28 Beckford Street CofNA extensionSalem Historical Commission
98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970 (978) 619-5685
CERTIFICATE OF NON-APPLICABILITY HCA-23-142
It is hereby certified that the Salem Historical Commission has determined that the proposed:
Type of Work: Reroofing
as described below will be appropriate to the preservation of said Historic District, as per the requirements set forth in the Historic
District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance.
District: McIntire
Address of Property: 28 BECKFORD STREET , SALEM, MA 01970
Name of Owner at time of Submission: WINTMAN HANRAHAN LIVING TRUST THE;WINTMAN ELAINE S/HANRAHAN
DANIELLE TRS
Applicant's Description of Work: The roofing shingles at 28 Beckford Street were replaced in July/August 2022 by MJM
Construction Company. The roof of the back addition is now leaking, creating water damage on the ceiling in one room (on the
second floor of the back addition). The south side of the back addition's roof needs to be re-shingled. This will involve adding 1/2"
plywood and installing the flashing properly, neither of which were done last year by MJM Construction. The flashing was installed
on top of the shingles, rather than under the shingles. The new contractor will be Shea Roofing Company. The shingles will be
exactly the same as the ones that were approved by the Salem Historical Commission last year on March 8, 2022 (GAF Slateline
shingles in "English Gray").
Statement of Conditions:
CERTIFICATE OF APPROPRIATENESS – EXTENDED 11/30/23
It is hereby certified that the Salem Historical Commission has determined that the proposed:
¨ Construction ¨ Moving
¨ Reconstruction v Alteration
¨ Demolition ¨ Painting
¨ Signage ¨ Other work
as described below will be appropriate to the preservation of said Historic District, as per the requirements set forth
in the Historic District's Act (M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance.
District: McIntire
Address of Property: 28 Beckford Street
Name of Record Owner: Danielle Hanrahan and Elaine Wintman
Description of Approval of Work:
1.In-kind repairs to damaged chimney to match existing brick color, dimensions and bond pattern and mortar
composition;
2.Replace 3tab asphalt roof with GAF Slateline designer shingles in “English Gray”;
3.Install new copper gutters and downspouts on south elevation of main house and north and south elevations of
rear addition with the following conditions:
a.Downspouts to be fabricated in smooth round copper;
b.New gutter on main house to be half-round copper placed over existing cornice molding;
c.New copper gutters on rear addition to be in half-round or K-style profile.
Upon completion of work, please notify Historical Commission staff for final review and sign-off of
Certificate.
Dated: March 8, 2022/November 30, 2023 SALEM HISTORICAL COMMISSION
The homeowner has the option not to commence the work (unless it relates to resolving an outstanding
violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS
IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or
any other necessary permits or approvals) prior to commencing work.
Upon completion of above work, please notify Historical Commission staff through permitting system as final
sign-off is required to document compliance with this Certificate and approved plans.
Dated: December 6, 2023
SALEM HISTORICAL COMMISSION
By:
This certificate will expire: December 6, 2024
The homeowner has the option not to commence the work (unless it relates to resolving an outstanding violation). All work
commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT.
Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals)
prior to commencing work.