373 Highland Ave_ Compressive Strength Report_ Concrete 11-2-23 Of Massachusetts
'The Construction Testing People'
-Page 1
5 Richardson Lane, Stoneham,MA 02180 781438-7755(Voice)781438-6216(Fax)
Compressive Strength Report - Concrete Report Date 11-02-2023
Distribution Copy Report No. 30
Job Number 27183
Project Tropical Products, 373 Highland Avenue
Salem, MA
Contractor Connolly Brothers Inc
Concrete Co. JG MacLellan
ALL FIELD TESTS DONE ACCORDING TO ASTM: C-172 C-31 C-143 C-1064 C-231
,ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: C-39 C-1231
CLASS CONCRETE: 4 0 0 0# 3/4" No. Of Sets: 6 CUBIC YARDS: 264
SET 1LOCATION: SOG LiNGood
C.S/7
:(Ibjs.)
Unit Slum in.
Lab Size Date Date Age Load Fracture pir Tem . F. 30
No. (in.) dition Cast Tested Days (psi.) Type Conc Tem F 68
T085 4.00 x 8.00ood 11/02/23 11/09/23 7 50,03,980 1
T086 4.00 x 8.00od 11/02/23 11/16/23 14 60,000 9,770 3 Truck No. 262
T087 4.00 x 6.00od 11/02/23 11/30/23 28 69,000 5,490 3 Ticket No. 2694
T088 4.00 x 8.00od 11/02/23 11/30/23 28 72,500 5,770 2 Time 7.20
T089 4.00 x 8.00od 11/02/23 11/30/23 28 73,000 5,810 3 Unit Wtlbs/cu ft
T090 4.00 x 8.00 12.57 Good 11/02/23 11/30/23 28 70,000 5,570 3 Air Content % 2.4
SET 2 LOCATION: SOG, Lines C.M/6
Total Unit SIUm in. 5 3/4
Lab Size Area AU5
ate Age Load Load Fracture pir Tem F. 31
No. (in.) (sq.in.) Condition ested Days (Iba) (psi.) Type Conc Tern F 66
T091 4.00 x 8.00 12.57 Good 1/09/23 7 53,000 4,220 2
T092 4.00 x 8.00 12.57 Good 1/16/23 19 62,500 9,970 3 Truck No. 264
T093 4.00 x 8.00 12.57 Good 1/30/23 28 67,000 5,33 0 2 Ticket No. 2698
T099 9.00 x 8.00 12.57 Good 1/30/23 28 68,000 5,910 3Time 8:10
T095 4.00 x 8.00 12.57 Good 1/30/23 28 70,000 5,570 1 Unit Wtlbs/cult
T096 4.00 x 8.00 12.571 Good 11/02/23 11/30/23 1 28 1 71,000 5,650 2 Air Content % 1.8
SET 3 LOCATION: SOG Lines C.D/5.5
Total Unit Slum in. 6
Lab Size Area Date Date Age No. (in.) (sq.in.) Condition Cast Load Load Fracture Air Temp. F. 35
Tested Days (lbs.) (psi.) Type Conc Tom F 69
T097 4.00 x 8.00 12.57 Good 11/02/23 11/09/23 7 55,500 4,420 2
T098 4.00 x 8.00 12.57 Good 11/02/23 11/16/23 14 64,000 5,090 2 Truck No. 268
T099 4.00 x 8.00 12.57 Good 11/02/23 11/30/23 28 68,500 5,950 2 Ticket No. 2706
T100 4.00 x 8.00 12.57 Good 11/02/23 21/30/23 28 72,500 5,770 3 Time 9:3 0
T101 9.00 x 8.00 12.57 Good 11/02/23 11/30/23 28 69,000 5,990 z Unit Wt lbs/cu ft
T102 4.00 x 8.00 12.57 Good 11/02/23 11/30/23 28 68,000 5,410 3 Air Content %) 2.2
SET 4 LOCATION: SOG, Lines B.N/5.5
Alar
Of Massachusetts
W 'The Construction Testing People'
Page 2
5 Richardson Lane,Stoneham,MA 02180 781-438-7755(Voice)781-438-6216(Fax)
Compressive Strength Report -Concrete Report Date 11-02-2023
Distribution Copy Report No. 30
Job Number 27183
Project Tropical Products, 373 Highland Avenue
Salem, MA
Contractor Connolly Brothers Inc
Concrete Co. JG MacLellan
Total Unit Slump(in.) 5 1/2
kT0654.00
Size Area Date Date Age Load Load Fracture Air Temp.(F.) 38
(in.) (sq.In.) Condition Cast Tested Days (lbs.) (psi.) Typa Conc Temp(F) 70
x 8.00 12.57 Good 11/02/23 11/09/23 7 51,000 4,060 2
x 8.00 12.57 Good 11/02/23 11/16/23 14 60,000 4,770 3 Truck No. 269
x 8.00 12.57 Good 11/02/23 11/30/23 28 63,000 5,010 2 Ticket No. 2718
x 8.00 - 12.57 Good 11/02/23 11/30/23 28 67,500 5,370 3 Time 10,40
x 8.00 12.57 Good 11/02/21 11/30/23 28 63,500 5,050 1 Unit Wtlbs/cuIt
x 8.00 12.57 Good 11/02/23 11/30/23 28 41,000 5,170 3 Air Content(%) 1,g
SET 5 LOCATION: SOG, Lines B.A/5.2
M(psi-)
Unit Slump(in.) 6
Lab Size Area Date Date Age Load Fracture
Air Temp.(F.) 43
No. (in.) (sq.in.) Condition Cast Tested Days (psi.) Type Conc Temp(F) 72
T067 4.00 x 8.00 12.57 Good 11/02/23 11/09/23 7 54,460 3T068 4.00 x 8.00 12.57 Good 11/02/23 11/16/ 19 6 ,970 z Truck No. 165
T069 4.00 x 8.00 12.57 Good 11/02/23 11/30/23 28 6 ,330 3 Ticket No. 2735
T070 4.00 x 8.00 12 57 Gd 11/02/23 11/30/23 28 6 ,250 2 Time 12:30
T071 4.00 x 8.00 12.57 Good 11/02/23 11/30/2 28 7 ,770 3 Unit Wtlbs/cu tt
T072 4.00 x 8.00 12.57 Good 11/02/23 11/30/23 26 6 ,410 1 Air Content(%) 2.4
SET 6 LOCATION: SOG Lines A.N/6.7
Total Unit -Slump(in.) 5 3/4
Lab Size Area Date Date Age Load Load Fracture
Air Temp.(F.) 45
No. (In.) (sq.in.) Condition Cast Tasted Days (Ibs.) (psi.) Type _Conc Temp(F) 73
T073 9.00 x 8.00 12.57 Good 11/02/23 11/09/23 7 98,500 3,860 2
T074 4.00 x 8.00 12.57 Good 11/02/23 11/16/23 19 57,500 9,570 1 Truck No. 165
T075 4.00 x 8.00 12.57 Good 11/02/23 11/30/23 26 62,500 9,970 3 Ticket No. 2755
T076 4.00 x 8.00 12.57 Good 11/02/23 11/30/23 26 65,000 5,170 2 Time 2:30
T077 9.00 x 8.00 12.57 Good 11/02/23 11/30/23 28 61,000 9,850 3 Unit WtlbS/CO ft
T078 4.00 x 8.00 12.57 1 Good 11/02/23 11/30/23 28 63,500 1 5,050 3 Air Con tent(%) 2.0
GENERAL REMARKS: *MRwR, la NCA, 20 NCA; Cylinder, received on 11/7/23.
Inspector Premium
Name Travel
Time Hours Time
Christopher Viger No Max Day+1.5 Hrs OT 1 Hr(s)
Austin Howes No Max Da +1.5 His OT
1 Hr(s)
IRwo! ■
r Of Massachusetts
'The Construction Testing People'
Page 3
5 Richardson Lane,Stoneham,MA 02180 781-438-7755(Voice)781438.6216(Fax)
Compressive Strength Report - Concrete Report Date 11-02-2023
Distribution Copy Report No. 30
Job Number 27183
Project Tropical Products, 373 Highland Avenue
Salem, MA
Contractor Connolly Brothers Inc
Concrete Co. JG MacLellan
.REVIEWED BY: Bryan M. Crabtree AC
FRACTURE TYPES
T7
XF
\
Typal Type 2 Type 3 Type 4 Type5 Type 6
Reasonably wellJonned Well-formed cone on Columnar vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends, one and,vertical cracks cracking through with no cracking or bottom(occur but and of
less than 1 in. running through caps, both ends,no through ends;tap commonly with cylinder is
[75 mm]of cracking no well-defined cone wellaormed cones with hammer to unbonded caps) pointed
1hrought caps on other and distinguish from
Type 1
Our reports are available in PDr form via email. Please email us at reportOutsofmass.com for more information.
cc: City of Salem Greg Salamida
Connolly Brothers Inc Robert Spence
JG MacLellan Garrison Todd
Connolly Brothers Inc Matthew Lawton
TF Moran Kyle Roy
Geotechnical Services Inc Glen Zoladz
City of Salem Voula Orfanos
Cumming Group Joe Vickery
Connolly Brothers Inc Chris Benton
Of Massachusetts
'The Construction Testing People'
Page 4
5 Richardson Lane,Stoneham, MA 02180 781-438.7755(Voice)781438.6216(Fax)
Compressive Strength Report - Concrete Report Date 11-02-2023
Distribution Copy Report No. 30
Job Number 27183
Project Tropical Products, 373 Highland Avenue
Salem, MA
Contractor Connolly Brothers Inc
Concrete Co. JG MacLellan
FIELD SUMMARY REPORT
Total Pour: SOG, Lines A-D/5-8
Method of Placement: ®Pump ❑Chute Discharge ❑ Bucket ❑Other
Other:
Method of Concrete Consolidation: ®Vibrator ❑ Other
Other.
Cylinder Fabrication Location: ❑ Truck Discharge Chute ® End of Pump Hose
Cylinder Storage: 0 Curing Box Thermal Blanket U Hay/Straw Ll Trailer Field
❑ Other
Placement Protection: ❑Thermal Blankets ❑ Heat ® None
❑ Other
Slump Specification(in.) 4-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks: Mix ID#40402542; Superintendent Chris Benton was aware of truck 262, load #1, being
poured at a slump out of specification and was ok with it.
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane,Stoneham,MA 02180 781.438.7755(Voice)781-438-6216(Fax)
Report Date 11-02-2023
Report No. 30
Job Number 27183
Project Tropical Products, 373 Highland Avenue
Attachment Salem, MA
Kssachusetts inc.
"The Construction Testing dim
DAILY REPORT/O1F CONCRETE POUR Page (p
PROJECT NAME: J ! ;1MA14 RyQ Y.14hn
PROJECT NO.:
DATE: —__AIR TEMP.: TOTAL YARDS: 4 b/-Y—
LOCATION OF POUR: 5oGA -
Load & Slump Batching Batching Time In I Yards Concrete I % of Ticet I No. of
Trucks Inches Inn 1� Out M�ijn/u�tes
�ji�i brl 1 7.Z I Temp. I A; k` Cylinders
1 Z
6.So ?3 I ('1zz I I • z( y� 14
7;y 15'p I `y33 ��ZI c
Z7y3 �} 177;o� /x7,/�S� [S�S I"1 I// I ,J 16Z( I f�
5'3/I I :O. V;(� J VV III L� IW° I°/� I I,
�7 II 7 i
5 .
�o
z,
26g 16 g I ; L. e I Z�03
-o C 6
z 19,�0 9;3 I�jl�z� I �Z►
7 y, lu 101.05 Ss I11 z
l� q0) I "I I s III Iq 16211
to:�fp `fo I I'Ils� 70° $ 11. 8 ' Z�
W 0 to ID, U `� III 6 I I 6Z1
10;,ZS II', Id q I i7 Ull i
7101 II;OU II' 31
/J
INSPECTOR:_ ay-/ u✓�A4'11 Nowt Ajx# y 25'y2
----.—� _._.__ REMARKS:
RiCharrlcnn 1 onn C+n..nbvm MoCcon1.11cnHc n91 Rn 17Ri1 AAR_779= C�� /7on �vo enac
UTS of Massachusetts, Inc. Page 6
5 Richardson Lane,Stoneham,MA 02180 781-438-7756(Voice)781.438-6216(Fax)
Report Date 11-02-2023
Report No. 30
Job Number 27183
Project Tropical Products, 373 Highland Avenue
Attachment Salem, MA
()f Mssuchusetts Inc.
'The Construction Testing > e°
DAILY REPORT OF CONCRETE POUR Page r Z�
PROJECT NAME: ( '
GM V� �J. Or PROJECT NO.:
_ I' Z Z _-
DATE: � AIR TEMP.: f /' TOTAL YARDS:
,,}}
LOCATION OF POUR: r. �) Zq
S u
-------------
Load & Slump Batching Batching Time In I Yards Concrete I % of Ticket# No. of
Trucks Inches In
y�� Out Minutes
Z63 II i W IZ10 I Ir Temp. I Air 16Z1 Cylinders
6500'
3 I ►r i627Y1
3 Ir/z ► `6i' �y
�3 3�
� S" 4 I�s'v 7�3�
Z61 Z;ZO `10 j6z�
INSPECTOR: