Loading...
167 FORT AVENUE EXTERIOR PAINT REMOVAL VIOLATION 5-13-2024 4D CITY OF SALEM, MASSACHUSETTS BOARD OF HEALTH 98 W ASHINGTON STREET 3'FLOOR PublicHeatth Prevent.Promote.Protect. TEL. (978) 741-1800 DOMINICK PANGALLO health0kalem.com DAVID GREENBAUM,RS MAYOR HEALTH AGENT Exterior Paint Removal Violation May 13, 2024 Campbell Realty Trust 14 Sutton Avenue Salem, MA 01970 Dear Sir or Madam, An inspection of your property at 167 Fort Avenue has revealed violation(s)of the City of Salem's Board of Health Regulation 23: Exterior Paint Removal and Abrasive Blasting. The following was discovered: �( 1. Operating without an exterior paint removal or abrasive blasting permit _2. Failure to enclose or curtain off that area of the building undergoing abrasive blasting 3. Visible emission of particulate matter or air contaminants outside of the area enclosed in accordance with provisions 6.4(b)and 6.5(a)of the regulation _4. Failure to ensure adequate precautions against ground surface contamination as required by provisions 6.4(d) and 6.5(b) of the regulation 5. Failure to clean property in accordance with section 7 of the regulation _6. Evidence of blood lead level elevation in operator 7. Other(Please describe): Exterior Paint Removal Contractor: Yes _No If Yes: KL Painting 54 Mason Street Unit 1 Salem, MA 01970 978-836-1495 The inspector has taken the following action: _A. Ordered all exterior paint removal work to cease and desist until all violations are corrected. Owner or contractor must correct all violations indicated to continue exterior paint removal work. _B. Ordered all exterior paint removal work to cease and desist until all violations are corrected. Exterior paint removal work allowed to continue after all violations were corrected on site. _C. Exterior paint removal permit revoked because of work needing to be stopped twice on the same day due to violations. 6le D. Other(Please Describe): Contractor was ordered to acquire an Exterior Paint Removal from the m Board of Health under threat of fines being issued to the contractor and the property owner for non-compliance. Exterior paint removal work was allowed to continue. Repeat of any violations may result in monetary fines issued to the property owner, and the contractor(if applicable). If a contractor has been found to commit the same or similar violations at different work sites that contractor may be issued a monetary fine. Should you be aggrieved by this order, you have the right to request a hearing before the Board of Health. A request for said hearing must be received in writing in the office of the Board of Health within 7 Days of receipt of this order. At said hearing, you will be given an opportunity to be heard and to present witness and documentary evidence as to why this order should be modified or withdrawn. You may be represented by an attorney. Please also be informed that you have the right to inspect and obtain copies of all relevant inspection or investigation reports, orders, and other documentary information in the possession of this Board, and that any adverse party has the right to be present at the hearing. For the Boa d of Health Reply t. . David Orden' a rev Barosy� Health Agent Sanitarian Cc: Exterior Paint Removal Contractor(if applicable)