33 Carlton Street - CofNA (002)
Salem Historical Commission
98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970
(978) 619-5685
CERTIFICATE OF NON-APPLICABILITY
It is hereby certified that the Salem Historical Commission has determined that the proposed:
Construction Moving
Reconstruction Alteration
Demolition Painting
Signage Other Work
as described below does not involve an exterior architectural feature or involves a feature covered by the
exemptions or limitations set forth in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic
Districts Ordinance.
District: Derby Street
Address of Property: 33 Carlton Street
Name of Record Owner: Wendy Walsh (Townsend House Condominiums)
Description of Work Proposed:
In-kind replacement of mortar that is missing and repointing deteriorated mortar for bricks/profile
segments near and at the roofline in the upper-right corner area (especially above the 3rd floor window)
of the Carlton St side of building
o Mortar to be type N mortar: 1/1/6 mix (Portland cement, hydrated lime and sand) to match
existing color, grain size, texture and pointing technique; and
o New brick to match existing in terms of color, size, texture and design.
Non-applicable due to being in-kind repair. There will be no changes in color, material, design, location or
outward appearance. Should any changes to materials, design or outward appearance be determined
necessary, Applicant must submit a new application for review.
Upon completion of above work, please notify Historical Commission staff as final sign-off is
required to document compliance with this Certificate and approved plans.
Dated: August 8, 2024 SALEM HISTORICAL COMMISSION:
By: ____________
The homeowner has the option not to commence the work (unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated.
THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of
Buildings (or any other necessary permits or approvals) prior to commencing work.