373 Highland Ave_Compressive Strength Report_Concrete_11.17.23 '' of Massachusetts
T& 'The Construction Testing People'
Page 1
5 Richardson Lane,Stoneham, MA 02180 781.438-7755(Voice)781438.6216(Fax)
Compressive Strength Report -Concrete Report Date 11-17-2023
Report No. 32
Distribution Copy Job Number 27183
Project Tropical Products, 373 Highland Avenue
Salem, MA
Contractor Connolly Brothers Inc
Concrete CO. JG MacLellan
ALL FIELD TESTS DONE ACCORDING TO ASTM: C-172 C-31 C-143 C-1064 C-231
-ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: C-39 C-1231 C-231
CLASS CONCRETE: 4000# 3/4" No. Of Sets: 1 CUBIC YARDS: 33
SET ILOCATION: Com actor Enclosure Wall
Total Unit Slum in. 6
Lab Size Area Date Date Age Load Load Fracture Air Temp. F. 57
No. (in.) (sq.in.) Condition I Cast Tested Days (lbs.) (psi.) Type Conc Temp F 77
A079 4.00 x 8.00 12.57 Good 11/17/23 11/24/23 7 52,000 4,140 3 Truck No. 262
A080 4 x 8 12.57 Good 11/17/23 12/01/23 19 Ticket No. 3290
A081 4 x 8 12.57 Good 11/17/23 12/15/23 28 Time 10:45
A082 4 x 8 12.57 Good 11/17/23 12/15/23 28 Unit WtIbslcu ft
A083 4 x 8 12.57 Good 11/17/23 12/15/23 28 Air Content % 5.2
A084 4 x 8 12.57 Good 11/17/23 12/15/23 26
GENERAL REMARKS: *MPWR to NCA; Cvlinders received cn 11/20/23. _
Inspector Premium Travel
Name Time Hours Time
Christopher Viger No Max Day 11 Hr(s)
REVIEWED BY: Bryan M. Crabtree /��/�
FRACTURE TYPES j`J! ('
\X/ \
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well4ormed Well-formed cone on Columnar vertical Diagonal fracture Side fractures at top Similar to Type
cones on both ends, one and,vertical cracks cracking through with no cracking or bottom(occur but and of
less than 1 In. running through caps, both ends,no through ends;tap commonly with cylinder Is
[25 mml of cracking no well-defined cone well-formed cones with hammer to unbonded caps) pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
of Massachusetts
-The Construction Testing People Paget
5 Richardson lane,Stoneham,MA 02180 781.438.7755(Voice)781-438-6216(Fax)
Compressive Strength Report -Concrete Report Date 11-17-2023
Report No. 32
Distribution Copy Job Number 27183
Project Tropical Products, 373 Highland Avenue
Salem, MA
Contractor Connolly Brothers Inc
Concrete Co. JG MacLellan
cc; City of Salem Greg Salamida
Connolly Brothers Inc Robert Spence
JG MacLellan Garrison Todd
Connolly Brothers Inc Matthew Lawton
TF Moran Kyle Roy
Geotechnical Services Inc Glen Zoladz
City of Salem Voula Orfanos
Cumming Group Joe Vickery
Connolly Brothers Inc Chris Benton
Of Massachusetts
-The Construction Testing People' Page
5 Richardson Lane,Stoneham,MA 02180 781-438-7755(Voice)781-4384216(Fax)
Compressive Strength Report - Concrete Report Date 11-17-2023
Report No. 32
Distribution Copy Job Number 27183
Project Tropical Products, 373 Highland Avenue
Salem, MA
Contractor Connolly Brothers Inc
Concrete Co. JG MacLellan
FIELD SUMMARY REPORT
-Total Pour: Compactor Enclosure Walls and Propane Pad
Method of Placement: ❑Pump ®Chute Discharge ❑ Bucket ❑Other
Other:
Method of Concrete Consolidation: ®Vibrator ❑ Other
Other:
Cylinder Fabrication Location: ® Truck Discharge Chute ❑ End of Pump Hose
Cylinder Storage: U Curing Box Thermal Blanket Hay/Straw El Trailer Field
❑ Other
Placement Protection: ❑Thermal Blankets ❑ Heat ® None
❑ Other
Slump Specification(in.) 4-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks: Mix ID#40402582
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane,Stoneham,MA 02180 781.438.7755(Voice)781438-6216(Fax)
Report Date 11-17-2023
Report No. 32
Job Number 27183
Project Tropical Products, 373 Highland Avenue
Salem, MA
Attachment
O MCI UKhUSeff5 tnc. (�
*1rhe C.omf wf{on Testing PeopLs=l Facie# I6�r I
2 U DAILY REPORT OFCONCRETE POUR
PROJECT NAME. J� 1IA t4V1 AS _Ih1 cm PROJECT NO.:
DATE: 1 AIR TEMP.: 51 ypF TOTAL YARDS:
LOCATION OF POUR: �� � CO�1nG br ehCIA-6 kA1� f D!I/LWKJ 14d
Load & Slump I Belching Batching Time In Yards Concrete I % of Ticket# I No. of
Truck# Inches In Out Minutes Temp. Air 1 Cylinders
10',T 10150 ( 50 r' s�'A ,Z i�Z► o P6
10:35II'. 11 V Ir2 rczl
Z `6 � ,00 U150 150 111n w Z1
INSPECTOR: ( k 0 REMARKS: Aj `�DyUZS 0
Rirharrienn 1 a..e ct......ti-.... •.-'-"`'..__.._ ,........ ....... ..... '--- - - - - -