L. PRIME SITE # tbd 24 M A Y 2 0 2 1 0 A G O R I G I N D A T E O F D R A W I N G 18 05/24/21 NORTHEAST ELEVATION SEE GRAPHIC SCALE NORTH ELEVATION (REAR) SEE GRAPHIC SCALE SCALE PROJECT ADDRESS SHEETDWG FILE ELEVATIONS 2 DE S C R I P T I O N RE V BY DA T E A.L. PRIME ENERGY SAUGUS MA 01906 (781)246-0201 18 LARK AVENUE CONSULTANT, INC. BUILDING A-2.2AS NOTED SALEM, MA 342 HIGHLAND AVENUE TBD-021-01 SALEM A.L. PRIME SITE # tbd 24 M A Y 2 0 2 1 0 A G O R I G I N D A T E O F D R A W I N G 19 WEST ELEVATION SEE GRAPHIC SCALE 05/24/21 .9000R E G NORTHEAST SOUTHEAST (FACING HIGHLAND AVE) SOUTHWEST (FACING BARCELONA)SOUTHEAST (FACING HIGHLAND AVE) MAIN CANOPY ELEVATIONS (FRONT) SEE GRAPHIC SCALE GENERAL NOTES 1. THIS PLAN FOR BOARD HEARINGS ONLY. REFER TO STEEL MANUFACTURER'S STAMPED DRAWINGS FOR BUILDING PERMIT AND CONSTRUCTION. 2. MINIMUM CLEARANCE 15'-0". 3. ALL TOP OF FOOTINGS AT SAME ELEVATION - 30" BELOW TO OF ISLAND AT ISLAND WITH LOWEST ELEVATION. 4. CANOPY DRAINS EXTERNAL TO THE COLUMN AND ROUTED TO UG INFILTRATION SYSTEM BY UG PIPING 5. ALL LIGHTING RECESSED IN CANOPY DECK AND ALL LIGHTING ARE LED FIXTURES 6. SIGNAGE SHOWN FOR INFORMATION ONLY, ALL SIGNAGE TO BE APPLIED FOR SEPARATELY AND LIMITED TO AS ALLOWED BY RIGHT. ALL SIGNAGE SUBJECT TO CITY OF SALEM SIGN BOARD APPROVAL. DIESEL ELEVATIONS SEE GRAPHIC SCALE SCALE PROJECT ADDRESS SHEETDWG FILE ELEVATIONS DE S C R I P T I O N RE V BY DA T E A.L. PRIME ENERGY SAUGUS MA 01906 (781)246-0201 18 LARK AVENUE CONSULTANT, INC. CANOPY A-2.3AS NOTED SALEM, MA 342 HIGHLAND AVENUE TBD-021-01 SALEM A.L. PRIME SITE # tbd 24 M A Y 2 0 2 1 0 A G O R I G I N D A T E O F D R A W I N G 20 05/24/21 HIGHLAND AVENUE B A R C E L O N A A V E N U E A F1 B C E D F2 F4 F3 F5 342 ATM C B E E3 E2.9000R E G E1 E4 .910000 .910000 REGULAR UNLEADED DIESEL A ATM COLD DRINKS F E4 SIGN LOCATION PLAN SIGNAGE SOUTH ELEVATION (FRONT) SEE GRAPHIC SCALE PROPOSED SIGNAGE TYPEKEY 6'-8" x 3'-6" SIZE AREA (sf)INTERNALLY 110.30 9'-2" x 3'-6" (irreg)19.09 TOTAL PROPOSED SITE SIGNAGE: 306.73 sf FREESTANDING B A C 8'-8" x 3'-6"30.34WALL (BLDG) DIST TO 11'-0" 15'-8" BOTTOM DIST TO TOP 14'-6" 19'-2" 7'-0"25'-0" Y ILLUMINATED CMTS LED PRICES Y Y F1 F2 F3 Allowed Signage 486sf (Calc 243 lf frontage x 2 sf lf = 486 sf) Allowed Signage 130sf (B2 zone with frontage exceeding 200') WALL (CANOPY) TOTAL PROPOSED FREESTANDING SIGNAGE: 110.30 sf WALL (BLDG) D WALL (BLDG) WALL (CANOPY) WALL (CANOPY) GAS CANOPY SOUTH ELEVATION WALL SEE GRAPHIC SCALE SIGN SEE GRAPHIC SCALE DIESEL CANOPY WALL SEE GRAPHIC SCALE GAS CANOPY NORTH ELEV WALL SEE GRAPHIC SCALE 7'-0" x 4'-0" 6'-10" x 2'-7" 28.00 16'-9" 19'-4" Y Y Y Y 17.50 4'-6" 8'-6" 16'-9" 19'-4" 16'-9" 19'-4" 6'-10" x 2'-7" 6'-10" x 2'-7" 17.50 17.50 SCALE PROJECT ADDRESS SHEETDWG FILE DE S C R I P T I O N RE V BY DA T E A.L. PRIME ENERGY SAUGUS MA 01906 (781)246-0201 18 LARK AVENUE CONSULTANT, INC. SG-1AS NOTED SALEM, MA 342 HIGHLAND AVENUE TBD-021-01 SALEM A.L. PRIME SITE # tbd 24 M A Y 2 0 2 1 0 A G O R I G I N D A T E O F D R A W I N G 21 05/24/21 WALL (CANOPY)9'-0" x 3'-6"16'-2" 19'-8" 31.50 F4 Y LED PRICES APPLICANT IS NOT SEEKING ANY WAIVER OR RELIEF FOR SIGNAGE AND WILL APPLY FOR SIGNAGE PERMITS SEPARATELY. THIS PLAN FOR BOARD INFORMATION, IT IS INTENDED AND BELIEVED THAT THE PROPOSED SIGNAGE IS AS ALLOWED BY RIGHT. FREESTANDING EAST ELEVATION SEE GRAPHIC SCALE GAS CANOPY NORTH ELEVATION WALL SEE GRAPHIC SCALE 6'-0" x 14'-6" E WALL (BLDG)Y WALL (CANOPY)16'-9" 19'-4" 6'-10" x 2'-7"17.50F5 Y 6'-10" x 2'-7"11'-2" 13'-9" 17.50 Revisions per 7‐8 hearing with Planning Board Removed 4 parking spaces and pavement in NE corner near Highland Ave driveway decreased pavement along Highland Ave and Barcelon Ave frontages by 2‐2.5 feet added a dozen shade trees and adjusted landscape  changed fence from white vinyl to natural cedar moved back plantings near intersection  added bike rack near SE corner of store added location for free air near trash enclosure light pole added location for future EV Charging station Existing View from Highland Avenue Proposed Improvements