Loading...
Violation letter 12.20.22_ Tent Mr Reilly, Ms Tallo & Mr Wear CITY OF SALEM MASSACHUSETTS BUILDING DEPARTMENT 98 WASHINGTON STREET,2m FLOOR KIMBERLEY DRISCOLL TEL. (978) 745-9595 MAYOR THOMAS ST.PIERRE DIRECTOR OF PUBLIC PROPERTY/BUILDING COMMISSIONER December 20, 2022 Mr. Terrell M. Reilly Leslie S. Tallo Christopher L. Wear Salem, MA 01970 Dear Mr. Reilly, Ms. Tallo and Mr. Wear Please be advised that I have visually inspected the tent structures connected v the main entrance to Old Town Hall. Old Town oresHal Ys an Malonou have e public building and you have attached your tent structures to the railings that are part of the stairways. You have no building perm required by State Building C 105 Permits. required egress S ode 780 CMR, Section The fabric structures are especial] y Unsafe and do occupancy. In cases fire in one of these tents or not meet any building codes relating to the use of the stair a inside Old Town Hall, the fire would impede egresses (State Building Code 780 CMR, Section 10. Additionally, no Permissions from the City have been granted to allow the attachment to public property. Therefore,Pursuant to the authority of State Building Code 780 C MR, Section and structural elements relating to these tents must be removed&o O d Town 14, these ten s comply may result in daily fines and fiuther enforcement actions. to If you feel you are aggrieved by my order or building code interpretations,Your right of a to the Board of Buildings, Regulations and Standards in Boston. The a e j 45 days of the date of this letter. appeal is PP must be filed within Sin�ly, A44� Thomas St Pierre Building Commissioner and Zoning Enforcement Officer Co. Elizabeth Renard, City Solicitor