Loading...
16 Summer Street U1 CofNA - AC Condenser Salem Historical Commission 98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 (978) 619-5685 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed:  Construction  Moving  Reconstruction  Alteration  Demolition  Painting  Signage  Other Work as described below does not involve an exterior architectural feature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 16 Summer Street Name of Record Owner: Abhijit Kamerkar and Halley Zummo Description of Work Proposed: • Replace furnace and air conditioning systems. o Work will be in kind o Vents on driveway side will be in the same spot and of same dimensions o New gray vent will be painted to match the house trim Non-Applicable due to being in-kind repairs and. There will be no changes in color, material, design, location or outward appearance. *NOTE: Historic materials and details must be retained and repaired except where material is not salvageable and must be replaced. If replacement is necessary, new elements must replicate existing dimensions, details and materials. Should any changes to materials, design or outward appearance be necessary, Applicant must submit a new application to the Historical Commission for review. Upon completion of the above work, please notify Historical Commission staff as final sign-off is required to document compliance with this Certificate and approved plans. Dated: October 21, 2024 SALEM HISTORICAL COMMISSION: By: The homeowner has the option not to commence the work (unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals) prior to commencing work. Gray vent will be painted to match trim Street view of existing vents (April 2022) s Existing Vents (October 2024) North Elevation (October 2024) Existing vents (October 2024)