25 Warren Street - C of A - remove siding_restore exterior_replace entry porch_paint colors
Salem Historical Commission
98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970
(978) 619-5685
CERTIFICATE OF APPROPRIATENESS
It is hereby certified that the Salem Historical Commission has determined that the proposed:
Construction Moving
✓ Reconstruction ✓ Alteration
Demolition ✓ Painting
Signage Other work
as described below will be appropriate to the preservation of said Historic District, as per the requirements
set forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance.
District: McIntire
Address of Property: 25 Warren Street
Name of Record Owner: Megan and Joel Nentwich
Description of Approval of Work:
• Remove aluminum siding on north and west elevations and restore underlying wood clapboards
and trim. If original cornerboards are not present under siding, new cornerboards to be in wood
to match cornerboards at 23 Warren Street.
• Window trim to be restored. If no trim exists under siding, new trim details to match dimensions of
any shadow evidence present or match band molding at 23 Warren Street.
• New white storm windows on north facade to match storm windows on west elevation.
• Reconstruct entry porch with following details:
o Posts to be 4x4 wrapped in Azek with band molding with option for turned posts;
o Vertical lattice in Azek to match entry porch at 14 Flint Street;
o Trim at porch roofline in wood with porch ceiling in beadboard;
o Intex “Hampton” railing to be painted to match trim color.
o Option for clapboard or flat panel in porch pediment.
• Restore door trim if present or replicate with wood. Storm door to be painted “Country
Redwood” to match door color.
• Paint colors (with final review of paint samples in field by Commissioner Joyce)√ COMPLETED:
o Body: “Shaker Beige”
o Trim: “Swiss Coffee”
o Doors: “Country Redwood” in gloss
o Windows: “Black”
Dated: November 21, 2024 SALEM HISTORICAL COMMISSION
By:
The homeowner has the option not to commence the work (unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise
indicated.
THIS IS NOT A BUILDING PERMIT. All applicable building permits to be obtained prior to work
commencing.