Violation letter 12.20.22_ Tent Mr Reilly, Ms Tallo & Mr Wear CITY OF SALEM
MASSACHUSETTS
BUILDING DEPARTMENT
98 WASHINGTON STREET,2m FLOOR
KIMBERLEY DRISCOLL TEL. (978) 745-9595
MAYOR THOMAS ST.PIERRE
DIRECTOR OF PUBLIC PROPERTY/BUILDING COMMISSIONER
December 20, 2022
Mr. Terrell M. Reilly
Leslie S. Tallo
Christopher L. Wear
Salem, MA 01970
Dear Mr. Reilly, Ms. Tallo and Mr. Wear
Please be advised that I have visually inspected the tent structures connected v the main entrance to Old Town Hall. Old Town oresHal Ys an Malonou have e public building
and you have attached your tent structures to the railings that are part of the
stairways. You have no building perm required by State Building C
105 Permits. required egress
S ode 780 CMR, Section
The fabric structures are especial]
y Unsafe and do occupancy. In cases fire in one of these tents or not meet any building codes relating to
the use of the stair a inside Old Town Hall, the fire would impede
egresses (State Building Code 780 CMR, Section 10. Additionally, no
Permissions from the City have been granted to allow the attachment to public property.
Therefore,Pursuant to the authority of State Building Code 780 C
MR, Section
and structural elements relating to these tents must be removed&o O d Town 14, these
ten s
comply may result in daily fines and fiuther enforcement actions.
to
If you feel you are aggrieved by my order or building code interpretations,Your right of a
to the Board of Buildings, Regulations and Standards in Boston. The a e j
45 days of the date of this letter. appeal is
PP must be filed within
Sin�ly, A44�
Thomas St Pierre
Building Commissioner and Zoning Enforcement Officer
Co. Elizabeth Renard, City Solicitor