2022-04-13 Meeting MinutesSRA
April 13, 2022
Page 1 of 13
City of Salem Massachusetts
Public Meeting Minutes
Board or Committee: Redevelopment Authority, Regular Meeting
Date and Time: Wednesday, April 13, 2022, at 6:00 pm
Meeting Location: Virtual Zoom Meeting
SRA Members Present: Chair Grace Napolitano, David Guarino, Cynthia Nina-Soto,
Dean Rubin
SRA Members Absent: Russ Vickers
Others Present: Tom Daniel – Director of Planning and Community
Development
Recorder: Colleen Brewster
Regular Meeting
Executive Director’s Report
Mr. Daniel stated:
1. Russ Vickers has officially resigned after serving on the SRA for many years as the gubernatorial
appointment. Mayor Driscoll is working with the Governor’s office to fill the vacancy. A
certificate will be sent to him to thank him for his service and contributions to the city of Salem.
Ms. Newhall-Smith stated:
2. Outdoor Dining: Ms. Newhall-Smith stated that the outdoor dining extensions enacted at the
height of the pandemic were extended again in early April 2022 and will allow local Licensing
Boards to grant liquor service to extended dining areas. In anticipation of the continued
extension, the same on-line review process has been reestablished. When applications are filed
several city departments are notified: herself in the Planning Department, Licensing Board,
Parking & Traffic, DPS, Health Department, and when necessary, the Building Department,
Engineering, and Public Safety. One of the biggest differences will be no large tent outside
Ledger, the city will construct a large platform at some of the angled parking spaces. It will
function as a sidewalk for pedestrians so seating can be placed closer to the restaurant. The
Licensing Board approved most of the applications on April 11, 2022, but held back on a couple
where additional information was required. Most of what has been seen in the past 2-years will
return in 2022, barriers for safety, outdoor platforms, etc. The Licensing Department is alerting
all restaurants that an extension by the city may not be granted in 2023, so they should contact the
state liquor board on their own to receive an official extension for the liquor service. If that
occurs the city will have to adjust their process to fit more typical regulations. Chair Napolitano
asked if the restaurants within the Urban Renewal Area would have to return to the SRA for
review and approval or if that could be included in the adjustment process. Ms. Newhall-Smith
replied that if the process returns to normal those restaurants would need submit an Outdoor
Dining Permit to the SRA and DRB. Mr. Daniel added that the Board would have to vote to
change the process. Mr. Rubin asked if umbrellas with logos was addressed. Ms. Newhall-Smith
stated that they’ve been lenient with umbrellas with logos the past two years, and they will be
again this year. The Board discussed their concern with the continued use of umbrellas with
SRA
April 13, 2022
Page 2 of 13
logos and the downtown being plastered with logos for liquor companies rather than the
restaurants. Chair Napolitano encouraged the businesses to be told well in advance that they will
no longer be allowed. Ms. Newhall-Smith agreed and noted that the new application includes
language that logo umbrellas should not be used. Mr. Rubin stated that there is still a signage
ordinance and umbrella logos should apply. Mr. Daniel added that restaurants should be notified
in advance of needing to return to the SRA and the rules around umbrellas.
Projects in the Urban Renewal Area
1. 5 Summer Street: Small Project Review – Review of DRB Recommendation for the installation
of up to 82 solar panels on roof. – Request to withdraw without prejudice
VOTE: Guarino made a motion to accept the request to withdrawal without prejudice. Seconded
by: Rubin.
Roll Call: Guarino, Nina-Soto, Rubin, Napolitano. 4-0 in favor.
2. 15 Summer Street: Small Project Review – Review of DRB Recommendation for the
installation of up to 32 solar panels on roof. – Request to withdraw without prejudice
VOTE: Rubin made a motion to accept the request to withdrawal without prejudice. Seconded
by: Nina-Soto.
Roll Call: Guarino, Nina-Soto, Rubin, Napolitano. 4-0 in favor.
3. 24 Charter Street: Small Project Review – Removal of two windows on the rear elevation to
facilitate interior remodel of residential building.
Matt Tatkow, owner of property, was present to discuss the project.
Mr. Tatkow stated that he intends to move into the third-floor unit. There is one window on the
second and third floors that he is like to remove to install a kitchen along the wall, and this façade
isn’t visible from any public ways. The proposed color options are Benjamin Moore: Sea Pearl or
Beige for the façade, the storm windows would be Benjamin Moore: Black, and the exterior
window frame, concrete header, and sills Benjamin Moore: Simply White.
Mr. Rubin asked if the building was historic. Mr. Tatkow replied that they have a historic
easement placed by the PEM which has already approved of the request to remove the two
windows. Ms. Newhall-Smith added that the building is historic, however this is not its original
location on Charter Street, the PEM moved it from Liberty Street to make room for one of their
expansion projects.
Mr. Rubin asked what building faces this façade. Mr. Tatkow replied that the Women’s Friend
building and the PEM parking lot. To the left of this building is the PEM security headquarters.
Chair Napolitano asked if this triggers a Historic Commission review or just the PEM. Ms.
Newhall-Smith said no. Mr. Tatkow noted that the building is not within a historic district and the
historic easement was a contingency to close on the sale of the property with the museum, and
they have a point person at the museum that deals with exterior maintenance. Mr. Daniel noted
that the building is within the Urban Renewal area and not a local historic district.
SRA
April 13, 2022
Page 3 of 13
Mr. Guarino requested photos of the rear façade. Mr. Tatkow replied that to the right of the
windows is an emergency stair addition that the PEM constructed in 2000, after the building
moved. The addition has unpainted wood siding and windows that will remain in place. Chair
Napolitano asked what buildings view this side of the building. Mr. Tatkow replied that the
Women’s Friend Society building and the PEM parking lot. Mr. Daniel requested confirmation
that the first-floor window would remain due to a different layout. Mr. Tatkow relied yes. Mr.
Guarino asked how many windows were on the addition. Mr. Tatkow replied one window per
floor that also face the back.
Mr. Guarino noted his concern for the window configuration along the rear with two windows
missing. Mr. Tatkow replied that this façade is minimally visible and hidden by the rear of the
Women’s Friend Society building.
Ms. Nina-Soto believed that windows along the left façade appear to have already been removed,
the first and second closets to the street and one window at the top left. Mr. Tatkow replied that
the front two windows locations are a spiral staircase with a curved wall that did not have
windows and at the third floor there is no evidence on the interior of a window being in that
location.
Public Comment:
No one in the assembly wished to speak.
Ms. Newhall-Smith suggested recommending approval upon successful review by the DRB since
the change will occur at the rear of the building and will be minimally visible.
VOTE: Rubin made a motion to approve modifying the building as proposed pending DRB
approval. Seconded by: Guarino.
Roll Call: Guarino, Nina-Soto, Rubin, Napolitano. 4-0 in favor.
4. 43 Church Street: Small Project Review – Construction of a one-story addition on the rear of the
building to extend the restaurant’s dining area. A portion of the proposed addition is located on
land owned by the Salem Redevelopment Authority. – Request to continue to May 11, 2022
VOTE: Nina-Soto made a motion to continue to the May 11, 2022, regular meeting. Seconded
by: Rubin.
Roll Call: Guarino, Nina-Soto, Rubin, Napolitano. 4-0 in favor.
5. 38 Norman Street: Final Design Review – Review of DRB Recommendation for the
construction of a new mixed-use building with commercial uses on the ground floor and
residential uses above.
Attorney Scott Grover of Tinti & Navins, Ryan Wittig and Matthew Moore of Kinvarra Capital,
Philip Sima of Balance Architects
Atty. Grover stated the SRA reviewed the project at the February 9, 2022, meeting where it was
referred to the DRB; the DRB reviewed the project on February 23, 2022, where they
unanimously and enthusiastically recommended a final approval by the SRA. The following
design recommendations were suggested that have been incorporated into the current plans.
SRA
April 13, 2022
Page 4 of 13
Regarding the remainder of the permitting process, they have been before the Planning Board
(PB) for the last 6-months for a Planned Unit Development (PUD) and Site Plan Review, and
they are expecting a vote from the PB at tomorrow’s meeting on both applications, concluding the
permitting process which began 1-year ago. They appreciate all the input they have received that
has shaped the final project.
Mr. Sima stated that the following changes have been implemented: changing the synthetic turf at
the rear seating area to synthetic pavers, changing the painted rear fence to cedar with a natural
finish, increased the density of the vegetative screen between their neighboring Crombie Street
property, added vegetative screening at all roof decks using tall grasses and native species in
aluminum planters with drip irrigation since many are accessed only through the tenant spaces.
The architectural changes were: providing a customizable pedestrian alert system along the
Crombie Street parking entrance/exit at the left side of the parking entrance, EV charging is being
provided at the covered parking spaces, hanging bike parking will be added over each parking
space in addition to the 1-1 bicycle parking in the basement, the trash room was compressed to
provide a space for electric and gas meters that is enclosed on three side only, and the material
palette below the rear lower cornice changed from grey with a red Hardi board at the middle
portion to continuous grey.
Mr. Rubin requested clarification on the location of the meters. Atty. Grover noted that the DRB
and PB was adamant about the meters not being visible from the street.
Mr. Rubin asked if there will be association By-Law’s stating that a tenant must maintain all
vegetative screening. Mr. Sima replied that as rental units not maintenance will not fall on the
tenants. Mr. Wittig added that the maintenance team will oversee plant care, trash removal, and
cleaning and can check on them by looking down on them the lower floor balconies from the
roof. Ms. Nina-Soto asked for specifics regarding the denser planting area between the Crombie
Street neighbor. Mr. Sima replied that the elm streets will be closer to the street and the shrubbery
should be no higher than the 6-foot fence that will divide the properties to reduce shadows.
Ms. Nina-Soto asked if the EV chargers would be open to the public or exclusive to the tenants.
Mr. Wittig replied that the parking is exclusive to the residents and commercial space tenants.
Ms. Nina-Soto asked if EV parking spaces would be exclusive to electric vehicles. Mr. Wittig
replied that the process will need to be managed, however, priority will go to EV’s.
Public Comment:
Anna Gordon, 12 Crombie Street. Concerned with the couple of months in the winter when there
will be a significant reduction in daylight at 16 and 18 Crombie Street, particularly for the rooftop
solar panel on the roof on 16 Crombie Street. Requested confirmation that the lower-level roof
terrace is on level three not four. Mr. Sima replied yes, it was a typo on the Drawing L-105. She
appreciated that the overall height is reduced but still can concerns with the loss of daylight for
her neighbors.
Attorney Chris Drucus, 81 Washington Street, Representing the owners of 16 Crombie Street
(Mr. Willis) and 18 Crombie Street (Ms. Roberta Hussey). Thanked the neighbor Ms. Gordon for
stating the issue concerning his client. They believe the building is still too high, shadow studies
show that during the coldest months of the year, October through March, much of the sunlight
will disappear at 18 Crombie Street which could have psychological effects. At 16 Crombie
SRA
April 13, 2022
Page 5 of 13
Street, Mr. Willis will suffer a monetary loss due to shadows on his rooftop solar panels. The
shadow study only showed the first day of each month. There are many other uses that could be
constructed on this site, and it is up to the permit granting authorities to determine an appropriate
use for the site because the damage it will cause for his clients. Removing 1-floor could still make
this a viable project. The developer should consider a different project. His client at 18 Crombie
Street asked for a reduction in parking spaces from 30 to 25, they are not pleased with the
Crombie Street vehicular entrance, particularly now that an audible sign will be installed.
No one else in the assembly wished to speak.
Atty. Grover stated that the height of the project has already been reduced from 6 to 4 stories to
mitigate the impact on the neighborhood and the unit count from over 30 down to 20. They have
adhered to the SRA design guidelines by moving it away from the residential neighborhoods 3-
feet and where the proposed building abuts a residence the building steps down to 3-stories. This
is the Urban Renewal Area which is a mix of commercial and residential uses and the design
criteria they have adhered to is designed to protect the residential neighbors. Mr. Sima added that
their shadow study saw almost no impact on the solar panels at 16 Crombie Street except for
early morning and early afternoon in the winter months, when photovoltaic panels are not
producing much electricity. Atty. Grover stated that the B5 zoning by right allows a 70-foot 6-
story building which they are below, and the allowed rear setback is 5-feet, and the proposed
building is further away from the rear lot line.
Mr. Rubin asked if there would be an the internal traffic study was completed. Ms. Newhall-
Smith replied that they were it was generated for the PB, but she does not have them it. Atty.
Grover stated that MDM Transportation completed a traffic study and that the city requested it be
peer reviewed by Jacobs Engineering,.and changes were made The Developer made changes in
response to some of their the concerns the peer reviewer recommended. In response to the
concerns with the audible sign at the parking entrance, Atty. Grover noted that the sign was
selected because it has controls to adjust the decibel level emitted.
Mr. Guarino stated that he appreciates the work done, this was not an easy project to review, the
process has been long for the neighbors, but he feels they’ve made the project better. He was
thrilled to see a new project in development at this site which is an eyesore, and the final project
will improve the downtown and this area. The design team has adjusted the plan to lessen the
impact on neighbors, but this is an Urban Renewal and downtown area, and the final project is a
good one.
VOTE: Guarino made a motion to approve with the DRB recommendations. Seconded by:
Guarino Nina-Soto.
Roll Call: Guarino, Nina-Soto, Rubin, Napolitano. 4-0 in favor.
6. 73 Lafayette Street and 9 Peabody Street: Schematic Design Review – Demolition of existing
building at 73 Lafayette Street and construction of new, mixed-use structure with 35,000 square
feet for the North Shore Health Center, pharmacy, and urgent care facility and for income-
restricted senior housing residential units. Construction of a new mixed-use structure on 9
Peabody Street with income-restricted senior housing residential units, commercial and gallery
space, continued from 2/9/22 February 9, 2022.
SRA
April 13, 2022
Page 6 of 13
Attorney Scott Grover of Tinti & Navins representing South River Partnership, LLC (joint
venture between the Northshore CDC and North Shore Community Health), Jonathan Evans and
Megan Altendorf of Mass Design Group, Ilene Vogel and Mickey Northcutt of Northshore CDC,
and Margaret Brenna of North Shore Community Health Center were present to discuss the
project.
Atty. Grover stated they were last before the SRA on February 9, 2022, where they discussed the
possibility of preserving the façade of the existing building. A series of investigations were
underway and are now complete and tonight’s focus will be the results of those investigations.
They will also explain where they stand with the Ch. 91 licensing process on the former tidelands
site. They were also asked to provide data on how patients are expected to travel to and from the
health center and how it would impact traffic and parking.
Mr. Evans stated that at the Lafayette Street building they have removed the artist housing on
level two, swapped the first-floor urgent care center and bank to keep the bank in operation with a
relocation of the drive-thru, which will allow for a grander public way entrance to the harbor
walk from New Derby Street. The harbor walk will have views connecting it to the Lafayette
Street building, permeable paving, and significant ecological investments. At the Peabody Street
building there has been a reduction in commercial space, the building has a patina copper crown
over the first-floor gallery space to celebrate the public programming, and next to the building
will be the revitalized park. Front the On the front side of the building on Peabody Street side,
the proposed brick façade will tie-in with the other structures on the street but will use different
patterns to make it more playful.
Mr. Evans stated that at the Lafayette Street building there are constructability construction
challenges, and risks and realities of the building code have made it so the façade cannot be kept
in place. They made this determination based on resiliency and building code requirements, the
structural assessment report, and contractor’s assessment report, which were submitted to the
Board. But they would like to pay homage to the existing building. Sea level rise, coastal
flooding, and storm surge are important factors to consider. Base Flood Elevation (BFE) is +10
above sea level and the code minimum is 1-foot above sea levels, but they want to be at +15 or
+16, or 4 or 5-feet above the current first floor elevation. These changes in floor elevation would
have severe impacts on the current building and the new floor lines would be mid-way up the first
floor and any investment in the existing building would require meeting the current building
code.
Mr. Evans stated that the structural assessment determined that keeping the building in place
would not be guaranteed during construction, the building could fall, and there would be aesthetic
impacts. Ms. Altendorf added that the required culvert work could have a significant impact on
where the façade could be saved, but and that the bracing needed to save the façade is unknown.
The assessment from Groom Construction who engaged a masonry restoration subcontractor and
a bracing and scaffolding contractor, who concluded that investigated that there were two options.
Option 1 would brace and maintain the existing façade in place, which interferes with aligning the
building with the raised floor elevations, use of using the sidewalk for 8-9 months for bracing,
and securing a guaranty from the GC and subcontractors not guaranteeing that the work will not
suffer a catastrophic failure. Option 2 would deconstruct and rebuild the façade using original
materials, although they estimate only 20-30% of materials will be salvageable deeming it an
unfeasible approach. Mr. Evans stated that a third option would involve constructing a new
building with materials and details that pay homage to the existing façade but not replicating it. It
SRA
April 13, 2022
Page 7 of 13
would include the raised floor elevations but and would incorporate some modern materials and
patterning. A display window could be incorporated into the Derby Street façade to celebrate the
existing building that was once there.
Mr. Evans noted that their Chapter 91 review with the state is underway and there is an
environmental justice public meeting planned for early May with a formal filing of Expanded
Environmental Notification Form planned for late Spring.
Ms. Brennan stated that the North Shore Community Health Center patient population consists of
74% of their patients are low-income that qualify for Mass Health & Health Safety Net, 13% are
Seniors or Disabled that are on Medicare, and 13% others that have private health insurance, but.
Mr. Brennan affirmed that the health Center serves anyone regardless of their insurance. They
anticipate a steady growth in their number of patients from those that find this geographical
location extremely convenient. and bBased on income requirements for health care coverage
utilized at the health center, it is unlikely that many of their patients have vehicles. Their current
location has extremely limited parking for their patients and those patients have never noted it as
an issue in their annual patient surveys. Mr. Rubin noted that wasn’t particularly relevant given
the current location at Shetland Park has ample parking available for whatever number of patients
drive to the site. Mr. Brennan replied that there are two other successful instances where
buildings of significant size were constructed in urban areas such as the East Boston
Neighborhood Health Center, a 40,000 SF building in Maverick Square with limited on-street
parking and a lot 1-block away, and the Lynn Community Health Center, a 76,000 SF building in
downtown Lynn with a parking lot 2-blocks away.
Ms. Nina-Soto noted her concern with moving the bank to Lafayette Street which could lead to
the likely increase in the number of vehicles lining up on the Lafayette Street to enter the
driveway for the combined bank and health care facilities. Mr. Evans estimated that 4 or 5
vehicles would be able to line up before entering blocking the public way, and this configuration
is being reviewed by the traffic engineer and it will be peer reviewed. Mr. Northcutt noted that
the bank only requested a double-lane drive-thru to match their current configuration. Mr. Evans
noted that there will be a total of three lanes, a teller lane, ATM lane, and a bypass lane that leads
to parking or to exit the site. Mr. Rubin stated that the number of vehicles that can utilize the
drive-thru is critical. Ms. Nina-Soto believed the proposed configuration would cause a back-up
onto the street and make it difficult for additional vehicles to enter the parking lot. Mr. Northcutt
noted that the ATM lane also has a teller tube, the bank was satisfied with the two lanes
configuration, and he believes there would be sufficient room for the banks typical drive-thru use.
Mr. Evans added that signage will clearly identify each lane. Atty. Grover reiterated that the
proposed site circulation and drive-thru lanes are being evaluated and peer reviewed.
Mr. Daniel asked how the drop-off zone will be used and the frequency of use. in which they will
be dropped-off. Mr. Evans replied that they have discussed considered and rejected having a
drop off area in front but they will need to be mindful of this because it is a major intersection in
Salem. Therefore, so patients will be dropped off at the back. Ms. Brennan replied that no line of
vehicles is created at their current location for drop-offs and pick-ups. Mr. Rubin noted that at
the current facility is a private lot where drop-offs and pick-ups do not impede traffic and some
people may take longer to exit the vehicles than others. The same percentage of drop-offs and
pick-ups could create some congestion at this new location. Ms. Brennan replied that they do not
have responses from patients to their transportation survey yet., m Many either walk or take the
bus, but and no one has ever said it was an issue. Mr. Rubin noted that people would need to
SRA
April 13, 2022
Page 8 of 13
cross the bank drive thru lanes to enter the building. Mr. Evans replied that they are trying to
determine a buffer to protect pedestrians. Ms. Altendorf added that the drop-off lane was
designed wider than usual to provide some protection to passing vehicles.
Mr. Guarino noted that the health center is hoping to increase the number of private health care
patients and he questioned how that changes their parking requirements for those that do not live
in the neighborhood. Ms. Brennan replied there are several options for those that understand the
site and parking limitation, but and that many could walk. He restated that they are open to
patients with all types of insurance. Mr. Northcutt added that this location is for patients that find
it convenient.
Ms. Nina-Soto is excited to see the new location but is hesitant due to the parking constraints but
agrees it will be attractive to those for which it is convenient. Mr. Evans noted that this will bring
vitality to the harbor walk and make it a destination and a welcoming entrance.
Mr. Rubin asked where utilities and trash will be located at the Peabody Street building, and how
trash will it be brought to the street to be picked up. Mr. Evans replied that each building has a
trash and compactor room and a set time to collect the trash. Utility connections will connect off
Peabody Street and all sensitive equipment will be located at a higher level within each building.
Atty. Grover noted that the locations will need to be refined as they move forward with the
Planning Board process. Mr. Northcutt added most of the 36 Northshore CDC buildings have no
off-street parking and minimal exterior areas used a public space. They have consolidated
dumpsters with their neighboring buildings to save space and have numerous pick-ups per week
to accommodate the volume of trash.
Mr. Rubin asked if the colors of the brick at the Lafayette Street could match the Derby Lofts for
consistency at the intersection. Mr. Evans replied that their intent was to match the aesthetics to
the building that can’t be saved.
Ms. Nina-Soto stated that asked in terms of sea level rise and flooding, has if there been any
consideration for sustainability by adding solar panels or a green roof to the building. Mr. Evans
replied that the roof area is too small to use solar panels but that they are using passive house
design for less energy use, equipment that uses less carbon, and all electric appliances (no gas).
Mr. Northcutt added that the healthcare component will influence their ability to achieve certain
certifications, but their priority has been a weather tight energy efficient building envelope with
excellent windows and insulation. They’ve look extensively at renewable energy options in the
past and found that they don’t add as much value when compared to the costs, but they are open
to finding new efficiencies. Ms. Altendorf noted that most of the mechanical equipment will be
on the roof, leaving a minimal amount of usable roof area. Mr. Northcutt added that they met
with the city’s sustainability team to review the strategies Mass Design Group has planned, and
the city’s consultants from Woods Hole will review them and respond with possible suggestions
to make the surrounding neighborhood more resilient over time to the inevitable flooding.
Mr. Guarino asked if the culvert repairs are not as significant as originally thought and if that
report was being peer reviewed. Atty. Grover replied that Woodward & Curran expanded their
standard civil review to include the culvert investigation and the peer review. A letter on both is
expected within the next couple of weeks, to and will be presented to the PB in mid-May. Mr.
Evans noted that some repairs were more significant than others.
SRA
April 13, 2022
Page 9 of 13
Mr. Guarino asked that if the current building was not up to code and if would any work was
done on the building would need to be brought up to code. Mr. Evans replied that the building
preceded the code but any new investment beyond a small bathroom renovation would require an
investment in the building to make it meet the current code. Ms. Altendorf added that if
construction totals more than 50% of the building’s value it would require code upgrades,
including meeting the required flood elevations. Mr. Guarino questioned if the city was
conducting a peer review on the façade evaluation given that the report is recommending the most
cost efficient and desired approach to constructing a new building. Atty. Grover replied that it
was unknown if the peer reviewer will review what it would take to save the façade, but they
have the reports. Mr. Evans welcomed a continued review of the reports and emphasized that the
finish first floor would still be 4-5-feet above the current floor elevation which was a significant
driving factor of the design. Mr. Northcutt stated that it wasn’t their preference to tear down the
building, they assumed the preference would be to save the building and analysis proved
otherwise.
Chair Napolitano asked if any reuse of the building would require the floor elevations to be
raised. Mr. Evans replied restated that any rehabilitation work that would cost more than 50% of
the price of the building requires meeting code. The which is a minimum increase is of 1-foot
above floor elevation and is based on FEMA maps which are extremely conservative. Ms.
Altendorf added that the FEMA maps are based on historical data and they do not consider sea
level rise and extreme storm surge events. Mr. Evans noted that the lobby is above the minimum
but not at the level of the urgent care center so that the entrance fits into the urban fabric rather
than acting as a wall around the perimeter of the building.
Chair Napolitano asked about the historical commission process and the 18-month waiting
period. Mr. Northcutt stated that they were not asking for the demolition delay to be granted.
They only wanted to get before the Salem Historical Commission (SHC) and that was their part
of their administrative process. The SHC jurisdiction is unknown. They are subject to
Massachusetts Historical Commission (MHC) review as well, who will consult with SHC. They
will go before SHC again during the consultation process. Atty. Grover added that the SHC is
open to releasing them from the demolition delay timeline once they demonstrated that saving the
building may not be feasible.
Mr. Daniel asked what Chapter 91 would require from the site. Mr. Evans replied that they
haven’t formally filed but it will include public access to the waterfront. Ms. Vogel added that
there were significant changes enacted by MEPA January 1, 2022, and they are still determining
what those impacts might be and if adjustments will need to be made to the plans. A more
substantive version of the E&F will be filed by the end of May 2022 and the permit could be
obtained by the end of the year.
Chair Napolitano asked if this project was triggering historical review because its historic or
because of the use of federal funds. Mr. Daniel replied that in Salem this building triggered a
review because it is older than 50-years-old which triggers a Demolition Delay review by the
SHC and an SRA review because its in the urban renewal district. Chair Napolitano asked if The
Point Neighborhood is on the National Register. Mr. Northcutt replied that The Point is on the
National Register, but that this building is not within that district; . However, they recently
nominated the lower Lafayette Street District for inclusion in The Point National Historic District
even though and although this building falls outside that area. They were advised by their historic
consultant to create a new district rather than amend an existing one and this building is listed as a
SRA
April 13, 2022
Page 10 of 13
contributing building to that National Historic District. Filing that allowed them to use historic
tax credits and the use of those funds is the biggest trigger.
Public Comment:
Emily Udy, HSI. Appreciated the thorough conversation and her topics of choice were discussed.
They appreciate the investigation by the Northshore CDC to the potential demolition of the
façade and not taking that lightly. They look forward to MHC’s involvement and one of the key
parts is an alternative to demolition and the reports obtained will be key. Regarding tThe peer
review of the existing façade, that information would will be beneficial to the historical
commission as well. There is a question about proving the point for demolition and how
accurately the new façade would reflect the existing façade, or if an homage is desired or stronger
accuracy. , which These will be discussed in the historical and DRB review process.
Christopher Barlow, 289 Essex Street. Regarding traffic concerns, people will utilize the facility
for its convenience and he purchased his condominium for walkability within the city since he
does not own a vehicle. He likes the amount of greenspace and effort put into the pedestrian
experience and thinks Salem should put more of this type of energy into designing for the people
rather than focusing on vehicles and traffic. He would prefer to see less asphalt and more
greenspace when it comes to designing for the future.
No one else in the assembly wished to speak.
VOTE: Rubin made a motion to refer to DRB. Seconded by: Nina-Soto.
Chair Napolitano asked if the peer review could be expanded and if the DRB can be asked to
provide an opinion on it. Mr. Daniel replied that the PB is managing the peer review. and may be
a request to explore with the applicant. Mr. Guarino requested to see the peer review analysis and
noted that while he is supportive of keeping the review process going, he does not want the DRB
to take their review recommendation as if they have settled their façade concerns. Chair
Napolitano, Ms. Nina-Soto agreed with Mr. Guarino. Mr. Evans stated that if the goal of
reviewing the peer review analysis is to determine if it is possible to invest in the project while
keeping the façade which would not eliminate the 4-5-foot elevation increase of the floor a factor.
Mr. Rubin replied that he is not keen on reviewing the peer review because it is obvious that
keeping the building will not work. Chair Napolitano replied that while she supports the
proposed usage, the SRA is charged with being as stewards of the buildings and the facades. their
The concern is with demolishing the building and wanting a thorough analysis so they we feel
confident that demolishing the building is the best option., although she does support the
proposed usage. Mr. Northcutt stated that they take historic preservation extremely seriously and
would welcome any recommendations because they have vetted all their known options
thoroughly. Atty. Grover suggested an additional scope expansion of the Woodward & Curran.[I
don’t understand this sentence.]
VOTE: Rubin made a motion to refer to DRB. Seconded by: Nina-Soto.
Roll Call: Guarino, Nina-Soto, Rubin, Napolitano. 4-0 in favor.
VOTE: Guarino made a motion to request a peer review of the applicant’s analysis on demolition
and keeping of the existing façade as part of the further analysis of this project. Seconded by:
Nina-Soto.
SRA
April 13, 2022
Page 11 of 13
Roll Call: Guarino, Nina-Soto, Rubin, Napolitano. 4-0 in favor.
7. 301 Essex Street: Final Design Review – Erect a 3 ½ story addition above the existing building
(known as Jerry’s Army & Navy Store) with eleven (11) residential units and an on-site parking
ratio of .9 vehicles to one unit. Parking will be located inside the building at the first-floor rear
with retail space fronting on Essex Street. – Request to continue to May 11, 2022
Mr. Guarino stated that he is happy to see a request to continue because many felt the proposed
design was not a good fit for the area.
VOTE: Guarino made a motion to continue to the May 11, 2022, regular meeting. Seconded by:
Rubin.
Roll Call: Guarino, Nina-Soto, Rubin, Napolitano. 4-0 in favor.
New / Old Business
1. Redevelopment of the Historic Courthouses and the Crescent Lot: Update on Project Status
Mr. Daniel stated that they have been working with Winn Development and the MBTA on the
remnant parcel being conveyed to the SRA to become part of the whole project. An ANR plan
was created for the lot will be reviewed by the Planning Board tomorrow, April 14, 2022. They
discovered in 2014 that there were a series of easements between the MBTA and City of Salem
during the parking garage construction, which were approved by the city and executed by the
mayor, that the MBTA did not record. The driveway to the MBTA parking lot extends over the
crescent lot which is SRA land. Everyone has agreed to move forward under those same
easements, although the SRA is now the owner of the crescent lot and not the city.
VOTE: Nina-Soto made a motion to grant an access easement to the MBTA. Seconded by:
Guarino.
Roll Call: Guarino, Nina-Soto, Rubin, Napolitano in favor. 4-0 in favor.
VOTE: Rubin made a motion to accept an access easement from the MBTA. Seconded by:
Nina-Soto.
Roll Call: Guarino, Nina-Soto, Rubin, Napolitano in favor. 4-0 in favor.
VOTE: Guarino made a motion to authorize Executive Director to execute easement documents.
Seconded by: Rubin.
Roll Call: Guarino, Nina-Soto, Rubin, Napolitano in favor. 4-0 in favor.
Mr. Daniel added that there is a P&S agreement with the MBTA, the ANR before the Planning
Board tomorrow, and these three easements that need to be recorded. They met with the MBTA
and WinnDevelopment earlier that day and determined that everything should be completed by
May 5, 2022. With the SRA owning this remnant parcel will allow it allows WinnDevelopment
to proceed with the application for their PUD special permit and site plan review. If that deadline
is not met, it may be due to the need to value engineer the project due to the increase in
construction pricing. They continue to work with DCAMM and WinnDevelopment, a A survey
is needed on the courthouse windows and masonry for historic tax credit applications and other
funding assistances. The shared access driveway by the trial court is also being worked through.
The 300 square foot stairway parcel was declared as surplus by the city council in March, but and
SRA
April 13, 2022
Page 12 of 13
the complete order will be reviewed by the council at tomorrow nights meeting on April 14, 2022,
where it will be conveyed.
Ms. Newhall-Smith stated that WinnDevelopemnt has contracted with Graffito to determine
through meetings with stakeholders what tenancies would make sense at the courthouses and
what the community would want to activate the buildings. They want to meet with herself, Mr.
Daniel, and some SRA members on either Monday, April 25, 2022, between 2-4PM or Tuesday,
April 26, 2022 between 11:30-1PM, to discuss goals, activation, and to provide guidance.
2. SRA Meetings: Discussion of Remote, Hybrid, and in-Person Meetings.
Ms. Newhall-Smith stated that the governor extended the opportunity to meet remotely until July
15, 2022, so the meetings can continue to meet remotely until August or a hybrid meeting. Mr.
Daniel added that if it is not extended there must be a quorum of members present in the meeting
room, the Chair must be there but if not, the Vice Chair must be present. Each meeting room can
now accommodate the hybrid meetings. He will determine if both the Chair and Vice Chair
cannot be present, but three members are able to be present if that counts as a quorum or would
that meeting need to be cancelled. Mr. Guarino noted that the authority’s vacancy needs to be
filled sooner rather than later. The Board agreed to continue with remote meetings.
VOTE: Rubin made a motion to continue with meetings in remote format until the August 2022
meeting. Seconded by: Guarino.
Roll Call: Guarino, Nina-Soto, Rubin, Napolitano. 4-0 in favor.
3. SRA By-Law Review: Project Update
Ms. Newhall-Smith stated that she, Chair Napolitano, and Mr. Rubin met twice to review the by-
laws, with the goal to modernize them since they were first established in the 1960’s. A preamble
was added to explain the goals of the authority, it was reorganized to include a section for
members versus support staff, and updated language and to reflect the Open Meeting Law. There
will be one more review before they are shared with the board for comment.
Ms. Newhall-Smith confirmed that most city boards and commissions operate under Roberts
Rules of Order, although the City Council uses the Cushings Manual of Parliamentary Practice.
Mr. Daniel thanked the group for their review of the by-laws and noted that the reason for
acknowledging what operational document is being referenced is to address questions when they
arise and clarification is needed for procedural questions. Mr. Guarino noted that the SRA
follows the rules of order closely. Ms. Nina-Soto agreed. Chair Napolitano asked if a mistake is
made how would that be addressed. Mr. Daniel suggested creating their own rules or
implementing what other Redevelopment Authorities have do. Ms. Nina-Soto noted
technicalities that could be missed but could be corrected, although all Board members should
refresh their knowledge of it as a guiding principle. Mr. Guarino questioned what other city
boards have done. Mr. Rubin noted his concern with following Roberts Rules of Order exacting,
which when amending motions to include specifics could cause confusion when motions need to
be separated, and requests to withdrawal motions are needed before new motions can move
forward. He suggested that in questions of uncertainty they will refer to Roberts Rules of Order
for guidance. Mr. Guarino suggested that control be put in the hands of the board rather than
applicants. Chair Napolitano suggested receiving city solicitor input. Ms. Newhall-Smith
suggested a concurrent review by the board while seeking answers from the city solicitor.
SRA
April 13, 2022
Page 13 of 13
4. SRA Financials - No comments.
Approval of Minutes
1. February 9, 2022, Regular Meeting Minutes
VOTE: Nina-Soto made a motion to approve the minutes of the February 9, 2022, regular
meeting minutes.
Nina-Soto amended her motion to include all edits.
Seconded by: Guarino.
Roll Call: Guarino, Nina-Soto, Rubin, Napolitano in favor. 4-0 in favor.
Adjournment
VOTE: Guarino made a motion to adjourn.
Seconded by: Nina-Soto.
Roll Call: Guarino, Nina-Soto, Rubin, Napolitano in favor. 4-0 in favor.
The meeting adjourned at 9:45PM.
Know your rights under the Open Meeting Law M.G.L. c. 39 §23B and City Ordinance Sections 2-
028 through 2-2033.