373 Highland Ave-Report 10.5.23-Compressive Strength Report-Concrete ' Of Massachusetts
'The Construction Testing People'
-Page 1
5 Richardson Lane, Stoneham,MA 02180 781-438.7755(Voice)781-438-6216(Fax)
Compressive Strength Report -Concrete Report Date 10-05-2023
Report No. 28
Distribution Copy Job Number 27183
Project Tropical Products, 373 Highland Avenue
Salem, MA
Contractor Connolly Brothers Inc
Concrete Co. JG MacLellan
ALL FIELD TESTS DONE ACCORDING TO ASTM: C-172 C-31 C-143 C-1064 C-231
ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: C-39 C-1231
CLASS CONCRETE: 4000# 3/4" No. Of Sets: 7 CUBIC YARDS: 341
SET ILOCATION: SOG column line A.n at 2.3
Total unit Slum in. 6
Lab Size Area Date Date Age Load Load Fracture Air Temp. F. 59
No. (in.) (sq.in.) Condition Cast Tested Days (lbs.) (psi.) Type Conc Temp F 79
F175 4.00 x 8.00 12.57 Good 10/05/23 10/12/23 7 56,000 4,460 3 Truck No. 261
F176 4.00 x 8.00 12.57 Good 10/05/23 10/19/23 14 62,500 4,970 3 Ticket No. 1846
F177 4.00 x 8.00 12.57 Good 10/05/23 11/02/23 28 69,000 5,490 3 Time 7:10
F178 4.00 x 8.00 12.57 Good 10/05/23 11/02/23 28 74,000 5,890 2 Unit Wtlbs/cutt
F179 9.00 x 8.00 12.57 Good 10/05/23 11/02/23 28 68,500 5,950 2 Air Content % 2.9
F180 4.00 x 8.00 12.57 Good 10/35/23 11/02/23 28 67,500 5,3701 3
SET 2 LOCATION: SOG, column line A.n at 3
Total Unit pTemp.
6
Lab Size Area Date Date Age Load Load Fracture . 61
No. (in.) (sq.In.) Condition Cast Tested Days (Ibs.) (psi.) Type F 8o
F205 4.00 x 8.00 12.57 Good 10/05/23 10/12/23 7 53,500 4,260 2 170
F206 4.00 x 8.00 12.57 Good 10/05/23 10/19/23 14 67,500 5,370 2 1856
F207 4.00 x 8.00 12.57 Good 10/05/23 11/02/23 28 68,500 5,450 2 8:30
F208 4.00 x 8.00 12.57 Good 10/OS/23 11/02/23 28 69,000 5,490 3 tuft
F209 4.00 x 8.00 12.57 Good 10/05/23 11/02/23 28 74,000 5,890 3 Air Content % 2.2
F210 4.00 x 8.00 12.57 Good 10/05/23 11/02/23 28 70,000 5,570 2
SET 3 LOCATION: SOG, column line A.n at 3.9
Total unit RAIrTem .
5 3/4
Lab Size Area Date Date Age Load I-= Fracture F. 62
No. (in.) (sq.in.) Condition Cast Tested Days (lbs.) (psi.) Type F 79
F151 4.00 x 8.00 12.57 Good 10/05/23 10/12/23 7 49,500 3,940 3 160
F152 4.00 x 8.00 12.57 Good 10/05/23 10/19/23 14 62,000 4,930 2 1862
F153 4.00 x 8.00 12.57 Good 10/05/23 11/02/23 28 64,000 5,090 3 9:20
F154 4.00 x 8.00 12.57 Good 10/OS/23 11/02/23 28 63,000 5,010 3 Icu tt
F155 9.00 x 8.00 12.57 Good 10/05/23 11/02/23 28 64,000 5,090 2 Air Content(°h) 1.9
F156 9.00 x 8.00 12.57 Good 10/05/23 11/02/23 28 63,000 5,010 1
SET 4 LOCATION: SOG, column line B at 4.5
As
aP of Massachusetts
'The Construction Testing People'
Page 2
5 Richardson Lane, Stoneham,MA 02180 781.438-7755(Voice)781-438-6216(Fax)
Compressive Strength Report - Concrete Report Date 10-05-2023
Report No. 28
Distribution Copy Job Number 27183
Project Tropical Products, 373 Highland Avenue
Salem, MA
Contractor Connolly Brothers Inc
Concrete Co. JG MacLellan
Total Unit Slump(in.) 6
Lab Size Area Date Date Age Load Load Fracture Air Temp.(F.) 64
No. (in.) (sq.in.) Condition Cast Tested Days (lbs.) (psi.) Type Conc Temp(F) 82
F211 4.00 x 8.00 12.57 Good 10/05/23 10/12/23 7 53,500 4,260 3 Truck No. 184
F212 4.00 x 8.00 12.57 Good 10/05/23 10/19/23 14 60,000 4,770 2 Ticket No. 1874
F213 4.00 x 8.00 12.57 Good 10/05/23 11/02/23 28 65,000 5,170 2 Time 10:15
F214 4.00 x 8.00 12.57 Good 10/05/23 11/02/23 28 71,000 5,650 2 Unit VAlbslcuIt
F215 4.00 x 8.00 12.57 Good 10/OS/23 11/02/23 28 63,500 5,050 3
Air Content(%) 2.3
F216 4.00 x 8.00 12.57 Good 10/05/23 11/02/23 28 62,500 9,970 3
SET 5 LOCATION: SOG, column line B.m at 4.5
Total Unit Slump(in.) 5 112
Lab Size Area Date Date Age Load Load Fracture Air Temp.(F.) 66
No. (in.) (sq.in.) Condition Cast Tested Days (lbs.) (psi.) Type Conc Temp(F) 82
F193 4.00 x 8.00 12.57 Good 10/05/23 10/12/23 7 59,000 4,690 3 Truck No. 195
F194 4.00 x 8.00 12.57 Good 10/05/23 10/19/23 14 70,000 5,570 1 Ticket No. 1883
F195 4.00 x 8.00 12.57 Good 10/05/23 11/02/23 28 75,000 5,970 2 Time 11:10
F196 4.00 x 8.00 12.57 Good 10/05 2 1 11/02/23 28 72,500 5,770 1 Unit Wtlbs/cu ft
R97 4.00 x 8.00 12.57 Good 10/05/23 11/02/23 28 75,000 5,970 3 Air Content(%) 1.7
8 4.00 x 8.00 12.57 Good 10/05/23 1 11/02/23 281 75,000 5,970 1
SET 6 LOCATION: SOG, column line B.v at 4.5
Total Unit Slump(in.) 5 3/4
Lab Size Area Date Date Age Load Load Fracture Air Temp.(F.) 69
No. (In.) (sq.in.) Condition Cast Tested Days (lbs.) (psi.) Type Conc Temp(F) 83
F181 4.00 x 8.00 12.57 Good 10/05/23 10/12/23 7 54,000 4,300 3 Truck No. 268
F182 4.00 x 8.00 12.57 Good 10/05/23 10/19/23 14 70,000 5,570 2 Ticket No. 1895
F183 4.00 x 8.00 12.57 Good 10/05/23 11/02/23 28 72,500 5,770 3 Time 11:50
F184 4.00 x 8.00 12.57 Good 10/05/23 11/02/23 28 72,000 5,730 3 Unit Wt lbs/cu It
F185 4.00 x 8.00 12.57 Good 10/05/23 11/02/23 28 76,000 6,050 1
Air Content(%) 2.1
F186 4.00 x 8.00 12.57 Good 10/05/23 11/02/23 28 73,000 1 5,8101 5
SET 7 LOCATION: SOG, column line C.m at 3.9
" Of Massachusetts
'The Construction Testing People'
Page 3
5 Richardson Lane, Stoneham,MA 02180 781-438.7755(Voice)781-438-6216(Fax)
Compressive Strength Report - Concrete Report Date 10-05-2023
Report No. 28
Distribution Copy Job Number 27183
Project Tropical Products, 373 Highland Avenue
Salem, MA
Contractor Connolly Brothers Inc
Concrete Co. JG MacLellan
Total Unit Slump(in.) 6
Lab Size Area Date Date Age Load Load Fracture Air Temp.(F.) 72
No. (in.) (sq.in.) Condition Cast Tested Days (lbs.) (psi.) Type Conc Temp(F) 83
F187 4.00 x 8.00 12.57 Good 10/05/23 10/12/23 7 47,500 3,780 3 Truck No. 184
F188 4.00 x 8.00 12.57 Good 10/05/23 10/19/23 14 64,000 5,090 3 Ticket No. 1902
F169 4.00 x 8.00 12.57 Good 10/05/23 11/02/23 28 65,000 5,170 3 Time 12:55
F190 4.00 x 8.00 12.57 Good 10/05/23 11/02/23 28 66,000 5,250 1 Unit Wtlbs/cu ft
F191 4.00 x 8.00 12.57 Good 10/05/23 11/02/23 28 67,500 5,370 1
Air Content(%) 2.4
F192 4.00 x 8.00 12.57 Good 10/05/23 11/02/23 28 68,000 5,410 3
GENERAL REMARKS: *MRWR, 1% NCA; Cylinders received on 10/6/23.
Inspector Premium Travel
Name Time Hours Time
Christopher Viger No Max Day+l Hrs OT 1 Hrls)
Charles Lanier No Max Day+l Hrs OT 11 Hr(s)
REVIEWED BY: Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 TypeS Type 6
Reasonably well4onned Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type
cones on both ends, one end,vertical cracks cracking through with no cracking or bottom(occur but end of
less than t in. running through caps, both ends,no through ends;tap commonly with cylinder is
[25 mm]of cracking no well-defined cone well-formed cones with hammer to unbonded caps) pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
' Of Massachusetts
'The Construction Testing People'
Page 4
5 Richardson Lane,Stoneham,MA 02180 781-438-7755(Voice)781-438-6216(Fax)
Compressive Strength Report -Concrete Report Date 10-05-2023
Report No. 28
Distribution Copy Job Number 27183
Project Tropical Products, 373 Highland Avenue
Salem, MA
Contractor Connolly Brothers Inc
Concrete Co. JG MacLellan
r1c: City of Salem Greg Salamida
Connolly Brothers Inc Robert Spence
JG MacLellan Garrison Todd
Connolly Brothers Inc Matthew Lawton
IF Moran Kyle Roy
Geotechnical Services Inc Glen Zoladz
City of Salem Voula Orfanos
Cumming Group Joe Vickery
Connolly Brothers Inc Chris Benton
' Of Massachusetts
'The Construction Testing People'
Page 5
5 Richardson Lane,Stoneham,MA 02180 781438-7755(Voice)781438-6216(Fax)
Compressive Strength Report - Concrete Report Date 10-05-2023
Report No. 28
Distribution Copy Job Number 27183
Project Tropical Products, 373 Highland Avenue
Salem, MA
Contractor Connolly Brothers Inc
Concrete Co. JG MacLellan
FIELD SUMMARY REPORT
Total Pour: SOG, column lines A to D at 2 to 5
Method of Placement: ®Pump ❑Chute Discharge ❑ Bucket ❑Other
Other:
Method of Concrete Consolidation: ®Vibrator ❑ Other
Other:
Cylinder Fabrication Location: ❑ Truck Discharge Chute ® End of Pump Hose
Cylinder Storage: El Curing Box Thermal Blanket U Hay/Straw U Trailer Field
❑ Other
Placement Protection: []Thermal Blankets ❑ Heat ® None
❑ Other
Slump Specification(in.) 4-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks: Mix ID#40402542.
UTS of Massachusetts, Inc. Page 6
5 Richardson Lane,Stoneham,MA 02180 781-438-7755(Voice)781.438-6216(Fax)
Report Date 10-05-2023
Report No. 28
Job Number 27183
Project Tropical Products, 373 Highland Avenue
Attachment Salem, MA
Of Massachusetts Inc.
"The Cantruc/toll Testing PeopLep Page# (U
� 'I DAILY REPORT OF CONCRETE POUR
PROJECT NAME: 373 H46 fl]�'�AIW PROJECT NO.:
DATE: r0I S�Z3 _AIRTEMP.: TOTAL YARDS:
LOCATION OF NUR: SDG 0- V'lf
Load & Slump Batching Batching Time In Yards Concrete I % of Ticket# No. of
k#Truc Inches In Out Minutes Temp. Air Cylinders
� ► 6 6;ZS 7,U I Ito 1�° Z'T 16z
o i 7,25 S'.K ': I "h I -►�s'3
li
�� �,ZS �S �SS� ° 61 ' Z. 8-4
17, � :'s ' 1"A6 1 1Igo
�� � •�') i , i � b Ij' i�l I �� � I
iTo I o -iv, I - 6
6I Ig ,ZU �� I " iz � I -I o
E e�) , �5 �+S I 'Y13Z
r �I �i _, ���',U� I �o I�U� I -► � '3
?1S' 101.50 'f6
INSPECTOR: IYIY �> V � �II�G� LINIV� REMARKS: Al); �f �UZ�yZ
UTS of Massachusetts, Inc. Page 7
5 Richardson Lane,Stoneham,MA 02180 781-438-7755(Voice)781.438-6216(Fax)
Report Date 10-05-2023
Report No. 28
Job Number 27183
Project Tropical Products, 373 Highland Avenue
Attachment Salem, 14A
• Of MWsachusetts Inc.
"The COnstructton Testing Peopse° Page I UCH
�J DAILY REPORT OF CONCRETE POUR
PROJECT NAME: 11� PROJECT NO.:
DATE: J /AIR TEMP.: L TOTAL YARDS:
J� (J/ I
LOCATION OF POUR: /I L li
Load & Slump Batching Batching Time In Yards Concrete I % of Ticket 1 No. of
Truck# Inches In Out Minutes Temp. Air �6'!- Cylinders
16a
I U I I :Zlb 10 I lyu
Io,,�t I I ,30 I1 1 1 -IND 1
zT3 ILI ►r3 �+ I h I I ► �� N�
Z7q I►', IZ,O I I&q I �►8
I` 6 ►I, IZ dil'i
ZU I I1,3O 'qD 70 1" Zi I -1161
6 113 = S0 11 o7ZAI J -moZIG-�
17: w r. K 7 I Y51 I _lye
1330 '1�116
g l,3 Z ' I
i I
INSPECTOR: V&4LLI(/(,� 1601L"'r REMARKS: 411 tM67j511Z