373 highland Ave_ Strength Report 12.12.23 ' Of Massachusetts "The Construction Testing People _Page 1 5 Richardson Lane,Stoneham,MA 02180 781.438.7755(Voice)781-438-6216(Fax) Compressive Strength Report -Concrete Report Date 12-12-2023 Report No. 33 Distribution Copy Job Number 27183 Project Tropical Products, 373 Highland Avenue Salem, MA Contractor Connolly Brothers Inc Concrete Co. JG MacLellan ALL FIELD TESTS DONE ACCORDING TO ASTM: C-172 C-31 C-143 C-1064 C-231 ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: C-39 C-1231 C-231 CLASS CONCRETE: 4000# 3/8" LW- No OfSets: 1 CUBIC YARDS: 4 SET 1LOCATION: Stair #1 Total Unit Slum in. 5 1/2 Lab Size Area Dab Date Age Load Load Fracture Air Tem . F. 32 No. (in.) (sq.in.) Condition Cast Tested Days (lbs.) (psi.) Type Conc Tern F 67 J031 4.00 x 8.00 12.57 Good 12/12/23 12/19/23 7 67,000 5,330 2 Truck No. 264 J032 4.00 x 8.00 12.57 Good 12/12/23 12/26/23 14 84,000 6,680 1 Ticket No. 3938 J033 4 x 8 12.57 Good 12/12/23 O1/09/29 28 Time 8:35 J034 4 x 8 12.57 Good 12/12/23 01/09/24 28 UnitWtlbs/cuff J035 9 x 8 12.57 Good 12/12/23 O1/09/29 28 Air Content % 2.6 J036 1 4 x 8 1 12.571 Good 12/22/23 01/09/24 1 28 GENERAL REMARKS: *2% NCA MHWR; C linders received on 12/13/23. Inspector Premium Travel Name Time Hours Time Christopher Viger No IMin Day 1 Hr(s) -REVIEWED BY: Bryan M. Crabtree FRACTURE TYPES X X Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably we114ormed Well-formed cone on columnar vertical Diagonal fracture Side fractures at top Similar to Type cones on both ends, one and,vertical cracks cracking through with no cracking or bottom(occur but end of less than 1 In. running through caps, both ends,no through ends;tap commonly with cylinder Is [25 mm]of cracking no well-defined cone well4ormed cones with hammer to unbonded caps) pointed throught caps on other end distinguish from Type 1 Our reports are available in FDF form via email. please email us at reports(lutsofmass.Com for more information. of Massachusetts 'The Construction Testing People' Paget 5 Richardson Lane,Stoneham,MA 02180 781-438-7755(Voice)781-438.6216(Fax) Compressive Strength Report -Concrete Report Date 12-12-2023 Report No. 33 Distribution Copy Job Number 27183 Project Tropical Products, 373 Highland Avenue Salem, MA Contractor Connolly Brothers Inc Concrete Co. JG MacLellan - cc; City of Salem Greg Salamida Connolly Brothers Inc Robert Spence JG MacLellan Garrison Todd Connolly Brothers Inc Matthew Lawton TF Moran Kyle Roy Geotechnical Services Inc Glen Zoladz City of Salem Voula Orfancs Cumming Group Joe Vickery Connolly Brothers Inc Chris Benton ti of Massachusetts 'The Construction Testing People' Page 3 5 Richardson Lane,Stoneham,MA 02180 781-438-7755(Voice)781438.6216(Fax) Compressive Strength Report -Concrete Report Date 12-12-2023 Report No. 33 Distribution Copy ,lob Number 27183 Project Tropical Products, 373 Highland Avenue Salem, MA Contractor Connolly Brothers Inc Concrete Co. JG MacLellan FIELD SUMMARY REPORT 'Total Pour: Stairs #1 s #2 Method of Placement: ❑Pump ❑Chute Discharge ❑ Bucket ®Other Other: Buggy Method of Concrete Consolidation: ❑Vibrator ® Other Other: Did not consolidate Cylinder Fabrication Location: ® Truck Discharge Chute ❑ End of Pump Hose Cylinder Storage: Curing Box U Thermal Blanket U Hay/Straw Trailer U Field ® Other Building Placement Protection: ❑Thermal Blankets ❑ Heat ® None ❑ Other Slump Specification(in.) 4-6 Number of slumps out of specification reported to If rejected Approved by Remarks: Mix ID#40142599; Superintendent Chris Benton was aware Truck #264 being poured over 90 minutes and was okay with it as long as it was tested.