Hawthorne Proposals COMBINED A5PEN ROOFING Aspen Roofing Services Rubber with Aluminum
58R Pulaski Street, (Corrected Estimate)
SERVICES Peabody, MA 01960 05/29/2024
Phone:(978)531-7663
Company Representative
Matt Sullivan
Phone:(978)648-7063
matts@aspenroofing.com
Claire Kallelis Job: Hawthorne Hotel-18 Washington Sq-Ballroom
Hawthorne Hotel Reroof
18 Washington Square West
Salem, MA 01970-4056
(978)689-5070
Rubber Section
Remove wall caps on wall for preparation of roof replacement.
-Remove existing E.P.D.M Reinforced Rubber roof system and roof insulation.
Furnish and install new 1/4"Tapered roof iso on prepped roof, and 1/2"polyiso board over tapered system.
-Install new Carlisle 60 Mil E.P.D.M Reinforced Rubber roof system-Color Black
All roof projection and roof penetrations to be properly installed.
New Rubber system to run up and over 3 sides of roof on walls.
-Fabricate and install new bronze aluminum/copper cap on walls for proper termination.
Furnish and install new termination bar on brick wall and aluminum apron flashing in new riglet on wall.
Roof to receive new retro fit drain on roof.
-All work to be done in a professional and timely manner.All job related debris to be removed from roof and properly disposed.All grounds to be
left in a neat and orderly appearance.
-For your convenience, please see attached Aspen Roofing Services Documents.
-A new roof does not guarantee against ice dams. Ice dams are caused by poor attic insulation and not enough ventilation.
-This proposal was based upon today's material pricing and availability and can only be guaranteed as such.
-Please note that Aspen Roofing Services carries the proper Workman's Compensation Insurance to work on your roof. Not all contractor's do
**All Unknowns(wood work, brick work,etc.)if any,to be dealt with at cost plus.**
Roof Options
PAYMENT SCHEDULE:
10% due with signed proposal
40%due at commencement of work
Installments payments throughout working process
Balance due upon completion of the work
TOTAL $28,965.33
NOTICE OF SCHEDULE CHANGES
The Contractor agrees that when delays become known to the Contractor,the Contractor will advise the Owner as soon as possible.
DELAYS IN COMPLETION DUE TO HIDDEN CONDITIONS
The Owner hereby acknowledges and agrees that in certain remodeling work, the demolition of portions of the pre-existing structure may reveal
additional defects, conditions or the need for additional work which must be repaired, altered or carried out in order to commence or to complete the
work described under the contract. In such case(s), the Owner agrees that the price, duration of the work and the schedule date of completion may
differ from the date stated on the front, and that such variation which is not avoidable by the Contractor shall not be considered to be a violation of this
Contract.
ADDITIONAL WARRANT(INFORMATION
All warranties fur equipment supplied by the Contractor under this agreement shall be those given by the manufacturers of such equipment,which
shall be and are hereby passed through directly to the owner. Under such manufacturers'warranties, the Owner may be required to register or mail in
a warranty card or other evidence of ownership and use of such equipment in order to activate such warranties.The Owners failure to mail in or
register such documentation,which failure voids the manufacturer's warranty, shall not create any responsibility for the Contractor to warranty such
equipment.
The warranty gives the Owner specific legal rights, and the Owner may also have other rights which may vary from state to state. Under Massachusetts
law,sales of goods carry an implied warranty of merchantability and fitness for a particular purpose.
All material is guaranteed to be as specified.All work to be completed in a workmanlike manner according to standard practices.Any alteration or
deviation from above specifications involving extra costs will be executed only upon written orders, and will become an extra charge over the
estimate.All agreements contingent upon strikes, accidents or delays beyond our control.
SUBCONTRACTING
Contractor agrees that, notwithstanding any agreement for materials and/or labor between Contractor and a third party, Contractor is responsible to
Owner for completion of all work described in a timely and workmanlike manner.
NO ACCELERATION OF PAYMENTS BUT ESCROWING ALLOWED
The Contractor may not require payments to be made in advance of the times specified in Payment Section (front)for the reason that he deems
himself or the payments to be insecure. If, however, he deems himself to be insecure, he may require, as a prerequisite to continuing the work
described herein,that the balance of the payments under this contract that are in the control of the Owner,shall be placed in a joint escrow account that
requires the signature of both the Contractor and the Owner for withdrawal.
INSURANCE
Contractor will be responsible to Owner or any third party for any property damage or bodily injury caused by himself, his employees or his
subcontractors in the performance of,or as a result of the work under this Agreement. Contractor agrees to carry insurance to cover such damage or
injury.
CONSTRUCTION RELATED PERMIT ACQUISITION
The Contractor under provisions of Chapter 142A of the General Laws is required to apply for and obtain all construction related permits.The
Contractor shall not be deemed responsible for delays in the work described in this agreement caused by regulatory, permit granting or inspectional
agencies, authorities or individuals.
Notice: If the owner obtains his own construction related permits for the work described under this agreement or deals with unregistered
contractors,the Owner is hereby advised that in the event of a dispute,judgment and nonpayment of the Contractor,the Owner will not be entitled
to make a claim to or collect from the guaranty fund established by Chapter 142A,M.G.L.
MODIFICATION
This Agreement, including the provisions relating to the price and payment schedule cannot be changed except by a written statement signed by both
Contractor and Owner.However,cancellation by Owner is allowed in accordance with the Notice of Cancellation.
COPY OF AGREEMENT TO BE GIVEN TO OWNER
This Agreement is governed by the laws of Massachusetts. It must be executed in duplicate and original signed copy hereof given to the Owner at the
time of execution. No work under this Agreement shall begin prior to the signing of the Agreement and a transmittal to the Owner of a copy thereof.
All home improvement contractors and subcontractors engaged in home improvement contracting, unless specifically from registration by Provisions
of Chapter 142A of the general laws, must be registered with the Commonwealth of Massachusetts. Inquiries about registration and status should be
made to the Director, Nome Improvement Contract Registration, One Ashburton Place, Room 1301, Boston, MA 02108(617) 727-8598. Owners who
secure their own construction related permits or deal with unregistered contractors will be excluded from the Guaranty Fund Provision of MGL c. 142A.
Massachusetts H.I.C. #207865
r 5/29/24
mpan ut orized Signature Date
C er Signat Date
Cus mer nature Date
ASPEN R►DDFING Aspen Roofing Services Kitchen Roof
58R Pulaski Street, 05/20/2024
SERVICES Peabody, MA 01960
Phone: (978)531-7663
Company Representative
Matt Sullivan
Phone: (978)648-7063
malts@aspenroofing.com
Claire Kallellis Job: Claire Kallellis
Hawthorne Hotel
18 Washington Square West
Salem, MA 01970
(978)689-5070
Rubber Section
Lower Kitchen
-Existing roofing system to be removed and disposed in to dumpster on-site
-New insulation system to be installed, replacing old insulation. 1/2"polyiso board over newly installed insulation
-New Reinforced EPDM Carlisle Black Rubber to be installed
-Perimeter strip also known as russ strip to be applied at walls
-100' of new termination bar is to be installed at walls
-All units are to receive new skirt metal and screws
-All posts that call for a pitch pocket will receive one,sealed with pourable sealer
-New 3"retro fit drain will replace the old one
-New bronze coping to be installed
-New walkway pads to be installed
-Carlisle warranty system to be properly applied
-All work to be done in a professional and timely manner.All job related debris to be removed from roof and properly disposed.All grounds to be
left in a neat and orderly appearance.
-For your convenience, please see attached Aspen Roofing Services Documents.
-This proposal was based upon today's material pricing and availability and can only be guaranteed as such.
-Please note that Aspen Roofing Services carries the proper Workman's Compensation Insurance to work on your roof. Not all contractors do
**All Unknowns(wood replacement,flashing work,etc.)if any,to be dealt with at cost plus.**
PAYMENT SCHEDULE:
10%due with signed proposal
40%due at commencement of work
Installments payments throughout working process
Balance due upon completion of the work
$56,585.00
TOTAL $56,585.00
NOTICE OF SCHEDULE CHANGES
The Contractor agrees that when delays become known to the Contractor, the Contractor will advise the Owner as soon as possible.
DELAYS IN COMPLETION DUE TO HIDDEN CONDITIONS
The Owner hereby acknowledges and agrees that in certain remodeling work, the demolition of portions of the pre-existing structure may reveal
additional defects, conditions or the need for additional work which must be repaired, altered or carried out in order to commence or to complete the
work described under the contract. In such case(s), the Owner agrees that the price, duration of the work and the schedule date of completion may
differ from the•date stated on the front, and that such variation which is not avoidable by the Contractor shall not be considered to be a violation of this
Contract.
ADDITIONAL WARRANTY INFORMATION
All warranties for equipment supplied by the Contractor under this agreement shall be those given by the manufacturers of such equipment, which
shall be and are hereby passed through directly to the owner. Under such manufacturers'warranties, the Owner may be required to register or mail in
a warranty card or other evidence of ownership and use of such equipment in order to activate such warranties.The Owner's failure to mail in or
register such documentation,which failure voids the manufacturer's warranty, shall not create any responsibility for the Contractor to warranty such
equipment.
The warranty gives the Owner specific legal rights, and the Owner may also have other rights which may vary from state to state. Under Massachusetts
law, sales of goods carry an implied warranty of merchantability and fitness for a particular purpose.
All material is guaranteed to be as specified.All work to be completed in a workmanlike manner according to standard practices. Any alteration or
deviation from above specifications involving extra costs will be executed only upon written orders, and will become an extra charge over the
estimate.All agreements contingent upon strikes, accidents or delays beyond our control.
SUBCONTRACTING
Contractor agrees that, notwithstanding any agreement for materials and/or labor between Contractor and a third party,Contractor is responsible to
Owner for completion of all work described in a timely and workmanlike manner.
NO ACCELERATION OF PAYMENTS BUT ESCROWING ALLOWED
The Contractor may not require payments to be made in advance of the times specified in Payment Section(front)for the reason that he deems
himself or the payments to be insecure. If, however, he deems himself to be insecure, he may require, as a prerequisite to continuing the work
described herein, that the balance of the payments under this contract that are in the control of the Owner,shall be placed in a joint escrow account that
requires the signature of both the Contractor and the Owner for withdrawal.
INSURANCE
Contractor will be responsible to Owner or any third party for any property damage or bodily injury caused by himself, his employees or his
subcontractors in the performance of, or as a result of the work under this Agreement. Contractor agrees to carry insurance to cover such damage or
injury.
CONSTRUCTION RELATED PERMIT ACQUISITION
The Contractor under provisions of Chapter 142A of the General Laws is required to apply for and obtain all construction related permits. The
Contractor shall not be deemed responsible for delays in the work described in this agreement caused by regulatory, permit granting or inspectional
agencies, authorities or individuals.
Notice: If the owner obtains his own construction related permits for the work described under this agreement or deals with unregistered
contractors,the Owner is hereby advised that in the event of a dispute,judgment and nonpayment of the Contractor,the Owner will not be entitled
to make a claim to or collect from the guaranty fund established by Chapter 142A,M.G.L.
MODIFICATION
This Agreement, including the provisions relating to the price and payment schedule cannot be changed except by a written statement signed by both
Contractor and Owner.However,cancellation by Owner is allowed in accordance with the Notice of Cancellation.
COPY OF AGREEMENT TO BE GIVEN TO OWNER
This Agreement is governed by the laws of Massachusetts. It must be executed in duplicate and original signed copy hereof given to the Owner at the
time of execution. No work under this Agreement shall begin prior to the signing of the Agreement and a transmittal to the Owner of a copy thereof.
All home improvement contractors and subcontractors engaged in home improvement contracting, unless specifically from registration by Provisions
of Chapter 142A of the general laws, must be registered with the Commonwealth of Massachusetts. Inquiries about registration and status should be
made to the Director, Home Improvement Contract Registration, One Ashburton Place, Room 1301, Boston, MA 02108(617) 727-8598. Owners who
secure their own construction related permits or deal with unregistered contractors will be excluded from the Guaranty Fund Provision of MGL c. 142A.
Massachusetts H.I.C.#207865
5/20/24
C mpany uth rized Signature Date
Cu tomeY' na rg Date
� y
Cuk6m& ignature Date
ASPEN ROOFING Aspen Roofing Services Parking Lot Side Lower 58R Pulaski Street, 05/20/2024
SERVICES Peabody, MA 01960
Phone: (978)531-7663
Company Representative
Matt Sullivan
Phone: (978)648-7063
matts@aspenroofing.com
Claire Kallellis Job: Claire Kallellis
Hawthorne Hotel
18 Washington Square West
Salem, MA 01970
(978)689-5070
Rubber Section
Lower roof facing the parking lot and street
-Remove existing roof system to install a New EPDM Reinforced Carlisle rubber roofing system with 1/2"polyiso board over new insulation
-New bronze colored aluminum coping to replace old and to be fabricated by us in the Aspen work shop
-New 3" retro fit drain will replace old drain
-Carlisle warranty system to be executed
-All work to be done in a professional and timely manner.All job related debris to be removed from roof and properly disposed.All grounds to be
left in a neat and orderly appearance.
-For your convenience, please see attached Aspen Roofing Services Documents.
-This proposal was based upon today's material pricing and availability and can only be guaranteed as such.
-Please note that Aspen Roofing Services carries the proper Workman's Compensation Insurance to work on your roof. Not all contractors do
**All Unknowns(wood replacement,flashing work, etc,)if any to be dealt with at cost plus.**
PAYMENT SCHEDULE:
10% due with signed proposal
40%due at commencement of work
Installments payments throughout working process
Balance due upon completion of the work
$23,466.00
TOTAL $23,466.00
NOTICE OF SCHEDULE CHANGES
The Contractor agrees that when delays become known to the Contractor,the Contractor will advise the Owner as soon as possible.
DELAYS IN COMPLETION DUE TO HIDDEN CONDITIONS
The Owner hereby acknowledges and agrees that in certain remodeling work, the demolition of portions of the pre-existing structure may reveal
additional defects, conditions or the need for additional work which must be repaired, altered or carried out in order to commence or to complete the
work described under the contract. In such case(s),the Owner agrees that the price,duration of the work and the schedule date of completion may
differ from the date stated on the front, and that such variation which is not avoidable by the Contractor shall not be considered to be a violation of this
Contract.
ADDITIONAL WARRANTY INFORMATION
All warranties for equipment supplied by the Contractor under this agreement shall be those given by the manufacturers of such equipment,which
shall be and are hereby passed through directly to the owner. Under such manufacturers'warranties,the Owner may be required to register or mail in
a warranty card or other evidence of ownership and use of such equipment in order to activate such warranties.The Owner's failure to mail in or
register such documentation,which failure voids the manufacturer's warranty, shall not create any responsibility for the Contractor to warranty such
equipment.
The warranty gives the Owner specific legal rights, and the Owner may also have other rights which may vary from state to state. Under Massachusetts
law,sales of goods carry an implied warranty of merchantability and fitness for a particular purpose.
All material is guaranteed to be as specified.All work to be completed in a workmanlike manner according to standard practices.Any alteration or
deviation from above specifications involving extra costs will be executed only upon written orders, and will become an extra charge over the
estimate.All agreements contingent upon strikes, accidents or delays beyond our control.
SUBCONTRACTING
Contractor agrees that, notwithstanding any agreement for materials and/or labor between Contractor and a third party, Contractor is responsible to
Owner for completion of all work described in a timely and workmanlike manner.
NO ACCELERATION OF PAYMENTS BUT ESCROWING ALLOWED
The Contractor may not require payments to be made in advance of the times specified in Payment Section(front)for the reason that he deems
himself or the payments to be insecure. If, however, he deems himself to be insecure, he may require, as a prerequisite to continuing the work
described herein,that the balance of the payments under this contract that are in the control of the Owner, shall be placed in a joint escrow account that
requires the signature of both the Contractor and the Owner for withdrawal.
INSURANCE
Contractor will be responsible to Owner or any third party for any property damage or bodily injury caused by himself, his employees or his
subcontractors in the performance of, or as a result of the work under this Agreement. Contractor agrees to carry insurance to cover such damage or
injury.
CONSTRUCTION RELATED PERMIT ACQUISITION
The Contractor under provisions of Chapter 142A of the General Laws is required to apply for and obtain all construction related permits.The
Contractor shall not be deemed responsible for delays in the work described in this agreement caused by regulatory, permit granting or inspectional
agencies, authorities or individuals.
Notice: If the owner obtains his own construction related permits for the work described under this agreement or deals with unregistered
contractors,the Owner is hereby advised that in the event of a dispute,judgment and nonpayment of the Contractor,the Owner will not be entitled
to make a claim to or collect from the guaranty fund established by Chapter 142A,M.G.L.
MODIFICATION
This Agreement, including the provisions relating to the price and payment schedule cannot be changed except by a written statement signed by both
Contractor and Owner. However,cancellation by Owner is allowed in accordance with the Notice of Cancellation.
COPY OF AGREEMENT TO BE GIVEN TO OWNER
This Agreement is governed by the laws of Massachusetts. It must be executed in duplicate and original signed copy hereof given to the Owner at the
time of execution. No work under this Agreement shall begin prior to the signing of the Agreement and a transmittal to the Owner of a copy thereof.
All home improvement contractors and subcontractors engaged in home improvement contracting, unless specifically from registration by Provisions
of Chapter 142A of the general laws, must be registered with the Commonwealth of Massachusetts. Inquiries about registration and status should be
made to the Director, Home Improvement Contract Registration, One Ashburton Place; Room 1301, Boston; MA 02108(617) 727-8598. Owners who
secure their own construction related permits or deal with unregistered contractors will be excluded from the Guaranty Fund Provision of MGL c. 142A.
Massachusetts H.I.C. #207865
5/20/24
ompany t zed Signature Date
y- 2Y
Cu ig to Date
Custo e nature Date
ASPEN RoDFIN6 Aspen Roofing Services Upper Stairwell Kitchen
58R Pulaski Street, Roof
SERVICES Peabody,MA 01960 05/20/2024
Phone:(978)531-7663
Company Representative
Matt Sullivan
Phone:(978)648-7063
matts@aspenroofing.com
Claire Kallellis Job: Claire Kallellis
Hawthorne Hotel
18 Washington Square West
Salem, MA 01970
(978)689-5070
Rubber Section
Kitchen roof at upper stair well
-Remove existing TPO roof system
-New insulation is to be installed with reinforced rubber with 1/2"polyiso board to go over newly installed insulation
-New termination bar is to be installed at walls and new skirt metal to be installed at curbs
-New coping is to be installed at 80'of wall
-New retro fit drain will replace old existing drain
-All work to be done in a professional and timely manner.All job related debris to be removed from roof and properly disposed.All grounds to be
left in a neat and orderly appearance.
-For your convenience see attached Aspen Roofing Services Documents.
-This proposal was based upon today's material pricing and availability and can only be guaranteed as such.
-Please note that Aspen Roofing Services carries the proper Workman's Compensation Insurance to work on your roof. Not all contractors do
**All Unknowns(wood replacement,flashing work,etc.)to be dealt with at cost plus.
PAYMENT SCHEDULE:
10% due with signed proposal
40%due at commencement of work
Installments payments throughout working process
Balance due upon completion of the work.
$15,314.89
TOTAL $15,314.89
NOTICE OF SCHEDULE CHANGES
The Contractor agrees that when delays become known to the Contractor,the Contractor will advise the Owner as soon as possible.
DELAYS IN COMPLETION DUE TO HIDDEN CONDITIONS
The Owner hereby acknowledges and agrees that in certain remodeling work, the demolition of portions of the pre-existing structure may reveal
additional defects, conditions or the need for additional work which must be repaired, altered or carried out in order to commence or to complete the
work described under the contract. In such case(s),the Owner agrees that the price, duration of the work and the schedule date of completion may
differ from the date stated on the front, and that such variation which is not avoidable by the Contractor shall not be considered to be a violation of this
Contract.
ADDITIONAL WARRANTY INFORMATION
All warranties for equipment supplied by the Contractor under this agreement shall be those given by the manufacturers of such equipment,which
shall be and are hereby passed through directly to the owner. Under such manufacturers'warranties, the Owner may be required to register or mail in
a warr.E.nty card or other evidence of ownership and use of such equipment in order to activate such warranties.The Owner's failure to mail in or
register such documentation,which failure voids the manufacturer's warranty, shall not create any responsibility for the Contractor to warranty such
equipment.
The warranty gives the Owner specific legal rights,and the Owner may also have other rights which may vary from state to state. Under Massachusetts
law, sales of goods carry an implied warranty of merchantability and fitness for a particular purpose.
All material is guaranteed to be as specified.All work to be completed in a workmanlike manner according to standard practices.Any alteration or
deviation from above specifications involving extra costs will be executed only upon written orders, and will become an extra charge over the
estimate.All agreements contingent upon strikes, accidents or delays beyond our control.
SUBCONTRACTING
Contractor agrees that,notwithstanding any agreement for materials and/or labor between Contractor and a third party, Contractor is responsible to
Owner for completion of all work described in a timely and workmanlike manner.
NO ACCELERATION OF PAYMENTS BUT ESCROWING ALLOWED
The Contractor may not require payments to be made in advance of the times specified in Payment Section(front)for the reason that he deems
himself or the payments to be insecure. If, however, he deems himself to be insecure, he may require, as a prerequisite to continuing the work
described herein, that the balance of the payments under this contract that are in the control of the Owner, shall be placed in a joint escrow account that
requires the signature of both the Contractor and the Owner for withdrawal.
INSURANCE
Contractor will be responsible to Owner or any third party for any property damage or bodily injury caused by himself, his employees or his
subcontractors in the performance of,or as a result of the work under this Agreement. Contractor agrees to carry insurance to cover such damage or
injury.
CONSTRUCTION RELATED PERMIT ACQUISITION
The Contractor under provisions of Chapter 142A of the General Laws is required to apply for and obtain all construction related permits.The
Contractor shall not be deemed responsible for delays in the work described in this agreement caused by regulatory, permit granting or inspectional
agencies, authorities or individuals.
Notice: If the owner obtains his own construction related permits for the work described under this agreement or deals with unregistered
contractors,the Owner is hereby advised that in the event of a dispute,judgment and nonpayment of the Contractor,the Owner will not be entitled
to make a claim to or collect from the guaranty fund established by Chapter 142A,M.G.L.
MODIFICATION
This Agreement, including the provisions relating to the price and payment schedule cannot be changed except by a written statement signed by both
Contractor and Owner. However, cancellation by Owner is allowed in accordance with the Notice of Cancellation.
COPY OF AGREEMENT TO BE GIVEN TO OWNER
This Agreement is governed by the laws of Massachusetts. It must be executed in duplicate and original signed copy hereof given to the Owner at the
time of execution. No work under this Agreement shall begin prior to the signing of the Agreement and a transmittal to the Owner of a copy thereof.
All home improvement contractors and subcontractors engaged in home improvement contracting, unless specifically from registration by Provisions
of Chapter 142A of the general laws, must be registered with the Commonwealth of Massachusetts, Inquiries about registration and status should be
made to the Director, Home Improvement Contract Registration, One Ashburton Place, Room 1301, Boston, MA 02108(617) 727-8598. Owners who
secure their oern construction related permits or deal with unregistered contractors will be excluded from the Guaranty Fund Provision of MGL c. 142A.
Massachusetts H.I.C.#207865
5/20/24
C mpany A hori ed Signature Date
Cu mer gn e Date
�'I
Cu#nagr ignature Date
ASPEN RoofING Aspen Roofing Services Fascia/Gutters Private
58R Pulaski Street , Society Room
SERVICES Peabody, MA 01960
Phone:(978)531-7663 06/06/2024
Company Representative
Matt Sullivan
Phone:(978)648-7063
matts@aspenroofing.com
Claire Kallelis Job: Hawthorne-18 Washington Sq-Hotel&Private
Hawthorne Hotel Society
18 Washington Square West
Salem, MA 01970
(978)689-5070
Siding/Trim/Carpentry Section
Removal of gutter/facia/soffit and install new
-5k bronze aluminum gutters equipped with bronze aluminum 2"x3"downspouts and wall bracket's
-180'veranda PVC to be installed at facia and soffit equipped with Cortex Hidden Fastening System
-Gutter to receive a counter metal behind cleat to insure no water will get behind gutter
-All work to be done in a professional and timely manner.All job related debris to be removed from roof and properly disposed.
-For your convenience, please see attached Aspen Roofing Services Documents.
-This proposal was based upon today's material pricing and availability and can only be guaranteed as such.
-Please note that Aspen Roofing Services carries the proper Workman's Compensation Insurance to work on your roof. Not all contractor's do
**All Unknowns(wood replacement,flashing work,etc.)to be dealt with at cost plus.**
PAYMENT SCHEDULE:
10%due with signed proposal.
40% installment payment upon commencement of work
Progress Payments weekly until completion
$3,959.00
TOTAL $3,959.00
NOTICE OF SCHEDULE CHANGES
The Contractor agrees that when delays become known to the Contractor,the Contractor will advise the Owner as soon as possible.
DELAYS IN COMPLETION DUE TO HIDDEN CONDITIONS
The Owner hereby acknowledges and agrees that in certain remodeling work,the demolition of portions of the pre-existing structure may reveal
additional defects, conditions or the need for additional work which must be repaired, altered or carried out in order to commence or to complete the
work described under the contract. In such case(s), the Owner agrees that the price,duration of the work and the schedule date of completion may
differ from the date stated on the front,and that such variation which is not avoidable by the Contractor shall not be considered to be a violation of this
Contract.
ADDITIONAL WARRANTY INFORMATION
All warranties for equipment supplied by the Contractor under this agreement shall be those given by the manufacturers of such equipment,which
shall be and are hereby passed through directly to the owner. Under such manufacturers'warranties, the Owner may be required to register or mail in
a warranty card or other evidence of ownership and use of such equipment in order to activate such warranties.The Owner's failure to mail in or
register such documentation,which failure voids the manufacturer's warranty,shall not create any responsibility for the Contractor to warranty such
equipment.
a warranty card or other evidence of ownership and use of such equipment in order to activate such warranties.The Owner's failure to mail in or
register such documentation,which failure voids the manufacturer's warranty, shall not create any responsibility for the Contractor to warranty such
equipment.
The warranty gives the Owner specific legal rights,and the Owner may also have other rights which may vary from state to state. Under Massachusetts
law, sales of goods carry an implied warranty of merchantability and fitness for a particular purpose.
All material is guaranteed to be as specified.All work to be completed in a workmanlike manner according to standard practices.Any alteration or
deviation from above specifications involving extra costs will be executed only upon written orders,and will become an extra charge over the
estimate.All agreements contingent upon strikes, accidents or delays beyond our control.
SUBCONTRACTING
Contractor agrees that, notwithstanding any agreement for materials and/or labor between Contractor and a third party,Contractor is responsible to
Owner for completion of all work described in a timely and workmanlike manner.
NO ACCELERATION OF PAYMENTS BUT ESCROWING ALLOWED
The Contractor may not require payments to be made in advance of the times specified in Payment Section(front)for the reason that he deems
himself or the payments to be insecure. If, however, he deems himself to be insecure, he may require, as a prerequisite to continuing the work
described herein,that the balance of the payments under this contract that are in the control of the Owner, shall be placed in a joint escrow account that
requires the signature of both the Contractor and the Owner for withdrawal.
INSURANCE
Contractor will be responsible to Owner or any third party for any property damage or bodily injury caused by himself, his employees or his
subcontractors in the performance of,or as a result of the work under this Agreement. Contractor agrees to carry insurance to cover such damage or
injury.
CONSTRUCTION RELATED PERMIT ACQUISITION
The Contractor under provisions of Chapter 142A of the General Laws is required to apply for and obtain all construction related permits.The
Contractor shall not be deemed responsible for delays in the work described in this agreement caused by regulatory, permit granting or inspectional
agencies, authorities or individuals.
Notice: If the owner obtains his own construction related permits for the work described under this agreement or deals with unregistered
contractors,the Owner is hereby advised that in the event of a dispute,judgment and nonpayment of the Contractor,the Owner will not be entitled
to make a claim to or collect from the guaranty fund established by Chapter 142A,M.G.L.
MODIFICATION
This Agreement, including the provisions relating to the price and payment schedule cannot be changed except by a written statement signed by both
Contractor and Owner. However,cancellation by Owner is allowed in accordance with the Notice of Cancellation.
COPY OF AGREEMENT TO BE GIVEN TO OWNER
This Agreement is governed by the laws of Massachusetts. It must be executed in duplicate and original signed copy hereof given to the Owner at the
time of execution. No work under this Agreement shall begin prior to the signing of the Agreement and a transmittal to the Owner of a copy thereof.
All home improvement contractors and subcontractors engaged in home improvement contracting, unless specifically from registration by Provisions
of Chapter 142A of the general laws, must be registered with the Commonwealth of Massachusetts. Inquiries about registration and status should be
made to the Director, Home Improvement Contract Registration, One Ashburton Place, Room 1301, Boston, MA 02108(617) 727-8598. Owners who
secure their own construction related permits or deal with unregistered contractors will be excluded from the Guaranty Fund Provision of MGL c. 142A.
Massachusetts H.I.C.#207865
'1
6/6/24
C mpany Au oriz d Signature Date
(p� fo�2V
Cu ignilafur Date
i
Custo Si a ure Date
4;:SERVICES
PEN ROOFING Aspen Roofing Services Hawthorne Hotel Main
58R Pulaski Street , Upper Roof
Peabody, MA 01960 05/20/2024
Phone: (978)531-7663
Company Representative
Corey
corey@aspenroofing.com
This proposal is to remove existing white PVC roof on the upper level and replace with new. Below are options for a 60mil EPDM roof system and
a 60Mil TPO roof system.The following areas are not included: Penthouse Roof and Elevator Doghouse Roof.
Claire Kallelis Job: Hawthorne Hotel-18 Washington Sq-Hotel
Hawthorne Hotel Reroof
18 Washington Square West
Salem, MA 01970
(978)689-5070
Upper Level Roof Estimate- EPDM
EPDM Reinforced Option
-Remove existing PVC roof and insulation down to the T&G roof and properly dispose. Please note this does not include removal of old tar and
gravel roof.Any roof deck removal to be done by others prior to roof work beginning.
-Furnish and install new 3"Polyisocya n u rate insulation on top of existing T&G roof. Furnish and install 1/2"polyisocyanurate HD coverboard over
top of 3"insulation. Option to add 1/2"Polyiso coverboard over entire roof area.
-Furnish and install new fully adhered Carlisle 60Mil Reinforced EPDM roof system on top of aforementioned insulation. Properly flash all roof
projections.At masonry walls on penthouse and elevator shaft,terminate roof with termination bar and new aluminum counter flashing..At
parapet walls,furnish and install new aluminum parapet cap and properly terminate roof underneath cap per Carlisle specifications. Furnish
and install new walkway pads from penthouse entrance to all necessary rooftop mechanical equipment.
Furnish Carlisle 20 Year Warranty
All trash and debris to be removed from jobsite and properly disposed. Grounds to be left clean and orderly.
-Furnish work related permits as required
All unknowns(wood replacement, etc.)or work requested and approved that is outside of the scope of this proposal is to be at additional costs.
Certificates of insurance are available upon request"
PAYMENT SCHEDULE:
10%due with signed proposal.
40% installment payment upon commencement of work
Progress Payments weekly until completion
$198,765.00
Upper Level Roof Estimate-TPO
TPO Option
-Remove existing PVC roof and insulation down to the T&G roof and properly dispose. Please note this does not include removal of old tar and
gravel roof.Any roof deck removal to be done by others prior to roof work beginning.
-Furnish and install new 3"Polyisocyanurate insulation on top of existing T&G roof. Furnish and install 1/2"Polyisocyanurate coverboard on top
of 3"insulation.
-Furnish and install new fully adhered Carlisle 60Mil TPO roof system on top of aforementioned insulation. Properly flash all roof projections.At
masonry walls on penthouse and elevator shaft,terminate roof with termination bar and new aluminum counter flashing.. At parapet walls,
furnish and install new aluminum parapet cap and properly terminate roof underneath cap per Carlisle specifications. Furnish and install new
walkway pads from penthouse entrance to all necessary rooftop mechanical equipment.
-Furnish Carlisle 20 Year Warranty
All t=ash and debris to be removed from jobsite and properly disposed. Grounds to be left clean and orderly.
-Furnish work related permits as required
-All unknowns(wood replacement, etc.)or work requested and approved that is outside of the scope of this proposal is to be at additional costs.
Certificates of insurance are available upon request"
PAYMENT SCHEDULE:
10%due with signed proposal.
40% installment payment upon commencement of work
Progress Payments weekly until completion
$223,334.00
TOTAL $422,099.00
NOTICE OF SCHEDULE CHANGES
The Contractor agrees that when delays become known to the Contractor,the Contractor will advise the Owner as soon as possible.
DELAYS IN COMPLETION DUE TO HIDDEN CONDITIONS
The Owner hereby acknowledges and agrees that in certain remodeling work,the demolition of portions of the pre-existing structure may reveal
additional defects, conditions or the need for additional work which must be repaired, altered or carried out in order to commence or to complete the
work described under the contract. In such case(s), the Owner agrees that the price,duration of the work and the schedule date of completion may
differ from the date stated on the front, and that such variation which is not avoidable by the Contractor shall not be considered to be a violation of this
Contract.
ADDITIONAL WARRANTY INFORMATION
All warranties for equipment supplied by the Contractor under this agreement shall be those given by the manufacturers of such equipment,which
shall be and are hereby passed through directly to the owner. Under such manufacturers'warranties,the Owner may be required to register or mail in
a warranty card or other evidence of ownership and use of such equipment in order to activate such warranties.The Owner's failure to mail in or
register such documentation,which failure voids the manufacturer's warranty,shall not create any responsibility for the Contractor to warranty such
equipment.
The warranty gives the Owner specific legal rights, and the Owner may also have other rights which may vary from state to state. Under Massachusetts
law,sales of goods carry an implied warranty of merchantability and fitness for a particular purpose.
All material is guaranteed to be as specified.All work to be completed in a workmanlike manner according to standard practices.Any alteration or
deviation from above specifications involving extra costs will be executed only upon written orders, and will become an extra charge over the
estimate.All agreements contingent upon strikes, accidents or delays beyond our control.
SUBCONTRACTING
Contractor agrees that, notwithstanding any agreement for materials and/or labor between Contractor and a third party, Contractor is responsible to
Owner for completion of all work described in a timely and workmanlike manner.
NO ACCELERATION OF PAYMENTS BUT ESCROWING ALLOWED
The Contractor may not require payments to be made in advance of the times specified in Payment Section (front)for the reason that he deems
himself or the payments to be insecure. If, however, he deems himself to be insecure, he may require, as a prerequisite to continuing the work
described herein, that the balance of the payments under this contract that are in the control of the Owner, shall be placed in a joint escrow account that
requires the signature of both the Contractor and the Owner for withdrawal.
INSURANCE
Contractor will be responsible to Owner or any third party for any property damage or bodily injury caused by himself, his employees or his
subcontractors in the performance of,or as a result of the work under this Agreement. Contractor agrees to carry insurance to cover such damage or
injury.
CONSTRUCTION RELATED PERMIT ACQUISITION
The Contractor under provisions of Chapter 142A of the General Laws is required to apply for and obtain all construction related permits. The
Contractor shall not be deemed responsible for delays in the work described in this agreement caused by regulatory, permit granting or inspectional
agencies, authorities or individuals.
Notice: If the owner obtains his own construction related permits for the work described under this agreement or deals with unregistered
contractors,the Owner is hereby advised that in the event of a dispute,judgment and nonpayment of the Contractor,the Owner will not be entitled
to make a claim to or collect from the guaranty fund established by Chapter 142A,M.G.L.
MODIFICATION
This Agreement, including the provisions relating to the price and payment schedule cannot be changed except by a written statement signed by both
Contractor and Owner. However,cancellation by Owner is allowed in accordance with the Notice of Cancellation.
COPY OF AGREEMENT TO BE GIVEN TO OWNER
This Agreement is governed by the laws of Massachusetts. It must be executed in duplicate and original signed copy hereof given to the Owner at the
time of execution. No work under this Agreement shall begin prior to the signing of the Agreement and a transmittal to the Owner of a copy thereof.
All home improvement contractors and subcontractors engaged in home improvement contracting, unless specifically from registration by Provisions
of Chapter 142A of the general laws, must be registered with the Commonwealth of Massachusetts. Inquiries about registration and status should be
made to the Director, Home Improvement Contract Registration, One Ashburton Place, Room 1301, Boston, MA 02108(617) 727-8598. Owners who
secure their own construction related permits or deal with unregistered contractors will be excluded from the Guaranty Fund Provision of MGL c. 142A.
Massachusetts H.I.C.#207865
7/i��6�� 5/20/24
C mpany Aut orized Signature Date
- C/- zy
Customer Signa re Date
C tourer Signatur Date
4 ASPEN ROOFING Aspen Roofing Services Private Society Roof &
58R Pulaski Street, Elevator Shaft Roof
SERVICES Peabody, MA 01960 06/06/2024
Phone:(978)531-7663
Company Representative
Matt Sullivan
Phone:(978)648-7063
matts@aspenroofing.com
Claire Kallelis Job: Hawthorne-18 Washington Sq-Hotel&Private
Hawthorne Hotel Society
18 Washington Square West
Salem, MA 01970
(978)689-5070
Rubber Section
Marine Society&Elevator shaft Re-roof
-Removal of existing roof system down to T&G roof system
-3" insulation to replace old
-Carlisle TPO base sheet to be applied
-New bronze coping and cleat to be installed and prefabricated at our shop
-Mortar at chimney to be re-pointed as needed and will receive new reglet metal at Marine Society roof
-All work to be done in a professional and timely manner.All job related debris to be removed from roof and properly disposed.
-For your convenience please see attached Aspen Roofing Services Documents.
-This proposal was based upon today's material pricing and availability and can only be guaranteed as such.
-Please note that Aspen Roofing Services carrier's the proper Workman's Compensation Insurance to work on your roof. Not all contractor's do
"AII Unknowns(wood replacement,flashing work, etc.)if any,to be dealt with at cost plus."
PAYMENT SCHEDULE:
10%due with signed proposal.
40% installment payment upon commencement of work
Progress Payments weekly until completion
$22,682.60
TOTAL $22,682.60
NOTICE OF SCHEDULE CHANGES
The Contractor agrees that when delays become known to the Contractor,the Contractor will advise the Owner as soon as possible.
DELAYS IN COMPLETION DUE TO HIDDEN CONDITIONS
The Owner hereby acknowledges and agrees that in certain remodeling work,the demolition of portions of the pre-existing structure may reveal
additional defects,conditions or the need for additional work which must be repaired,altered or carried out in order to commence or to complete the
work described under the contract. In such case(s), the Owner agrees that the price,duration of the work and the schedule date of completion may
differ from the date stated on the front,and that such variation which is not avoidable by the Contractor shall not be considered to be a violation of this
Contract.
ADDITIONAL WARRANTY INFORMATION
All warranties for equipment supplied by the Contractor under this agreement shall be those given by the manufacturers of such equipment,which
shall be and are hereby passed through directly to the owner. Under such manufacturers'warranties, the Owner may be required to register or mail in
The warranty gives the Owner specific legal rights, and the Owner may also have other rights which may vary from state to state. Under Massachusetts
law, sales of goods carry an implied warranty of merchantability and fitness for a particular purpose.
All material is guaranteed to be as specified.All work to be completed in a workmanlike manner according to standard practices.Any alteration or
deviation from above specifications involving extra costs will be executed only upon written orders, and will become an extra charge over the
estimate.All agreements contingent upon strikes, accidents or delays beyond our control.
SUBCONTRACTING
Contractor agrees that, notwithstanding any agreement for materials and/or labor between Contractor and a third party,Contractor is responsible to
Owner for completion of all work described in a timely and workmanlike manner.
NO ACCELERATION OF PAYMENTS BUT ESCROWING ALLOWED
The Contractor may not require payments to be made in advance of the times specified in Payment Section(front)for the reason that he deems
himself or the payments to be insecure. If, however, he deems himself to be insecure, he may require,as a prerequisite to continuing the work
described herein, that the balance of the payments under this contract that are in the control of the Owner,shall be placed in a joint escrow account that
requires the signature of both the Contractor and the Owner for withdrawal.
INSURANCE
Contractor will be responsible to Owner or any third party for any property damage or bodily injury caused by himself, his employees or his
subcontractors in the performance of,or as a result of the work under this Agreement.Contractor agrees to carry insurance to cover such damage or
injury.
CONSTRUCTION RELATED PERMIT ACQUISITION
The Contractor under provisions of Chapter 142A of the General Laws is required to apply for and obtain all construction related permits.The
Contractor shall not be deemed responsible for delays in the work described in this agreement caused by regulatory, permit granting or inspectional
agencies, authorities or individuals.
Notice: If the owner obtains his own construction related permits for the work described under this agreement or deals with unregistered
contractors,the Owner is hereby advised that in the event of a dispute,judgment and nonpayment of the Contractor,the Owner will not be entitled
to make a claim to or collect from the guaranty fund established by Chapter 142A,M.G.L.
MODIFICATION
This Agreement, including the provisions relating to the price and payment schedule cannot be changed except by a written statement signed by both
Contractor and Owner. However,cancellation by Owner is allowed in accordance with the Notice of Cancellation.
COPY OF AGREEMENT TO BE GIVEN TO OWNER
This Agreement is governed by the laws of Massachusetts. It must be executed in duplicate and original signed copy hereof given to the Owner at the
time of execution. No work under this Agreement shall begin prior to the signing of the Agreement and a transmittal to the Owner of a copy thereof.
All home improvement contractors and subcontractors engaged in home improvement contracting, unless specifically from registration by Provisions
of Chapter 142A of the general laws, must be registered with the Commonwealth of Massachusetts. Inquiries about registration and status should be
made to the Director, Home Improvement Contract Registration, One Ashburton Place, Room 1301, Boston, MA 02108(617) 727-8598. Owners who
secure their own construction related permits or deal with unregistered contractors will be excluded from the Guaranty Fund Provision of MGL c. 142A.
Massachusetts H.I.C.#207865
6/6/24
mpany A horiz d ignature Date
U L - -z�
C tomer na re Date
Cus m fsibnature Date