Loading...
13 CRESCENT DRIVE - BUILDING JACKET �' 13 CRESCENT DRIVE- CrttU 11{ ` �1:Ill, ��1c�55IC�11i5FitG APR 8 9 57 Ah #88 @nr E—alrm (5rrrn FILE# FOEN A — DECISIO:< CITY CLERK. S4 H. >JASS. Ms. Josephine Fusco City Clerk City Hall Salem, MA 01970 Dear ^?s. Fusco: At a regularly scheduled meetira of t`.e S_ale-. =land;:; Board held on March 24, 1988 it was voted to endorse ":,pproval Under Sub- division Control Law Not Required" on the Following described plan: 1. Applicant: Richard Watkins 22 Larchmont Road Salem, MA 01970 2. Location and Description - The two parcels of land shown on City of Salem Assessors Map 15 as Lot 513, consisting of 7,203 s.f. of land and Lot 514, consisting of 7,000 s.f. of land having a Street address at 13-19 Crescent Drive, Salem, MA, Deed of property records in Essex South District Registry. C� N N _ Sincerely, tj WT ... r' ULn r O `,, •W 1, Walter Power III �. . _ CO °'CD Chairman r WP t �M KEVIN T. DALY LEONARD F. FEMINO ASSISTANT CITY SOLICITOR ��� _,�� ;? ASSISTANT CITY SOLICITOR 93 WASHINGTON STREET R!�umnl�� 93 WASHINGTON STREET AND CITY OF SALEM - MASSACHUSETTS AND ONE CHURCH STREET ONE SCHOOL STREET MICHAEL E. O'B RIEN SALEM. MA 01970 BEVERLY, MA 01915 745-4311 CITY SOLICITOR 745-4311 ' 745-0500 93 WASHINGTON STREET 921-1990 AND PLEASE REPLY TO ONE CHURCH STREET 81 WASHINGTON STREET PLEASE REPLY TO ONE SCHOOL STREET SALEM, MA 01970 745-4311 744-3363 PLEASE REPLY TO BI WASHINGTON STREET March 7 , 1988 James B. Hacker, Chairman Board of Appeal One Salem Green Salem, Massachusetts 01970 Re : Svend Madson v Board of Appeals, et als Essex Superior Court #86-871 Dear Mr. Hacker: For your records please be advised that the Appeal in the above matter has this date been dismissed. The matter involved ,judcialreview of a March 19 , 1986 grant of a var- iance at E3=Crescent=DDr'e to divide one lot into two build- able lots. "i Kindly note the same in your records . Very truly yours, Michael E. O' Brien City Solicitor MEO/jp Li l �g The Common"ealth of Massachusetts c E0 rYOF J s I Board of But tiling Regulations and Standa4MPECT10N.AL S� 2d1G l�,EM Massachusetts State Building Code, 780 CMR Revrsedddm 1011 1 Building Permit Application To Construct, Repair, RenovatIM Vgtoli$t ap 12: 3 b (�J One-or 7Hvo-Family Duelling This Section For Official Use Only Building Permit Number: Date Ap ted: l Building Oficial(Print Name) Signature Date �L SECTION 1: SITE INFORMATION 1.1 Property Address: 1.2 Assessors Map& Parcel Numbers 13 Crescent Dr I.la Is this an accepted street?Ves no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq ft) Frontage(ft) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Ym d Required Provided Required Provided Required Provided 1.6 Water Supply: (M.G.L c.40.§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Zone: Outside Flood Zone? Public❑ Private 13Zone irves❑ Municipal 13On site disposal system ❑ SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner'of Record: Janet Watkins Salem, MA 01970 Name(Print) City.State,ZIP 13 Crescent Dr 978-807-1893 No.and Street Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORK' (check all that apply) Nev, onsuction ❑ Existing Building 13 Owner-Occupied ❑ Repair,,(,) ❑ Alteration(s) ❑ Addition ❑ w n- Demolition ❑ Accessory Bldg. ❑ Number of Units (Aher )(Speeipv: Solar Brief Description of Proposed Work-2: Install 10.14 kw solar panels on roof. Will not exceed roof panel, but will add 6" to roof height. 39 panels total. SECTION 4: ESTIMATED CONSTRUCTION COSTS Estimated Costs: Ilan (Labor and Materials) Official Use Only I. Building $ 2,000 1. Building Permit Fee: $ Indicate how fee is determined: 2.Electrical $ ❑ Standard City/ Town Application Fee 32,000 ❑Total Project Cost'(Item 6)s multiplier s 3. Plumbing $ 2. Other Fees: $ / 4. Mechanical (HVAC) $ List: RtP- S.Mechanical (Fire $ r6, pression) Total All Fees: $ Check No. Check Amount Cash Amount: Total Project Cost: $ 34,000 0 Paid in Full 0 Outstanding Balance Due: SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) 103631 8/30/17 Gregg LaCasse License Number Expiration Data it:of CSL Holder List CSL Typc(see below)_ U 20 Patterson Brook Rd. Unit 10 No.and Street Type Description U Unrestricted(Buildings up to 35,000 cu.ft W.Wareham, MA 02576 R Restricted IR2 Family Dwellin Cihdfo} State,ZIP M Masonry RC Roofing Cc%crin Window and Siding SF Solid Fuel Bumin;Appliances (508)291-0007 1 Insulation Telephone Email address D Demolition 5.2 Registered Home Improvement Contractor(HIC) 170355 10/12/17 Tom Blumetti/Trinity Solar HIC Registration Number Expiration Date HIC Company Name or HIC Registrant Name 20 Patterson Brook Rd. Unit 10 No.and Street Email address W.Wareham, MA 02576 (508)291-0007 Cib-ft'own,State,ZIP Telephone SECTION 6: WORKERS' COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152. § 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached'? Yes ..........Nr No........... ❑ SECTION 7a: OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property,hereby authorize Toni Blumetti to act on my behalf.in all matters relative to work authorized by this building permit application. Please see attached letter. 11/16/15 Piint Owner's Name(Electronic Signature) Date SECTION 7b: OWNEROR AUTHORIZED AGENT DECLARATION By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application 1 e an ate to the best of my knowledge and understanding. Tom Blumetti 11/16/15 Print Owner's or Authorized AdMnt's Nmn ,,lectronie Signature) Date NOTES: 1. Ari Owner who obtains it building permit to do his/her own work,or tin owner who hires an unregistered contractor (not registered in the home Improvement Contractor(HIC) Program),will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A. Other important information on the HIC Program can be found at www.rnass.eov/oca'Inforination on the Construction Supervisor License can be found at wAvw.mass.gov/dns 2. WLen substantial work is planned,provide the information below: Total floor area('sq. ft.) (including garage,finished basement/attics,decks or porch) Gross living area('sq.ft.) Flabitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths 'Typc of heating system Number of decks/porches Type of cooling system Enclosed Open 3. 'Loyal Project Square Footage'maybe substituted for 11'fotal Project Cost" Optimize Engineering Co., LLC P.O. Box 264•Farmville•VA 23901 Ph: 434.574.6138.E-mail: grichardpe@aol.com Richard B. Gordon, P.E. President October 26,2015 Salem Building Dept. Salem, MA Re: Solar Electric Panels Roof Structural Framing Support To Whom It May Concern: I hereby certify that I am a Licensed Professional Engineer in the State of Massachusetts. Please note the following conclusions regarding framing structure, roof loading,and proposed site location of installation: 1. Existing roof framing: Conventional framing 2x6 at 24" o.c.with 12'span (horizontal rafter projection). This existing structure is definitely capable to support all of the loads that are indicated below for this photovoltaic project after sister the rafters with a 2x8 or(2)2x6 using (2)10d nails 1' o.c. Use of(2)Guard Dog TM FMGDO02 screws is approved, or equal shear strength of approx. 120 Ib, V o.c.at areas where little space is available only with remainder of member secured with (2)10d nails V o.c. If do not sister,then install a 2x4 @ 24"o.c. knee wall over an interior bearing wall to limit span of rafters between supports to 7'-11". Sister of rafters only required at those rafters accepting anchor screw for module rails. 2. Roof Loading • 4.33 psf dead load (modules plus all mounting hardware) • 30 psf snow live load (50 psf ground snow live load reference) • 4.5 psf dead load roof materials • Exposure Category B, 115 mph wind uplift live load of 19.6 psf(wind resistance) 3. Address of Proposed installation: Residence of Janet Watkins, 13 Crescent Dr., Salem, Massachusetts This installation design is in general conformance to the manufacturer's specifications,and is in compliance with all applicable laws,codes, and ordinances,and specifically, International Residential Code/IRC 2009, 2014 NEC,and 2012 ICC Energy Code. The spacing and fastening of the Unirac mounting brackets is to have a maximum of 64" o.c. span along the rail between mounting brackets and secured using 5/16"x 3 Yd' length corrosive resistant steel lag bolts. In order to evenly distribute the load across the roof rafters,there shall be a minimum of 2 mounting brackets per rafter&min. 2" penetration of lag bolt per bracket,which is adequate to resist all 115 mph wind live loads including wind shear. The mounting brackets shall alternate between adjacent rafters between rail rows for better distribution of roof load. Penetration of anchors for modules mounted within 18"of ridge and edges of roof is to be a minimum of 3". Rails may be attached to either of two mounting holes in the L-feet. Mounting in the lower hole for a low profile, more aesthetically pleasing installation or mount in the upper hole for a higher profile to maximize airflow under the modules to cool them more.Slide the 318-inch mounting bolts into the footing bolt slots.The rails will be attached to the footings with the flange nuts. Very truly yours, Optimize Engineering Co., LLC OF M Richard don, .E. ��P�SH ASS�cy Massachusetts P.E.1-icense No. 49993 0= �0 V RICHARD 9. m� nGORDON O -1 0 MECHANICAL CIVIL, MECHANICAL, &ELECTRICAL ENGINEERING N0.49993 o � �FGISTV- \ lONA �v D�S'S ��G IPUry GP '111Pu o}I c.I EARBI ElL BARG�5 III BRIE uEwLW uIIW Yoo4 rrn NOTIINE [pLPR MOpuLE FN NnoISE _ _ cfonemcxD o xID "-lou RON RIDUE RAIL p L6EA RAN a+arv. ra REETIPRAL Z.EZI.OIINI PUpI— a1F 0 ER-1-1.1111- 1 LEI I:ce-"c' •.ttvrra ecev ty \_ 9TRABIlt I.,IIIEBATE EAI nPpp V015EPL9Ni hUPP PTY11 D I.,D}50 Npx tY.I.TIrC WVCV 'ILP AGE,AG PERE,"Ll IIAIL NOT 0 BE D A v, E%GEL.PEAU HEIGHT. B..IAL III f�ATTALHAIEII cors`smEx Tovrn0Du95asfsas fos TPV 610011.E ATTFlCHVENT ON gSPHALT STI ROOF THEIGHT FR 00 GROUND LEVEL TO PEAK OF ROOF a,n w vwLs corms>re wfrw�aawf Issuetll Realsipns' BACK xa salrn.ry .aiT Pr.lecl Till ) W TINS JANET �i I�, IPINIY D!14)!lp MEE) I PRI Al t V �j F I Ili x ' 3 '!`+N F{E� #-Ir-Er i .3 CflESCENT D0. kRF [ rT J 1 r 111 hnt 1 4FU' � I,., T ' sn ran.MA ULB>o � k= r Sff ISR ET � M ' E/ // �' JDAI / TN 7777777 PROPOSED IR1 KW P SO OSE srsren) v 1 CaCt° �..k T Y 4 r I{�{�FT�PiE hr-°KI�I.'t I[k:t Dt; D wl. J ar ft 1 E i ro tT'f'F tiL dvkT L PE PET i EN,. I�5P ° 11ttttltIEll h 2. N f0 d10 �LGII �I Irt .. �L I [T[ L , B e >i11E IIIIIjERB, R1 FRONT III"LIPI El uuLeDumaNI�.LBE�uTHLaplAu Uu NcEATETIE -1< c R s. Rov.Np SM1DDr a) ROOFTOP SOLAR INSTALLATION ONLY PV ARRAY WILL NOT EMEND BEYOND THE METING BUILDING ENVELOPE AFRAYSCHEDULL SYNBOLLIERGERD PLLARRiNG SCHEDULE EOWI IIENIS HEOU E ABER, 1 ® ) DL D B.—GI 4 R 0 NIMC I Ell, r[v a w D D 0 LD QE (E NREEOFDOS III Ll RATIE-INITIRIEL". u¢nl N V AR D .NTD D o 'VnNAC I 1 9 0 0 p. 5 ro D 0[HER OBS THUG RONS EY111.1 —LETRA LEE L11.11,1.11PEREIRIP1111 qx x- LEC.< rL K[ VSlnc ATI REAREMAT—I'Eica TEL e[ PER SPEL56W OIETRILL OuT' N.NEPRElN 11.11 L GII U1H .PANEL • NDLErtENR.N 0.TO E4UbLN YCNLD Lc fuF.c.NL� Optimize Engineering Co., LLC P.O. Box 264•Farmville•VA 23901 Ph: 434.574.6138•E-mail: grichardpe@aol.com Richard B. Gordon, P.E. President October 26,2015 Salem Building Dept. Salem, MA Re: Solar Electric Panels Roof Structural Framing Support To Whom It May Concern: I hereby certify that I am a Licensed Professional Engineer in the State of Massachusetts. Please note the following conclusions regarding framing structure, roof loading, and proposed site location of installation: 1. Existing roof framing: Conventional framing 2x6 at 24" o.c.with 12' span(horizontal rafter projection). This existing structure is definitely capable to support all of the loads that are indicated below for this photovoltaic project after sister the rafters with a 2x8 or(2)2x6 using (2)10d nails 1' o.c. Use of(2)Guard Dog T'" FMGDO02 screws is approved, or equal shear strength of approx. 120 Ib, V o.c.at areas where little space is available only with remainder of member secured with(2)10d nails V o.c. If do not sister,then install a 2x4 @ 24"o.c. knee wall over an interior bearing wall to limit span of rafters between supports to 7'-11". Sister of rafters only required at those rafters accepting anchor screw for module rails. 2. Roof Loading 4.33 psf dead load(modules plus all mounting hardware) • 30 psf snow live load (50 psf ground snow live load reference) • 4.5 psf dead load roof materials • Exposure Category B, 115 mph wind uplift live load of 19.6 psf(wind resistance) 3. Address of proposed installation: Residence of Janet Watkins, 13 Crescent Dr.,Salem, Massachusetts This installation design is in general conformance to the manufacturer's specifications,and is in compliance with all applicable laws, codes,and ordinances,and specifically, International Residential Code/IRC 2009, 2014 NEC,and 2012 ICC Energy Code. The spacing and fastening of the Unirac mounting brackets is to have a maximum of 64" o.c.span along the rail between mounting brackets and secured using 5/16"x 3 Yd' length corrosive resistant steel lag bolts. In order to evenly distribute the load across the roof rafters,there shall be a minimum of 2 mounting brackets per rafter&min.2" penetration of lag bolt per bracket,which is adequate to resist all 115 mph wind live loads including wind shear. The mounting brackets shall alternate between adjacent rafters between rail rows for better distribution of roof load. Penetration of anchors for modules mounted within 18" of ridge and edges of roof is to be a minimum of 3". Rails may be attached to either of two mounting holes in the L-feet. Mounting in the lower hole for a low profile, more aesthetically pleasing installation or mount in the upper hole for a higher profile to maximize airflow under the modules to cool them more. Slide the 3B-inch mounting bolts into the footing bolt slots.The rails will be attached to the footings with the Flange nuts. Very truly yours, Optimize Engineering Con., LLC •—n \ � Ott{OF MASS Richard don P.E. �� "C, Massachusetts P. License No. 49993 02 �m f RICHARD H. m Z GORDON O MECHANICAL to U CIVIL, MECHANICAL, &ELECTRICAL ENGINEERING NO'49993 &GISTS O�SSIONM �G YT