373 highland Ave_ Strength Report 11.17.23 Of Massachusetts 'The Construction Testing People' 0 Page 1 5 Richardson Lane,Stoneham,MA 02180 781-438-7755(Voice)781-4384216(Fax) Compressive Strength Report -Concrete Report Date 11-17-2023 Report No. 32 Distribution Copy Job Number 27183 Project Tropical Products, 373 Highland Avenue Salem, MA Contractor Connolly Brothers Inc Concrete Co. JG MacLellan ALL FIELD TESTS DONE ACCORDING TO ASTM: C-172 C-31 C-143 C-1064 C-231 ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: C-39 C-1231 C-231 CLASS CONCRETE: 4000# 3/4" No. Of Sets: 1 CUBIC YARDS: 33 SET 1LOCATION: Compactor Enclosure Wall Total Unit Slum In. 6 Lab Size Area Date Data All ge Lod Load Fracture Air Temp. F. 57 No. (in.) (sq.in.) Condition Cast Tested Days (lbs.) (psi.) Type Conc Temp F 77 A079 4.00 x 8.00 12.57 Good 11/17/23 11/24/23 7 52,000 4,140 3 Truck No. 262 A080 4.00 x 8.00 12.57 Good 11/17/23 12/01/23 14 61,000 4,850 1 Ticket No. 3290 A081 4.00 x 8.00 12.57 Good 11/17/23 12/15/23 28 64,500 5,130 3 Time 10:45 A082 4.00 x 8.00 12.57 Good 11/17/23 12/15/23 28 66,000 5,250 3 Unit Wtlbslcu ft A013 4.00 x 8.00 12.57 Good 11/17/23 12/15/23 28 70,000 5,570 2 pir Content % 5.2 A089 4.00 x 8.00 12.57 Good 11/17/23 12/15/23 28 69,000 5,490 3 GENERAL REMARKS: *MRWR, 1% NCA; Cylinders received on 11/20/23. Inspector Premium Travel Name Time Hours Time Christopher Viger No iMax Day 11 Hr(s) -REVIEWED BY: Bryan M. Crabtree 9 xfoc FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably"114ormed Well-formed cone on columnar vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends, one end,vertical cracks cracking through with no cracking or bottom(occur but end of less than t In. running through caps, both ends,no through ends;tap commonly with cylinder is [25 mm)of cracking no well-defined cone wellaormad cones with hammer to unbonded caps) pointed throught caps on other end distinguish from Type t Our reports are available in PDF form via email, please email us at reports@utsofmass.com for more information. Of Massachusetts 'The Construction Testing People' 0 Page 2 5 Richardson Lane,Stoneham, MA 02180 781438-7755(Voice)781438.6216(Fax) Compressive Strength Report -Concrete Report Date 11-17-2023 Report No. 32 Distribution Copy Job Number 27183 Project Tropical Products, 373 Highland Avenue Salem, MA Contractor Connolly Brothers Inc Concrete Co. JG MacLellan Cc: City of Salem Greg Salamida Connolly Brothers Inc Robert Spence JG MacLellan Garrison Todd Connolly Brothers Inc Matthew Lawton TF Moran Kyle Roy Geotechnical Services Inc Glen Zolads City of Salem Voula Orfanos Cumming Group Joe Vickery Connolly Brothers Inc Chris Benton el r of Massachusetts The Construction Testing People' Page 3 5 Richardson Lane,Stoneham,MA 02180 781.438-7755(Voice)781438-6216(Fax) Compressive Strength Report - Concrete Report Date 11-17-2023 Report No. 32 Distribution Copy Job Number 27183 Project Tropical Products, 373 Highland Avenue Salem, MA Contractor Connolly Brothers Inc Concrete CO. JG MacLellan FIELD SUMMARY REPORT Total POUT: Compactor Enclosure Walls and Propane Pad Method of Placement: ❑Pump ®Chute Discharge ❑ Bucket ❑Other Other: Method of Concrete Consolidation: ®Vibrator ❑ Other Other: Cylinder Fabrication Location: ® Truck Discharge Chute ❑ End of Pump Hose Cylinder Storage: U Curing Box W Thermal Blanket Hay/Straw Trailer LJ Field ❑ Other Placement Protection: ❑Thermal Blankets ❑ Heat ® None ❑ Other Slump Specification(in.) 9-6 Number of slumps out of specification reported to If rejected Approved by Remarks: Mix ID#40402582 UTS of Massachusetts, Inc. Page a 5 Richardson Lane,Stoneham,MA 02180 781-438-7755(Voice)781.438-6216(Fax) Report Date 11-17-2023 Report No. 32 Job Number 27183 Project Tropical Products, 373 Highland Avenue Attachment Salem, MA Of Minsachusetts inc. `The Construction Testing PeapLaw ''JJ �I DAILY REPORT OF CONCRETE POUR Page 6 PROJECT NA E: 7 wwn� AV6 Sde 1 _ PROJECT NO.:�_ Ii 3 DATE: AIR TEMP.: 5� TOTAL YARDS: }LOCATION OF POUR: C(�f'I,Acbr eh���u �41k f D�Q Ui OAd Load Slump Batching Batching Time In Yards Concrete I % of Ticket# I No. of Truck Inches In Out Minutes Temp. Air Cylinders 2 1101D IU;SD I SU 1 u s�'AI ,Z ►�z► o /�-t! M( 16:35 I I'. I %2z I rci t � I I I I I I I I I i i I I i INSPECTOR: CN1 U� i REMARKS: /III 'ft�`fpZS