Loading...
373 Highland Ave_Strength Report_ Concrete 12.12.23 r Of Massachusetts 'The Construction Testing People' -Page 1 5 Richardson Lane,Stoneham,MA 02180 781-438-7755(Voice)781438.6216(Fax) Compressive Strength Report - Concrete Report Date 12-12-2023 Distribution Copy Report No. 33 Job Number 27183 Project Tropical Products, 373 Highland Avenue Salem, MA Contractor Connolly Brothers Inc Concrete Co. JG MacLellan ALL FIELD TESTS DONE ACCORDING TO ASTM: C-172 C-31 C-143 C-1064 C-231 ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: C-39 C-1231 C-231 CLASS CONCRETE: 4 0 0 0# 3/8rr LW* No Of Sets: i CUBIC YARDS 4 SET 1LOCATION: Stair #1 &Age otal Unit Slum in. 5 1/2 Lab Size Area Date Age Load Load FractureAir Tem F. 32 No. (in.) (sq.in.) Condition Cast Days (Ibs.) (psi.) Type Conc Tem F 67J031 4.00 x 8.00 12.57 Good 12/12/23 7 67,000 5,330 2J032 4 x 8 12.57 Good 12/12/23 14 Truck No. 264J033 4 x 8 12.57 Good 12/12/23 28 Ticket No. 3938J039 9 x B 1257 Gd 28 Time 8:35J035 9 x 8 12.57 Good 12/12/23 28 Unit Wtlbs/tuftJ036 4 x 8 12.57 Good 12/22/23 2g Air Content % 2.6 GENERAL REMARKS: *2% NCA MRWR; C linders received on 12/13/23. Inspector Premium Travel Name Time Hours Time Christopher viger No Min Day 1 He(s) REVIEWED BY: Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well•tonned cone on Columnar vertical Diagonal fracture Side fractures at top Similar to Type 5 canes on both ends, one end,vertical cracks cracking through with no cracking or bottom occur ( but end of less than 1 In. running through raps, both ends,no through ends;ta p p commonly with cylinder Is 125 mm]of cracking no well-defined cone well-formed cones with hammer to unbontled caps) pointed through[ups on other and distinguish from P � Type t Our reports are available in PDF form via email. Please email us at reports@utso£mass.com for awre information. rltaaaraa��r r Of Massachusetts 'The Construction Testing People' Page z 5 Richardson Lane,Stoneham,MA 02180 781.438-7755(Voice)781.438-6216(Fax) Compressive Strength Report -Concrete Report Date 12-12-2023 Distribution Copy Report No. 33 Job Number 27183 Project Tropical Products, 373 Highland Avenue Salem, MA Contractor Connolly Brothers Inc Concrete Co. JG MacLellan CC: City of Salem Greg Salamida Connolly Brothers Inc Robert Spence JG MacLellan Garrison Todd Connolly Brothers Inc Matthew Lawton TF Moran Kyle Roy Geotechnical Services Inc Glen Zoladz City of Salem Voula Orfanos Cumming Group Joe Vickery Connolly Brothers Inc Chris Benton r Of Massachusetts 'The Construction Testing People' Page 3 5 Richardson Lane,Stoneham,MA 02180 781438.7755(Voice)781438.6216(Fax) Compressive Strength Report - Concrete Report Date 12-12-2023 Distribution Copy Report No. 33 Job Number 27183 Project Tropical Products, 373 Highland Avenue Salem, MA Contractor Connolly Brothers Inc Concrete Co. JG MacLellan FIELD SUMMARY REPORT 'Total Pour: Stairs #1 s #2 Method of Placement: ❑Pump []Chute Discharge ❑ Bucket ®Other Other: Buggy Method of Concrete Consolidation: ❑Vibrator ® Other Other: Did not consolidate Cylinder Fabrication Location: ® Truck Discharge Chute ❑ End of Pump Hose Cylinder Storage 13 Curing Box U Thermal Blanket U Hay/Straw El Trailer U Field ® Other Building Placement Protection: ❑Thermal Blankets ❑ Heat ® None ❑ Other Slump Specification(in.) 4-6 Number of slumps out of specification reported to If rejected Approved by Remarks: Mix ID#40142599; Superintendent Chris Benton was aware Truck #264 being poured over 90 minutes and was okay with it as long as it was tested.