Loading...
131 DERBY STREET - BUILDING JACKET (002) 1� � �k�y s��_��— M FIELD REPORT Pagel ABERJONA ENGINEERING INC. BATE JOB NO. One Mt.Vernon St. 9/27/06 106211 Winchester,MA 01890 PROJECT Ph: 781-729-6188Fax: 781-729-7960 131 Rear Derby Street LOCATION Salem, MA CONTRACTOR OWNER TO: Renaissance Condo Trust Navarro Construction Ren. Condo Trust 131 Derby Street (Rear) WEATHER TEMP Salem, MA 01970 Fair 58 OAT 8:30 AM Attn: Steve Navarro PRESENT AT SITE Steve Navarro/Trustee David Halter/Trustee Alan A. Vitukevich/AEI THE FOLLOWING WAS NOTED: Visited the site to review excavations for new tube columns in Garage area. • Excavation complete to bottom of existing footings. Soil is a compact silty sand with some gravel, acceptable for bearing. • Structural framing at Garage reviewed with David Halter to clarify changes required at two story wall due to brick masonry not being reliable for epoxy anchors. • Steve Navarro requested substituting steel tube for 6x6 wood posts supporting Deck beams on west section of roof. HSS 3x3x1/4 tubes or 3" diameter schedule 40 pipe columns will be acceptable. Columns will require a 4x9x3/8" base plate and 5x9x3/8" cap plate. Refer to drawing SK927A attached. • The connection of the existing 18 inch beam to the existing 21 inch beam was exposed. Top of 18 inch beam is above W21 and web is notched for flange clearance. Provide new connection in accordance with drawing SK927B attached. FIELD REPORT Page The comments in this field report are a record of transactions that occurred at the site between those present. If there are any errors or omissions please notify Aberjona Engineering in writing or all comments and directives shall be considered factual and acceptable by all parties. SUBMITTED: Alan A. Vitukevich, P.E. Vice President Copies: Thomas St. Pierre/Salem Building Inspector Anthony Navarro/GC NEW PARAPET WALL DESIGN PENDING NEW ROOF FRAMING 161 EXIST. W18 ADD CLIP ANGLE EaEXIST. CLIP . SIDE 4x4x3/8 x0'-4" EXIST. W21 ADD SEAT ANGLE 6x6x3/8x0'-8" W/ 3/8" STIFF PLATE PROPOSED REMEDIAL WORK a EXISTING BEAM FIELD REPORT ITEMS 9-27-06 131 REAR DERBY STREET ABERJONA ENGINEERING INC. ' DATE 10/3/06 STRUCTURAL DESON INVE=AT,ON RENOVATION PESTIXiATION SALEM, MA ONE MOUNT VERNON STREET TEL 781.729.6188 JOB 06211 WG VAN BOX TE FAX 781 7 29 7960 WINCHESTER MA 01890 DRAWN BY RAC SCALE 11/2"=l'-O' SK-927A WOOD POST U210 GALV. 5 1/4x14 P.T. PSL HANGER BEYOND 3-1/2"4x8" GALV L70 CLIP — LAGS POST Ea. END ', III 2x10 m 12" P. CAP PLATE � 5x9x3/8 W/ --�-TPI IIII 4-3/8'4x4" LAGS HSS3x3x1/4 OR 3" ID PIPE COLUMN BASE PLATE 4x9x3/8 W/ 4-3/8'4x4" LAGS EXIST. 2x8 8" WALL REINFORCED ADD 2x8 AS REOUIRED WITH L70 CLIP Ea. END I. LI 2-2x8 FT SECTION ALTERNATE DECK SUPPORT POST FIELD REPORT ITEMS 9-27-06 131 REAR DERBY STREET ABERJONA ENGINEERING INC. % DATE 10/3/06 S JCMU L DESIGN INVES9GAPON RENOVAMON RE6 CRAnI SALEM, MA ONE MOUNT VERNON STREET TEL 781.729.6188 JOB # 06211 P.O.BOX 215 FAX 781.729.7960 WG WINCHESTER MA 01890 t DRAWN BY RAC SCALE 11/2"=1'-0" SK-927B